CN107426016A - The highly reliable ground TTC channel design method of satellite launch area electrical testing - Google Patents

The highly reliable ground TTC channel design method of satellite launch area electrical testing Download PDF

Info

Publication number
CN107426016A
CN107426016A CN201710419043.7A CN201710419043A CN107426016A CN 107426016 A CN107426016 A CN 107426016A CN 201710419043 A CN201710419043 A CN 201710419043A CN 107426016 A CN107426016 A CN 107426016A
Authority
CN
China
Prior art keywords
measurement
observing
highly reliable
equipment
controlling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710419043.7A
Other languages
Chinese (zh)
Other versions
CN107426016B (en
Inventor
蔡先军
张波
程卫强
王储
李昆吉
毕建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Satellite Engineering
Original Assignee
Shanghai Institute of Satellite Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Satellite Engineering filed Critical Shanghai Institute of Satellite Engineering
Priority to CN201710419043.7A priority Critical patent/CN107426016B/en
Publication of CN107426016A publication Critical patent/CN107426016A/en
Application granted granted Critical
Publication of CN107426016B publication Critical patent/CN107426016B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0668Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/22Arrangements for detecting or preventing errors in the information received using redundant apparatus to increase reliability
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • H04L41/145Network analysis or design involving simulating, designing, planning or modelling of a network

Abstract

The invention provides a kind of highly reliable ground TTC channel design method of satellite launch area electrical testing, it comprises the following steps:Step 1, two secondary ground observing and controlling antennas are set up in pylon fixed platform, up-downgoing branch is carried out by multiple circulators, two secondary ground observing and controlling antennas are respectively connecting to main part interface and backup interface of base RF optical fiber repeater systems, when the ground plane TT&C antenna of main part interface is blocked or unstable, base personnel is directly switched to Backup Antenna etc. by the switch matrix of an optical fiber repeater system.The present invention can make full use of existing equipments resources, and redundancy backup design is carried out to ground TTC channel, reduce failure as far as possible and solve the time.

