Prior art keywords
mrow
msub
direct current
current
mfrac
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710651888.9A
Other languages
English (en)
Other versions
CN107394807B (zh
Inventor
侯玉强
王玉
刘福锁
李威
薛峰
罗剑波
李兆伟
张红丽
黄志龙
曹路
李建华
李海峰
庄侃沁
张倩
赵彥丽
陈珏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
East China Grid Co Ltd
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
East China Grid Co Ltd
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, East China Grid Co Ltd, State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710651888.9A priority Critical patent/CN107394807B/zh
Publication of CN107394807A publication Critical patent/CN107394807A/zh
Application granted granted Critical
Publication of CN107394807B publication Critical patent/CN107394807B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/36Arrangements for transfer of electric power between ac networks via a high-tension dc link
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Power Engineering (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Emergency Protection Circuit Devices (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种多馈入直流换相失败快速评估方法,属于电力系统自动化技术领域。本发明基于初始运行方式下的潮流结果和多馈入交直流电网的结构参数,综合考虑了多回直流间的交互影响、直流自身的运行状态、结构参数以及交流电网对直流逆变站换流母线的支撑能力,在不进行暂态稳定时域仿真前提下实现对多直流馈入交流电网三相短路故障可能引发的多回直流换相失败风险的快速评估。本发明能够有效避免因仅依赖直流逆变站换流母线电压跌落导致的判断错误。

Description

一种多馈入直流换相失败快速评估方法
技术领域
本发明属于电力系统自动化技术领域,更准确地说,本发明涉及一种多馈入直流换相失败快速评估方法。
背景技术
随着我国特高压交直流电网的快速发展,大规模直流密集接入,交直流交互影响问题突出,特别是多直流馈入受端系统,因交流系统引发的多直流换相失败问题已经成为制约电网安全稳定运行的关键因素。
国家电网和南方电网均含有大规模多馈入直流输电系统。以国网华东分部为例,至2017年底将接入10回高压直流或特高压直流,总馈入容量达57760MW。由于直流逆变侧电气距离较近,单一交流故障可能引起多回直流同时发生换相失败,导致直流传输功率的中断,并对交直流系统的安全稳定运行造成显著影响。
目前评估多馈入直流系统换相失败风险的做法主要是借助机电暂态仿真程序进行批量故障扫描计算,再对仿真计算结果进行汇总梳理。由于交流电网规模大,批量故障扫描不仅计算量大,耗时长;也难以得到导致某一回直流或某几回直流换相失败的统计性规律。
针对此问题,许多研究者提出了快速判断直流是否发生换相失败的评估方法,譬如文献《采用多馈入交互作用因子判断高压直流系统换相失败的方法》(中国电机工程学报,2012年,32卷4期)提出基于多馈入直流的多馈入交互因子,计算直流熄弧角降至临界值时对应的逆变站换流母线电压,进而计算因某回直流换相失败可能引发其它直流换相失败的多馈入交互因子临界值;但该方法仅适用于故障发生在换流母线的情况。文献《考虑直流电流上升及交流电压下降速度的换相失败分析》(电力系统自动化,2016年,40卷22期)提出一种直流逆变站换流母线的临界换相电压计算方法,但该方法仅考虑了直流自身的结构参数影响,没有计及多回直流间的交互作用。
实际上,对于多直流馈入系统而言,交流系统故障后是否发生换相失败与故障冲击程度、交流电网对直流换流母线支撑能力、直流当前运行状态及多回直流间的交互作用等多个因素有关。仅考虑多馈入交互影响因子或者某回直流自身的运行状态均无法全面衡量交流系统故障对多回直流的故障冲击影响。因此,需要一种能够综合考虑上述影响,快速评估多馈入直流换相失败风险的方法。
发明内容
本发明目的是,针对现有技术的不足,考虑多馈入直流系统,综合交流故障冲击程度、交流电网对直流换流母线支撑能力、直流当前运行状态及多直流间的交互作用等多个因素的作用,提出一种多馈入直流换相失败快速评估方法。
具体地说,本发明是采用以下技术方案实现的,包括如下步骤:
1)计算n回直流馈入系统中任意两回直流i与j的多馈入交互作用因子MIIFji以及各回直流的多馈入有效短路比Mscr,其中,i=1,2,…,n,j=1,2,…,n,i≠j;
2)设故障点母线为F,计算母线F的自阻抗ZFF以及母线F与各回直流逆变站换流母线的互阻抗;
3)记母线F的初始电压为UF0,利用公式(1)预估母线F发生三相金属性短路时n回直流逆变站换流母线的暂态电压跌落:
式中,M为n×n满秩矩阵,其n个对角元素均取n、第j行i列的非对角元素Mji=-MIIFji;ΔUj为直流j逆变站换流母线的暂态电压跌落,MjF为ZFj与ZFF之比的模,ZFj为母线F与直流j逆变站换流母线的互阻抗,j=1,2,…,n;
4)利用公式(2)计算各回直流逆变站换流母线电压最小值:
Umin_j=UI0j-ΔUj (2)
其中,Umin_j为直流j逆变站换流母线电压最小值,UI0j为初始运行方式下直流j的逆变站换流母线电压;
5)利用公式(3)计算各回直流的换相失败结构约束电压指标:
其中,Upara_j为直流j的换相失败结构约束电压指标;TRj为直流j的整流站换流变压器变比,TIj为直流j的逆变站换流变压器变比;α0j为初始运行方式下直流j的整流侧触发角,UR0j为初始运行方式下直流j的整流站换流母线电压;RΣj=πRLj+3(XRj-XIj),RLj为直流j线路电阻,XRj为直流j的整流侧换相电抗,XIj为直流j的逆变侧换相电抗;γmin为直流换相失败的临界熄弧角;β0j为初始运行方式下直流j的逆变侧超前触发角;
6)利用公式(4)计算各回直流的换相失败运行约束电压指标:
其中,Urun_j为直流j的换相失败运行约束电压指标,γ0j为初始运行方式下直流j的逆变侧关断角;
7)利用公式(5)计算各回直流的交流电网综合支撑能力:
其中,Sj为直流j的交流电网综合支撑能力,Mscrj为直流j的多馈入有效短路比,Xscj为直流j的等效短路电抗,XjF为直流j的逆变站换流母线与故障母线F的两端口等值电抗;
8)记各回直流的逆变站换流母线临界电压为其换相失败结构约束电压指标和换相失败运行约束电压指标中的较大值;将n回直流按其交流电网综合支撑能力由小到大排序,并记直流k为n回直流中交流电网综合支撑能力最弱的直流,若利用式(2)得到的故障后直流k的逆变站换流母线电压最小值Umin_k大于直流k的逆变站换流母线临界电压UCRk,则判定F点发生三相短路故障时n回直流均不会发生换相失败,结束本方法;否则,进入步骤9);
9)利用公式(6)计算故障后各回直流的关断角最小值,若有直流的关断角最小值小于γmin,则判定该直流换相失败:
其中,γj为直流j的关断角最小值,Idj为初始运行方式下直流j的直流电流;
10)对于步骤9)中未判定为换相失败的各直流,若故障后某直流的逆变站换流母线电压最小值大于其逆变站换流母线临界电压,则判定该直流未发生换相失败;否则,利用公式(7)计算该直流的换流母线电压越限指标:
其中,UOVj为直流j的换流母线电压越限指标,UCRj为直流j的逆变站换流母线临界电压;
11)对于步骤10)计算了换流母线电压越限指标的任意直流j,若在判定未发生换相失败的直流集合中,至少能够找到一回直流m,其与直流k的多馈入交互作用因子MIIFmk满足公式(8)所示条件,则判定该直流j未发生换相失败,否则判定直流j发生换相失败:
其中,MIIFjk为直流j与直流k的多馈入交互作用因子,Sm为直流m的交流电网综合支撑能力。
本发明的有益效果如下:本发明方法结合直流的一次结构参数、初始运行状态、交直流耦合程度及交流电网短路故障冲击程度,实现多馈入直流在交流电网发生三相短路故障时的换相失败风险快速扫描,无需开展大规模的故障批量扫描仿真,并可有效避免因仅依赖直流逆变站换流母线电压跌落导致的判断错误。
附图说明
图1为本发明方法的流程图。
图2为基于某实际电网,时域仿真一回500kV线路发生三相短路故障,得到的3回换相失败直流熄弧角和直流功率曲线。
图3为基于某实际电网,时域仿真一回500kV线路发生三相短路故障,得到的4回未换相失败直流熄弧角和直流功率曲线。
具体实施方式
下面参照附图表,并结合具体实施例对本发明作进一步详细描述。
实施例1:
本实施例方法,用于对多馈入直流换相失败进行评估,其流程如图1所示,主要包括以下步骤:
1)计算n回直流馈入系统中任意两回直流i与j的多馈入交互作用因子MIIFji以及各回直流的多馈入有效短路比Mscr,其中,i=1,2,…,n,j=1,2,…,n,i≠j;
2)设故障点母线为F,计算母线F的自阻抗ZFF以及母线F与各回直流逆变站换流母线的互阻抗;
3)记母线F的初始电压为UF0,利用公式(1)预估母线F发生三相金属性短路时n回直流逆变站换流母线的暂态电压跌落:
式中,M为n×n满秩矩阵,其n个对角元素均取n、第j行i列的非对角元素Mji=-MIIFji;ΔUj为直流j逆变站换流母线的暂态电压跌落,MjF为ZFj与ZFF之比的模,ZFj为母线F与直流j逆变站换流母线的互阻抗,j=1,2,…,n;
4)利用公式(2)计算各回直流逆变站换流母线电压最小值:
Umin_j=UI0j-ΔUj (2)
其中,Umin_j为直流j逆变站换流母线电压最小值,UI0j为初始运行方式下直流j的逆变站换流母线电压;
5)利用公式(3)计算各回直流的换相失败结构约束电压指标:
其中,Upara_j为直流j的换相失败结构约束电压指标;TRj为直流j的整流站换流变压器变比,TIj为直流j的逆变站换流变压器变比;α0j为初始运行方式下直流j的整流侧触发角,UR0j为初始运行方式下直流j的整流站换流母线电压;RΣj=πRLj+3(XRj-XIj),RLj为直流j线路电阻,XRj为直流j的整流侧换相电抗,XIj为直流j的逆变侧换相电抗;γmin为直流换相失败的临界熄弧角,典型值取7°;β0j为初始运行方式下直流j的逆变侧超前触发角;
6)利用公式(4)计算各回直流的换相失败运行约束电压指标:
其中,Urun_j为直流j的换相失败运行约束电压指标,γ0j为初始运行方式下直流j的逆变侧关断角;
7)利用公式(5)计算各回直流的交流电网综合支撑能力:
其中,Sj为直流j的交流电网综合支撑能力,Mscrj为直流j的多馈入有效短路比,Xscj为直流j的等效短路电抗,XjF为直流j的逆变站换流母线与故障母线F的两端口等值电抗;
8)记各回直流的逆变站换流母线临界电压为其换相失败结构约束电压指标和换相失败运行约束电压指标中的较大值;将n回直流按其交流电网综合支撑能力由小到大排序,并记直流k为n回直流中交流电网综合支撑能力最弱的直流,若利用式(2)得到的故障后直流k的逆变站换流母线电压最小值Umin_k大于直流k的逆变站换流母线临界电压UCRk,则判定F点发生三相短路故障时n回直流均不会发生换相失败,结束本方法;否则,进入步骤9);
9)利用公式(6)计算故障后各回直流的关断角最小值,若有直流的关断角最小值小于γmin,则判定该直流换相失败:
其中,γj为直流j的关断角最小值,Idj为初始运行方式下直流j的直流电流;
10)对于步骤9)中未判定为换相失败的各直流,若故障后某直流的逆变站换流母线电压最小值大于其逆变站换流母线临界电压,则判定该直流未发生换相失败;否则,利用公式(7)计算该直流的换流母线电压越限指标:
其中,UOVj为直流j的换流母线电压越限指标,UCRj为直流j的逆变站换流母线临界电压;
11)对于步骤10)计算了换流母线电压越限指标的任意直流j,若在判定未发生换相失败的直流集合中,至少能够找到一回直流m,其与直流k的多馈入交互作用因子MIIFmk满足公式(8)所示条件,则判定该直流j未发生换相失败,否则判定直流j发生换相失败:
其中,MIIFjk为直流j与直流k的多馈入交互作用因子,Sm为直流m的交流电网综合支撑能力。
以下通过具体事例进行说明。设有某实际受端电网共7回直流馈入,其初始运行状态及结构参数信息如表1所示。通过表1提供的7回馈入直流的初始运行状态及结构参数,以及当前运行方式下交流电网的潮流计算结果,根据上述方法中的相关计算公式,可以计算得表2~表6,其中表2为计算得到的7回馈入直流的多馈入交互作用因子,表3为故障母线CANGJIA及与各回直流逆变站换流母线的自阻抗与互阻抗(忽略实部),表4为计算得到的7回直流的交流电网综合支撑能力,表5为计算得到的7回直流逆变站换流母线最低值,表6为计算得到的7回直流的换相失败结构约束电压指标和换相失败运行约束电压指标。
表1实际电网7回馈入直流的初始运行状态及结构参数
表2七回馈入直流的多馈入交互作用因子
表3故障母线CANGJIA及与7回直流逆变站换流母线的自阻抗与互阻
抗(对角元素为自阻抗,非对角元素为互阻抗)
母线名 XADC CANGJIA CSDC PQDC NCDC TGDC JCDC GZDC
XADC 0.001774 0.000085 0.000254 0.000146 0.000107 0.000103 0.000147 0.000085
CANGJIA 0.000085 0.003408 0.000246 0.000562 0.000355 0.00036 0.000183 0.00251
CSDC 0.000254 0.000246 0.001886 0.000175 0.000494 0.000475 0.000697 0.000259
PQDC 0.000146 0.000562 0.000175 0.002288 0.000169 0.000218 0.000107 0.000547
NCDC 0.000107 0.000355 0.000494 0.000169 0.002366 0.000606 0.000849 0.000377
TGDC 0.000103 0.00036 0.000475 0.000218 0.000606 0.005521 0.000327 0.000381
JCDC 0.000147 0.000183 0.000697 0.000107 0.000849 0.000327 0.002092 0.000194
GZDC 0.000085 0.00251 0.000259 0.000547 0.000377 0.000381 0.000194 0.002873
表4七回直流的交流电网综合支撑能力
表5计算7回直流逆变站换流母线电压最低值
直流 TGDC GZDC XADC JCDC CSDC PQDC NCDC
电压值(p.u.) 0.859 0.224 0.973 0.933 0.898 0.770 0.872
表6七回直流的换相失败结构约束电压指标和换相失败运行约束电压
指标
直流 TGDC GZDC XADC JCDC CSDC PQDC NCDC
换相失败结构约束电压指标 0.87719 0.89288 0.88626 0.90962 0.90416 0.9052 0.90159
换相失败运行约束电压指标 0.887656 0.8764919 0.88262118 0.909507426 0.895229536 0.892 0.896
根据本实施例方法,针对上述7回直流馈入系统对直流换相失败进行快速评估的过程如下:
首先,利用公式(1)和公式(2),并将表1至表3信息代入,可计算得到表5所示7回直流逆变站换流母线最低值(最小值)。
接着,根据表4可知交流电网综合支撑能力最弱的直流为GZDC,其换流母线电压最低值为0.224,小于其逆变站换流母线临界电压,表明发生该故障后7回直流中必然存在发生换相失败的直流。
然后,利用公式(6)计算可知GZDC和PQDC发生换相失败,而TGDC、和NCDC的换流母线电压最小值小于其逆变站换流母线临界电压,需进一步判断。
最后,NCDC的换流母线电压越限指标为2.75%,在JCDC、CSDC、XADC三回未发生换相失败的直流中,JCDC和XADC均满足公式(8)所示条件,表明NCDC换流站母线电压越限主要是由于其与GZDC具有较大的交互作用因子,而直流本身具有较强的综合支撑能力,不会发生换相失败。
TGDC的换流母线电压越限指标为3.37%,但在JCDC、CSDC、XADC三回未发生换相失败的直流中,找不到任一回直流满足公式(8)所示条件,表明TGDC发生了换相失败。
因此,判断TGDC、GZDC、PQDC发生了换相失败。采用PSD-BPA进行时域仿真分析,图2和图3给出的仿真结果证明上述判断正确无误。
虽然本发明已以较佳实施例公开如上,但实施例并不是用来限定本发明的。在不脱离本发明之精神和范围内,所做的任何等效变化或润饰,同样属于本发明之保护范围。因此本发明的保护范围应当以本申请的权利要求所界定的内容为标准。

Claims (1)

1.一种多馈入直流换相失败快速评估方法,其特征在于,包括以下步骤:
1)计算n回直流馈入系统中任意两回直流i与j的多馈入交互作用因子MIIFji以及各回直流的多馈入有效短路比Mscr,其中,i=1,2,…,n,j=1,2,…,n,i≠j;
2)设故障点母线为F,计算母线F的自阻抗ZFF以及母线F与各回直流逆变站换流母线的互阻抗;
3)记母线F的初始电压为UF0,利用公式(1)预估母线F发生三相金属性短路时n回直流逆变站换流母线的暂态电压跌落:
<mrow> <mfenced open = "[" close = "]"> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mn>1</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mn>2</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mi>n</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>=</mo> <mfrac> <mn>1</mn> <msup> <mi>M</mi> <mrow> <mo>-</mo> <mn>1</mn> </mrow> </msup> </mfrac> <mo>&amp;CenterDot;</mo> <mfenced open = "[" close = "]"> <mtable> <mtr> <mtd> <msub> <mi>M</mi> <mrow> <mn>1</mn> <mi>F</mi> </mrow> </msub> </mtd> </mtr> <mtr> <mtd> <msub> <mi>M</mi> <mrow> <mn>2</mn> <mi>F</mi> </mrow> </msub> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <mo>.</mo> </mtd> </mtr> <mtr> <mtd> <msub> <mi>M</mi> <mrow> <mi>n</mi> <mi>F</mi> </mrow> </msub> </mtd> </mtr> </mtable> </mfenced> <mo>&amp;CenterDot;</mo> <msub> <mi>U</mi> <mrow> <mi>F</mi> <mn>0</mn> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
式中,M为n×n满秩矩阵,其n个对角元素均取n、第j行i列的非对角元素Mji=-MIIFji;ΔUj为直流j逆变站换流母线的暂态电压跌落,MjF为ZFj与ZFF之比的模,ZFj为母线F与直流j逆变站换流母线的互阻抗,j=1,2,…,n;
4)利用公式(2)计算各回直流逆变站换流母线电压最小值:
Umin_j=UI0j-ΔUj (2)
其中,Umin_j为直流j逆变站换流母线电压最小值,UI0j为初始运行方式下直流j的逆变站换流母线电压;
5)利用公式(3)计算各回直流的换相失败结构约束电压指标:
<mrow> <msub> <mi>U</mi> <mrow> <mi>p</mi> <mi>a</mi> <mi>r</mi> <mi>a</mi> <mo>_</mo> <mi>j</mi> </mrow> </msub> <mo>=</mo> <mfrac> <msub> <mi>T</mi> <mrow> <mi>I</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>T</mi> <mrow> <mi>R</mi> <mi>j</mi> </mrow> </msub> </mfrac> <mo>&amp;CenterDot;</mo> <mfrac> <mrow> <msub> <mi>U</mi> <mrow> <mi>R</mi> <mn>0</mn> <mi>j</mi> </mrow> </msub> <msub> <mi>cos&amp;alpha;</mi> <mrow> <mn>0</mn> <mi>j</mi> </mrow> </msub> </mrow> <mrow> <mn>1</mn> <mo>+</mo> <mfrac> <msub> <mi>R</mi> <mrow> <mi>&amp;Sigma;</mi> <mi>j</mi> </mrow> </msub> <mrow> <mn>6</mn> <msub> <mi>X</mi> <mrow> <mi>I</mi> <mi>j</mi> </mrow> </msub> </mrow> </mfrac> </mrow> </mfrac> <mo>&amp;CenterDot;</mo> <mfrac> <mn>1</mn> <mrow> <mo>&amp;lsqb;</mo> <msub> <mi>cos&amp;gamma;</mi> <mi>min</mi> </msub> <mo>-</mo> <mfrac> <msub> <mi>R</mi> <mrow> <mi>&amp;Sigma;</mi> <mi>j</mi> </mrow> </msub> <mrow> <mn>6</mn> <msub> <mi>X</mi> <mrow> <mi>I</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>&amp;Sigma;</mi> <mi>j</mi> </mrow> </msub> </mrow> </mfrac> <msub> <mi>cos&amp;beta;</mi> <mrow> <mn>0</mn> <mi>j</mi> </mrow> </msub> <mo>&amp;rsqb;</mo> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
其中,Upara_j为直流j的换相失败结构约束电压指标;TRj为直流j的整流站换流变压器变比,TIj为直流j的逆变站换流变压器变比;α0j为初始运行方式下直流j的整流侧触发角,UR0j为初始运行方式下直流j的整流站换流母线电压;RΣj=πRLj+3(XRj-XIj),RLj为直流j线路电阻,XRj为直流j的整流侧换相电抗,XIj为直流j的逆变侧换相电抗;γmin为直流换相失败的临界熄弧角;β0j为初始运行方式下直流j的逆变侧超前触发角;
6)利用公式(4)计算各回直流的换相失败运行约束电压指标:
<mrow> <msub> <mi>U</mi> <mrow> <mi>r</mi> <mi>u</mi> <mi>n</mi> <mo>_</mo> <mi>j</mi> </mrow> </msub> <mo>=</mo> <mfrac> <msub> <mi>U</mi> <mrow> <mi>I</mi> <mn>0</mn> <mi>j</mi> </mrow> </msub> <msub> <mi>T</mi> <mrow> <mi>I</mi> <mi>j</mi> </mrow> </msub> </mfrac> <mo>&amp;CenterDot;</mo> <msqrt> <mfrac> <mrow> <msup> <mi>cos</mi> <mn>2</mn> </msup> <msub> <mi>&amp;gamma;</mi> <mrow> <mn>0</mn> <mi>j</mi> </mrow> </msub> <mo>-</mo> <msup> <mi>cos</mi> <mn>2</mn> </msup> <msub> <mi>&amp;beta;</mi> <mrow> <mn>0</mn> <mi>j</mi> </mrow> </msub> </mrow> <mrow> <msup> <mi>cos</mi> <mn>2</mn> </msup> <msub> <mi>&amp;gamma;</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>-</mo> <msup> <mi>cos</mi> <mn>2</mn> </msup> <msub> <mi>&amp;beta;</mi> <mrow> <mn>0</mn> <mi>j</mi> </mrow> </msub> </mrow> </mfrac> </msqrt> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>4</mn> <mo>)</mo> </mrow> </mrow>
其中,Urun_j为直流j的换相失败运行约束电压指标,γ0j为初始运行方式下直流j的逆变侧关断角;
7)利用公式(5)计算各回直流的交流电网综合支撑能力:
<mrow> <msub> <mi>S</mi> <mi>j</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>M</mi> <mrow> <mi>s</mi> <mi>c</mi> <mi>r</mi> <mi>j</mi> </mrow> </msub> <mrow> <mn>1</mn> <mo>+</mo> <mfrac> <msub> <mi>X</mi> <mrow> <mi>s</mi> <mi>c</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>X</mi> <mrow> <mi>j</mi> <mi>F</mi> </mrow> </msub> </mfrac> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> </mrow>
其中,Sj为直流j的交流电网综合支撑能力,Mscrj为直流j的多馈入有效短路比,Xscj为直流j的等效短路电抗,XjF为直流j的逆变站换流母线与故障母线F的两端口等值电抗;
8)记各回直流的逆变站换流母线临界电压为其换相失败结构约束电压指标和换相失败运行约束电压指标中的较大值;将n回直流按其交流电网综合支撑能力由小到大排序,并记直流k为n回直流中交流电网综合支撑能力最弱的直流,若利用式(2)得到的故障后直流k的逆变站换流母线电压最小值Umin_k大于直流k的逆变站换流母线临界电压UCRk,则判定F点发生三相短路故障时n回直流均不会发生换相失败,结束本方法;否则,进入步骤9);
9)利用公式(6)计算故障后各回直流的关断角最小值,若有直流的关断角最小值小于γmin,则判定该直流换相失败:
<mrow> <msub> <mi>&amp;gamma;</mi> <mi>j</mi> </msub> <mo>=</mo> <mi>a</mi> <mi>r</mi> <mi>c</mi> <mi>c</mi> <mi>o</mi> <mi>s</mi> <mrow> <mo>(</mo> <mfrac> <mrow> <msqrt> <mn>2</mn> </msqrt> <mo>&amp;CenterDot;</mo> <msub> <mi>T</mi> <mrow> <mi>I</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>I</mi> <mrow> <mi>d</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>X</mi> <mrow> <mi>I</mi> <mi>j</mi> </mrow> </msub> </mrow> <msub> <mi>U</mi> <mrow> <mi>min</mi> <mo>_</mo> <mi>j</mi> </mrow> </msub> </mfrac> <mo>+</mo> <msub> <mi>cos&amp;beta;</mi> <mrow> <mn>0</mn> <mi>j</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
其中,γj为直流j的关断角最小值,Idj为初始运行方式下直流j的直流电流;
10)对于步骤9)中未判定为换相失败的各直流,若故障后某直流的逆变站换流母线电压最小值大于其逆变站换流母线临界电压,则判定该直流未发生换相失败;否则,利用公式(7)计算该直流的换流母线电压越限指标:
<mrow> <msub> <mi>U</mi> <mrow> <mi>O</mi> <mi>V</mi> <mi>j</mi> </mrow> </msub> <mo>=</mo> <mfrac> <msub> <mi>U</mi> <mrow> <mi>C</mi> <mi>R</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>U</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> <mo>_</mo> <mi>j</mi> </mrow> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>7</mn> <mo>)</mo> </mrow> </mrow>
其中,UOVj为直流j的换流母线电压越限指标,UCRj为直流j的逆变站换流母线临界电压;
11)对于步骤10)计算了换流母线电压越限指标的任意直流j,若在判定未发生换相失败的直流集合中,至少能够找到一回直流m,其与直流k的多馈入交互作用因子MIIFmk满足公式(8)所示条件,则判定该直流j未发生换相失败,否则判定直流j发生换相失败:
其中,MIIFjk为直流j与直流k的多馈入交互作用因子,Sm为直流m的交流电网综合支撑能力。
CN201710651888.9A 2017-08-02 2017-08-02 一种多馈入直流换相失败快速评估方法 Active CN107394807B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710651888.9A CN107394807B (zh) 2017-08-02 2017-08-02 一种多馈入直流换相失败快速评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710651888.9A CN107394807B (zh) 2017-08-02 2017-08-02 一种多馈入直流换相失败快速评估方法

Publications (2)

Publication Number Publication Date
CN107394807A true CN107394807A (zh) 2017-11-24
CN107394807B CN107394807B (zh) 2020-08-11

Family

ID=60342963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710651888.9A Active CN107394807B (zh) 2017-08-02 2017-08-02 一种多馈入直流换相失败快速评估方法

Country Status (1)

Country Link
CN (1) CN107394807B (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107681678A (zh) * 2017-08-31 2018-02-09 国网河南省电力公司电力科学研究院 一种基于整流侧触发角紧急控制的换相失败预防方法
CN108123456A (zh) * 2017-12-29 2018-06-05 国网江苏省电力有限公司经济技术研究院 一种提高近区直流换相失败恢复速度的statcom附加控制方法
CN108400609A (zh) * 2018-02-13 2018-08-14 南京师范大学 适应于调相机的抑制多馈入直流换相失败选址方法
CN108535560A (zh) * 2018-03-19 2018-09-14 中国电力科学研究院有限公司 一种多直流馈入系统直流之间耦合程度的表征方法及系统
CN108695879A (zh) * 2018-06-15 2018-10-23 四川大学 一种抑制多馈入直流换相失败的直流功率控制方法
CN109167400A (zh) * 2018-08-29 2019-01-08 中国电力科学研究院有限公司 一种确定多馈入交直流系统的电压稳定性的方法及系统
CN109167378A (zh) * 2018-07-31 2019-01-08 中国电力科学研究院有限公司 一种评估多回直流同时换相失败风险的方法和系统
CN109217302A (zh) * 2018-10-11 2019-01-15 清华大学 一种混合多馈入系统中传统直流受端电网强度的评价方法
CN109449965A (zh) * 2018-09-07 2019-03-08 中国电力科学研究院有限公司 一种直流电流变化的临界多馈入交互作用因子的计算方法及系统
CN109617107A (zh) * 2018-11-19 2019-04-12 国网浙江省电力有限公司电力科学研究院 一种多馈入直流系统直流支撑能力及换相失败的评估方法
CN110198044A (zh) * 2019-05-13 2019-09-03 国网内蒙古东部电力有限公司电力科学研究院 考虑传输功率极限的lcc-hvdc换相失败免疫能力评估方法及系统
CN110417042A (zh) * 2019-08-16 2019-11-05 国网山东省电力公司电力科学研究院 一种抑制直流系统连续换相失败的安全控制方法和系统
CN110797898A (zh) * 2019-10-31 2020-02-14 国网河南省电力公司电力科学研究院 一种特高压直流多馈入系统换相失败预防控制方法及系统
CN111555640A (zh) * 2020-03-31 2020-08-18 清华大学 一种高压直流输电混合换流器的控制方法
WO2021047347A1 (zh) * 2019-09-11 2021-03-18 国电南瑞科技股份有限公司 基于自适应自抗扰比例积分的直流输电系统控制方法及系统
CN112909943A (zh) * 2021-05-10 2021-06-04 国网江西省电力有限公司电力科学研究院 基于换相失败预测的直流控制功能策略优化方法及装置
CN113433426A (zh) * 2021-08-30 2021-09-24 国网江西省电力有限公司电力科学研究院 直流输电系统的换流母线临界故障位置计算方法及装置
CN114884113A (zh) * 2022-05-05 2022-08-09 华北电力大学 多馈入直流输电系统换相失败判别方法
CN115051396A (zh) * 2022-06-15 2022-09-13 华北电力大学 基于归一化思想的多馈入直流输电系统的换相失败风险程度量化评估方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017042018A (ja) * 2015-08-21 2017-02-23 株式会社東芝 電力変換器の制御装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017042018A (ja) * 2015-08-21 2017-02-23 株式会社東芝 電力変換器の制御装置

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107681678A (zh) * 2017-08-31 2018-02-09 国网河南省电力公司电力科学研究院 一种基于整流侧触发角紧急控制的换相失败预防方法
CN107681678B (zh) * 2017-08-31 2020-05-29 国网河南省电力公司电力科学研究院 一种基于整流侧触发角紧急控制的换相失败预防方法
CN108123456A (zh) * 2017-12-29 2018-06-05 国网江苏省电力有限公司经济技术研究院 一种提高近区直流换相失败恢复速度的statcom附加控制方法
CN108123456B (zh) * 2017-12-29 2019-12-13 国网江苏省电力有限公司经济技术研究院 一种提高近区直流换相失败恢复速度的statcom附加控制方法
CN108400609A (zh) * 2018-02-13 2018-08-14 南京师范大学 适应于调相机的抑制多馈入直流换相失败选址方法
CN108400609B (zh) * 2018-02-13 2020-02-07 南京师范大学 适应于调相机的抑制多馈入直流换相失败选址方法
CN108535560A (zh) * 2018-03-19 2018-09-14 中国电力科学研究院有限公司 一种多直流馈入系统直流之间耦合程度的表征方法及系统
CN108695879A (zh) * 2018-06-15 2018-10-23 四川大学 一种抑制多馈入直流换相失败的直流功率控制方法
CN108695879B (zh) * 2018-06-15 2021-06-15 四川大学 一种抑制多馈入直流换相失败的直流功率控制方法
CN109167378A (zh) * 2018-07-31 2019-01-08 中国电力科学研究院有限公司 一种评估多回直流同时换相失败风险的方法和系统
CN109167400A (zh) * 2018-08-29 2019-01-08 中国电力科学研究院有限公司 一种确定多馈入交直流系统的电压稳定性的方法及系统
CN109449965A (zh) * 2018-09-07 2019-03-08 中国电力科学研究院有限公司 一种直流电流变化的临界多馈入交互作用因子的计算方法及系统
CN109217302B (zh) * 2018-10-11 2019-11-19 清华大学 一种混合多馈入系统中传统直流受端电网强度的评价方法
CN109217302A (zh) * 2018-10-11 2019-01-15 清华大学 一种混合多馈入系统中传统直流受端电网强度的评价方法
CN109617107A (zh) * 2018-11-19 2019-04-12 国网浙江省电力有限公司电力科学研究院 一种多馈入直流系统直流支撑能力及换相失败的评估方法
CN110198044A (zh) * 2019-05-13 2019-09-03 国网内蒙古东部电力有限公司电力科学研究院 考虑传输功率极限的lcc-hvdc换相失败免疫能力评估方法及系统
CN110417042B (zh) * 2019-08-16 2021-07-06 国网山东省电力公司电力科学研究院 一种抑制直流系统连续换相失败的安全控制方法和系统
CN110417042A (zh) * 2019-08-16 2019-11-05 国网山东省电力公司电力科学研究院 一种抑制直流系统连续换相失败的安全控制方法和系统
WO2021047347A1 (zh) * 2019-09-11 2021-03-18 国电南瑞科技股份有限公司 基于自适应自抗扰比例积分的直流输电系统控制方法及系统
CN110797898A (zh) * 2019-10-31 2020-02-14 国网河南省电力公司电力科学研究院 一种特高压直流多馈入系统换相失败预防控制方法及系统
CN111555640A (zh) * 2020-03-31 2020-08-18 清华大学 一种高压直流输电混合换流器的控制方法
CN112909943A (zh) * 2021-05-10 2021-06-04 国网江西省电力有限公司电力科学研究院 基于换相失败预测的直流控制功能策略优化方法及装置
CN113433426A (zh) * 2021-08-30 2021-09-24 国网江西省电力有限公司电力科学研究院 直流输电系统的换流母线临界故障位置计算方法及装置
CN113433426B (zh) * 2021-08-30 2021-12-31 国网江西省电力有限公司电力科学研究院 直流输电系统的换流母线临界故障位置计算方法及装置
CN114884113A (zh) * 2022-05-05 2022-08-09 华北电力大学 多馈入直流输电系统换相失败判别方法
CN115051396A (zh) * 2022-06-15 2022-09-13 华北电力大学 基于归一化思想的多馈入直流输电系统的换相失败风险程度量化评估方法

Also Published As

Publication number Publication date
CN107394807B (zh) 2020-08-11

Similar Documents

Publication Publication Date Title
CN107394807A (zh) 一种多馈入直流换相失败快速评估方法
EP3460936B1 (en) Pilot protection method for transmission line of new energy station based on current waveform similarity
CN103825267B (zh) 一种mmc-mtdc直流侧短路电流的计算方法
CN102818973B (zh) 一种基于相序电压幅值比较的故障选相方法及其装置
CN103812129A (zh) 一种多馈入直流输电系统换相失败的判断方法
CN103050933B (zh) 基于单端电流突变量的大型电池储能电站接口保护方法
CN109375052B (zh) 一种高频暂态分量方向纵联保护方法及系统
CN102508098B (zh) 用于交直流混联电网的快速零序方向元件判别方法
CN104333030B (zh) 一种多馈入直流相互作用因子的分析方法
CN104578013B (zh) 一种基于电流频率差的含dfig配电网的方向保护方法
CN105024364A (zh) 规模风电接入交直流混联系统对距离保护影响的分析方法
CN103296650A (zh) 基于突变量差动系数矩阵特高压输电线路继电保护方法
CN112883592A (zh) 一种电网全电磁暂态建模方法
CN101825677B (zh) 基于环流量电流相角差的同塔四回输电线路故障选相方法
CN106845852B (zh) 多直流馈入受端交流系统电压稳定评估故障集形成方法
CN104993466A (zh) 一种适用于交直流电网的连锁故障快动态仿真方法
CN106505563A (zh) 一种电网故障下并网变流器韧性评估方法
CN105445618A (zh) 一种小电流接地系统故障选线方法及装置
CN108872712A (zh) 中性点不接地场景下计算并联电容器电容值的系统及方法
CN106786564A (zh) 一种基于动态跟踪的直流受端交流系统电压薄弱区域评估方法
CN104167755B (zh) 一种确定单相短路导致换相失败区域的方法
CN106611959A (zh) 一种基于wams异常波动动态跟踪的直流受端交流系统电压稳定判别方法
CN110492517A (zh) 一种多馈入直流输电系统换相失败的风险评估方法及系统
CN110703134A (zh) 一种基于故障序分量的小电流接地选线选相方法
CN106451401B (zh) 直流电压跌落时换流器最大功率输出的控制方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant