CN107299762A - 一种基于bim的混凝土浇注方法 - Google Patents

一种基于bim的混凝土浇注方法 Download PDF

Info

Publication number
CN107299762A
CN107299762A CN201710629985.8A CN201710629985A CN107299762A CN 107299762 A CN107299762 A CN 107299762A CN 201710629985 A CN201710629985 A CN 201710629985A CN 107299762 A CN107299762 A CN 107299762A
Authority
CN
China
Prior art keywords
construction
bim
interface
concrete
procedure based
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710629985.8A
Other languages
English (en)
Other versions
CN107299762B (zh
Inventor
周江峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN HONGRONGHE CONSTRUCTION ENGINEERING Co.,Ltd.
Original Assignee
Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Zhi Jian New Architectural Design Consulting Co Ltd filed Critical Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Priority to CN201710629985.8A priority Critical patent/CN107299762B/zh
Publication of CN107299762A publication Critical patent/CN107299762A/zh
Application granted granted Critical
Publication of CN107299762B publication Critical patent/CN107299762B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Abstract

本发明公开了一种基于BIM的混凝土浇注方法,包括以下几个步骤:(1)、基于施工图纸,建立三维模型;(2)、基于BIM,模拟动态过程,同时模拟混凝土从上到下放入施工界面的动态过程,模拟完成后获得每个施工界面内的空隙位置和数量,以及每个振动器的分布位置、获得两两施工界面之间的间隙大小;(3)、调整施工界面上的振动器的分布数量和位置,获得施工方案;(4)、根据步骤(3)得到的施工方案以及施工图纸进行混凝土的浇筑。本发明能够在动态模拟过程中发现问题及时调整施工图纸上的相关参数,获取较为合适的用于建造施工的相关数据,使得施工能够快速准确的进行。

Description

一种基于BIM的混凝土浇注方法
技术领域
本发明涉及建筑领域,具体涉及一种基于BIM的混凝土浇注方法。
背景技术
建筑信息模型是建筑学、工程学及土木工程的新工具。建筑信息模型(BuildingInformation Modeling,简称BIM),被定义成由完全和充足信息构成以支持生命周期管理,并可由计算机应用程序直接解释的建筑或建筑工程信息模型。简言之,即数字技术支撑的对建筑环境的生命周期管理。利用BIM技术对现有建筑施工进行辅助,是建筑施工的一大趋势。
现有的混凝土浇注完全是按照CAD二维图纸和浇注经验进行少空隙和少间隙的浇注。这种浇注无法预测施工时会出现的问题,并且也无法及时给出解决问题的技术手段。
发明内容
本发明的目的在于一种提供一种基于BIM的混凝土浇注方法,该方法通过对浇注过程中的相关构件进行三维建模,基于BIM对浇注过程用三维模型进行动态模拟,并通过不断调整相关构件的三维模型的位置、数量关系等进行可能问题的处理和方案的选择,通过这种动态预演能够将符合实际生产中的相关参数量化,为施工提供数据支撑,使得施工符合要求并且没有较大的技术效果差别化,符合施工需求。
本发明通过下述技术方案实现:
一种基于BIM的混凝土浇注方法,包括以下几个步骤:
(1)、基于施工图纸,建立多个振动器、多个施工界面层的三维模型;
(2)、基于BIM,模拟多个振动器同时放入在多个竖直重叠排列的施工界面层内的动态过程,同时模拟混凝土从上到下放入施工界面的动态过程,模拟完成后获得每个施工界面内的空隙位置和数量,以及每个振动器的分布位置、获得两两施工界面之间的间隙大小;
(3)、调整施工界面上的振动器的分布数量和位置,获得多个施工界面内的平均空隙最小、两两施工界面之间的间隙最小的施工方案;
(4)、根据步骤(3)得到的施工方案以及施工图纸进行混凝土的浇筑。
步骤(1)中还需要建立钢筋、芯管、吊环、预埋件和空心胶管的三维模型。
模拟动态过程时,需要将多个振动器避开钢筋、芯管、吊环、预埋件和空心胶管。
浇注时,水灰比为0.4-0.8。
本发明与现有技术相比,具有如下的优点和有益效果:
本发明基于BIM能够在动态模拟过程中发现问题及时调整施工图纸上的相关参数,获取较为合适的用于建造施工的相关数据,使得施工能够快速准确的进行。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。
实施例1
一种基于BIM的混凝土浇注方法,包括以下几个步骤:
(1)、基于施工图纸,建立多个振动器、多个施工界面层的三维模型;
(2)、基于BIM,模拟多个振动器同时放入在多个竖直重叠排列的施工界面层内的动态过程,同时模拟混凝土从上到下放入施工界面的动态过程,模拟完成后获得每个施工界面内的空隙位置和数量,以及每个振动器的分布位置、获得两两施工界面之间的间隙大小;
(3)、调整施工界面上的振动器的分布数量和位置,获得多个施工界面内的平均空隙最小、两两施工界面之间的间隙最小的施工方案;
(4)、根据步骤(3)得到的施工方案以及施工图纸进行混凝土的浇筑。
实施例2
步骤(1)中还需要建立钢筋、芯管、吊环、预埋件和空心胶管的三维模型。
模拟动态过程时,需要将多个振动器避开钢筋、芯管、吊环、预埋件和空心胶管。
浇注时,水灰比为0.4-0.8。
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (4)

1.一种基于BIM的混凝土浇注方法,其特征在于,包括以下几个步骤:
(1)、基于施工图纸,建立多个振动器、多个施工界面层的三维模型;
(2)、基于BIM,模拟多个振动器同时放入在多个竖直重叠排列的施工界面层内的动态过程,同时模拟混凝土从上到下放入施工界面的动态过程,模拟完成后获得每个施工界面内的空隙位置和数量,以及每个振动器的分布位置、获得两两施工界面之间的间隙大小;
(3)、调整施工界面上的振动器的分布数量和位置,获得多个施工界面内的平均空隙最小、两两施工界面之间的间隙最小的施工方案;
(4)、根据步骤(3)得到的施工方案以及施工图纸进行混凝土的浇筑。
2.根据权利要求1所述的一种基于BIM的混凝土浇注方法,其特征在于,步骤(1)中还需要建立钢筋、芯管、吊环、预埋件和空心胶管的三维模型。
3.根据权利要求2所述的一种基于BIM的混凝土浇注方法,其特征在于,模拟动态过程时,需要将多个振动器避开钢筋、芯管、吊环、预埋件和空心胶管。
4.根据权利要求1所述的一种基于BIM的混凝土浇注方法,其特征在于,浇注时,水灰比为0.4-0.8。
CN201710629985.8A 2017-07-28 2017-07-28 一种基于bim的混凝土浇注方法 Active CN107299762B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710629985.8A CN107299762B (zh) 2017-07-28 2017-07-28 一种基于bim的混凝土浇注方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710629985.8A CN107299762B (zh) 2017-07-28 2017-07-28 一种基于bim的混凝土浇注方法

Publications (2)

Publication Number Publication Date
CN107299762A true CN107299762A (zh) 2017-10-27
CN107299762B CN107299762B (zh) 2020-05-22

Family

ID=60134167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710629985.8A Active CN107299762B (zh) 2017-07-28 2017-07-28 一种基于bim的混凝土浇注方法

Country Status (1)

Country Link
CN (1) CN107299762B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108298430A (zh) * 2018-02-06 2018-07-20 张恒春 一种智能塔吊及应用该塔吊的建筑方法
CN109267753A (zh) * 2018-11-22 2019-01-25 南通四建集团有限公司 一种基于bim的清水混凝土施工方法
CN109726445A (zh) * 2018-12-07 2019-05-07 佛山科学技术学院 基于bim的装配式建筑混凝土浇注方法
CN109779261A (zh) * 2018-12-20 2019-05-21 上海建工集团股份有限公司 基于bim技术的混凝土浇筑动态控制的方法及系统
CN111488642A (zh) * 2020-04-15 2020-08-04 中国十七冶集团有限公司 一种基于bim技术的预防大体积混凝土冷缝的方法
CN111535588A (zh) * 2020-06-11 2020-08-14 中国十七冶集团有限公司 一种基于bim技术的选择最佳浇筑方案的系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195988A (zh) * 2014-09-16 2014-12-10 葛洲坝集团第一工程有限公司 一种大跨度u型薄壁渡槽混凝土振捣方法
CN104264984A (zh) * 2014-10-15 2015-01-07 济南黄河路桥工程公司 混凝土构筑物浇注用模板以及浇注施工方法
CN105888248A (zh) * 2016-04-27 2016-08-24 河北建筑工程学院 一种基于bim技术指导信息化预制构件的施工方法
JP2016217740A (ja) * 2015-05-14 2016-12-22 株式会社安藤・間 コンクリートのワーカビリティ判定方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195988A (zh) * 2014-09-16 2014-12-10 葛洲坝集团第一工程有限公司 一种大跨度u型薄壁渡槽混凝土振捣方法
CN104264984A (zh) * 2014-10-15 2015-01-07 济南黄河路桥工程公司 混凝土构筑物浇注用模板以及浇注施工方法
JP2016217740A (ja) * 2015-05-14 2016-12-22 株式会社安藤・間 コンクリートのワーカビリティ判定方法
CN105888248A (zh) * 2016-04-27 2016-08-24 河北建筑工程学院 一种基于bim技术指导信息化预制构件的施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曹文达: "《袖珍混凝土工技术手册》", 31 January 2008, 北京金盾出版社 *
赵永任: "《工程项目管理》", 31 August 2016, 中国水利水电出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108298430A (zh) * 2018-02-06 2018-07-20 张恒春 一种智能塔吊及应用该塔吊的建筑方法
CN109267753A (zh) * 2018-11-22 2019-01-25 南通四建集团有限公司 一种基于bim的清水混凝土施工方法
CN109726445A (zh) * 2018-12-07 2019-05-07 佛山科学技术学院 基于bim的装配式建筑混凝土浇注方法
CN109779261A (zh) * 2018-12-20 2019-05-21 上海建工集团股份有限公司 基于bim技术的混凝土浇筑动态控制的方法及系统
CN109779261B (zh) * 2018-12-20 2023-06-23 上海建工集团股份有限公司 基于bim技术的混凝土浇筑动态控制的方法及系统
CN111488642A (zh) * 2020-04-15 2020-08-04 中国十七冶集团有限公司 一种基于bim技术的预防大体积混凝土冷缝的方法
CN111535588A (zh) * 2020-06-11 2020-08-14 中国十七冶集团有限公司 一种基于bim技术的选择最佳浇筑方案的系统

Also Published As

Publication number Publication date
CN107299762B (zh) 2020-05-22

Similar Documents

Publication Publication Date Title
CN107299762A (zh) 一种基于bim的混凝土浇注方法
CN104850709B (zh) 建筑装饰工程施工三维模拟方法
WO2021128675A1 (zh) 一种基于bim技术的地下连续墙施工方法
CN108427814A (zh) 一种装配式墙体钢筋数据处理方法及装置
US8155928B2 (en) Method for generating data of plant construction simulation and system thereof
CN105781064A (zh) 基于bim的地砖铺设施工方法
CN105868440A (zh) 一种基于bim技术的建设工程数据建模方法
CN110362887A (zh) 一种基于Revit的快速建模方法
CN106777779B (zh) 一种基于bim的铁路涵洞设计方法
CN105279329A (zh) 一种基于bim的样板引路质量管理方法
CN108427851A (zh) 一种基于bim技术的装配式支吊架施工方法
CN106779476A (zh) 一种基于bim‑ifc技术的建筑施工进度管理平台及方法
CN110750823A (zh) 一种bim可视化展示方法
CN109740245A (zh) 一种在吧台组合拆分预制化中bim技术的应用方法
CN107451358A (zh) 一种基于bim的弧形墙体的砌筑方法
CN106088598A (zh) 一种运用bim技术进行施工样板引路的方法
CN108984876A (zh) 一种基于bim的预埋套管自动化建模方法和系统
CN106354933B (zh) 一种基于bim技术的超大型余热锅炉管道试压方法
CN107292060A (zh) 基于bim技术的地下室路面涂覆方法
CN107292058A (zh) 一种基于bim技术的空心砖砌体方法
Yun et al. Basic research on BIM-based quantity take-off guidelines
CN111535588A (zh) 一种基于bim技术的选择最佳浇筑方案的系统
CN107436984A (zh) 一种基于bim的酒窖施工方法
CN107451356A (zh) 一种基于bim的外墙砌筑方法
CN112926105B (zh) 一种利用bim市政管网快速精细化建模方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230404

Address after: A1311P13, Aerospace Building, No. 4019 Shennan Avenue, Fu'an Community, Futian Street, Futian District, Shenzhen City, Guangdong Province, 518000

Patentee after: SHENZHEN HONGRONGHE CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 610000 1, 7 Building 266, Qinglong Road, Qinglong field, Chenghua District, Chengdu, Sichuan.

Patentee before: CHENGDU ZHIJIAN XINYE ARCHITECTURAL DESIGN CONSULTING CO.,LTD.

TR01 Transfer of patent right