Description

The highly reliable ground TTC channel design method of satellite launch area electrical testing
Technical field
The present invention relates to a kind of link design method, in particular it relates to a kind of satellite launch area highly reliable ground of electrical testing TTC channel design method.
Background technology
Satellite has higher requirement in launching site launch site electrical testing, for ground telemetering distant control chain circuit reliability, Particularly face after transmitting advances into transmitting flow, once remote measuring and controlling link occurs abnormal, may result in postponement transmitting.
At present, conventional ground observing and controlling link scheme when factory building is tested, due to needing full link test, therefore alternate device Or passage is limited, cause some single-points on link be present, such as:Measurement and control center's management equipment is the pass of remote-control romote-sensing data mart modeling Button apparatus, it is general use cold standby scheme, only have in test system one it is in running order, once go wrong, it is necessary to tear open Lower main alternate device simultaneously changes alternate device, and whole star measurement monitoring can not be carried out during replacing, can not send telecommand to satellite. However, into launch site behind launching site, is particularly transferred to, general TTC channel only needs to ensure definitely reliable all the way, radio frequency link Or equipment has that unnecessary passage is available, therefore to improve the reliability of ground observing and controlling link, resource is made full use of to link Carry out re-optimization and be designed to inevitable requirement.
The content of the invention
For in the prior art the defects of, the technical problem to be solved in the present invention is to provide a kind of satellite launch area electrical testing Highly reliable ground TTC channel design method, it can make full use of existing equipments resources, and redundancy is carried out to ground TTC channel Hot Spare designs, and reduces failure as far as possible and solves the time.
According to an aspect of the present invention, there is provided a kind of highly reliable ground TTC channel design side of satellite launch area electrical testing Method, the highly reliable ground TTC channel design method of satellite launch area electrical testing comprise the following steps:
Step 1, two secondary ground observing and controlling antennas are set up in pylon fixed platform, pass through multiple circulators and carry out up-downgoing Branch, two secondary ground observing and controlling antennas are respectively connecting to main part interface and backup interface of base RF optical fiber repeater system (front end), When the ground plane TT&C antenna of main part interface is blocked or unstable, base personnel's directly opening by optical fiber repeater system Backup Antenna can be switched to by closing matrix;
Step 2, descending in base RF optical fiber repeater system (rear end) will be descending distant by a power splitter by outlet Survey signal and carry out branch, power splitter is respectively connecting to two independent down going channels of a radio frequency link control cabinet, passes through independence Down going channel a frequency converter, an observing and controlling baseband equipment and measurement and control center's management equipment, form two-way independence Telemetering channel;
Step 3, data feedback channel are set after being simultaneously emitted by by Liang Tai measurement and control centers management equipment by independent observing and controlling base band A combiner is accessed after the independent path of standby, data feedback channel frequency converter and radio frequency road control cabinet, passes through the change of data feedback channel The output switch of frequency device is controlled, formed two-way can component selections output independent remote-control channel;
Step 4, it is descending that the telemetry demodulation software merit ratings of two observing and controlling baseband equipments corresponds to two-way remote measurement on star respectively, from And two-way remote measurement can independently be shown by ensureing remote measurement display terminal;
Step 5, the remote control modulation software merit ratings of two observing and controlling baseband equipments correspond to it is up with being remotely controlled all the way on star, so as to Ensure the full link backup of telecommand, can wherein remote signal be broadcast TV programs by satellite all the way by the selection of the frequency converter of data feedback channel;
Step 6, a comprehensive server of surveying use cold standby scheme, when main part failure, then started backup, measurement and control center Management equipment possesses the comprehensive function of surveying server of Auto-reconnect.
Preferably, electrical testing highly reliable ground TTC channel design method in the satellite launch area is for ground observing and controlling link In in single-point state equipment carry out it is cold and hot backup deployment, the highly reliable ground TTC channel design side of satellite launch area electrical testing Method enters line link distribution using power splitter and combiner, is changed by appropriate software merit rating, realizes ground observing and controlling link Highly reliable design, it is ensured that any equipment fault can fast quick-recovery on link.
Preferably, the step 3 Zhong Liangtai measurement and control centers management equipment is serviced using measurement and control center's management equipment and comprehensive survey LAN mouth TCP and IP communication mechanisms between device, Liang Tai measurement and control centers management equipment use completely the same user name, password, set Standby number is waited the comprehensive survey server of login, is referred to so as to ensure that Liang Tai measurement and control centers management equipment can receive comprehensive survey server remote control Order, comprehensive survey server can also receive the telemetry that Liang Tai measurement and control centers tube apparatus is sent;Liang Tai measurement and control centers management equipment Utilize LAN mouth TCP and the IP communication mechanisms between measurement and control center's management equipment and observing and controlling encryption and decryption equipment, Liang Tai measurement and control centers pipe Manage equipment and observing and controlling encryption and decryption equipment is logged in using completely the same user name, password, device number etc., so as to ensure in two observing and controlling Heart management equipment can be remotely controlled encryption and remote measurement decryption by observing and controlling encryption and decryption equipment.
Preferably, during the comprehensive survey server fail, it is only necessary to comprehensive survey server start will be backed up, relevant device can be certainly The dynamic comprehensive survey server of reconnection, can quick-recovery up-downgoing data link soon.
Preferably, measurement and control center's management equipment and observing and controlling baseband equipment correspond, and pass through observing and controlling baseband equipment Modulation and demodulation channel parameters configure, the passage configuration of corresponding measurement and control center management equipment, can be independent with telemetering channel by remote control Separate, realize the selection of remote-control channel, avoid the aliasing of telemetry parameter.
Preferably, the data feedback channel is in order to avoid interference, while only opens the output of the frequency converter of a data feedback channel Switch, guarantee is simultaneously only up all the way to broadcast TV programs by satellite, and current remote-control channel is problematic, it is only necessary to sends another frequency converter output switch Go code and can switch to backup link.
Preferably, when the RF optical fiber repeater systems failure in the base needs to cut standby, it is only necessary to rear end by data feedback channel and Two radio-frequency cables of down going channel are connected to the backup interface of optical fiber forwarding unit, and front end has connected active and standby two sets of days Line, without action.
Compared with prior art, the present invention has following beneficial effect:The present invention can directly apply to all at present Model satellite electrical testing task, it is significant for raising test system reliability, reduction failure solution time.
Embodiment
With reference to specific embodiment, the present invention is described in detail.Following examples will be helpful to the technology of this area Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill to this area For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection domain.
Electrical testing highly reliable ground TTC channel design method in satellite launch area of the present invention comprises the following steps:
Step 1, two secondary ground observing and controlling antennas are set up in pylon fixed platform, pass through multiple circulators and carry out up-downgoing Branch, two secondary ground observing and controlling antennas are respectively connecting to main part interface and backup interface of base RF optical fiber repeater system (front end), When the ground plane TT&C antenna of main part interface is blocked or unstable, base personnel's directly opening by optical fiber repeater system Backup Antenna can be switched to by closing matrix;
Step 2, in base, the descending of RF (Radio Frequency, radio frequency) optical fiber repeater systems (rear end) passes through outlet Downlink telemetry signal is carried out by branch by a power splitter, power splitter is respectively connecting to a radio frequency link control cabinet two solely Vertical down going channel, managed by a frequency converter of independent down going channel, an observing and controlling baseband equipment and a measurement and control center Equipment is managed, forms the telemetering channel of two-way independence;
Step 3, data feedback channel are set after being simultaneously emitted by by Liang Tai measurement and control centers management equipment by independent observing and controlling base band A combiner is accessed after the independent path of standby, data feedback channel frequency converter and radio frequency road control cabinet, passes through the change of data feedback channel The output switch of frequency device is controlled, formed two-way can component selections output independent remote-control channel;
Step 4, it is descending that the telemetry demodulation software merit ratings of two observing and controlling baseband equipments corresponds to two-way remote measurement on star respectively, from And two-way remote measurement can independently be shown by ensureing remote measurement display terminal;
Step 5, the remote control modulation software merit ratings of two observing and controlling baseband equipments correspond to it is up with being remotely controlled all the way on star, so as to Ensure the full link backup of telecommand, can wherein remote signal be broadcast TV programs by satellite all the way by the selection of the frequency converter of data feedback channel;
Step 6, a comprehensive server of surveying use cold standby scheme, when main part failure, then started backup, measurement and control center Management equipment possesses the comprehensive function of surveying server of Auto-reconnect.
Electrical testing highly reliable ground TTC channel design method in the satellite launch area in ground observing and controlling link for being in The equipment of single-point state carries out cold and hot backup deployment, and electrical testing highly reliable ground TTC channel design method in satellite launch area uses Power splitter and combiner enter line link distribution, are changed by appropriate software merit rating, realize the highly reliable of ground observing and controlling link Design, it is ensured that any equipment fault can fast quick-recovery on link.
The step 3 Zhong Liangtai measurement and control centers management equipment is using between measurement and control center's management equipment and comprehensive survey server LAN (Local Area Network, LAN) mouth TCP (Transmission Control Protocol, transmission control Agreement) and IP (Internet Protocol, the agreement interconnected between network) communication mechanism, Liang Tai measurement and control centers management equipment Comprehensive survey server is logged in using completely the same user name, password, device number etc., so as to ensure Liang Tai measurement and control centers management equipment Comprehensive survey server telecommand can be received, comprehensive survey server can also receive the remote measurement that Liang Tai measurement and control centers tube apparatus is sent Data;Liang Tai measurement and control centers management equipment using between measurement and control center's management equipment and observing and controlling encryption and decryption equipment LAN mouths TCP and IP communication mechanisms, Liang Tai measurement and control centers management equipment log in observing and controlling using completely the same user name, password, device number etc. and add solution Close equipment, so as to ensure that Liang Tai measurement and control centers management equipment can be remotely controlled encryption and remote measurement solution by observing and controlling encryption and decryption equipment It is close.
During the comprehensive survey server fail, it is only necessary to comprehensive survey server start will be backed up, relevant device can Auto-reconnect Comprehensive survey server, can quick-recovery up-downgoing data link soon.
Measurement and control center's management equipment and observing and controlling baseband equipment correspond, and are conciliate by the modulation of observing and controlling baseband equipment Channel parameters configuration is adjusted, the passage configuration of corresponding measurement and control center management equipment, remote control can independently be separated with telemetering channel, realized The selection of remote-control channel, avoid the aliasing of telemetry parameter.
The data feedback channel only opens the output switch of the frequency converter of a data feedback channel in order to avoid interference, protects Card is simultaneously only up all the way to broadcast TV programs by satellite, and current remote-control channel is problematic, it is only necessary to sends another frequency converter output switch connection and refers to Order can switch to backup link.
When the RF optical fiber repeater systems failure in the base needs to cut standby, it is only necessary in rear end by data feedback channel and down going channel Two radio-frequency cables are connected to the backup interface of optical fiber forwarding unit, and front end has connected active and standby two sets of antennas, without dynamic Make.
The specific embodiment of the present invention is described above.It is to be appreciated that the invention is not limited in above-mentioned Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow Ring the substantive content of the present invention.

Claims (7)

  1. A kind of 1. highly reliable ground TTC channel design method of satellite launch area electrical testing, it is characterised in that satellite launch area electricity Highly reliable ground TTC channel design method is tested to comprise the following steps:
    Step 1, two secondary ground observing and controlling antennas are set up in pylon fixed platform, carry out up-downgoing branch by multiple circulators, Two secondary ground observing and controlling antennas are respectively connecting to main part interface and backup interface of base RF optical fiber repeater systems, when main part interface Ground plane TT&C antenna is blocked or unstable, and base personnel is directly switched to standby by the switch matrix of an optical fiber repeater system Part antenna;
    Step 2, in base, the descending of RF optical fiber repeater systems is carried out downlink telemetry signal by a power splitter by exporting Branch, power splitter are respectively connecting to two independent down going channels of a radio frequency link control cabinet, pass through independent down going channel A frequency converter, an observing and controlling baseband equipment and measurement and control center's management equipment, formed two-way independence telemetering channel;
    Step 3, data feedback channel be simultaneously emitted by by Liang Tai measurement and control centers management equipment after by independent observing and controlling baseband equipment, on A combiner is accessed after the frequency converter of row of channels and the independent path of radio frequency road control cabinet, passes through the frequency converter of data feedback channel Output switch is controlled, and forms the independent remote-control channel of two-way component selections output;
    Step 4, it is descending that the telemetry demodulation software merit ratings of two observing and controlling baseband equipments corresponds to two-way remote measurement on star respectively, so as to protect Card remote measurement display terminal independently shows two-way remote measurement;
    Step 5, the remote control modulation software merit ratings of two observing and controlling baseband equipments correspond to it is up with being remotely controlled all the way on star, so as to ensure The full link backup of telecommand, by the frequency converter selection of data feedback channel, wherein remote signal is broadcast TV programs by satellite all the way;
    Step 6, a comprehensive server of surveying use cold standby scheme, when main part failure, then started backup, measurement and control center's management Equipment possesses the comprehensive function of surveying server of Auto-reconnect.
  2. 2. the highly reliable ground TTC channel design method of satellite launch area according to claim 1 electrical testing, its feature exist In electrical testing highly reliable ground TTC channel design method in the satellite launch area is for being in single point-like in ground observing and controlling link The equipment of state carries out cold and hot backup deployment, and electrical testing highly reliable ground TTC channel design method in satellite launch area uses power splitter Enter line link distribution with combiner, changed by appropriate software merit rating, realize the highly reliable design of ground observing and controlling link, really Protect the fast quick-recovery of any equipment fault on link.
  3. 3. the highly reliable ground TTC channel design method of satellite launch area according to claim 1 electrical testing, its feature exist In the step 3 Zhong Liangtai measurement and control centers management equipment utilizes measurement and control center's management equipment and the comprehensive LAN surveyed between server Mouth TCP and IP communication mechanisms, Liang Tai measurement and control centers management equipment are logged in using completely the same user name, password, device number etc. Comprehensive survey server, so as to ensure that Liang Tai measurement and control centers management equipment receives comprehensive survey server telecommand, comprehensive survey server Also the telemetry that Liang Tai measurement and control centers tube apparatus is sent is received;Liang Tai measurement and control centers management equipment is managed using measurement and control center LAN mouth TCP and IP communication mechanisms between equipment and observing and controlling encryption and decryption equipment, Liang Tai measurement and control centers management equipment use complete one The user name of cause, password, device number etc. log in observing and controlling encryption and decryption equipment, so as to ensure that Liang Tai measurement and control centers management equipment passes through Observing and controlling encryption and decryption equipment is remotely controlled encryption and remote measurement decryption.
  4. 4. the highly reliable ground TTC channel design method of satellite launch area according to claim 3 electrical testing, its feature exist In, it is described it is comprehensive survey server fail when, it is only necessary to will back up it is comprehensive survey server start, relevant device Auto-reconnect it is comprehensive survey service Device, fast quick-recovery up-downgoing data link.
  5. 5. the highly reliable ground TTC channel design method of satellite launch area according to claim 1 electrical testing, its feature exist In measurement and control center's management equipment and observing and controlling baseband equipment correspond, and are led to by the modulation and demodulation of observing and controlling baseband equipment Road parameter configuration, the passage configuration of corresponding measurement and control center management equipment, remote control is independently separated with telemetering channel, realizes that remote control is logical The selection in road, avoid the aliasing of telemetry parameter.
  6. 6. the highly reliable ground TTC channel design method of satellite launch area according to claim 1 electrical testing, its feature exist In the data feedback channel only opens the output switch of the frequency converter of a data feedback channel in order to avoid interference, ensures simultaneously Only up all the way to broadcast TV programs by satellite, current remote-control channel is problematic, it is only necessary to sends another frequency converter output switch and goes code switching To backup link.
  7. 7. the highly reliable ground TTC channel design method of satellite launch area according to claim 1 electrical testing, its feature exist When the RF optical fiber repeater systems failure in, the base needs to cut standby, it is only necessary in rear end by data feedback channel and down going channel two Radio-frequency cable is connected to the backup interface of optical fiber forwarding unit, and front end has connected active and standby two sets of antennas, without action.
CN201710419043.7A 2017-06-06 2017-06-06 Design method of high-reliability ground measurement and control link for satellite emission area electrical test Active CN107426016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710419043.7A CN107426016B (en) 2017-06-06 2017-06-06 Design method of high-reliability ground measurement and control link for satellite emission area electrical test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710419043.7A CN107426016B (en) 2017-06-06 2017-06-06 Design method of high-reliability ground measurement and control link for satellite emission area electrical test

Publications (2)

Publication Number Publication Date
CN107426016A true CN107426016A (en) 2017-12-01
CN107426016B CN107426016B (en) 2020-07-14

Family

ID=60429109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710419043.7A Active CN107426016B (en) 2017-06-06 2017-06-06 Design method of high-reliability ground measurement and control link for satellite emission area electrical test

Country Status (1)

Country Link
CN (1) CN107426016B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108519751A (en) * 2018-04-02 2018-09-11 南京国睿安泰信科技股份有限公司 A kind of novel solid matrix switching system
CN112557787A (en) * 2020-11-25 2021-03-26 中国科学院微小卫星创新研究院 Universal satellite electronics testing system
CN113204188A (en) * 2021-04-26 2021-08-03 中国人民解放军国防科技大学 Multimode-driven quick-response satellite switching instruction system and design and application method thereof
CN113993003A (en) * 2021-09-18 2022-01-28 深圳航天东方红卫星有限公司 Multi-satellite parallel data forwarding system and method
CN114465672A (en) * 2022-01-14 2022-05-10 上海卫星工程研究所 Testing method and system for radio frequency forwarding system of field emission region of Mars detector

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040085976A1 (en) * 2002-11-06 2004-05-06 Mark Dale Downstream time domian based adaptive modulation for DOCSIS based applications
CN101145825A (en) * 2007-10-30 2008-03-19 航天东方红卫星有限公司 Small satellite satellite-ground communication integrated system
CN201523380U (en) * 2009-09-17 2010-07-07 航天东方红卫星有限公司 Relay observation and control responder satellite observation and control allocation system with controllable priority levels
CN102520715A (en) * 2011-12-28 2012-06-27 北京航空航天大学 Universal satellite ground overall control test system
CN106688319B (en) * 2010-01-12 2013-10-23 中国航天空气动力技术研究院 A kind of integrated UAV ground control station
CN105162490A (en) * 2015-07-02 2015-12-16 华侨大学 Double-frequency measurement and control transmitting-receiving system
CN105721958A (en) * 2016-02-02 2016-06-29 上海卫星工程研究所 Remote control system for uplink multi-channel signals of low earth orbit satellite
CN106100658A (en) * 2016-07-07 2016-11-09 上海航天测控通信研究所 Spaceborne S band Dual Channel observing and controlling receiver

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040085976A1 (en) * 2002-11-06 2004-05-06 Mark Dale Downstream time domian based adaptive modulation for DOCSIS based applications
CN101145825A (en) * 2007-10-30 2008-03-19 航天东方红卫星有限公司 Small satellite satellite-ground communication integrated system
CN201523380U (en) * 2009-09-17 2010-07-07 航天东方红卫星有限公司 Relay observation and control responder satellite observation and control allocation system with controllable priority levels
CN106688319B (en) * 2010-01-12 2013-10-23 中国航天空气动力技术研究院 A kind of integrated UAV ground control station
CN102520715A (en) * 2011-12-28 2012-06-27 北京航空航天大学 Universal satellite ground overall control test system
CN105162490A (en) * 2015-07-02 2015-12-16 华侨大学 Double-frequency measurement and control transmitting-receiving system
CN105721958A (en) * 2016-02-02 2016-06-29 上海卫星工程研究所 Remote control system for uplink multi-channel signals of low earth orbit satellite
CN106100658A (en) * 2016-07-07 2016-11-09 上海航天测控通信研究所 Spaceborne S band Dual Channel observing and controlling receiver

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙金懿等: "基于CAN总线的卫星电源地面测试系统", 《上海第二工业大学学报》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108519751A (en) * 2018-04-02 2018-09-11 南京国睿安泰信科技股份有限公司 A kind of novel solid matrix switching system
CN112557787A (en) * 2020-11-25 2021-03-26 中国科学院微小卫星创新研究院 Universal satellite electronics testing system
CN112557787B (en) * 2020-11-25 2023-12-01 中国科学院微小卫星创新研究院 Universal satellite electronics test system
CN113204188A (en) * 2021-04-26 2021-08-03 中国人民解放军国防科技大学 Multimode-driven quick-response satellite switching instruction system and design and application method thereof
CN113993003A (en) * 2021-09-18 2022-01-28 深圳航天东方红卫星有限公司 Multi-satellite parallel data forwarding system and method
CN113993003B (en) * 2021-09-18 2023-12-26 深圳航天东方红卫星有限公司 Multi-satellite parallel data forwarding system and method
CN114465672A (en) * 2022-01-14 2022-05-10 上海卫星工程研究所 Testing method and system for radio frequency forwarding system of field emission region of Mars detector
CN114465672B (en) * 2022-01-14 2023-12-12 上海卫星工程研究所 Test method and system for radio frequency forwarding system of Mars detector emission field emission area

Also Published As

Publication number Publication date
CN107426016B (en) 2020-07-14

Similar Documents

Publication Publication Date Title
CN107426016A (en) The highly reliable ground TTC channel design method of satellite launch area electrical testing
US9549301B2 (en) Method and system for real time control of an active antenna over a distributed antenna system
US8213993B2 (en) Messenger strand mounted pico-cell radio
CN101630979B (en) Extender, data transmission method and passive optical network system
CN103081439B (en) Logical Link Management method and communicator
WO2008117973A1 (en) Microwave repeater system for wireless network
KR102158867B1 (en) System for monitoring signal abnormality of optical line and method of operation
CN206559565U (en) Terminal communication access network EPON ring-shaped network structures
US20130067525A1 (en) Service provisioning device with integrated cable modem
US11799771B2 (en) Circuitry for demarcation devices and methods utilizing same
CN101702634B (en) Device and method for realizing providing DOCSIS service by radio frequency passive optical network
KR102124531B1 (en) Apparatus for providing optical intergrated wired and wireless service at in-building and apparatus for processing wired optical signal
CN106791515B (en) Intelligent switching system for main and standby transmitters of digital television transmitter and implementation method thereof
CN105491577B (en) Asymmetric single double fluid mixing indoor covering system
CN204392249U (en) The integral system of remote sensing satellite receiving system
Dat et al. High-spectral efficiency millimeter wave-over-fiber system for future mobile fronthaul
CN104702467B (en) A kind of reverse link test method and system based on C-DOCSIS networking structures
US20120243529A1 (en) Wireless base station, reference signal supply device, and wireless base station system
CN201726412U (en) NGB network terminal integrated access equipment
CN208638352U (en) Satellite controlling system
CN112672374B (en) Electric power data communication state processing system and terminal
CN108009644A (en) A kind of mobile monitoring system of 10KV demarcation switch
Turco et al. TLC strategy for power distribution grids
JP4347001B2 (en) CATV monitoring system and CATV monitoring method
KR20090036404A (en) Hybrid fiber coaxial network management system using wpan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant