CN107402041A - It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency - Google Patents

It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency Download PDF

Info

Publication number
CN107402041A
CN107402041A CN201710818588.5A CN201710818588A CN107402041A CN 107402041 A CN107402041 A CN 107402041A CN 201710818588 A CN201710818588 A CN 201710818588A CN 107402041 A CN107402041 A CN 107402041A
Authority
CN
China
Prior art keywords
bucket
biology
water
detained
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710818588.5A
Other languages
Chinese (zh)
Other versions
CN107402041B (en
Inventor
顾盛
杨飞凯
崔咏军
傅大放
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Southeast Sponge Facilities Performance Evaluation Co Ltd
KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Southeast University
Original Assignee
Jiangsu Southeast Sponge Facilities Performance Evaluation Co Ltd
KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Southeast Sponge Facilities Performance Evaluation Co Ltd, KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER, Southeast University filed Critical Jiangsu Southeast Sponge Facilities Performance Evaluation Co Ltd
Priority to CN201710818588.5A priority Critical patent/CN107402041B/en
Publication of CN107402041A publication Critical patent/CN107402041A/en
Application granted granted Critical
Publication of CN107402041B publication Critical patent/CN107402041B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a kind of experimental rig for being used to detect biology delay facility operation efficiency, including rainwater-collecting bucket, water-carriage system, flow monitoring system, biology to be detained bucket, gas permeability measurement component and electric expansion awning;Rainwater in rainwater-collecting bucket is detained simulated rainfall in bucket by water-carriage system conveying spray in biology;Gas permeability measurement component is used for during simulated rainfall the infiltration coefficient for calculating filter layer medium;Flow monitoring system is used to record the amount of rainfall that biology is detained bucket disengaging;Electric expansion awning is arranged on biology and is detained above bucket, and can block natural rain by its stretching is detained in bucket into biology.Apparatus of the present invention cost is cheap, it is simple to operate, data are reliable, it is and convenient to gather, it is repeatable to utilize, the hydrology-water quality effect of biological delaying basin when different rain types, different filling mixture ratios, different floristics can be simulated, related basic research is significant for promoting sponge urban construction.

Description

It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency
Technical field
The present invention relates to sponge urban construction technical field, and in particular to one kind is used to detect biology delay facility operation effect The experimental rig of energy.
Background technology
Sponge city, is new generation of city storm water man- agement concept, and it follows the principles such as Ecology Precedence, by natural way and people Work measure is combined, and on the premise of municipal drainage prevention waterlogging safety is ensured, realizes product of the rainwater in urban area to greatest extent Deposit, permeate and purify, promote the utilization and ecological environmental protection of rainwater resource.It is not to make a new start to build " sponge city ", Substitute traditional drainage system, but one kind " Reduction of Students' Study Load " and supplement to conventional drainage systems, farthest play city sheet The effect of body, water suction when raining, water storage, infiltration, water purification, it is necessary to when by the water stored " release " and be used.
Biological delaying basin be it is a kind of be located at the relatively low region of physical features, stored by plant, soil and microflora and ooze, purify The facility of runoff rainwater, it is a crucial technology in sponge urban construction.China for biological delaying basin research starting compared with Evening, existing biological delaying basin experimental rig have ground type as the underground type and experiment bucket, chamber of simulating actual conditions Deng, but function is all relatively single, underground type can not observe the growing state and pool inner water position situation of root system of plant, and flow The installation inconvenience of the monitoring devices such as gauge, interference of the actual catchment to experiment can not be excluded by simulating rain making in addition.
In November, 2014, the firmly portion's of building issue《Sponge urban construction technical manual》, it is pointed out that the hydrology, waterpower can be used Calculate with successively being decomposed to annual flow overall control the methods of modeling, substep is analyzed, but biology is detained facility feelings Condition is complex, it is necessary to which actual test data checking modeling and the correctness of calculating, continue to optimize model, same to duration The data accumulation of phase is also the specified offer more fully foundation of urban planning.
The content of the invention
It is an object of the invention to overcome problem above existing for prior art, there is provided one kind is set for detecting biology delay The experimental rig of Operating ettectiveness is applied, the present invention is simple to operate, and data are reliable, and convenient collection, repeats and utilizes, can simulate The hydrology-water quality effect of biological delaying basin, related when different rain types, different filling mixture ratios, different floristics Basic research is significant for promoting sponge urban construction.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency, including rainwater-collecting bucket, water-carriage system, stream Measure monitoring system, biology is detained bucket, gas permeability measurement component and electric expansion awning;
The rainwater-collecting bucket is placed on the ground of building downpipe side, the water inlet of the rainwater-collecting bucket with Building downpipe connects, and the water side of the rainwater-collecting bucket is connected with water-carriage system, also set up on the rainwater-collecting bucket There is intake;
The water-carriage system includes water delivery house steward and flow controller, and the water delivery house steward passes through water pump and rainwater-collecting bucket Water side connection, be additionally provided with some delivery pipe branches on the water delivery house steward, be provided with and automatically control on the delivery pipe branch Valve and shower nozzle, the autocontrol valve are adjusted by flow controller and are opened and closed;
The biology is detained bucket and is arranged on below shower nozzle, and the biology, which is detained in bucket, is provided with filler, is planted on the filler There is plant and be provided with plant growth sight gauge, the biology, which is detained on bucket, is provided with delivery port, overfall and some sample taps, institute The delivery port for stating biology delay bucket is connected with outer row water pipe, and the overfall that the biology is detained bucket is connected with overflow pipe, overflow Steel wire screen pack is provided with mouthful, U-tube is provided with the outer row water pipe and overflow pipe, the U-tube is stagnant positioned at biology The end set of barrel side is stayed highly to be less than the end set height that U-tube is detained bucket side away from biology, the sample tap tool There is opening and closing function, the flow monitoring system includes feed water flow gauge, water flow meter, excess flow meter and flow registering instrument, The feed water flow gauge is arranged on delivery pipe branch, and the water flow meter is arranged on outer row water pipe, and is located at delivery port Between U-tube, the excess flow meter is arranged on overflow pipe, and between overfall and U-tube, the flow of inlet water Meter, water flow meter and excess flow meter are connected with flow registering instrument;
The gas permeability measurement component includes pressure-measuring pipe and installing plate, and described pressure-measuring pipe one end penetrates biology and is detained bucket simultaneously It is arranged in filler, the installing plate is fixedly installed on the side that biology is detained bucket.
The electric expansion rain cover is arranged on biology and is detained above bucket.
Further, it is transparent plastics material that the biology, which is detained bucket, and the biology, which is detained on bucket outer surface, to be also wrapped on Black spongy layer.
Further, the filler is divided into filter layer, transition zone, water conservation layer and drainage blanket, the life from top to bottom The sample tap that thing is detained bucket is arranged on filter layer and the bucket wall of water conservation layer side, and respectively close to the bottom of filter layer and water conservation layer Portion is set, and the delivery port that the biology is detained bucket is arranged on the bucket wall of transition zone side, and perforation is provided with the drainage blanket Drainpipe, described perforated drain pipe one end are connected with backwash tube, and the backwash tube sequentially passes through drainage blanket, water conservation layer, mistake Cross layer and filter layer and protrude from the biology and be detained at the top of bucket, the perforated drain pipe other end is connected with soil stack, institute Soil stack is stated to be connected with delivery port through drainage blanket and water conservation layer.
Further, the filler is divided into filter layer, transition zone and drainage blanket from top to bottom, and the biology is detained bucket Sample tap be arranged on the bucket wall of filter layer side, and close to filter layer bottom set, it is described biology be detained bucket water outlet Mouthful be arranged on the bucket wall of drainage blanket side, be provided with perforated drain pipe in the drainage blanket, described perforated drain pipe one end with Backwash tube connects, and the backwash tube, which sequentially passes through drainage blanket, transition zone and filter layer and protrudes from the biology, is detained bucket Top, the perforated drain pipe other end are connected with delivery port.
