CN206146901U - A test device for detecting green roof peak regulation effect of damming - Google Patents

A test device for detecting green roof peak regulation effect of damming Download PDF

Info

Publication number
CN206146901U
CN206146901U CN201621155878.3U CN201621155878U CN206146901U CN 206146901 U CN206146901 U CN 206146901U CN 201621155878 U CN201621155878 U CN 201621155878U CN 206146901 U CN206146901 U CN 206146901U
Authority
CN
China
Prior art keywords
water
green roof
collecting container
bed surface
assay device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621155878.3U
Other languages
Chinese (zh)
Inventor
白直旭
许月萍
周碧云
高超
刘莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201621155878.3U priority Critical patent/CN206146901U/en
Application granted granted Critical
Publication of CN206146901U publication Critical patent/CN206146901U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a detect the dam test device of effect of green roof peak regulation, including experimental bed surface and support, the bed surface frame is drawn together to test bed bread, is separated by the water -stop sheet in the bed surface frame and is the left and right sides, and one side sets up water drainage tank, and the drain bar is laid to the opposite side, is equipped with filter layer, soil horizon and plant layer on the drain bar in proper order, the water -stop sheet on open and to have a plurality of wash ports to be used for in the leading -in water drainage tank of water, water drainage tank upper portion is equipped with the top cap, it has the delivery port in the leading -in collecting container of drain pipe to open in the water drainage tank, the drain bar is also with in the leading -in above -mentioned collecting container of drainage, test device still include comprehensive testing analytic system. This test device can be used for simulating the effect of damming under the green roof of the actual roof transformation condition, carries out quantitative analysis, eliminates other factors to the influence of test result, provides the basis for the formulation of sponge city construction scheme. The utility model discloses a device low cost, installation, dismantlement convenience, maneuverability is strong, and it is wide to use the face.

Description

It is a kind of for detecting that Green Roof is dammed the assay device of peak regulation effect
Technical field
This utility model is related to Urban Hydrologic and flood control field, specifically a kind of for detecting that Green Roof peak regulation dams effect The assay device of fruit.
Background technology
The report of national effectiveness factors is of common occurrence in recent years, and sponge the idea of the city is widelyd popularize in China, mesh Before, the urban architecture roofing of China accounts for the 40%-50% of the waterproof underlying surface in city, controls the rainwater of urban architecture roofing Stream is produced for Urban Storm Flood is managed and meaning of preventing and reducing natural disasters is very great.In recent years, Green Roof is used as the complicated city of solution The technology of rain flood regulation problem is extensively paid attention to.Green Roof as one kind effectively can dam rainwater, implement improvement cost close The technology of reason, with great development potentiality and researching value.It is at present domestic for Green Roof is dammed the research of peak regulation effect Still do not popularize, micro-judgment is more, qualitative investigation is more, quantitative study is less, the application area of covering, floristics are less, Lack a research method for being available for contrasting simultaneously.The method attempted has been crossed at present has been included on building integrally placement green Roof simultaneously carries out rainwater rejection effect research, and this achievement in research is confined to single building.Meanwhile, in this kind of research, finely The runoff coefficient of type Green Roof is between 15~35%, and extensive Green Roof runoff coefficient is between 19~73%, no Effectively cannot be compared with the result of study in region.
In November, 2014, house town and country construction portion issues《Sponge urban construction technical manual》, Green Roof rate conduct Sponge city --- an index of low impact storm-water system constructing technology framework is put into wherein.《Technical manual》Point out, can Successively to be decomposed to annual flow overall control using methods such as the hydrology, water force and modelings, substep is analyzed.But it is green Color roof situation is complicated, is tightly combined with building, and the weak point of experimental study energy supplement calculation and simulation, is Plan More fully foundation is provided.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, there is provided a kind of to be used to detect that Green Roof peak regulation cuts The assay device of stream effect, the device adopt assembled structure, and monitoring meanss are advanced, there is provided the evaluation criterion of specification, are green Plan and design there is provided helpful reference and guidance in roof.
For solve above-mentioned technical problem, it is of the present utility model for detect Green Roof dam peak regulation effect test dress Put, including test bed surface, test bed surface is placed on support and described support can be used to adjust the inclination angle of test bed surface, described Test bed face include bed surface frame, the left and right sides is divided into by water-stop sheet in bed surface frame, side arranges rhone, opposite side Laying draining board, is sequentially provided with filter layer, soil horizon and layer of plants on draining board, lateral by draining board on described water-stop sheet Rhone side is provided with some osculums for directing water in rhone, and rhone top is provided with top cover, is provided with out in rhone Mouth of a river Jing drain pipies are imported in collecting container, and draining board also imports draining in above-mentioned collecting container, and described assay device is also Including comprehensive detection analysis system, the system includes computer, the pluviometer for measuring the amount of rainfall, ultrasonic sensor, ultrasound Wave sensor is installed on the inner side upper wall of described collecting container, for measuring height of water level in collecting container, and transmits to electricity Brain.
In above-mentioned technical proposal, it is preferred that described soil horizon thickness is 5 centimetres, consisting of 2/3 loam and 1/3 day Right peat.
Preferably, described layer of plants plantation Herba Sedi Lineariss, Herba Sedi Lineariss are southeastern coast frequently seen plants, are sengreens, Various harsh weather can be born, maintenance is not required to, and root is minimum, roof will not be constituted a threat to, be adapted for roof greening, With coverage rate is high, the feature such as oxygen-supplying amount is big, irrigation amount is little.
Preferably, baffle plate is provided with described collecting container and divides the container into catchment area and measured zone, two regions Bottom connects, and draining imports catchment area, and ultrasonic sensor is installed on measured zone.
Preferably, described filter layer includes afforesting special draining board, covers on special draining board and water-stop sheet is afforested Lid geotextiles, for draining and prevent soil with rain water runoff.
Assay device simple structure of the present utility model, it is easy to use, repeat and utilize, be obtained in that different type green The coefficient that dams on roof, is embodied as qualitative assessment Green Roof retention rainwater design and provides good reference frame, and should Device autgmentability is high, and the equipment such as soil humidity sensor, temperature sensor, anemoscope can be added to obtain more detailed data money Material, carries out finer analysis and research, with low cost, practical, is particularly suited for the rainy southeastern coastal areas.
Description of the drawings
Fig. 1 is bed structure schematic diagram in this utility model assay device;
Top views of the Fig. 2 for this utility model bed body;
Structural representations of the Fig. 3 for this utility model Green Roof analog portion;
Fig. 4 is this utility model tank profile;
Fig. 5 flows to schematic diagram for this utility model rainwater.
Specific embodiment
With reference to the accompanying drawings and detailed description this utility model is described in detail.
Referring to Fig. 1,2, assay device of the present utility model include bed surface frame 1, water-stop sheet 2, rhone 3, draining board 4, High 60 centimetres of irony support 5, the inclination-angle regulating device 6 loaded on frame bottom.There is the row of a diameter of 2 centimetres of 3 rows on water-stop sheet 2 Water hole so that the interflow of horizontal direction can flow into rhone by water-stop sheet in soil horizon.Rhone 3 is furnished with upper lid, is used for Prevent rainwater from falling directly into rhone, impact is produced on result of the test.The inclination-angle regulating device of 5 each foot of adjusting bracket can be passed through 6 respective height come leveling or adjustment bed body bed surface inclination angle, it is ensured that current smoothly import rhone.
Osculum 7 is provided with rhone, a diameter of 3 centimetres, is connected with drain pipe, access collecting container, it is same on draining board 4 Sample is provided with osculum, and the equal Jing drain pipies of all drainings are imported in collecting container.
It is the structural representation of Green Roof analog portion referring to Fig. 3, filter layer, soil is sequentially provided with draining board 4 Layer 9 and layer of plants 8, wherein layer of plants 8 select Herba Sedi Lineariss, and Herba Sedi Lineariss are a kind of Crassulaceae herbaceos perennials, vitality pole By force, not only in the poor soils such as low mountain, level land, Cao Po, rock ground, and can grow where sunny or dark and damp.Soil Earth layer 9 selects 2/3 loam and 1/3 natural peat, and thickness is 5 centimetres.Filter layer is afforested special using the special draining board 10 of greening Draining board 10 is laid in soil bottom, afforests special draining board 10 and is all covered with geotextiles with water-stop sheet 2, to prevent soil from passing through Osculum is lost in or blocks osculum.Water-stop sheet 2 is laid in the position between soil and rhone 3, afforests special draining board 10 There is osculum to draining with water-stop sheet 2.The water flowed out from filter layer imports collecting container by draining board.In Green Roof In the design of structure, draining board can install plastics drainage plate so as to certain water storage function, this fully to simulate Design.
Fig. 4 is collecting container schematic cross-section, including collecting container 12, drain pipe 13, ultrasonic distance-measuring sensor 11.Collection Baffle forms are designed in water container, catchment area is kept apart with measured zone, measured zone water level fluctuation is reduced to measurement Impact.
Fig. 5 is that this utility model received rainwater flows to schematic diagram.Fig. 5 illustrates possible stream after rainwater landing substantially To.The rainfall for falling into test bed surface will be infiltrated by layer of plants and be entered soil horizon, then have directly ooze out into rhone and via Drainage blanket enters two kinds of routes of rhone, finally comes together in collecting container.
During generation rainfall, computer is connected with ultrasonic distance sensor 11 and pluviometer, is received by computer and recorded Real time data.Less, when not producing overland flow, Rainfall Infiltration, through soil and draining board 4, converges under draining board rainfall Enter rhone 3;When rainfall is larger, overland flow is produced, part rainfall imports rhone by water-stop sheet 2.
The outflow point final to drop to the rainfall on plank bed of osculum 7.Rainwater is from Jing drain pipies 13 after the outflow of osculum 7 Flow into collecting container 12.Ultrasonic sensor 11 is placed in rainwater-collecting wall, is connected with computer, in real time in measurement collecting container Height of water level, and by data incoming computer.
Principle of the present utility model is:Go out stream situation come interim in rainfall using plank bed modeling Green Roof.By There is crown_interception to precipitation in soil, flowing velocity of the water in soil is smaller, therefore the outflow peak value meeting of Green Roof Less than conventional roof, while outflow peak value time of origin also can be delayed.Green Roof mainly includes to the regulating and controlling effect of rainfall 1) precipitation can be received by edaphic hole;2) plant in Green Roof can be by intercepting, accumulating abatement roof runoff; 3) some moisture can be trapped in plant surface, and be returned in air by evaporation;4) by plant transpiration effect in or Person's substrate evaporation is returned in air.Green Roof passes through soil horizon and layer of plants absorbs and intercept rainfall, can postpone Contributing time and reduction runoff peak value.Before peak value is reached, the Rainfall runoff of Green Roof is less than exposed roof;Work as rainfall When amount is very little, due to filtration and the barrier effect of soil horizon and plant to rainwater, Green Roof may not produce footpath Stream;For the catchment of a small amount of rainfall or short time, the time required to reaching peak value, difference is very big, and this depends on green The retentivity on roof.Green Roof is simulated by the assay device, the rainfall and time graph of pluviometer detection is obtained, and In collecting container, the displacement and time graph of ultrasonic sensor detection, can be used for evaluating the effect of damming of Green Roof.

Claims (4)

1. it is a kind of for detecting that Green Roof is dammed the assay device of peak regulation effect, it is characterised in that the assay device includes Test bed surface, test bed surface is placed on support and the support can be used to adjust the inclination angle of test bed surface, described test bed Face includes being divided into the left and right sides by water-stop sheet in bed surface frame, bed surface frame, and side arranges rhone, opposite side laying draining Plate, is sequentially provided with filter layer, soil horizon and layer of plants on draining board, by draining board lateral row tank side on described water-stop sheet Some osculums are provided with for directing water in rhone, rhone top is provided with top cover, in rhone, are provided with outlet Jing rows Water pipe is imported in collecting container, and draining board also imports draining in above-mentioned collecting container, and described assay device also includes comprehensive Testing and analysis system, the system include computer, the pluviometer for measuring the amount of rainfall, ultrasonic sensor, ultrasonic sensor The inner side upper wall of described collecting container is installed on, for measuring height of water level in collecting container, and is transmitted to computer.
2. according to claim 1 for detecting that Green Roof is dammed the assay device of peak regulation effect, it is characterised in that:Institute The soil horizon thickness stated is 5 centimetres.
3. according to claim 1 for detecting that Green Roof is dammed the assay device of peak regulation effect, it is characterised in that:Institute Baffle plate is provided with the collecting container stated and divides the container into catchment area and measured zone, the connection of two region bottoms, draining are led Enter catchment area, ultrasonic sensor is installed on measured zone.
4. according to claim 1 for detecting that Green Roof is dammed the assay device of peak regulation effect, it is characterised in that:Institute The filter layer stated includes afforesting special draining board, on special draining board and water-stop sheet is afforested covers geotextiles.
CN201621155878.3U 2016-10-31 2016-10-31 A test device for detecting green roof peak regulation effect of damming Active CN206146901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621155878.3U CN206146901U (en) 2016-10-31 2016-10-31 A test device for detecting green roof peak regulation effect of damming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621155878.3U CN206146901U (en) 2016-10-31 2016-10-31 A test device for detecting green roof peak regulation effect of damming

Publications (1)

Publication Number Publication Date
CN206146901U true CN206146901U (en) 2017-05-03

Family

ID=58623377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621155878.3U Active CN206146901U (en) 2016-10-31 2016-10-31 A test device for detecting green roof peak regulation effect of damming

Country Status (1)

Country Link
CN (1) CN206146901U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106370791A (en) * 2016-10-31 2017-02-01 浙江大学 Testing device for detecting closure and peak regulating effects of green roof
CN107727801A (en) * 2017-10-09 2018-02-23 上海市政工程设计研究总院(集团)有限公司 A kind of sponge city implementation result monitoring method of roof greening
CN108760979A (en) * 2018-04-25 2018-11-06 同济大学 A kind of the roof greening backwater system safety testing device and test method on flat roof
CN109856369A (en) * 2019-04-02 2019-06-07 中水珠江规划勘测设计有限公司 A kind of greenery patches structure pilot-plant in sponge city

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106370791A (en) * 2016-10-31 2017-02-01 浙江大学 Testing device for detecting closure and peak regulating effects of green roof
CN107727801A (en) * 2017-10-09 2018-02-23 上海市政工程设计研究总院(集团)有限公司 A kind of sponge city implementation result monitoring method of roof greening
CN108760979A (en) * 2018-04-25 2018-11-06 同济大学 A kind of the roof greening backwater system safety testing device and test method on flat roof
CN109856369A (en) * 2019-04-02 2019-06-07 中水珠江规划勘测设计有限公司 A kind of greenery patches structure pilot-plant in sponge city

Similar Documents

Publication Publication Date Title
CN206146901U (en) A test device for detecting green roof peak regulation effect of damming
Lange et al. Runoff generation from successive simulated rainfalls on a rocky, semi‐arid, Mediterranean hillslope
CN106370791B (en) Shut off the experimental rig of peak regulation effect for detecting Green Roof
Moors Water use of forests in the Netherlands
CN107091916B (en) covering layer structure optimization method for adjusting landfill seepage through plant dissipation
Bowling et al. Evaluation of the effects of forest roads on streamflow in Hard and Ware Creeks, Washington
CN100507560C (en) Rainfall regulation and control experiment research device and experimental method
CN104483465A (en) Ecological grassed swale simulation experiment device and experiment operating method thereof
CN104679985A (en) Method for improving DHSVM (distributed hydrology soil vegetation model)
CN106088305A (en) Greenery patches and construction method thereof with underground conservation pool
CN107421577A (en) The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN108332999B (en) Dew measuring device and dew measuring method
CN207317837U (en) The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN201196606Y (en) Drain collecting pipe and device under paddy-upland rotation condition
CN210322734U (en) Urban outdoor green road cold plate testing device
CN211553983U (en) Device for simulating soil pesticide migration condition under rainfall condition
CN101246093B (en) Drain collecting pipe and device under paddy-upland rotation condition
CN201196640Y (en) Farmland underground eluviation and surface runoff in situ monitoring integration apparatus
CN209945955U (en) Soil depthkeeping moisture seepage monitoring devices
CN206960182U (en) Tree crown rainwater-collecting automatic recording instrument
CN208000260U (en) A kind of stone face nature runoff measurement device of karst dew stone
CN106258557A (en) There is lawn and the construction method thereof collecting rainwater function
CN109002740A (en) Island rain-flood resources effective utilization system
CN204202928U (en) Sloping upland is along the runoff gathering-device under slope or cross ridge condition
Seiler et al. Mechanisms and processes of recharge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant