CN107435544A - 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 - Google Patents
一种单洞双线复合衬砌盾构隧道内部结构的施工方法 Download PDFInfo
- Publication number
- CN107435544A CN107435544A CN201710381186.3A CN201710381186A CN107435544A CN 107435544 A CN107435544 A CN 107435544A CN 201710381186 A CN201710381186 A CN 201710381186A CN 107435544 A CN107435544 A CN 107435544A
- Authority
- CN
- China
- Prior art keywords
- construction
- tunnel
- composite lining
- stage
- internal structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 85
- 239000002131 composite material Substances 0.000 title claims abstract description 46
- 238000005520 cutting process Methods 0.000 claims abstract description 23
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000000758 substrate Substances 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 238000009415 formwork Methods 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 3
- 238000013473 artificial intelligence Methods 0.000 claims description 3
- 238000005266 casting Methods 0.000 claims description 3
- 230000003137 locomotive effect Effects 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 2
- 238000007493 shaping process Methods 0.000 claims description 2
- 238000003780 insertion Methods 0.000 claims 1
- 230000037431 insertion Effects 0.000 claims 1
- 210000002435 tendon Anatomy 0.000 claims 1
- 230000006641 stabilisation Effects 0.000 abstract description 2
- 238000011105 stabilization Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 230000002787 reinforcement Effects 0.000 description 4
- 238000004513 sizing Methods 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明提供了一种单洞双线复合衬砌盾构隧道内部结构的施工方法,涉及盾构隧道施工领域,其步骤主要包括:第一阶段和第二阶段,所述第一阶段在隧道掘进时同步对隧道的中段和/或后段进行复合衬砌施工,所述复合衬砌施工采用由下至上先衬砌后分割的顺序对隧道进行衬砌,所述第二阶段为隧道贯通后施工阶段。使用该施工方法能够在盾构隧道掘进的同时在隧道的中段和/或后端同步进行内衬结构的施工,有效提高了施工效率,且复合衬砌施工总体上采用由下至上先衬砌后分割的顺序,能够保证隧道内部的稳定,并保证施工空间的顺利通行,具有良好的实用性。
Description
技术领域
本发明提供了一种单洞双线复合衬砌盾构隧道内部结构的施工方法,涉及盾构隧道施工领域。
背景技术
目前国内正在掀起一股地铁建设热潮,许多穿越复杂区域的长距离、大直径的盾构隧道正在建设或即将开建,盾构隧道修建过程中面临诸如地质条件复杂、施工周期长、风险大等诸多技术难题,同时随着对城市地下隧道工程功能性要求的不断增加,在防火、防撞、防爆以及耐久性等要求下,复合式衬砌结构开始出现在城市地铁盾构隧道中,单洞双线复合衬砌结构的盾构隧道无法充分满足同步施工,难以保证施工的效率和质量。
发明内容
为了解决以上问题,本发明提供了一种单洞双线复合衬砌盾构隧道内部结构的施工方法,能够在隧道挖掘时同步对隧道内部结构进行复合衬砌,有效提高效率。
本发明的技术方案如下:一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其步骤主要包括:第一阶段和第二阶段,所述第一阶段在隧道掘进时同步对隧道的中段和/或后段进行复合衬砌施工,所述复合衬砌施工采用由下至上先衬砌后分割的顺序对隧道进行衬砌,所述第二阶段为隧道贯通后施工阶段。
本发明技术方案还包括:所述复合衬砌施工的主要步骤包括:
1)安装预制箱涵构件;
2)二衬底部拱墙现浇;
3)烟道板及以下衬砌拱墙现浇;
4)拱顶衬砌现浇;
5)中隔墙施工。
本发明技术方案还包括:所述复合衬砌施工的步骤1)包括将预制箱涵构件运送到盾构机车架内,在盾构掘进过程中同步对预制箱涵构件进行安装,安装完成后对预制箱涵构件两侧空间进行混凝土填充。
本发明技术方案还包括:所述预制箱涵构件为口字型箱涵,所述预制箱涵构件安装在预制管片拼接成的环状管的内侧的下部。
本发明技术方案还包括:所述复合衬砌施工的步骤2)中二衬底部拱墙区域采用人工立模进行浇筑,所述底部拱墙的浇筑空间提前预留。
本发明技术方案还包括:复合衬砌施工的步骤3)包括钢筋绑扎和烟道板及以下拱墙现浇,所述预制管片内预埋有接驳器,当钢筋绑扎时多组台车同步施工,拱圈钢筋机械固定于接驳器上,烟道板部分钢筋骨架由吊筋悬吊于顶部的预制管片。
本发明技术方案还包括:复合衬砌施工的步骤5)中所述中隔墙施工为直线段中隔墙施工,中隔墙施工时,首先用定型小钢模对疏散平台下方墙体进行施工作为中隔墙的基座,然后用移动式台车从烟道板上部将中隔墙的墙体混凝土浇筑至烟道板底部作为中隔墙的上部。
本发明技术方案还包括:所述烟道板上预留有施工孔,混凝土的泵管通过施工孔接至烟道板上方,烟道板内设置有风道板,风道板中间预留有浇注孔,混凝土通过浇注孔灌注入中隔墙。
本发明技术方案还包括:所述第二阶段主要步骤包括:
1)曲线段中隔墙浇筑;
2)疏散平台施工;
3)路面找平层施工。
本发明技术方案还包括:所述疏散平台采用人工智力钢管支撑和木面膜配合结构。
需要说明的是,所述的隧道的前端、中段和后段,是以盾构机掘进的方向为前方。
本发明的有益效果为:本发明提供了一种单洞双线复合衬砌盾构隧道内部结构的施工方法,使用该施工方法能够在盾构隧道掘进的同时在隧道的中段和/或后端同步进行内衬结构的施工,有效提高了施工效率,且复合衬砌施工总体上采用由下至上先衬砌后分割的顺序,能够保证隧道内部的稳定,并保证施工空间的顺利通行,具有良好的实用性。
附图说明
图1为采用本发明施工效果盾构隧道断面效果图;
图2为本发明施工方法工艺流程图;
图3为本发明预制箱涵构件安装示意图;
图4为二衬底部拱墙现浇施工示意图;
图5为烟道板钢筋台车示意图;
图6为拱顶二衬钢筋台车示意图;
图7为烟道板及以下衬砌拱墙施工示意图;
图8为拱顶衬砌现浇示意图;
图9为现浇中隔墙示意图;
图10为中隔墙浇筑施工纵断面图;
图11为内部结构施工断面流程图。
其中,1、预制管片,2、预制箱涵构件,3、箱涵两侧混凝土填充,4、底部拱墙,5、烟道板及以下衬砌拱墙,6、拱顶衬砌,7、中隔墙,8、疏散平台及混凝土找平层。
具体实施方式
下面将结合附图和实施例对本发明作进一步介绍。
同时,由于下文所述的只是部分实施例,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。
一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其步骤主要包括:第一阶段和第二阶段,所述第一阶段在隧道掘进时同步对隧道的中段和/或后段进行复合衬砌施工,所述复合衬砌施工采用由下至上先衬砌后分割的顺序对隧道进行衬砌,所述第二阶段为隧道贯通后施工阶段。
实施例1:所述复合衬砌施工的主要步骤包括:
1)安装预制箱涵构件2;
2)二衬底部拱墙4现浇;
3)烟道板及以下衬砌拱墙5现浇;
4)拱顶衬砌6现浇;
5)中隔墙7施工。
实施例2:所述复合衬砌施工的步骤1)包括将预制箱涵构件2运送到盾构机车架内,在盾构掘进过程中同步对预制箱涵构件2进行安装,安装完成后对预制箱涵构件2两侧空间进行混凝土填充。
所述预制箱涵构件2为口字型箱涵,所述预制箱涵构件2安装在预制管片1拼接成的环状管的内侧的下部。所述预制管片1的拼接安装在盾构掘进时同步进行。
实施例3:受两侧管线影响,在盾构机制造和管线敷设过程中,提前预留足够底部拱墙浇筑空间,二衬底部拱墙区域4采取人工立模进行浇筑,拼装模板为定型圆弧小块模板,尺寸结合隧道设计情况同时以现场操作人员能够搬运为宜,不宜过大。
实施例4:复合衬砌施工的步骤3)包括钢筋绑扎和烟道板及以下拱墙现浇,当钢筋绑扎时多组台车同步施工,所述预制管片1内预埋有接驳器,当钢筋绑扎时多组台车同步施工,拱圈钢筋机械固定于接驳器上,烟道板部分钢筋骨架由吊筋悬吊于顶部的预制管片1上。烟道板及以下衬砌拱墙浇筑采用一台模板台车进行。
实施例5:复合衬砌施工的步骤4)拱顶衬砌现浇时,待烟道板砼达到设计强度后施工拱顶衬砌6,亦可在烟道板等强期间利用下部台车作为上部拱顶施工的支撑进行拱顶的混凝土施工。台车移位并定位准确后实施砼浇筑,浇筑采用混凝土输送泵在模板台车前方单侧进行砼的供应,混凝土从烟道板顶部输送,侧弧面内衬混凝土振捣采用台车面板肋部安装附着式平板振动器振捣附带振动棒人工振捣。
实施例6:复合衬砌施工的步骤5)中所述中隔墙7施工为直线段中隔墙施工,中隔墙7施工时,首先用定型小钢模对疏散平台下方墙体进行施工作为中隔墙7的基座,然后用移动式台车从烟道板上部将中隔墙7的墙体混凝土浇筑至烟道板底部作为中隔墙7的上部。
所述烟道板上预留有施工孔,混凝土的泵管通过施工孔接至烟道板上方,烟道板内设置有风道板,风道板中间预留有浇注孔,混凝土通过浇注孔灌注入中隔墙,浇注孔兼做振捣孔。
实施例7:所述第二阶段主要步骤包括:
1)曲线段中隔墙7浇筑;
2)疏散平台施工,所述疏散平台采用人工智力钢管支撑和木面膜配合结构;
3)路面找平层施工。
由于隧道内空间有限,因此先施工直线段中隔墙,待贯通后施工曲线段。
以上所述,仅是本发明的较佳实施例,并非对本发明做任何形式上的限制,凡在本发明的精神和原则之内所做任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其步骤主要包括:第一阶段和第二阶段,所述第一阶段在隧道掘进时同步对隧道的中段和/或后段进行复合衬砌施工,所述复合衬砌施工采用由下至上先衬砌后分割的顺序对隧道进行衬砌,所述第二阶段为隧道贯通后施工阶段。
2.如权利要求1所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述复合衬砌施工的主要步骤包括:
1)安装预制箱涵构件(2);
2)二衬底部拱墙(4)现浇;
3)烟道板及以下衬砌拱墙(5)现浇;
4)拱顶衬砌(6)现浇;
5)中隔墙(7)施工。
3.如权利要求2所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述复合衬砌施工的步骤1)包括将预制箱涵构件(2)运送到盾构机车架内,在盾构掘进过程中同步对预制箱涵构件(2)进行安装,安装完成后对预制箱涵构件(2)两侧空间进行混凝土填充。
4.如权利要求3所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述预制箱涵构件(2)为口字型箱涵,所述预制箱涵构件(2)安装在预制管片(1)拼接成的环状管的内侧的下部。
5.如权利要求2所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述复合衬砌施工的步骤2)中二衬底部拱墙区域采用人工立模进行浇筑,所述底部拱墙(4)的浇筑空间提前预留。
6.如权利要求2所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:复合衬砌施工的步骤3)包括钢筋绑扎和烟道板及以下拱墙现浇,所述预制管片(1)内预埋有接驳器,当钢筋绑扎时多组台车同步施工,拱圈钢筋机械固定于接驳器上,烟道板部分钢筋骨架由吊筋悬吊于顶部的预制管片(1)。
7.如权利要求2所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:复合衬砌施工的步骤5)中所述中隔墙(7)施工为直线段中隔墙施工,中隔墙(7)施工时,首先用定型小钢模对疏散平台下方墙体进行施工作为中隔墙(7)的基座,然后用移动式台车从烟道板上部将中隔墙(7)的墙体混凝土浇筑至烟道板底部作为中隔墙(7)的上部。
8.如权利要求7所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述烟道板上预留有施工孔,混凝土的泵管通过施工孔接至烟道板上方,烟道板内设置有风道板,风道板中间预留有浇注孔,混凝土通过浇注孔灌注入中隔墙。
9.如权利要求1至8任一所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述第二阶段主要步骤包括:
1)曲线段中隔墙浇筑;
2)疏散平台施工;
3)路面找平层施工。
10.如权利要求9所述的一种单洞双线复合衬砌盾构隧道内部结构的施工方法,其特征在于:所述疏散平台采用人工智力钢管支撑和木面膜配合结构。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710381186.3A CN107435544A (zh) | 2017-05-25 | 2017-05-25 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
PCT/CN2018/086275 WO2018214737A1 (zh) | 2017-05-25 | 2018-05-10 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
EP18806523.9A EP3633141B1 (en) | 2017-05-25 | 2018-05-10 | Construction method for inner structure of single-bore double-track composite lining shield tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710381186.3A CN107435544A (zh) | 2017-05-25 | 2017-05-25 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107435544A true CN107435544A (zh) | 2017-12-05 |
Family
ID=60458589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710381186.3A Pending CN107435544A (zh) | 2017-05-25 | 2017-05-25 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3633141B1 (zh) |
CN (1) | CN107435544A (zh) |
WO (1) | WO2018214737A1 (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107916936A (zh) * | 2017-12-20 | 2018-04-17 | 北京市政建设集团有限责任公司 | 一种大直径单洞双线地铁隧道及其施工方法 |
CN108756929A (zh) * | 2018-05-07 | 2018-11-06 | 中铁工程设计咨询集团有限公司 | 一种高速铁路隧道分离式轨下预制结构 |
WO2018214737A1 (zh) * | 2017-05-25 | 2018-11-29 | 中铁十四局集团有限公司 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
CN109707395A (zh) * | 2019-01-17 | 2019-05-03 | 中铁第四勘察设计院集团有限公司 | 具有上下层排烟道的双层盾构隧道及排烟道设置方法 |
CN110410108A (zh) * | 2019-08-02 | 2019-11-05 | 中建四局贵州投资建设有限公司 | 一种隧道电缆沟槽施工装置及施工方法 |
CN110700851A (zh) * | 2019-10-14 | 2020-01-17 | 中铁第四勘察设计院集团有限公司 | 基于市域d型车限界设计的单洞双线射流风机隧道断面 |
CN112727482A (zh) * | 2021-02-05 | 2021-04-30 | 中铁工程装备集团有限公司 | 大直径盾构隧道及其内部预制结构施工成套设备和方法 |
CN113803088A (zh) * | 2021-09-27 | 2021-12-17 | 中铁一局集团有限公司 | 一种隔离式双衬砌盾构隧道施工结构及施工方法 |
CN114017062A (zh) * | 2021-11-03 | 2022-02-08 | 北京城建设计发展集团股份有限公司 | 一种大直径盾构隧道管片监测线缆通过二衬的方法 |
CN115949427A (zh) * | 2023-03-08 | 2023-04-11 | 中铁第六勘察设计院集团有限公司 | 一种地铁配线区间双切换盾构衬砌结构及其拼装方法 |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653768A (zh) * | 2018-12-29 | 2019-04-19 | 北京城建信捷轨道交通工程咨询有限公司 | 用于盾构管片内壁的可调支架、盾构管片及调节方法 |
CN109519195A (zh) * | 2018-12-30 | 2019-03-26 | 中铁十四局集团有限公司 | 预制轨下结构 |
CN110410103A (zh) * | 2019-09-03 | 2019-11-05 | 中铁十四局集团大盾构工程有限公司 | 一种新型嵌缝台车 |
CN110486039B (zh) * | 2019-09-26 | 2024-05-07 | 西南交通大学 | 一种多用途的盾构隧道衬砌结构 |
CN110700852A (zh) * | 2019-10-14 | 2020-01-17 | 中铁第四勘察设计院集团有限公司 | 市域d型车限界设计的单洞双线带中隔墙矿山法隧道断面 |
CN110714779A (zh) * | 2019-10-14 | 2020-01-21 | 中铁第四勘察设计院集团有限公司 | 一种基于市域d型车限界设计的盾构隧道断面结构 |
CN110847946A (zh) * | 2019-12-24 | 2020-02-28 | 山西省交通科技研发有限公司 | 长大公路隧道射流风机安装支架及安装方法 |
CN112127942A (zh) * | 2020-08-24 | 2020-12-25 | 中铁第四勘察设计院集团有限公司 | 一种盾构区间疏散平台在联络通道处的连接结构 |
CN112324467A (zh) * | 2020-12-08 | 2021-02-05 | 中铁第四勘察设计院集团有限公司 | 一种盾构隧道现浇内部结构的模型及其试验制作方法 |
CN113356882B (zh) * | 2021-05-21 | 2023-06-20 | 中铁十九局集团第五工程有限公司 | 大断面隧道墙体支架和施工方法 |
CN113323718A (zh) * | 2021-05-24 | 2021-08-31 | 中铁第四勘察设计院集团有限公司 | 一种用于常温常导磁浮隧道的敞口型疏散平台 |
CN113279771A (zh) * | 2021-06-22 | 2021-08-20 | 中建交通建设集团有限公司 | 一种防止水下盾构隧道管片上浮的预制装配式结构 |
CN113586086B (zh) * | 2021-07-12 | 2024-02-20 | 山西工程技术学院 | 一种半封闭式大断面巷道软弱破碎底板加固方法 |
CN113622956B (zh) | 2021-08-31 | 2022-12-06 | 中铁十八局集团有限公司 | 一种高速铁路双线隧道穿过垂直涌泥溶洞时的施工方法 |
CN113863949B (zh) * | 2021-09-13 | 2023-05-16 | 中铁十九局集团第五工程有限公司 | 既有洞室的水池施工方法 |
CN114278341B (zh) * | 2022-02-16 | 2024-02-27 | 中铁一局集团有限公司 | 一种基于矿山法隧道异形断面的二衬模板施工结构及方法 |
CN114808776A (zh) * | 2022-04-18 | 2022-07-29 | 中交一公局集团有限公司 | 一种装配式箱型涵通预制安装施工方法 |
CN115418983B (zh) * | 2022-09-27 | 2023-07-28 | 中铁十四局集团有限公司 | 公铁合建大断面盾构隧道内预制箱涵施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102061926A (zh) * | 2009-11-11 | 2011-05-18 | 中铁十八局集团有限公司 | 连续皮带机出碴时tbm掘进与二次衬砌同步施工方法及台车 |
CN202417530U (zh) * | 2012-01-17 | 2012-09-05 | 张新泉 | 用于隧洞的连续运输机施工的底置穿越同步衬砌台车 |
CN203308471U (zh) * | 2012-11-20 | 2013-11-27 | 中铁十八局集团有限公司 | 一种开敞式tbm现浇混凝土仰拱同步衬砌台车 |
CN203847130U (zh) * | 2013-12-27 | 2014-09-24 | 中铁十八局集团有限公司 | 一种与tbm掘进同步施工的现浇仰拱衬砌台车及混凝土养护系统 |
CN104612711A (zh) * | 2015-02-09 | 2015-05-13 | 浙江省交通规划设计研究院 | 一种城市地铁上下区间重叠盾构隧道的衬砌管片结构 |
CN104747200A (zh) * | 2015-03-18 | 2015-07-01 | 中铁工程装备集团有限公司 | 带有双层支护和可变管片直径的硬岩掘进机及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003206693A (ja) * | 2002-01-08 | 2003-07-25 | Taisei Corp | シールドトンネルの覆工方法 |
CN102003207B (zh) * | 2010-12-31 | 2012-08-29 | 上海市隧道工程轨道交通设计研究院 | 用于单洞双线磁悬浮隧道的疏散平台及安全通道结构 |
CN103195440A (zh) * | 2013-04-03 | 2013-07-10 | 中铁隧道勘测设计院有限公司 | 三层结构地铁双线单管圆隧道 |
CN107435544A (zh) * | 2017-05-25 | 2017-12-05 | 中铁十四局集团有限公司 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
CN107916936A (zh) * | 2017-12-20 | 2018-04-17 | 北京市政建设集团有限责任公司 | 一种大直径单洞双线地铁隧道及其施工方法 |
-
2017
- 2017-05-25 CN CN201710381186.3A patent/CN107435544A/zh active Pending
-
2018
- 2018-05-10 EP EP18806523.9A patent/EP3633141B1/en active Active
- 2018-05-10 WO PCT/CN2018/086275 patent/WO2018214737A1/zh unknown
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102061926A (zh) * | 2009-11-11 | 2011-05-18 | 中铁十八局集团有限公司 | 连续皮带机出碴时tbm掘进与二次衬砌同步施工方法及台车 |
CN202417530U (zh) * | 2012-01-17 | 2012-09-05 | 张新泉 | 用于隧洞的连续运输机施工的底置穿越同步衬砌台车 |
CN203308471U (zh) * | 2012-11-20 | 2013-11-27 | 中铁十八局集团有限公司 | 一种开敞式tbm现浇混凝土仰拱同步衬砌台车 |
CN203847130U (zh) * | 2013-12-27 | 2014-09-24 | 中铁十八局集团有限公司 | 一种与tbm掘进同步施工的现浇仰拱衬砌台车及混凝土养护系统 |
CN104612711A (zh) * | 2015-02-09 | 2015-05-13 | 浙江省交通规划设计研究院 | 一种城市地铁上下区间重叠盾构隧道的衬砌管片结构 |
CN104747200A (zh) * | 2015-03-18 | 2015-07-01 | 中铁工程装备集团有限公司 | 带有双层支护和可变管片直径的硬岩掘进机及其施工方法 |
Non-Patent Citations (1)
Title |
---|
孟凡伦: "预制装配+整体模筑的双层复合式衬砌在地下轨道交通中的施工研究", 《铁道建筑技术》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018214737A1 (zh) * | 2017-05-25 | 2018-11-29 | 中铁十四局集团有限公司 | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 |
CN107916936A (zh) * | 2017-12-20 | 2018-04-17 | 北京市政建设集团有限责任公司 | 一种大直径单洞双线地铁隧道及其施工方法 |
CN108756929A (zh) * | 2018-05-07 | 2018-11-06 | 中铁工程设计咨询集团有限公司 | 一种高速铁路隧道分离式轨下预制结构 |
CN109707395B (zh) * | 2019-01-17 | 2024-01-16 | 中铁第四勘察设计院集团有限公司 | 具有上下层排烟道的双层盾构隧道及排烟道设置方法 |
CN109707395A (zh) * | 2019-01-17 | 2019-05-03 | 中铁第四勘察设计院集团有限公司 | 具有上下层排烟道的双层盾构隧道及排烟道设置方法 |
CN110410108A (zh) * | 2019-08-02 | 2019-11-05 | 中建四局贵州投资建设有限公司 | 一种隧道电缆沟槽施工装置及施工方法 |
CN110700851A (zh) * | 2019-10-14 | 2020-01-17 | 中铁第四勘察设计院集团有限公司 | 基于市域d型车限界设计的单洞双线射流风机隧道断面 |
CN112727482A (zh) * | 2021-02-05 | 2021-04-30 | 中铁工程装备集团有限公司 | 大直径盾构隧道及其内部预制结构施工成套设备和方法 |
CN113803088A (zh) * | 2021-09-27 | 2021-12-17 | 中铁一局集团有限公司 | 一种隔离式双衬砌盾构隧道施工结构及施工方法 |
CN113803088B (zh) * | 2021-09-27 | 2024-05-10 | 中铁一局集团有限公司 | 一种隔离式双衬砌盾构隧道施工结构及施工方法 |
CN114017062A (zh) * | 2021-11-03 | 2022-02-08 | 北京城建设计发展集团股份有限公司 | 一种大直径盾构隧道管片监测线缆通过二衬的方法 |
CN114017062B (zh) * | 2021-11-03 | 2023-11-14 | 北京城建设计发展集团股份有限公司 | 一种大直径盾构隧道管片监测线缆通过二衬的方法 |
CN115949427A (zh) * | 2023-03-08 | 2023-04-11 | 中铁第六勘察设计院集团有限公司 | 一种地铁配线区间双切换盾构衬砌结构及其拼装方法 |
Also Published As
Publication number | Publication date |
---|---|
EP3633141A4 (en) | 2021-03-24 |
EP3633141A1 (en) | 2020-04-08 |
WO2018214737A1 (zh) | 2018-11-29 |
EP3633141B1 (en) | 2024-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107435544A (zh) | 一种单洞双线复合衬砌盾构隧道内部结构的施工方法 | |
CN106703814B (zh) | 暗挖地铁车站洞桩施工方法 | |
CN104060629B (zh) | 盖挖逆作地铁车站叠合墙施工方法及移动式侧墙模板台车 | |
CN105201516B (zh) | 一种地铁车站主体结构及其四联拱pba暗挖施工方法 | |
CN103939113B (zh) | 一种悬轨式施工台车 | |
CN205242436U (zh) | 地下复合围护体系中辅助基础底板换撑的临时支撑结构 | |
CN203948108U (zh) | 一种带纵向隔墙和隔板的隧道的混凝土浇筑成型模具 | |
CN104131704A (zh) | 一种钢管柱混凝土的侧浇方法及所用的钢管柱结构 | |
CN108086353A (zh) | 一种用现浇暗梁拼接的空芯墙板混合预制装配式综合管廊及其施工方法 | |
CN103375171A (zh) | 一种盾构洞内始发反力架 | |
CN110499779A (zh) | 一种与地铁车站共用侧墙的风道结构施工方法 | |
CN110486036A (zh) | 一种扩大拱脚初支拱盖法施工方法 | |
CN110374630A (zh) | 一种隧洞拱顶混凝土振捣的施工方法 | |
CN110158656A (zh) | 一种一体化模板管廊及其建造方法 | |
CN104481555A (zh) | 一种穿过软弱围岩进行钻注注浆施工的方法 | |
CN108843346A (zh) | 超大断面浅埋暗挖隧道在富水砂层的衬砌施工方法 | |
CN103835728B (zh) | 连拱隧道中隔墙拱顶混凝土浇筑方法 | |
CN107476340A (zh) | 一种地铁隧道与扩建车站的新型连接结构及其施工方法 | |
CN106948350B (zh) | 深基坑附属结构的快速施工方法 | |
CN104314048B (zh) | 气囊式混凝土工程变形缝止水型腔模的制造及施工方法 | |
CN102828506A (zh) | 超深大截面方形支护桩及其施工方法 | |
CN107448217A (zh) | 一种实用隧道衬砌台车振捣系统 | |
CN205036388U (zh) | 一种四联拱pba暗挖地铁车站的扣拱施工结构 | |
CN104846745A (zh) | 一种城市高墩无支架翻模施工方法 | |
CN107740423A (zh) | 一种预制拼装式城市下穿隧道施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171205 |