Further, delay height is provided between the overfall and filter layer.
Further, the quantity of the pressure-measuring pipe be 3, three pressure-measuring pipes set gradually from top to bottom and one end all It is arranged in filter layer, the spacing between adjacent pressure-measuring pipe is equal, and the pressure-measuring pipe is fixedly installed on a mounting board, pressure-measuring pipe The setting height of the other end is more than the setting height of overfall, and scale strip is additionally provided with the installing plate.
Further, the motor of the electric expansion awning is connected with rainwater inductive switch.
Its test method comprises the following steps:
Step 1) selects corresponding storm recurrence period and rainfall duration, it is determined that simulation according to local Rain Intensity Formula Based The rainfall intensity and quantum of rainfall of rainfall;
Feed water flow gauge, water flow meter, the flow reading of excess flow meter under step 2) record original state, are recorded as Q1, Q2, Q3, and feed water flow gauge, water flow meter, excess flow meter are connected with flow registering instrument, flow registering instrument is real-time Gathered data, flow controller adjust flow by adjusting the autocontrol valve on delivery pipe branch, determine working time, rainfall Start;
After step 3) rainfall terminates, record feed water flow gauge, water flow meter, the flow reading of excess flow meter, record For Q11, Q22, Q33;
Quantum of rainfall, rainfall in step 4) record rainfall terminate after go out to flow total amount and rainfall terminate after overflow Total amount is flowed, Q1 ', Q2 ', Q3 ' is recorded as respectively, quantum of rainfall Q1 '=(Q11-Q1), goes out to flow total amount Q2 '=(Q22-Q2), overflow Total amount Q3 '=(Q33-Q3);
Step 5) reads rainfall from flow registering instrument and goes out the curve that stream changes over time, and computer is accessed, according to curve Can directly read out flow delay time t1, flood peak time delay t2, runoff volume reduction rate=(Q1 '-Q2 '-Q3 ')/(Q1 '- Q3 ') × 100% and flood peak reduction rate=(q1-q2)/q1, wherein q1 be the Peak Flow Rate in rainfall, q2 is to flow through Peak Flow Rate in journey.
Further, after rainfall terminates in step 3), treat that biology is detained in bucket between surface level and filtering layer surface The reading of three pressure-measuring pipes is recorded when spacing is 10cm, h1, h2, h3 is recorded as and goes out flow velocity q, the infiltration coefficient of filter layer K=qL/Ah, wherein q be flow velocity, L is adjacent pressure measurement tube pitch, A is that biology is detained bucket surface area and h=[(h1-h2) +(h2-h3)]/2。
Further, the intake in rainwater-collecting bucket is fetched water and detects to obtain contaminants associated concentration in original rainwater and refers to Mark, contaminants associated concentration refers in then being fetched water at the water outlet port of outside drainpipe and detecting the rainwater after being purified Mark, going for each pollutant is calculated by contaminants associated concentration in contaminants associated concentration in original rainwater and the rainwater after purification Except rate.The beneficial effects of the invention are as follows:
1st, this experimental rig prepares biology delay bucket, outside black sponge wrapping, simulation ground using transparent plastic material The environment of lower lucifuge, the growing state of observation of plant root system can be torn at any time;Barrel side face installation pressure-measuring pipe is tested, can long term monitoring The situation of change of the infiltration coefficient of filter layer medium.
2nd, biology is detained installation induction type awning above bucket, and simulated rainfall shower nozzle be located at awning lower section, rain during natural rainfall Canopy is pulled on automatically, is packed up automatically after not raining for a period of time, receives illumination without prejudice to plant, also ensure that simulated rain trails is complete It is complete controllable, do not influenceed by external condition, practical, intelligent effect is good, and be particularly suitable for use in the rainy south of the lower reaches of the Yangtze River.
3rd, simulated rain trails is the rain water on roof collected with water, can be toward in rainwater-collecting bucket if do not rained for a long time Running water is supplemented, and according to the rainfall runoff water quality test preparation water of actual measurement;Experiment is set not limited by natural conditions, and can be with According to the Runoff test preparation water on the different road surfaces of actual measurement, study biology and be detained place of the bucket to different type runoff pollution Manage effect.
4th, the enterprising water flow data of flowmeter can be directly read, and its data changed over time is uploaded to discharge record Instrument, computer is then inputted, convenient further processing and application, can also be directly read, it is intuitive and reliable, it is easy to operate.
5th, it is provided with one section of U-tube on the outer row water pipe of delivery port and the overflow pipe of overfall, it is ensured that go out Water is full-section pipe-flow, and meter readings are more accurate;Water outlet can utilize the pneumatosis effect of U-tube elbow simultaneously, at U-tube A large amount of loss of flood peakes are caused, make the discharge pressure of outlet pipe reduce, reduced velocity flow, in this case, biology are detained in bucket Moisture content will be higher, can reach very high for the utilization rate in staving space;Steel wire screen pack, anti-falling stop are provided with overfall The debris such as leaf, which enter overflow blockage pipeline, makes overflow tube failure.
6th, biology delay barrel side wall is provided with some sample taps, can be in corresponding construction layer for the feature of its filler layering Water sample detection effects of purification quality is taken out in bottom, analyzes removal of each layer to the contribution margin and pollutant of pollutant removal Journey;It is also possible to take each layer filler to carry out microbiological analysis in sample tap, and then study the cutting mechanisms of pollutant.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after. The embodiment of the present invention is shown in detail by following examples and its accompanying drawing.
Brief description of the drawings
Technical scheme in technology in order to illustrate the embodiments of the present invention more clearly, in being described below to embodiment technology The required accompanying drawing used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present invention Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the dimensional structure diagram of an embodiment;
Fig. 2 is U-tube part-structure view;
Fig. 3 is that the biology with water conservation layer is detained barrel structure schematic diagram;
Fig. 4 is the biology delay barrel structure schematic diagram without water conservation layer.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Shown in reference picture 1 and Fig. 2, a kind of experimental rig for being used to detect biology delay facility operation efficiency of the invention One embodiment, including rainwater-collecting bucket 1, water-carriage system 2, flow monitoring system, biology are detained bucket 3, gas permeability measurement component 4 With electric expansion awning;Rainwater-collecting bucket collects rainwater by building roof and downpipe, farthest reduction and simulation Rainwater situation in actual environment;Rainwater in rainwater-collecting bucket is detained in bucket by water-carriage system conveying spray in biology simulates Rainfall, the flow of simulated rainfall is adjusted by flow controller;Gas permeability measurement component is used to obtain during simulated rainfall To the infiltration coefficient of filter layer medium;Flow monitoring system is used to record the amount of rainfall that biology is detained bucket disengaging;Electric expansion rain Canopy is arranged on biology and is detained above bucket, and can block natural rain by its stretching is detained in bucket into biology, ensures round-the-clock The reliability and accuracy of experiment, the motor of electric expansion awning are connected with rainwater inductive switch, automatically controlled, without artificial behaviour Make, intelligent effect is good.
Above-mentioned rainwater-collecting bucket is placed on the ground of building downpipe side, the water inlet and building of rainwater-collecting bucket Thing downpipe connects, and after being fallen under rainwater on the roof of building, can be flowed into from building downpipe in rainwater-collecting bucket, rainwater The water side of collecting vessel is connected with water-carriage system, and intake is additionally provided with rainwater-collecting bucket, is easy to water intaking to chemically examine;
Wherein, water-carriage system includes water delivery house steward 21 and flow controller, and water delivery house steward passes through water pump 22 and rainwater-collecting The water side of bucket connects, and is additionally provided with some delivery pipe branches 23 on water delivery house steward, autocontrol valve is provided with delivery pipe branch 32 and shower nozzle 24;Shower nozzle is arranged on biology and is detained above bucket, and flow controller is by adjusting the autocontrol valve on delivery pipe branch Door adjustment flow of inlet water size, reaches the effect that simulated rainfall and water catchment area runoff import from rainfall;Biology is detained in bucket Filler is provided with, kind has plant and is provided with plant growth sight gauge on filler, is easy to record plant growth situation in real time, and biology is stagnant Stay and delivery port, overfall and some sample taps 31 are provided with bucket, delivery port can discharge the rainwater after purification, overfall energy The rainwater discharge oozed under enough having little time, the delivery port that biology is detained bucket are connected with outer row water pipe 11, and biology delay bucket overflows Head piece is connected with overflow pipe 12, and in the case where rainfall intensity is excessive, rainwater oozes under having little time, therefore overflow pipe can be by excess Rainwater is drained, and is avoided excessive rainfall from being detained barrel edge from biology and is overflowed, influences the accuracy of result of the test;It is provided with overfall Steel wire screen pack, prevent the debris such as fallen leaves from entering overflow blockage pipeline and making overflow tube failure;Sample tap has opening and closing function, day Often it is closed during work, opens during sampling.
U-tube 13 is provided with outer row water pipe and overflow pipe, the end set that U-tube is detained bucket side positioned at biology is high Degree is less than the end set height that U-tube is detained bucket side away from biology, and U-tube can ensure that water outlet is full-section pipe-flow, make flow It is more accurate to count reading;Water outlet can utilize the pneumatosis effect of U-tube elbow simultaneously, cause a large amount of heads to damage at U-tube Losing, make the discharge pressure of outlet pipe reduce, reduced velocity flow, in this case, the moisture content that biology is detained in bucket will be higher, It can reach very high for the utilization rate in staving space.
Flow monitoring system includes feed water flow gauge 51, water flow meter 52, excess flow meter 53 and flow registering instrument, enters Water ga(u)ge is arranged on delivery pipe branch, to monitor the water for flowing into biology through delivery pipe branch and being detained bucket, water flow meter in real time It is arranged on outer row water pipe, and between delivery port and U-tube, to monitor the water from the outflow of outer row water pipe in real time, Excess flow meter is arranged on overflow pipe, and between overfall and U-tube, to monitor the water from overflow pipe outflow in real time Amount, feed water flow gauge, water flow meter and excess flow meter are connected with flow registering instrument, and flow registering instrument can be by flowmeter Monitoring Data collects, and then inputs computer, convenient record and the data processing in later stage;
Above-mentioned gas permeability measurement component includes pressure-measuring pipe 41 and installing plate 42, and pressure-measuring pipe one end penetrates biology and is detained bucket And be arranged in filler, installing plate is fixedly installed on the side that biology is detained bucket, by recording pressure-measuring pipe in rainfall Liquid level data and go out flow velocity, the infiltration coefficient of filter layer medium can be calculated.
Wherein, it is transparent plastics material that biology, which is detained bucket, can intuitively observe inner stuffing layer status and root system of plant Growing state, biology, which is detained on bucket outer surface, is also wrapped on black spongy layer, and it is dark to simulate underground while convenient observe Environment, reduce the interference of the extraneous factors such as illumination.
As shown in figure 3, in one embodiment, filler is divided into filter layer 14, transition zone 15, water conservation layer 16 from top to bottom With drainage blanket 17, above-mentioned four-layer structure is the packing layer of experiment, and the height of each layer can adjust within the specific limits, each layer Filler can be needed voluntarily to select to change according to experiment, and the hydrology-water quality data of correlation are obtained eventually through simulated rain trails, on Stating kind on filter layer has plant;The sample tap 31 that biology is detained bucket is arranged on filter layer and the bucket wall of water conservation layer side, and point Do not set close to filter layer and water conservation layer bottom, sample tap can distinguish water sampling and a small amount of filler carries out water quality and microorganism point Analysis, study the process and mechanism of pollutant removal;The delivery port that biology is detained bucket is arranged on the bucket wall of transition zone side, draining Perforated drain pipe 18 is provided with layer, rainwater can enter into and through perforation after above-mentioned packing layer from the perforation of perforated drain pipe Drainpipe is discharged, and perforated drain pipe one end is connected with backwash tube 19, and backwash tube sequentially passes through drainage blanket, water conservation layer, transition Layer and filter layer simultaneously protrude from biology and are detained at the top of bucket, when some impurity or the grains of sand block perforated drain pipe, pass through recoil Washing pipe can be dredged, and be provided with block at the top of backwash tube, and the leaf etc. that prevents from dropping in perforated drain pipe results in blockage And secondary pollution problems;The perforated drain pipe other end is connected with soil stack 181, and soil stack passes through drainage blanket and water conservation Layer is connected with delivery port, and soil stack extends from bottom to top, and rainwater is enabled in perforated drain pipe by rainwater gravity pressure Can be pressed into soil stack, final discharge, thus part of the rainwater below soil stack drain height be can not by from Weight pressure venting, the effect for reaching water conservation improves the Regulation capacity that biology is detained bucket.Water conservation layer provides anaerobism Environment, it is easy to the growth of anaerobe, improves removal effect of the system to nitrogen, while the season of drought can also be for The moisture needed to plant growth.
As shown in figure 4, in one embodiment, filler is divided into filter layer 14, transition zone 15 and drainage blanket from top to bottom 17, the sample tap 31 that biology is detained bucket is arranged on the bucket wall of filter layer side, and is set close to the bottom of filter layer, sample tap Water sampling can be distinguished and a small amount of filler carries out water quality and microbiological analysis, study the process and mechanism of pollutant removal;Biology is stagnant Stay the delivery port of bucket to be arranged on the bucket wall of drainage blanket side, perforated drain pipe 18, perforated drain pipe one are provided with drainage blanket End is connected with backwash tube 19, and backwash tube sequentially passes through drainage blanket, transition zone and filter layer and protrudes from biological treatment case top Portion, the perforated drain pipe other end are connected with delivery port, and it is not present water conservation layer, therefore rainwater can be from perforated drain pipe directly to going out The mouth of a river is discharged, and the biology to simulate without water conservation layer is detained the hydrologic effect and effects of purification quality of facility, and with guarantor The result of the test that the biology of water layer is detained facility is contrasted.
Delay height is provided between above-mentioned overfall and filter layer, when rainfall is excessive, rainwater oozes under having little time, rain Water can be trapped in filtering layer surface, and after depth of immersion reaches overfall, rainwater can discharge from overflow pipe, the rainwater being detained herein Certain depth of water is formed, can so increase the storage capacity that biology is detained in bucket, further improves the effect for the slow row that avoids the peak hour.
The quantity of pressure-measuring pipe is 3, and three pressure-measuring pipes are set gradually from top to bottom and one end is all disposed within filter layer, phase Spacing between adjacent pressure-measuring pipe is equal, and pressure-measuring pipe is fixedly installed on a mounting board, and the setting of the other end of pressure-measuring pipe is highly more than The setting of overfall highly, is additionally provided with scale strip on installing plate, facilitates direct reading.
To improve the accuracy of experiment and convincing power, its test method comprises the following steps:
Step 1) selects corresponding storm recurrence period and rainfall duration, it is determined that simulation according to local Rain Intensity Formula Based The rainfall intensity and quantum of rainfall of rainfall;
Feed water flow gauge, water flow meter, the flow reading of excess flow meter under step 2) record original state, are recorded as Q1, Q2, Q3, and feed water flow gauge, water flow meter, excess flow meter are connected with flow registering instrument, flow registering instrument is real-time Gathered data, flow controller adjust flow by adjusting the autocontrol valve on delivery pipe branch, determine working time, rainfall Start;
After step 3) rainfall terminates, record feed water flow gauge, water flow meter, the flow reading of excess flow meter, record For Q11, Q22, Q33;
Quantum of rainfall, rainfall in step 4) record rainfall terminate after go out to flow total amount and rainfall terminate after overflow Total amount is flowed, Q1 ', Q2 ', Q3 ' is recorded as respectively, quantum of rainfall Q1 '=(Q11-Q1), goes out to flow total amount Q2 '=(Q22-Q2), overflow Total amount Q3 '=(Q33-Q3);
Step 5) reads rainfall from flow registering instrument and goes out the curve that stream changes over time, and computer is accessed, according to curve Can directly read out flow delay time t1, flood peak time delay t2, runoff volume reduction rate=(Q1 '-Q2 '-Q3 ')/(Q1 '- Q3 ') × 100% and flood peak reduction rate=(q1-q2)/q1, wherein q1 be the Peak Flow Rate in rainfall, q2 is to flow through Peak Flow Rate in journey.
In order to detect infiltration coefficient, after rainfall terminates in step 3), treat that biology is detained surface level and filter layer in bucket The reading of three pressure-measuring pipes is recorded when spacing between surface is 10cm, h1, h2, h3 is recorded as and goes out to flow flow velocity q, filter layer Osmotic coefficient k=qL/Ah, wherein q be flow velocity, L is adjacent pressure measurement tube pitch, A is that biology is detained bucket surface area and h =[(h1-h2)+(h2-h3)]/2.
By the restriction of above-mentioned formula and and collection data record, biology delay can be obtained under corresponding filling-material structure The relevant parameter of the hydrologic effect of bucket.
In addition, in order to detect effects of purification quality,:Fetched water in the intake of rainwater-collecting bucket and detect to obtain original rainwater In contaminants associated concentration index, then fetch water at the water outlet port of outside drainpipe and detect in the rainwater after being purified Contaminants associated concentration index, pass through contaminants associated concentration in contaminants associated concentration in original rainwater and the rainwater after purification The clearance of each pollutant is calculated, computational methods are as follows:If the initial concentration of certain pollutant index is C1, water outlet dirt after purification The concentration for contaminating thing is C2, then the clearance of the whole process pollutant=(C1-C2)/C1 × 100%.
In one embodiment, the quantity that biology is detained bucket is 4, and two of which biology is detained bucket and is provided with water conservation layer, in addition two Individual biology is detained bucket and does not set water conservation layer, to simulate influence of the different filling-material structures to plant growth, sets check experiment to improve Test accuracy and test efficiency.
It the above embodiments, comprehensively can on the ground complete to test, without carrying out ground excavation, pass through the receipts of rainwater Collection can also avoid carrying out experiment in the case where not raining, and have great convenience, shorten the test period;It is stagnant in biology Stay the packing layer in bucket also to replace at any time, it is small to replace difficulty.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (10)

1. a kind of be used to detect the experimental rig that biology is detained facility operation efficiency, it is characterised in that:Including rainwater-collecting bucket, defeated Water system, flow monitoring system, biology are detained bucket, gas permeability measurement component and electric expansion awning;
The rainwater-collecting bucket is placed on the ground of building downpipe side, the water inlet and building of the rainwater-collecting bucket Thing downpipe connects, and the water side of the rainwater-collecting bucket is connected with water-carriage system, is additionally provided with and takes on the rainwater-collecting bucket The mouth of a river;
The water-carriage system includes water delivery house steward and flow controller, and the water delivery house steward is gone out by water pump and rainwater-collecting bucket Water end (W.E.) connects, and is additionally provided with some delivery pipe branches on the water delivery house steward, autocontrol valve is provided with the delivery pipe branch And shower nozzle, the autocontrol valve are adjusted by flow controller and are opened and closed;
The biology is detained bucket and is arranged on below shower nozzle, and the biology, which is detained in bucket, is provided with filler, and kind has plant on the filler Thing is simultaneously provided with plant growth sight gauge, and the biology, which is detained on bucket, is provided with delivery port, overfall and some sample taps, the life The delivery port that thing is detained bucket is connected with outer row water pipe, and the overfall that the biology is detained bucket is connected with overflow pipe, at overfall Provided with steel wire screen pack, U-tube is provided with the outer row water pipe and overflow pipe, the U-tube is detained bucket positioned at biology The end set of side is highly less than the end set height that U-tube is detained bucket side away from biology, and the sample tap, which has, to be opened Function is closed, the flow monitoring system includes feed water flow gauge, water flow meter, excess flow meter and flow registering instrument, described Feed water flow gauge is arranged on delivery pipe branch, and the water flow meter is arranged on outer row water pipe, and positioned at delivery port with it is U-shaped Between pipe, the excess flow meter is arranged on overflow pipe, and between overfall and U-tube, the feed water flow gauge, is gone out Water ga(u)ge and excess flow meter are connected with flow registering instrument;
The gas permeability measurement component includes pressure-measuring pipe and installing plate, and described pressure-measuring pipe one end penetrates biology and is detained bucket and sets In filler, the installing plate is fixedly installed on the side that biology is detained bucket.
The electric expansion rain cover is arranged on biology and is detained above bucket.
2. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 1, its feature exist In:It is transparent plastics material that the biology, which is detained bucket, and the biology, which is detained on bucket outer surface, is also wrapped on black spongy layer.
3. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 1, its feature exist In:The filler is divided into filter layer, transition zone, water conservation layer and drainage blanket from top to bottom, and the biology is detained the sampling of bucket Mouth is arranged on filter layer and the bucket wall of water conservation layer side, and is set respectively close to the bottom of filter layer and water conservation layer, the life The delivery port that thing is detained bucket is arranged on the bucket wall of transition zone side, and perforated drain pipe is provided with the drainage blanket, described to wear Hole drainpipe one end is connected with backwash tube, and the backwash tube sequentially passes through drainage blanket, water conservation layer, transition zone and filter layer simultaneously Protrude from the biology to be detained at the top of bucket, the perforated drain pipe other end is connected with soil stack, and the soil stack passes through Drainage blanket and water conservation layer are connected with delivery port.
4. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 1, its feature exist In:The filler is divided into filter layer, transition zone and drainage blanket from top to bottom, and the sample tap that the biology is detained bucket is arranged on On the bucket wall of filter layer side, and set close to the bottom of filter layer, the delivery port that the biology is detained bucket is arranged on drainage blanket On the bucket wall of side, perforated drain pipe is provided with the drainage blanket, described perforated drain pipe one end is connected with backwash tube, institute State backwash tube and sequentially pass through drainage blanket, transition zone and filter layer and protrude from the biology and be detained at the top of bucket, the perforation row The water pipe other end is connected with delivery port.
5. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 1, its feature exist In:Delay height is provided between the overfall and filter layer.
6. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 3 or 4, its feature It is:The quantity of the pressure-measuring pipe is 3, and three pressure-measuring pipes are set gradually from top to bottom and one end is all disposed within filter layer Interior, the spacing between adjacent pressure-measuring pipe is equal, and the pressure-measuring pipe is fixedly installed on a mounting board, the setting of the other end of pressure-measuring pipe Highly it is more than the setting height of overfall, scale strip is additionally provided with the installing plate.
7. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 1, its feature exist In:The motor of the electric expansion awning is connected with rainwater inductive switch.
8. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 1, its feature exist In its test method comprises the following steps:
Step 1) selects corresponding storm recurrence period and rainfall duration, determines simulated rainfall according to local Rain Intensity Formula Based Rainfall intensity and quantum of rainfall;
Step 2) record original state under feed water flow gauge, water flow meter, the flow reading of excess flow meter, be recorded as Q1, Q2, Q3, and feed water flow gauge, water flow meter, excess flow meter are connected with flow registering instrument, flow registering instrument gathers in real time Data, flow controller adjust flow by adjusting the autocontrol valve on delivery pipe branch, determine the working time, rainfall is opened Begin;
After step 3) rainfall terminates, record feed water flow gauge, water flow meter, the flow reading of excess flow meter, it is recorded as Q11、Q22、Q33;
Quantum of rainfall, rainfall in step 4) record rainfall terminate after go out to flow total amount and rainfall terminate after overflow it is total Amount, is recorded as Q1 ', Q2 ', Q3 ', quantum of rainfall Q1 '=(Q11-Q1), goes out to flow total amount Q2 '=(Q22-Q2), overflow total amount respectively Q3 '=(Q33-Q3);
Step 5) reads rainfall from flow registering instrument and goes out the curve that stream changes over time, and accesses computer, can be with according to curve Directly read out flow delay time t1, flood peak time delay t2, runoff volume reduction rate=(Q1 '-Q2 '-Q3 ')/(Q1 '-Q3 ') × 100% and flood peak reduction rate=(q1-q2)/q1, wherein q1 be the Peak Flow Rate in rainfall, q2 is in out of flow procedure Peak Flow Rate.
9. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 8, its feature exist In:After rainfall terminates in step 3), remember when the spacing that biology is detained in bucket between surface level and filtering layer surface is 10cm The reading of three pressure-measuring pipes is recorded, h1, h2, h3 is recorded as and goes out flow velocity q, osmotic coefficient k=qL/Ah of filter layer, wherein q To go out flow velocity, L be adjacent pressure measurement tube pitch, A be that biology is detained bucket surface area and h=[(h1-h2)+(h2-h3)]/2.
10. a kind of experimental rig for being used to detect biology delay facility operation efficiency according to claim 8, its feature exist In:Intake in rainwater-collecting bucket is fetched water and detects to obtain contaminants associated concentration index in original rainwater, then in outside Fetched water at the water outlet port of drainpipe and detect contaminants associated concentration index in the rainwater after being purified, pass through original rainwater In in rainwater after contaminants associated concentration and purification contaminants associated concentration calculate the clearance of each pollutant.
CN201710818588.5A 2017-09-12 2017-09-12 Test device for detecting operation efficiency of biological detention facility Active CN107402041B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710818588.5A CN107402041B (en) 2017-09-12 2017-09-12 Test device for detecting operation efficiency of biological detention facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710818588.5A CN107402041B (en) 2017-09-12 2017-09-12 Test device for detecting operation efficiency of biological detention facility

Publications (2)

Publication Number Publication Date
CN107402041A true CN107402041A (en) 2017-11-28
CN107402041B CN107402041B (en) 2023-04-25

Family

ID=60388814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710818588.5A Active CN107402041B (en) 2017-09-12 2017-09-12 Test device for detecting operation efficiency of biological detention facility

Country Status (1)

Country Link
CN (1) CN107402041B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108414420A (en) * 2018-01-31 2018-08-17 北京林业大学 Detect the research device and method of permeable pavement permeability rate decaying and recovery effects
CN108414730A (en) * 2018-04-16 2018-08-17 浙江广川工程咨询有限公司 A kind of measuring device for the native stone slope runoff in south
CN108955757A (en) * 2018-04-26 2018-12-07 同济大学 The stagnant storage performance testing device of the roof greening rainwater of inclined roof and test method
CN109970173A (en) * 2019-04-18 2019-07-05 青岛大学 Denitrogenation dephosphorizing test process system and its treatment process based on shuck filling
CN110093967A (en) * 2019-04-24 2019-08-06 华南理工大学 A kind of system and its effect monitoring method for road rain water diameter flow control
CN113376077A (en) * 2021-08-13 2021-09-10 昆山市建设工程质量检测中心 On-site actual measurement device and method for evaluating performance of biological retention facility sponge
CN114112302A (en) * 2021-11-30 2022-03-01 河南师范大学 Biological retention device for simulating pavement runoff

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104126439A (en) * 2014-07-25 2014-11-05 内蒙古工业大学 Plant retention element experimental facility for plant growth and water quality and water quantity analog control
CN105692908A (en) * 2016-03-09 2016-06-22 四川大学 Bioretention system for intensive farm
CN106277568A (en) * 2016-08-09 2017-01-04 南昌大学 A kind of multimedium biology being applicable to South Red Soil Region is detained facility
CN206233338U (en) * 2016-09-30 2017-06-09 南昌大学 A kind of biological delaying basin that can dynamically permeate
CN107100261A (en) * 2017-05-19 2017-08-29 广西益江环保科技股份有限公司 A kind of novel rainwater is detained filtration system
CN207317838U (en) * 2017-09-12 2018-05-04 昆山市建设工程质量检测中心 It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104126439A (en) * 2014-07-25 2014-11-05 内蒙古工业大学 Plant retention element experimental facility for plant growth and water quality and water quantity analog control
CN105692908A (en) * 2016-03-09 2016-06-22 四川大学 Bioretention system for intensive farm
CN106277568A (en) * 2016-08-09 2017-01-04 南昌大学 A kind of multimedium biology being applicable to South Red Soil Region is detained facility
CN206233338U (en) * 2016-09-30 2017-06-09 南昌大学 A kind of biological delaying basin that can dynamically permeate
CN107100261A (en) * 2017-05-19 2017-08-29 广西益江环保科技股份有限公司 A kind of novel rainwater is detained filtration system
CN207317838U (en) * 2017-09-12 2018-05-04 昆山市建设工程质量检测中心 It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108414420A (en) * 2018-01-31 2018-08-17 北京林业大学 Detect the research device and method of permeable pavement permeability rate decaying and recovery effects
CN108414420B (en) * 2018-01-31 2020-09-22 北京林业大学 Research device and method for detecting permeable rate attenuation and recovery effect of permeable pavement
CN108414730A (en) * 2018-04-16 2018-08-17 浙江广川工程咨询有限公司 A kind of measuring device for the native stone slope runoff in south
CN108955757A (en) * 2018-04-26 2018-12-07 同济大学 The stagnant storage performance testing device of the roof greening rainwater of inclined roof and test method
CN109970173A (en) * 2019-04-18 2019-07-05 青岛大学 Denitrogenation dephosphorizing test process system and its treatment process based on shuck filling
CN110093967A (en) * 2019-04-24 2019-08-06 华南理工大学 A kind of system and its effect monitoring method for road rain water diameter flow control
CN110093967B (en) * 2019-04-24 2021-04-06 华南理工大学 System for controlling road rainwater runoff and effect monitoring method thereof
CN113376077A (en) * 2021-08-13 2021-09-10 昆山市建设工程质量检测中心 On-site actual measurement device and method for evaluating performance of biological retention facility sponge
CN114112302A (en) * 2021-11-30 2022-03-01 河南师范大学 Biological retention device for simulating pavement runoff

Also Published As

Publication number Publication date
CN107402041B (en) 2023-04-25

Similar Documents

Publication Publication Date Title
CN107402041A (en) It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency
CN105839758B (en) A kind of variable early-stage rainwater stream abandoning control system, control method and construction method
CN107421577B (en) Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition
CN104126439B (en) The plant that one plant growth and water quality and quantity simulation control is detained unit's experimental provision
CN106226489B (en) Pollution of waterhead simulation and forecast devices and methods therefor under a kind of Extreme Precipitation weather
CN110093967B (en) System for controlling road rainwater runoff and effect monitoring method thereof
CN107618484B (en) The collection rain car washer for being purified and being automatically replenished based on automatic control
CN206146901U (en) A test device for detecting green roof peak regulation effect of damming
JP2009108537A (en) Rainwater storage facility
CN106370791B (en) Shut off the experimental rig of peak regulation effect for detecting Green Roof
CN207317838U (en) It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency
KR20150078216A (en) A Earth and Sand Collection Unit for Monitoring Leaking Sand
CN204317137U (en) The plant of one plant growth and water quality and quantity analogue enlargement is detained first experimental provision
Gibler Comprehensive benefits of green roofs
CN201915443U (en) Rainwater management system
CN205688484U (en) Building rainwater-collecting and high-altitude dedusting irrigation system
CN109269564A (en) The stagnant storage monitoring system of roof greening rainwater and monitoring method
CN217332377U (en) Can automatic measure rice water demand evaporate infiltration survey hole device
CN205636411U (en) Ecological grass planting ditch in sponge city
CN111504715A (en) Automatic gate and time-interval water level and water sample collection composite device
CN104221745A (en) Wall greening system and installation method capable of using rain water efficiently
CN106682272A (en) Method for determining different underlying surface overland runoff pollutant parameters W contained in SWMM
CN207317837U (en) The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN202648993U (en) Moisture leakage sampling automatic collecting equipment of leakage pool
CN113449435B (en) Multi-objective optimization method for sponge city engineering design

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant