CN107404356A - A kind of vector modulator automatical measure and control system based on Fast Ethernet agreement - Google Patents

A kind of vector modulator automatical measure and control system based on Fast Ethernet agreement Download PDF

Info

Publication number
CN107404356A
CN107404356A CN201710648254.8A CN201710648254A CN107404356A CN 107404356 A CN107404356 A CN 107404356A CN 201710648254 A CN201710648254 A CN 201710648254A CN 107404356 A CN107404356 A CN 107404356A
Authority
CN
China
Prior art keywords
vector modulator
ethernet
observing
process plate
vector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710648254.8A
Other languages
Chinese (zh)
Other versions
CN107404356B (en
Inventor
王鹏
陈东
余大庆
张昆
龚克
连帅彬
孙秋菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyang Normal University
Original Assignee
Xinyang Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyang Normal University filed Critical Xinyang Normal University
Priority to CN201710648254.8A priority Critical patent/CN107404356B/en
Publication of CN107404356A publication Critical patent/CN107404356A/en
Application granted granted Critical
Publication of CN107404356B publication Critical patent/CN107404356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/10Monitoring; Testing of transmitters
    • H04B17/11Monitoring; Testing of transmitters for calibration
    • H04B17/12Monitoring; Testing of transmitters for calibration of transmit antennas, e.g. of the amplitude or phase
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/10Monitoring; Testing of transmitters
    • H04B17/15Performance testing
    • H04B17/19Self-testing arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/20Monitoring; Testing of receivers
    • H04B17/21Monitoring; Testing of receivers for calibration; for correcting measurements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/20Monitoring; Testing of receivers
    • H04B17/29Performance testing
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/03Protocol definition or specification 
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/16Implementation or adaptation of Internet protocol [IP], of transmission control protocol [TCP] or of user datagram protocol [UDP]
    • H04L69/164Adaptation or special uses of UDP protocol
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Computer Security & Cryptography (AREA)
  • Small-Scale Networks (AREA)
  • Monitoring And Testing Of Transmission In General (AREA)

Abstract

A kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, including ethernet PHY transceiver, ethernet mac controller, vector modulator process plate, vector modulator aerial array to be measured;The ethernet PHY transceiver connects the ethernet mac controller by MII interface bus, the ethernet mac controller connects the vector modulator process plate by external bus, and the vector modulator process plate connects the vector modulator aerial array to be measured by aerial array test cable.Vector modulator automatical measure and control system based on Fast Ethernet agreement greatly improves test data efficiency of transmission, the complexity of whole system is controlled well, almost without increase design cost compared with traditional design, but automatic test efficiency then greatly improves.

Description

A kind of vector modulator automatical measure and control system based on Fast Ethernet agreement
Technical field
The present invention relates to a kind of vector modulator automatical measure and control system, and in particular to one kind is based on Fast Ethernet agreement Vector modulator automatical measure and control system.
Background technology
Vector modulator (VM) controls phase shift and the amplitude fading of radiofrequency signal, its batch using a pair of analog voltages simultaneously Amount production cost has than traditional numerical control phase shift, attenuator and significantly reduced, and is the core of many New Generation of Intelligent aerial arrays Part.But vector modulator is typical analog device, be different from per a piece of VM actual controlling curve, and in practice in order to Reach the control of intelligent antenna array wave beam(Ripple control)Accuracy, it is necessary to which VM controlling curve is critically extracted and quantified Storage, under prior art conditions, this usually requires to use a special PC host computer, ripple control test equipment and necessity Microwave test instrument form complete TT&C system.For a long time, adopted towards the automatical measure and control system of vector modulator more The information exchange of test host computer and detection and control terminal is realized with traditional UART serial ports.Limited by Technical Architecture, UART interface Highest Transmission bit rate is only 115200bps, hereafter has part TT&C system to use USB virtual serial ports instead again and substitutes traditional UART Serial ports, such as CP2102, FT232R etc., but its maximum speed is also typically not greater than 1Mbps, and the controlling curve of vector modulator Quantized data is very intensive and different, and this causes the substantial amounts of time in traditional observation and control technology to be wasted in wait serial data It is transmitted, the VM data of a set of antenna of complete extraction generally require time a couple of days, significantly limit carrying for testing efficiency Height, and conventional testing techniques need manual control and record a variety of instrument and meter count values, also do not meet automatic test Developing direction.
The content of the invention
In order to solve the above technical problems, it is an object of the invention to provide a kind of Vector Modulation based on Fast Ethernet agreement Device automatical measure and control system.
Technical scheme is specially:
A kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, including ethernet PHY transceiver, Ethernet mac controller, vector modulator process plate, vector modulator aerial array to be measured;The ethernet physical layer transmitting-receiving Device connects the ethernet mac controller by MII interface bus, and the ethernet mac controller connects institute by external bus Vector modulator process plate is stated, the vector modulator process plate connects the vector to be measured by aerial array test cable and adjusted Device aerial array processed.
Further, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, in addition to it is upper Machine program, the observing and controlling computer containing host computer procedure, programmable power supply, power meter, vector network analyzer, external dc power supply;Institute State host computer procedure to run in the observing and controlling computer containing host computer procedure, the Ethernet switch includes at least five RJ45 ports, the observing and controlling computer containing host computer procedure, the programmable power supply, the Ethernet thing are connected by netting twine respectively Manage layer transceiver, the vector network analyzer, the power meter;The programmable power supply connects the vector modulator day to be measured Linear array is simultaneously powered for it, and the vector modulator aerial array to be measured connects institute respectively by microwave cable 1 and microwave cable 2 State power meter and the vector network analyzer;The external dc power supply connected vector modulator process plate simultaneously provides confession for it Electricity.
Further, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, it is characterised in that: The programmable power supply uses high-power high-performance direct current power supply.
Further, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, it is characterised in that: The upper computer software uses MFC program architectures, and the upper computer software utilizes ripe VISA Virture Instrumentation Software Architectures.
Further, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, it is characterised in that: The ethernet PHY transceiver uses ethernet PHY integrated transceiver chip.
Further, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, it is characterised in that: The ethernet mac controller is built using FPGA.
Further, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, it is characterised in that: The vector modulator observing and controlling process plate is built using FPGA.
A kind of method of testing according to any of the above-described system, comprise the following steps:
The first step:It is prepared work, including antenna connection, probe positions initialization;
Second step:Detect vector modulator observing and controlling process plate and other instrument and meters whether successful connection;
3rd step:Successful connection then carries out the 4th step, and otherwise sending connection failure by observing and controlling computer prompts, and operator should check Second step is retried after Ethernet connection;
4th step:Retaking of a year or grade vector modulator observing and controlling process plate FPGA program versions number;
5th step:The vector modulator observing and controlling process plate FPGA program versions number of retaking of a year or grade are normal then to carry out the 6th step, otherwise again The 4th step is retried after burning FPGA programs;
6th step:Antenna self-test;
7th step:Antenna self-test normally then carries out the 8th step, otherwise provides self-test abnormal passage quantity and position, aids in day Line repairs troubleshooting, and the 6th is retried after antenna maintenance;
8th step:Operating personnel are waited to start specific function test, if function input then enters the 9th step, otherwise continue etc. Treat;
9th step:It is different according to operating personnel's selection function, start corresponding automatic test operation.
Relative to prior art, technique effect of the invention is that ethernet communication protocol is introduced in TT&C system, greatly Ground improves test data efficiency of transmission, and is controlled well entirely by the use of ethernet PHY integrated transceiver chip The complexity of system, almost without increase design cost compared with the design of transmission, but automatic test efficiency is then significantly Improve.
In addition, observing and controlling host computer procedure is also fully utilized by VISA virtual instrument software frameworks, equally with ethernet communication Based on agreement, a variety of special instruments needed for observing and controlling are constituted to the program controlled testing system of complete set, without manual control Being automatically brought into operation for multiple instruments can be achieved.Further alleviate test pressure.
Brief description of the drawings
Fig. 1 is the hardware composition frame chart of the present invention.
Fig. 2 is host computer procedure flow chart.
Embodiment
As shown in accompanying drawing 1-2, a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement, including it is upper Position machine program, the observing and controlling computer containing host computer procedure, Ethernet switch, ethernet PHY transceiver, ethernet mac control Device, vector modulator observing and controlling process plate, external dc power supply, programmable power supply, vector network analyzer, power meter and to be measured Vector modulator aerial array.The ethernet PHY transceiver connects the ethernet mac by MII interface bus and controlled Device, the ethernet mac controller connect the vector modulator process plate, the vector modulator process plate by external bus The vector modulator aerial array to be measured is connected by aerial array test cable.The Ethernet switch includes at least 5 Individual RJ45 ports, the observing and controlling computer containing host computer procedure, the programmable power supply, the Ethernet are connected by netting twine respectively Physical layer transceiver, the vector network analyzer, the power meter.The programmable power supply connects the vector modulator to be measured Aerial array is simultaneously powered for it, and the vector modulator aerial array to be measured is connected respectively by microwave cable 1 and microwave cable 2 The power meter and the vector network analyzer.The external dc power supply connected vector modulator process plate simultaneously provides for it Power supply.
Host computer procedure is present in the form of exe executable programs in observing and controlling computer, and the program utilizes socket programming skills Art realizes that UDP communicates, and it is electric that all UDP message bags are converted to conventional RJ45 after the Ethernet chip processing of observing and controlling computer Interface, complete RJ45 include 8 signal wires altogether, but actually only need to use therein 1,2,3,6 this four signal line groups Into 2 couples of differential level TX+/-, RX+/- can be achieved to communicate with outside 10/100Mbps adaptive full duplexes.
Ethernet switch is used to handle the observing and controlling computer in whole automatical measure and control system, vector modulator observing and controlling Plate, programmable power supply, vector network analyzer, power meter form a complete Ethernet LAN, and its electric interfaces is equally adopted With RJ45 interfaces, 10/100Mbps system adaptive recognitions are supported.Whole Ethernet switch should at least possess 5 RJ45 and connect Mouthful, wherein RJ45 interfaces 1 are used for connected vector Network Analyzer, and RJ45 interfaces 2 are used to connect power meter, and RJ45 interfaces 3 are used for Ethernet PHY transceiver is connected, RJ45 interfaces 4 are used to connect observing and controlling computer, and RJ45 interfaces 5 are used to connect programmable power supply.Often The full duplex UDP message that individual RJ45 interfaces are completed under corresponding annexation in the lump with common netting twine is transmitted.
Observing and controlling computer is the hardware operation carrier of host computer procedure, and the Win being widely used at present can be selected in operating system XP/7/8/10, and require that the observing and controlling computer possesses Ethernet card RJ45 interfaces.Host computer procedure realizes that it is led using MFC frameworks It is to possess very strong hardware bottom layer operational capacity and best Compatibility of Operating System to want advantage, and this is exactly industrial measurement and control program The prerequisite speciality of institute.Moreover, using the ripe VISA Virture Instrumentation Software Architectures of industry, host computer procedure only needs basis The stereotyped command that different instrument manuals provide carries out secondary encapsulation, you can flexibly controls program-controlled electric using RJ45 Ethernet interfaces The working condition of the special instrument instrument such as source, vector network analyzer, power meter.
Ethernet PHY transceiver is using the RJ45 sockets of the integrated transformer of main flow and ethernet PHY integrate on the market Transponder chip combination is formed, and such as HY931147C+Realtek RTL8211, being internally integrated transformer in RJ45 sockets can be reduced Circuit board volume, while also contribute to reduce the interference of external interference and self electromagnetism radiation to other elements.Ethernet PHY collection The mutual conversion between ethernet physical layer signal and MII interface data signals is then realized into transponder chip, the MII interfaces can It is joined directly together with follow-up ethernet mac controller, so as to complete the conversion from physical layer to MAC layer.Ethernet mac controller The other end is then connected directly to the external bus of vector modulator observing and controlling process plate.
Because the transmission rate of Ethernet is very high, ethernet mac controller must possess suitable disposal ability, current Mainstream scheme is to use microprocessor or FPGA, and the present invention is built using FPGA, and compared with microprocessor arrangement, FPGA has more Strong parallel processing capability and upgradability, Simultaneous Stabilization is also more preferable, is quite suitable for big batch test data transmission field Close.
Vector modulator observing and controlling process plate is the printed circuit board (PCB) (PCB) of one piece of customization processing, and power supply is from outside straight Stream is powered, using Width funtion input DC/DC power supply chip LTM8027, externally fed voltage in vector modulator observing and controlling process plate Scope is 16 ~ 60V, because vector modulator observing and controlling process plate is directly connected with bay, is disturbed to reduce, external dc supplies Electricity need to use the linear power supply or high performance switch power supply of low ripple.
The core of vector modulator observing and controlling process plate is FPGA, and it is the maincenter part of whole TT&C system, and its function is sharp Realized with finite state machine (FSM) technology of maturation, the Ethernet data control instruction from host computer can be received, and according to finger The difference of identification of function code is made, jumps to the different conditions of state machine, so as to complete the control of external instrument instrument, lock-out pulse production The switching of raw and state, communicate three zones with DAC chip inside vector modulator aerial array, wherein and with vector modulator DAC chip communication is the most key inside aerial array.With the maturation of manufacturing process, effective array element of some typical smart antennas Up to more than 3000, it means that the beam controlling system of antenna at least needs the DAC passages of 6000 tunnel independences, and due to phased array The harsh space limitation of antenna, configures independent DAC chip for each DAC passage and is difficult to, therefore existing vector is adjusted Device scheme smart antenna processed is using integrated channel quantity is more, control accuracy is high, external interface is succinct, low in energy consumption, small volume Single-chip multichannel DAC.Such DAC chip is the most typical with the AD5372/5373 of Aanlog Devices companies, its numeral control Interface processed is the line spi bus of industrial standard 4, therefore vector modulator observing and controlling process plate FPGA need to utilize its parallel advantage instantiation Multigroup spi bus transceiver, so as to reach the accurate width phase control to each bay.
Pass through aerial array test cable between vector modulator observing and controlling process plate and vector modulator aerial array to be measured Connection, to reduce cable signal line number amount, SPI clocks and SPI host datas transmitting terminal between multigroup spi bus can be multiplexed It is shared, but the choosing of SPI pieces must be implemented separately with SPI host datas receiving terminal, otherwise be unable to reach specify single to aerial array The control of vector modulator.
The main purpose of programmable power supply is to provide the various working powers needed for aerial array proper testing, need to use big work( Rate high-performance direct current power supply, the N8925A that it is moral company that typical products, which are, multiple power sources are used to combine if necessary to meet The needs of different antennae array, but require that the programmable power supply should possess Ethernet interface, so that observing and controlling computer host computer procedure The working condition of power supply can be set and monitored automatically by ethernet communication, improve testing efficiency.
Power meter and vector network analyzer are one of the most frequently used instrument and meter of microwave test, are received available for antenna Tested with emitting performance, the one end of both is connected to vector modulator aerial array to be measured, the other end by microwave cable 1 ~ 2 The RJ45 interfaces of Ethernet switch are then connected to by netting twine, finally the control still by observing and controlling computer host computer procedure and prison Control, for realizing the automatic test of antenna.
Except the above-mentioned hardware composition part of TT&C system, observing and controlling host computer procedure software is then another master of TT&C system Part is wanted, the concrete function of observing and controlling host computer is realized by various dialog controls, and is reasonably classified.This implementation The observing and controlling host computer procedure of case can support synchronized-pulse control, antenna beam to control, T/R modules control, antenna condition monitors, Vector modulator observing and controlling handles onboard Flash controls, the extraction of vector modulator annulus data, transmitting calibration, reception are calibrated and Test data background process function, each function inside include different setting options and control button again.
The workflow of observing and controlling host computer procedure is:
The first step:It is prepared work, including antenna connection, probe positions initialization.
Second step:Detect vector modulator observing and controlling process plate and other instrument and meters whether successful connection.
3rd step:Successful connection then carries out the 4th step, and otherwise sending connection failure by observing and controlling computer prompts, and operator should Second step is retried after checking Ethernet connection.
4th step:Retaking of a year or grade vector modulator observing and controlling process plate FPGA program versions number.
5th step:The vector modulator observing and controlling process plate FPGA program versions number of retaking of a year or grade are normal then to carry out the 6th step, otherwise Again the 4th step is retried after burning FPGA programs.
6th step:Antenna self-test.
7th step:Antenna self-test normally then carries out the 8th step, otherwise provides self-test abnormal passage quantity and position, auxiliary Help antenna to repair troubleshooting, the 6th is retried after antenna maintenance.
8th step:Wait operating personnel to start specific function test, if function input then enters the 9th step, otherwise hold It is continuous to wait.
9th:It is different according to operating personnel's selection function, start corresponding automatic test operation.
In order to complete the multiple functions that foregoing host computer is supported, the observing and controlling that the implementation case gives complete set is upper Machine and vector modulator observing and controlling process plate communication protocol, using UDP message bag form, support full-duplex communication.It is wherein descending logical Letter agreement refers to be transmitted to the data frame of vector modulator observing and controlling process plate by observing and controlling host computer, is segmented into 3 kinds, the first is direct Handled by vector modulator observing and controlling process plate(Processing Frame, it is abbreviated as PF frames), second then only by Vector Modulation Device observing and controlling process plate is converted into the ripple control motherboard that SPI forms are then forwarded to inner antenna to be measured, and itself is not handled (Forwarding Frame, it is abbreviated as FF frames), the third had then both been handled by vector modulator observing and controlling process plate, had been converted into again SPI data formats issue the ripple control motherboard of inner antenna to be measured(Compound Frame, it is abbreviated as CF frames).
Similarly, uplink communication protocol frame refers to is transmitted to the data of observing and controlling host computer by vector modulator observing and controlling process plate Frame, it can also be divided into 2 kinds:It is a kind of by vector modulator observing and controlling process plate receive after the downlink data frame that certain needs return data from Row produces(Protosomatic Feedback Frame, PFF), it is another then be to connect the feelings of antenna ripple control motherboard to be measured Under condition, produced by antenna ripple control motherboard to be measured and finally transmitted to host computer procedure after vector modulator observing and controlling process plate transfer (Relay Frame, RF).
It is descending with the specific form of uplink communication protocol frame and definition need to according to actual test it needs to be determined that, it is a kind of typical It is descending as shown with uplink communication protocol frame list.
As shown in Figure 2, complete observing and controlling host computer procedure flow chart is explained as follows:
The preparation of test is carried out first, such as antenna connection, probe positions initialization, front polarization alignment, antenna leveling, instrument Instruments and meters connection etc..Hereafter host computer procedure can be run, host computer procedure is surveyed first with Ethernet connected vector modulator Process plate and other instrument and meters are controlled, only can carry out subsequent step after connection is successfully established, connection otherwise can be provided and lose Prompting is lost, is retried after can now checking the connection of the netting twine between different instrument and meters and Ethernet switch, until successful connection.
, should to ensure the correctness of observing and controlling work because the processing core of vector modulator observing and controlling process plate is FPGA FPGA adds version retaking of a year or grade function, and host computer obtains current FPGA program versions number using Ethernet protocol, and with built-in mark Quasi- storehouse contrast, needs burning vector modulator observing and controlling process plate FPGA programs again if wrong.
Hereafter host computer procedure starts the self-test work to whole aerial array, and this passes through to vector where each array element Modulator DAC passages carry out write-in and the read back operation of specific data, so as to check single bay width phase control passage Validity realizes that last host computer can be provided in the presence of abnormal control passage quantity and position.Usually, even if having about 10% or so array-element antenna control is abnormal, also the performance of whole antenna will not be caused to significantly affect, if needs further dimension Repairing troubleshooting can be determined on a case-by-case basis by operating personnel.
After completing self-test work, host computer procedure entry instruction wait state, according to the input parameter of operating personnel and press Button selects, and realizes the extraction of vector modulator annulus data, transmitting calibration respectively, receives calibration totally 3 kinds of automatic test functions, is Coordinate this 3 kinds of automatic test, host computer procedure also supports each of manual control vector modulator observing and controlling process plate and antenna Kind state, respectively including synchronized-pulse control, antenna beam control, the control of T/R modules, antenna condition monitoring, vector modulator Observing and controlling handles onboard Flash controls and test data background process function.
Communication protocol and host computer flow between above-described observing and controlling host computer and vector modulator observing and controlling process plate Figure is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, not departing from, the present invention is whole Under body concept thereof, some changes and improvements can also be made, these should also be considered as protection scope of the present invention.

Claims (8)

  1. A kind of 1. vector modulator automatical measure and control system based on Fast Ethernet agreement, it is characterised in that:Including Ethernet Physical layer transceiver, ethernet mac controller, vector modulator process plate, vector modulator aerial array to be measured;The ether Net physical layer transceiver connects the ethernet mac controller by MII interface bus, and the ethernet mac controller passes through External bus connects the vector modulator process plate, and the vector modulator process plate connects institute by aerial array test cable State vector modulator aerial array to be measured.
  2. 2. a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement as claimed in claim 1, it is special Sign is:Also include host computer procedure, observing and controlling computer, programmable power supply, power meter, vector network analysis containing host computer procedure Instrument, external dc power supply;The host computer procedure is run in the observing and controlling computer containing host computer procedure, and the Ethernet is handed over Change planes and include at least five RJ45 ports, the observing and controlling computer containing host computer procedure, the program-controlled electric are connected by netting twine respectively Source, the ethernet PHY transceiver, the vector network analyzer, the power meter;Described in the programmable power supply connection Vector modulator aerial array to be measured simultaneously passes through microwave cable 1 and micro- for its power supply, the vector modulator aerial array to be measured Ripple cable 2 connects the power meter and the vector network analyzer respectively;The external dc power supply connected vector modulator Process plate simultaneously provides power supply for it.
  3. 3. a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement as claimed in claim 2, it is special Sign is:The programmable power supply uses high-power high-performance direct current power supply.
  4. 4. a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement as claimed in claim 2, it is special Sign is:The upper computer software uses MFC program architectures, and the upper computer software utilizes ripe VISA virtual instrument softwares Structure.
  5. 5. a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement as claimed in claim 1, it is special Sign is:The ethernet PHY transceiver uses ethernet PHY integrated transceiver chip.
  6. 6. a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement as claimed in claim 1, it is special Sign is:The ethernet mac controller is built using FPGA.
  7. 7. a kind of vector modulator automatical measure and control system based on Fast Ethernet agreement as claimed in claim 1, it is special Sign is:The vector modulator observing and controlling process plate is built using FPGA.
  8. 8. a kind of method of testing of the system according to any of the above-described claim, it is characterised in that comprise the following steps:
    The first step:It is prepared work, including antenna connection, probe positions initialization;
    Second step:Detect vector modulator observing and controlling process plate and other instrument and meters whether successful connection;
    3rd step:Successful connection then carries out the 4th step, and otherwise sending connection failure by observing and controlling computer prompts, and operator should check Second step is retried after Ethernet connection;
    4th step:Retaking of a year or grade vector modulator observing and controlling process plate FPGA program versions number;
    5th step:The vector modulator observing and controlling process plate FPGA program versions number of retaking of a year or grade are normal then to carry out the 6th step, otherwise again The 4th step is retried after burning FPGA programs;
    6th step:Antenna self-test;
    7th step:Antenna self-test normally then carries out the 8th step, otherwise provides self-test abnormal passage quantity and position, aids in day Line repairs troubleshooting, and the 6th is retried after antenna maintenance;
    8th step:Operating personnel are waited to start specific function test, if function input then enters the 9th step, otherwise continue etc. Treat;
    9th step:It is different according to operating personnel's selection function, start corresponding automatic test operation.
CN201710648254.8A 2017-08-01 2017-08-01 Vector modulator automatic measurement and control system based on fast Ethernet protocol Active CN107404356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710648254.8A CN107404356B (en) 2017-08-01 2017-08-01 Vector modulator automatic measurement and control system based on fast Ethernet protocol

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710648254.8A CN107404356B (en) 2017-08-01 2017-08-01 Vector modulator automatic measurement and control system based on fast Ethernet protocol

Publications (2)

Publication Number Publication Date
CN107404356A true CN107404356A (en) 2017-11-28
CN107404356B CN107404356B (en) 2023-07-14

Family

ID=60401802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710648254.8A Active CN107404356B (en) 2017-08-01 2017-08-01 Vector modulator automatic measurement and control system based on fast Ethernet protocol

Country Status (1)

Country Link
CN (1) CN107404356B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102207545A (en) * 2011-05-26 2011-10-05 中国科学院上海微系统与信息技术研究所 Automatic testing method and system for transmission characteristic of microwave/millimeter wave vector modulator
CA2713606A1 (en) * 2010-08-23 2012-02-23 Elta Systems Ltd. System and method for calibration of phased array antenna having integral calibration network in presence of an interfering body
CN102590792A (en) * 2012-02-29 2012-07-18 中国电子科技集团公司第二十二研究所 L-wave-band shore-based sea clutter observation system based on vector network analyzer
CN102590795A (en) * 2012-02-29 2012-07-18 中国电子科技集团公司第二十二研究所 Microwave scattering property test system based on vector network analyzer
CN203337742U (en) * 2013-07-25 2013-12-11 成都雷电微力科技有限公司 Scanning device applied to antenna near field test
CN103985965A (en) * 2014-05-28 2014-08-13 成都雷电微力科技有限公司 Application system of simulation vector modulator in phased-array antenna
CN105203980A (en) * 2015-09-14 2015-12-30 广西电网有限责任公司电力科学研究院 Electric energy quality self-inspection system and self-inspection method thereof
CN106291134A (en) * 2016-11-10 2017-01-04 成都锐芯盛通电子科技有限公司 Antenna intelligent test system based on robot and method of testing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2713606A1 (en) * 2010-08-23 2012-02-23 Elta Systems Ltd. System and method for calibration of phased array antenna having integral calibration network in presence of an interfering body
CN102207545A (en) * 2011-05-26 2011-10-05 中国科学院上海微系统与信息技术研究所 Automatic testing method and system for transmission characteristic of microwave/millimeter wave vector modulator
CN102590792A (en) * 2012-02-29 2012-07-18 中国电子科技集团公司第二十二研究所 L-wave-band shore-based sea clutter observation system based on vector network analyzer
CN102590795A (en) * 2012-02-29 2012-07-18 中国电子科技集团公司第二十二研究所 Microwave scattering property test system based on vector network analyzer
CN203337742U (en) * 2013-07-25 2013-12-11 成都雷电微力科技有限公司 Scanning device applied to antenna near field test
CN103985965A (en) * 2014-05-28 2014-08-13 成都雷电微力科技有限公司 Application system of simulation vector modulator in phased-array antenna
CN105203980A (en) * 2015-09-14 2015-12-30 广西电网有限责任公司电力科学研究院 Electric energy quality self-inspection system and self-inspection method thereof
CN106291134A (en) * 2016-11-10 2017-01-04 成都锐芯盛通电子科技有限公司 Antenna intelligent test system based on robot and method of testing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王鹏,龚克,孙秋菊,郭玉霞: "基于高速UART协议的自动化测控系统设计", 信阳师范学院学报 *
胡楚锋;许家栋;李南京;张麟兮;: "基于矢量网络分析仪的目标极化散射特性测量与校准", 西北工业大学学报, no. 03 *

Also Published As

Publication number Publication date
CN107404356B (en) 2023-07-14

Similar Documents

Publication Publication Date Title
CN102495353B (en) Radio frequency integrated circuit test system and control method thereof
CN102323531A (en) Method for automatically testing parameters of millimeter wave power amplifier and system
CN205105224U (en) Micropower wireless communication module testing arrangement
CN105207712A (en) Multi-channel parallel test system and method for optical modules
CN104808096B (en) Based on the list-directed wireless module automatic testing equipment of instrument and method
CN101902272A (en) Optical transceiver module SFP tester
CN105406930B (en) Multichannel channel simulator, terminal consistency test system and phase alignment system
CN106646053A (en) Antenna testing device and method for batch production WiFi/Bluetooth products
CN110609183A (en) IVI technology-based identification module and automatic test system of complete machine
CN205179063U (en) Automobile -used radio frequency communication device hardware is at ring testing tool
CN110445538A (en) A kind of optical module multiple channel test system
CN109547101A (en) The test macro of optical module
CN105873108A (en) Test system for radio frequency conformance of LTE (long term evolution) terminal
CN209375654U (en) The test macro of optical module
CN106301608A (en) A kind of ultrashort wave Transmit-Receive Unit Universal debugging fitting device
CN205484781U (en) General open transmitter debugging test system
CN108957164A (en) A kind of test device and test method of buckle
CN212258965U (en) Automatic test system of radio frequency module
CN110418369A (en) A kind of test device
CN207339884U (en) A kind of WIFI performances and functional tester
CN206712797U (en) Wireless communication signal high-performance test module
CN107404356A (en) A kind of vector modulator automatical measure and control system based on Fast Ethernet agreement
CN201854284U (en) Automatic measuring device of antenna in multiple input multiple output (MIMO) system
CN201562285U (en) Fixed reader writer
CN103746736A (en) Integrated test system for 14 channel optical fiber data transmission TR equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant