CN107391862A - 一种装配式混凝土结构三维协同设计方法 - Google Patents

一种装配式混凝土结构三维协同设计方法 Download PDF

Info

Publication number
CN107391862A
CN107391862A CN201710631576.1A CN201710631576A CN107391862A CN 107391862 A CN107391862 A CN 107391862A CN 201710631576 A CN201710631576 A CN 201710631576A CN 107391862 A CN107391862 A CN 107391862A
Authority
CN
China
Prior art keywords
component
node
concrete structure
cast
design method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710631576.1A
Other languages
English (en)
Other versions
CN107391862B (zh
Inventor
李贝
姚博强
杨嘉伟
吕雪源
袁齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201710631576.1A priority Critical patent/CN107391862B/zh
Publication of CN107391862A publication Critical patent/CN107391862A/zh
Application granted granted Critical
Publication of CN107391862B publication Critical patent/CN107391862B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/20Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/04Architectural design, interior design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2219/00Indexing scheme for manipulating 3D models or images for computer graphics
    • G06T2219/20Indexing scheme for editing of 3D models
    • G06T2219/2008Assembling, disassembling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • Architecture (AREA)
  • Computer Graphics (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种装配式混凝土结构三维协同设计方法,其包括依据图纸资料完成装配式建筑拆分设计、Revit项目中心文件准备、建立预制构件和现浇节点的参数化模型、将参数化构件和现浇节点载入Revit项目中心文件组建整体模型、对各类型构件进行修改以及完成模型整体信息输出和单个构件出图等过程。本发明基于Revit平台,通过建立可视化的三维实体模型,之后通过协同的方式进行设计、修改和出图。具有以下有益效果:告别二维抽象绘制方式,实现可视化的三维建模;同一模型共同体现各专业信息,实现专业互通,避免重复性调整修改;缩短同类型构件建模和出图时间,提升效率,统一质量,便于管理。

Description

一种装配式混凝土结构三维协同设计方法
技术领域
本发明涉及建筑工程领域,尤其涉及一种装配式混凝土结构三维协同设计方法。
背景技术
近年来,随着国家对装配式建筑的重视程度不断加深,未来在国内必将掀起一场装配式设计的高潮。装配式建筑是指构件预先在构件厂进行生产,之后运输至现场进行起吊安装,最终实现的建筑结构。在装配式混凝土结构设计中,传统方法是在CAD二维平面内完成绘制的,首先是出图效率低下,易出错,修改反复性高,其次要求设计者有很强的空间思维能力,不足以满足日益复杂多变的建筑结构形式要求,极大限制了装配式结构的开展。另外,由于在构件生产前就需要对各专业信息进行综合考虑,因此需要在图纸中很清晰地体现各种预留预埋信息,这也意味着传统的二维设计思想很难满足这一硬性要求,需要向三维设计倾斜;同时装配式建筑目前还未形成一套完善且清晰的设计思路,急需进行总结凝练。
本发明提出了一种基于Revit平台,通过建立可视化的三维实体模型,之后通过协同的方式进行设计、修改和出图。本发明的研究受到“国家重点研发计划资助”(“NationalKey R&D Program of China”),项目编号为“2016YFC0701700”。
发明内容
本发明的主要目的就是要提高结构设计的效率和质量,同时避免因信息遗漏和思考不清晰造成工作重复,因此针对以上现状主要解决的技术问题为:
①告别二维抽象绘制方式,实现可视化的三维建模;
②同一模型共同体现各专业信息,实现专业互通,避免重复性调整修改;
③缩短同类型构件建模和出图时间,提升效率,统一质量,便于管理。
为达到上述目的,本发明采用了以下技术方案:
一种装配式混凝土结构三维协同设计方法,其过程是:
一、在方案设计和初步设计完成后,依据设计图纸完成装配式建筑拆分设计
其主要流程为:利用AutoCAD程序,打开装配式建筑.dwg格式的项目图纸,新建构件拆分边线的图层,在对应的图层中完成项目预制构件的拆分设计,并对各个构件进行编号,然后保存。
二、Revit项目中心文件准备
其主要流程为:启动Revit程序,在结构样板中导入CAD软件所保存的拆分底图,绘制竖向、横向以及标高轴网,另存为项目的中心文件。
三、调用参数化构件族库,得到项目所需各个预制构件
其主要流程为:打开参数化构件族库文件夹,选择对应的构件类型,然后选择参数化样板文件,按设计输入构件的相关参数,得到参数化模型,另存为构件族文件,依次建立各类型的各个预制构件。
四、调用现浇节点族库,得到项目所需各类型现浇节点族文件
其主要流程为:打开现浇节点族库文件夹,选择项目中涉及到的节点类型,按设计输入构件的相关参数,生成相应类型的节点,另存为节点族文件,依次建立项目所涉及到的所有类型节点。
五、将参数化构件和现浇节点载入Revit项目中心文件组建整体模型
其主要流程为:打开Revit项目中心文件,载入构件的族文件,完成构件的放置,调整构件方向,保证载入的构件与布置图所示方向一致,重复载入构件、放置、调整操作,完成构件整体搭建;然后绘制内部剪力墙、楼板等现浇构件;新建工作集,将模型中所有构件分配到与构件名相同的工作集中。
六、完成各类型构件的修改工作
对各构件的钢筋排布,电气专业线盒、线管、线槽预留,暖通、给排水专业开槽、开洞,生产、施工措施性埋件预留预埋等进行修改。
七、完成模型整体信息输出和单个构件出图
①所有构件修改完善后,通过视图选项卡下创建选项组中剖面、平面视图、立面、明细表命令,分别得到构件连接节点、预制构件平面布置图、建筑各立面(剖面)图、图纸目录、材料总量统计表、预制构件数量统计表。
②根据实际情况确定图纸的版幅大小,图框信息,视图比例,标注样式,字体等相关信息,使用视图选项卡下创建选项组中剖面命令,创建构件的正面、侧面、顶面、底面、水平剖面、竖向剖面等视图,使用修改选项卡测量选项组尺寸标注命令对每个视图所示的构件截面的几何形体突变位置创建对齐尺寸标注,并创建构件总尺寸标注。使用视图选项卡下创建选项组中三维视图命令创建构件立体模型。使用视图选项卡下创建选项组中明细表命令创建构件混凝土用量统计表,完成模板图出图。
③使用视图选项卡下创建选项组中剖面命令,创建构件的正面、侧面、顶面、水平剖面、竖向剖面等透视视图,使用修改选项卡测量选项组尺寸标注命令对每个视图所示的构件透视截面的钢筋排布创建对齐尺寸标注,并创建构件总尺寸标注。使用视图选项卡下创建选项组中明细表命令创建构件钢筋统计表,完成配筋图出图。仿照此双窗剪力墙的出图过程,可完成整体模型中其他各个构件出图。
本发明的有益效果:(1)告别二维抽象绘制方式,实现可视化的三维建模;(2)同一模型共同体现各专业信息,实现专业互通,避免重复性调整修改;(3)缩短同类型构件建模和出图时间,提升效率,统一质量,便于管理。
附图说明
图1为本发明三维协同设计方法流程图;
图2-3为依据设计图纸资料完成装配式建筑的拆分设计操作过程示意图;
图4-5为Revit项目中心文件准备操作过程示意图;
图6-10为调用参数化构件族库得到项目所需各个预制构件操作过程示意图;
图11-12为调用现浇节点族库得到项目所需各类型现浇节点族文件操作过程及生成的相应节点模型示意图;
图13-24为将参数化构件和现浇节点载入Revit项目中心文件组建整体模型操作过程示意图;
图25为完成各类型构件的修改工作操作过程示意图;
图26-30为完成模型整体信息输出和单个构件出图操作过程示意图。
具体实施方式
本发明中提出的方法适用于装配式混凝土结构,其中包括剪力墙结构和框架结构。这里仅以装配整体式剪力墙结构形式为例进行说明。值得注意的是,本方法中涉及到的所有操作流程都是基于网络存储器环境完成的。本方法相关流程详细说明如下:
1、依据方案设计及初步设计完成后的图纸资料完成装配式建筑的拆分设计
主要操作流程:
①如图2所示,启动AutoCAD程序,点击菜单栏中打开选项,在选择文件弹框中选择需要打开的.dwg格式的项目结构图纸(北京XX项目结构图纸);
②如图3所示,新建结构拆分边线的图层,在对应的图层中完成相应结构的拆分布置,并对各个构件进行编号;
③单击AutoCAD图标,选择另存为菜单中图形选项;
④在图形另存为弹框中,选择文件需要保存的路径,将文件名更改为北京XX项目拆分平面布置图,最后单击保存;
⑤启动Excel程序,将拆分完成的预制构件对应编号信息,将各构件的相关参数整理到表格中,并将各个构件按照类型进行分类整理。
2、Revit项目中心文件准备
主要流程:
①启动Revit程序,点击项目结构样板选项;
②如图4所示,点击插入选项卡中导入选项组中导入CAD选项;
③在导入CAD格式弹框中选择需要导入的.dwg格式文件,并将选项卡中定位选项选择手动-中心,图层/标高选项选择可见,放置于选项选择标高1,导入单位选项选择毫米,然后点击打开;
④如图5所示,选择标高1视图,点击建筑选项卡中基准选项组下轴网选项,依次绘制竖向和横向轴网;
⑤选择北立面视图,点击建筑选项卡中基准选项组下标高选项,绘制标高轴网;
⑥单击Revit图标,在下拉菜单中选择保存;
⑦在另存为弹框中选择项目中心文件的保存路径,并将文件名更改为北京XX项目中心文件,最后单击保存;
3、调用参数化构件族库,得到项目所需各个预制构件
主要流程:
①如图6所示,打开参数化构件族库文件夹,选择对应的构件类型,参数化构件族库中包含叠合板、外墙、内墙、楼梯、梁、柱、空调板、PCF板参数化构件类型,此处以外墙为例进行说明;
②如图7所示,以带双窗的外墙为例进行说明,双击WQC2(300+-XXXX-双暗柱宽-YYYY-300+)参数化样板文件;
③如图8所示,单击修改选项卡下属性选项组中族类型选项;
④ 如图9所示,在族类型弹框中,单击重命名,在名称弹框中输入WQC2-001,单击确定;
⑤如图10所示,按照外墙WQC2-001相关的参数依次将数据填入族类型表格中,单击确定,得到最终的参数化模型;
⑥单击Revit图标,在下拉菜单中选择另存为中的族选项;
⑦在另存为弹框中,选择文件保存的路径,并将文件名更改为WQC2-001,最后单击保存;
⑧重复上述步骤生成项目中所有外墙构件族文件;
⑨参考外墙的生成方式,生成内墙、叠合板、空调板、楼梯、PCF板等各类型的预制构件;
4、调用现浇节点族库,得到项目所需各类型现浇节点族文件
主要流程:
①打开现浇节点族库文件夹,选择项目中涉及到的节点类型,这里以一个T字型节点为例;
②单击修改选项卡下属性选项组中的族类型选项;
③如图11所示,在族类型弹框中单击重命名,在名称弹框中输入T-01,单击确定;
④根据拆分布置图中得到的T-01有关的参数将数值输入族类型表格中,并单击确定;
⑤如图12所示,生成最终的T型节点;
⑥单击Revit图标,在下拉菜单中选择另存为下的族文件;
⑦在另存为的弹框中选择现浇节点需要保存的路径,并将文件名改为T-01,最后单击保存;
⑧重复上述步骤生成项目中所有现浇T型节点族文件,参考T型节点的生成方式,生成L型节点、一型节点等各类型的节点族文件;
5、将参数化构件和现浇节点载入Revit项目中心文件组建整体模型
主要流程:
①如图13所示,打开Revit项目中心文件,单击插入选项卡下从库中载入选项组中载入族选项;
②在载入族弹框中,选择WQC2-001族文件,单击打开;
③如图14所示,单击结构选项卡下模型选项组中构件选项;
④如图15所示,在属性选项卡中选择WQC2-001,并在视图窗口上单击完成构件放置;
⑤如图16所示,选择修改选项卡下修改选项组中对齐命令,点击平面布置图上对应构件的上侧边线,再点击载入的构件的上侧边线;使用对齐命令,点击平面布置图上对应构件的左侧边线,再点击载入的构件的左侧边线,使载入的构件与布置图所示边线重合;若载入的构件方向与布置图所示方向不同,则需先选择修改选项卡下修改选项组中旋转命令,使载入的构件与布置图所示方向一致;
⑥如图17所示,重复载入构件,放置,调整操作完成构件整体搭建;
⑦如图18-21所示,鼠标框选全部的构件,单击临时隐藏/隔离选项卡,选择隐藏图元选项;单击结构选项卡下结构选项组中墙选项;调整结构墙放置的位置,标高选择2F,深度选择1F,定位线选择墙中心线;单击编辑类型选项,在弹出的类型属性弹框中单击复制按钮,在名称弹框中的名称改为内部-200mm混凝土,单击确定;之后单击编辑按钮,在编辑部件弹框中将样本的高度改为2800,结构厚度改为200,并单击确定;再次单击确定回到主界面,依据底图绘制内部剪力墙;仿照内剪力墙的绘制方式,绘制项目楼板。
⑧如图22-24所示,单击工作集选项,在弹出的工作集弹框中单击新建,在新建工作集弹框中,将新工作集的名称改为WQC2-001,并单击确定,选择视图中的WQC2-001构件,在属性快捷窗口中的工作集选项中选择WQC2-001单击应用,重复以上操作,将模型中所有构件分配到与构件名相同的工作集中。
6、完成各类型构件的修改工作
如图25所示,选中WQC2-001构件,双击进入构件编辑窗口,借助修改选项卡下修改选项组编辑命令,对构件的钢筋排布,电气专业线盒、线管、线槽预留,暖通、给排水专业开槽、开洞,生产、施工措施性埋件预留预埋等进行修改,修改完成后单击载入到项目并关闭选项,在弹框中选择覆盖原来的版本选项更新构件样式;仿照WQC2-001的修改方式,完成所有其他构件的修改工作。项目文件存储于网络存储器上,通过工作共享和工作集功能,可以实现多人同时分别对多个构件进行编辑,并且专人负责专项,修改完成后可实时同步至整体的模型中,避免了重复工作或信息滞后。
7、完成模型整体信息输出和单个构件出图
①如图26-28所示,所有构件修改完善后,通过视图选项卡下创建选项组中剖面、平面视图、立面、明细表命令,分别得到构件连接节点、预制构件平面布置图、建筑各立面(剖面)图、图纸目录、材料总量统计表、预制构件数量统计表。
②根据实际情况确定图纸的版幅大小,图框信息,视图比例,标注样式,字体等相关信息,使用视图选项卡下创建选项组中剖面命令,创建构件的正面、侧面、顶面、底面、水平剖面、竖向剖面等视图,使用修改选项卡测量选项组尺寸标注命令对每个视图所示的构件截面的几何形体突变位置创建对齐尺寸标注,并创建构件总尺寸标注。使用视图选项卡下创建选项组中三维视图命令创建构件立体模型。使用视图选项卡下创建选项组中明细表命令创建构件混凝土用量统计表,完成模板图出图。
③如图29-30所示,使用视图选项卡下创建选项组中剖面命令,创建构件的正面、侧面、顶面、水平剖面、竖向剖面等透视视图,使用修改选项卡测量选项组尺寸标注命令对每个视图所示的构件透视截面的钢筋排布创建对齐尺寸标注,并创建构件总尺寸标注。使用视图选项卡下创建选项组中明细表命令创建构件钢筋统计表,完成配筋图出图。仿照此双窗剪力墙的出图过程,可完成整体模型中其他各个构件出图。

Claims (7)

1.一种装配式混凝土结构三维协同设计方法,其特征在于,包括以下步骤:
一、在方案设计和初步设计完成后,依据设计图纸完成装配式建筑拆分设计;
二、Revit项目中心文件准备;
三、调用参数化构件族库,得到项目所需各个预制构件;
四、调用现浇节点族库,得到项目所需各类型现浇节点族文件;
五、将参数化构件和现浇节点载入Revit项目中心文件组建整体模型;
六、完成各类型构件的修改工作;
七、完成模型整体信息输出和单个构件出图。
2.根据权利要求1所述的一种装配式混凝土结构三维协同设计方法,其特征在于,在步骤一中,应新建结构拆分边线图层,在对应的图层中完成相应结构的拆分布置。
3.根据权利要求1所述的一种装配式混凝土结构三维协同设计方法,其特征在于,对于所述步骤三,其流程为:在参数化构件族库中选择对应的构件类型以及参数化样板文件,按设计输入构件的相关参数,得到参数化模型;建立的预制构件包括外墙、内墙、叠合板、空调板、楼梯以及PCF板。
4.根据权利要求1所述的一种装配式混凝土结构三维协同设计方法,其特征在于,对于所述步骤四,其流程为:在现浇节点族库中选择项目中涉及到的节点类型,按设计输入构件的相关参数,生成相应类型的节点,建立的现浇节点族包括一型节点、L型节点和T型节点。
5.根据权利要求1所述的一种装配式混凝土结构三维协同设计方法,其特征在于,对于所述步骤五,在载入并放置构件后要调整构件方向,保证载入的构件与布置图所示方向一致。
6.根据权利要求1所述的一种装配式混凝土结构三维协同设计方法,其特征在于,对于所述步骤六,对构件的修改包括钢筋排布,电气专业线盒、线管、线槽预留,暖通、给排水专业开槽、开洞,埋件预留预埋。
7.根据权利要求1所述的一种装配式混凝土结构三维协同设计方法,其特征在于,对于所述步骤七,输出的整体信息包括构件连接节点、预制构件平面布置图、建筑各立面图、剖面图、图纸目录、材料总量统计表、预制构件数量统计表;对单个构件的信息表达包括对每个视图所示的构件截面的几何形体突变位置创建对齐尺寸标注,并创建构件总尺寸标注以及为每个视图所示截面的钢筋排布创建对齐尺寸标注。
CN201710631576.1A 2017-07-28 2017-07-28 一种装配式混凝土结构三维协同设计方法 Active CN107391862B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710631576.1A CN107391862B (zh) 2017-07-28 2017-07-28 一种装配式混凝土结构三维协同设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710631576.1A CN107391862B (zh) 2017-07-28 2017-07-28 一种装配式混凝土结构三维协同设计方法

Publications (2)

Publication Number Publication Date
CN107391862A true CN107391862A (zh) 2017-11-24
CN107391862B CN107391862B (zh) 2021-04-13

Family

ID=60342799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710631576.1A Active CN107391862B (zh) 2017-07-28 2017-07-28 一种装配式混凝土结构三维协同设计方法

Country Status (1)

Country Link
CN (1) CN107391862B (zh)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388719A (zh) * 2018-02-08 2018-08-10 墨点狗智能科技(东莞)有限公司 基于bim的装配式建筑快速工艺设计方法
CN108416076A (zh) * 2017-12-19 2018-08-17 江苏镇江建筑科学研究院集团股份有限公司 一种基于bim技术的装配式建筑设计方法
CN108664697A (zh) * 2018-04-03 2018-10-16 山东住工装配建筑有限公司 一种基于bim的装配式构件参数化设计方法
CN109147013A (zh) * 2018-09-30 2019-01-04 深圳市华阳国际工程设计股份有限公司 一种构件的深化图自动生成方法、设备及存储介质
CN109344506A (zh) * 2018-09-30 2019-02-15 深圳市华阳国际建筑产业化有限公司 Bim三维模型的深化图自动生成方法、设备及存储介质
CN109472084A (zh) * 2018-11-05 2019-03-15 长沙远大住工智能科技有限公司 装配式建筑设计方法及系统、计算机设备和存储介质
CN109680960A (zh) * 2018-12-28 2019-04-26 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN109680959A (zh) * 2018-12-28 2019-04-26 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN109680961A (zh) * 2018-12-28 2019-04-26 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN110440950A (zh) * 2019-07-29 2019-11-12 湖北省水利水电规划勘测设计院 基于光纤测温的大体积混凝土温度监测可视化系统及方法
CN110543710A (zh) * 2019-08-23 2019-12-06 中国中材国际工程股份有限公司 基于Revit的水泥工程三维非标准件设计方法
CN110543707A (zh) * 2019-08-21 2019-12-06 中国中材国际工程股份有限公司 一种基于Revit创建工厂非标准件的出图方法
CN110704932A (zh) * 2019-10-09 2020-01-17 北京中外建建筑设计有限公司 一种基于Revit软件预制楼梯详图快速出图方法
CN110728086A (zh) * 2019-09-20 2020-01-24 中建一局集团建设发展有限公司 机电bim二三维一体化装配式自动万能族制作方法
CN110866304A (zh) * 2019-12-25 2020-03-06 中铁建设集团有限公司 一种基于钢筋模板一体化直墙构件模型的创建方法
CN110866303A (zh) * 2019-12-25 2020-03-06 中铁建设集团有限公司 一种基于钢筋模板一体化t型墙构件模型的创建方法
CN110895615A (zh) * 2019-12-25 2020-03-20 中铁建设集团有限公司 一种基于钢筋模板一体化l型墙构件模型的创建方法
CN110968907A (zh) * 2019-12-04 2020-04-07 北京建都设计研究院有限责任公司 基于bim的集团房地产建设工程的实施方法
CN111062082A (zh) * 2019-12-25 2020-04-24 中铁建设集团有限公司 一种基于一体化模板安装的剪力墙结构设计系统
CN111177827A (zh) * 2019-12-12 2020-05-19 武汉市政工程设计研究院有限责任公司 一种结构配筋断面图的自动成图方法、装置和系统
CN111428295A (zh) * 2020-03-17 2020-07-17 中色科技股份有限公司 一种用于bim正向设计的大车间采暖出图方法
CN111950979A (zh) * 2020-08-03 2020-11-17 上海原构设计咨询有限公司 一种提高协同设计效率的方法
CN112052490A (zh) * 2020-05-22 2020-12-08 杭州嗡嗡科技有限公司 基于bim的装配式深化设计方法及其设计工具
CN112446084A (zh) * 2020-12-14 2021-03-05 四川蓉信开工程设计有限公司 Revit与传统绘图软件交互设计的适应性出图方法
CN112464350A (zh) * 2020-12-14 2021-03-09 四川蓉信开工程设计有限公司 快速生成柱网、主梁三维模型的智能设计方法
CN112528357A (zh) * 2019-08-31 2021-03-19 广东博越智慧建造科技有限公司 基于建筑信息模型的预制件和铝模排布模拟建造的方法
CN113032868A (zh) * 2021-03-08 2021-06-25 万翼科技有限公司 预制构件管理方法、装置、电子设备及存储介质
CN113449365A (zh) * 2021-06-25 2021-09-28 上海原构设计咨询有限公司 一种装配式建筑信息模型设计平台
CN113553453A (zh) * 2021-07-20 2021-10-26 广联达科技股份有限公司 一种二维图纸标注方法、装置及电子设备
CN113836613A (zh) * 2021-09-03 2021-12-24 上海原构设计咨询有限公司 一种基于CAD和Revit的二、三维协同设计平台
CN113902877A (zh) * 2021-09-30 2022-01-07 中北大学 一种基于revit族图元模型互导的方法
CN114118977A (zh) * 2021-12-06 2022-03-01 中科智领(青岛)数字科技有限公司 基于Revit的同步中心模型校审信息的数据处理方法
CN114925427A (zh) * 2022-05-19 2022-08-19 中国建筑第二工程局有限公司 一种基于bim的屈曲约束支撑设计方法
CN115577437A (zh) * 2022-11-21 2023-01-06 广东卓智设计工程有限公司 一种基于bim技术的装配式建筑的施工方法及系统
CN113553453B (zh) * 2021-07-20 2024-08-02 广联达科技股份有限公司 一种二维图纸标注方法、装置及电子设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130338974A1 (en) * 2012-06-15 2013-12-19 Kevin Kochman System and method for efficiently importing objects into a computer-aided design program
CN105279609A (zh) * 2015-10-26 2016-01-27 中国十七冶集团有限公司 一种基于bim跨高速桥梁施工交通管制的施工方法
CN105888317A (zh) * 2016-04-19 2016-08-24 中建三局第二建设工程有限责任公司 中央制冷机房模块化预制及装配化施工方法
CN106599477A (zh) * 2016-12-15 2017-04-26 广州华森建筑与工程设计顾问有限公司 一种基于revit三维平台桩基自动生成与三维算量方法
CN206174195U (zh) * 2016-09-29 2017-05-17 沈阳建筑大学建筑设计研究院 一种装配式混凝土剪力墙拆分、拼装连接结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130338974A1 (en) * 2012-06-15 2013-12-19 Kevin Kochman System and method for efficiently importing objects into a computer-aided design program
CN105279609A (zh) * 2015-10-26 2016-01-27 中国十七冶集团有限公司 一种基于bim跨高速桥梁施工交通管制的施工方法
CN105888317A (zh) * 2016-04-19 2016-08-24 中建三局第二建设工程有限责任公司 中央制冷机房模块化预制及装配化施工方法
CN206174195U (zh) * 2016-09-29 2017-05-17 沈阳建筑大学建筑设计研究院 一种装配式混凝土剪力墙拆分、拼装连接结构
CN106599477A (zh) * 2016-12-15 2017-04-26 广州华森建筑与工程设计顾问有限公司 一种基于revit三维平台桩基自动生成与三维算量方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
L.FREGONESE: "BIM: An integrated model for planned and preventive maintenance of architectural heritage", 《IEEE XPLORE》 *
孟祥良 等: "Revit软件在装配式住宅设计中的应用研究", 《绿色建筑》 *
王建宇 等: "二次开发实现从AUTOCAD到REVIT快速翻模技术研究", 《土木建筑工程信息技术》 *

Cited By (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108416076A (zh) * 2017-12-19 2018-08-17 江苏镇江建筑科学研究院集团股份有限公司 一种基于bim技术的装配式建筑设计方法
CN108388719A (zh) * 2018-02-08 2018-08-10 墨点狗智能科技(东莞)有限公司 基于bim的装配式建筑快速工艺设计方法
CN108664697A (zh) * 2018-04-03 2018-10-16 山东住工装配建筑有限公司 一种基于bim的装配式构件参数化设计方法
CN109147013A (zh) * 2018-09-30 2019-01-04 深圳市华阳国际工程设计股份有限公司 一种构件的深化图自动生成方法、设备及存储介质
CN109344506A (zh) * 2018-09-30 2019-02-15 深圳市华阳国际建筑产业化有限公司 Bim三维模型的深化图自动生成方法、设备及存储介质
CN109344506B (zh) * 2018-09-30 2022-03-04 深圳市华阳国际建筑产业化有限公司 Bim三维模型的深化图自动生成方法、设备及存储介质
CN109472084A (zh) * 2018-11-05 2019-03-15 长沙远大住工智能科技有限公司 装配式建筑设计方法及系统、计算机设备和存储介质
CN109680961A (zh) * 2018-12-28 2019-04-26 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN109680960B (zh) * 2018-12-28 2021-02-02 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN109680959A (zh) * 2018-12-28 2019-04-26 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN109680960A (zh) * 2018-12-28 2019-04-26 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN109680961B (zh) * 2018-12-28 2021-02-02 中民筑友科技投资有限公司 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN110440950A (zh) * 2019-07-29 2019-11-12 湖北省水利水电规划勘测设计院 基于光纤测温的大体积混凝土温度监测可视化系统及方法
CN110543707A (zh) * 2019-08-21 2019-12-06 中国中材国际工程股份有限公司 一种基于Revit创建工厂非标准件的出图方法
CN110543707B (zh) * 2019-08-21 2024-02-13 中国中材国际工程股份有限公司 一种基于Revit创建工厂非标准件的出图方法
CN110543710A (zh) * 2019-08-23 2019-12-06 中国中材国际工程股份有限公司 基于Revit的水泥工程三维非标准件设计方法
CN112528357A (zh) * 2019-08-31 2021-03-19 广东博越智慧建造科技有限公司 基于建筑信息模型的预制件和铝模排布模拟建造的方法
CN110728086A (zh) * 2019-09-20 2020-01-24 中建一局集团建设发展有限公司 机电bim二三维一体化装配式自动万能族制作方法
CN110704932A (zh) * 2019-10-09 2020-01-17 北京中外建建筑设计有限公司 一种基于Revit软件预制楼梯详图快速出图方法
CN110968907A (zh) * 2019-12-04 2020-04-07 北京建都设计研究院有限责任公司 基于bim的集团房地产建设工程的实施方法
CN111177827A (zh) * 2019-12-12 2020-05-19 武汉市政工程设计研究院有限责任公司 一种结构配筋断面图的自动成图方法、装置和系统
CN110866304B (zh) * 2019-12-25 2024-02-02 中铁建设集团有限公司 一种基于钢筋模板一体化直墙构件模型的创建方法
CN111062082B (zh) * 2019-12-25 2021-10-29 中铁建设集团有限公司 一种基于一体化模板安装的剪力墙结构设计系统
CN110895615A (zh) * 2019-12-25 2020-03-20 中铁建设集团有限公司 一种基于钢筋模板一体化l型墙构件模型的创建方法
CN111062082A (zh) * 2019-12-25 2020-04-24 中铁建设集团有限公司 一种基于一体化模板安装的剪力墙结构设计系统
CN110866303A (zh) * 2019-12-25 2020-03-06 中铁建设集团有限公司 一种基于钢筋模板一体化t型墙构件模型的创建方法
CN110866304A (zh) * 2019-12-25 2020-03-06 中铁建设集团有限公司 一种基于钢筋模板一体化直墙构件模型的创建方法
CN110866303B (zh) * 2019-12-25 2024-02-02 中铁建设集团有限公司 一种基于钢筋模板一体化t型墙构件模型的创建方法
CN111428295B (zh) * 2020-03-17 2023-02-28 中色科技股份有限公司 一种用于bim正向设计的大车间采暖出图方法
CN111428295A (zh) * 2020-03-17 2020-07-17 中色科技股份有限公司 一种用于bim正向设计的大车间采暖出图方法
CN112052490A (zh) * 2020-05-22 2020-12-08 杭州嗡嗡科技有限公司 基于bim的装配式深化设计方法及其设计工具
CN111950979B (zh) * 2020-08-03 2024-01-09 上海原构设计咨询有限公司 一种提高协同设计效率的方法
CN111950979A (zh) * 2020-08-03 2020-11-17 上海原构设计咨询有限公司 一种提高协同设计效率的方法
CN112464350A (zh) * 2020-12-14 2021-03-09 四川蓉信开工程设计有限公司 快速生成柱网、主梁三维模型的智能设计方法
CN112446084A (zh) * 2020-12-14 2021-03-05 四川蓉信开工程设计有限公司 Revit与传统绘图软件交互设计的适应性出图方法
CN112464350B (zh) * 2020-12-14 2023-08-25 四川蓉信开工程设计有限公司 快速生成柱网、主梁三维模型的智能设计方法
CN113032868A (zh) * 2021-03-08 2021-06-25 万翼科技有限公司 预制构件管理方法、装置、电子设备及存储介质
CN113032868B (zh) * 2021-03-08 2023-10-27 深圳市万翼数字技术有限公司 预制构件管理方法、装置、电子设备及存储介质
CN113449365A (zh) * 2021-06-25 2021-09-28 上海原构设计咨询有限公司 一种装配式建筑信息模型设计平台
CN113449365B (zh) * 2021-06-25 2023-07-14 上海原构设计咨询有限公司 一种装配式建筑信息模型设计平台
CN113553453B (zh) * 2021-07-20 2024-08-02 广联达科技股份有限公司 一种二维图纸标注方法、装置及电子设备
CN113553453A (zh) * 2021-07-20 2021-10-26 广联达科技股份有限公司 一种二维图纸标注方法、装置及电子设备
CN113836613B (zh) * 2021-09-03 2023-07-21 上海原构设计咨询有限公司 一种基于CAD和Revit的二、三维协同设计平台
CN113836613A (zh) * 2021-09-03 2021-12-24 上海原构设计咨询有限公司 一种基于CAD和Revit的二、三维协同设计平台
CN113902877A (zh) * 2021-09-30 2022-01-07 中北大学 一种基于revit族图元模型互导的方法
CN113902877B (zh) * 2021-09-30 2024-05-17 中北大学 一种基于revit族图元模型互导的方法
CN114118977A (zh) * 2021-12-06 2022-03-01 中科智领(青岛)数字科技有限公司 基于Revit的同步中心模型校审信息的数据处理方法
CN114925427B (zh) * 2022-05-19 2022-12-13 中国建筑第二工程局有限公司 一种基于bim的屈曲约束支撑设计方法
CN114925427A (zh) * 2022-05-19 2022-08-19 中国建筑第二工程局有限公司 一种基于bim的屈曲约束支撑设计方法
CN115577437B (zh) * 2022-11-21 2023-02-28 广东卓智设计工程有限公司 一种基于bim技术的装配式建筑的施工方法及系统
CN115577437A (zh) * 2022-11-21 2023-01-06 广东卓智设计工程有限公司 一种基于bim技术的装配式建筑的施工方法及系统

Also Published As

Publication number Publication date
CN107391862B (zh) 2021-04-13

Similar Documents

Publication Publication Date Title
CN107391862A (zh) 一种装配式混凝土结构三维协同设计方法
CN110929328A (zh) 基于bim的混凝土装配式建筑施工方法
Hitchcock et al. Transforming IFC architectural view BIMs for energy simulation: 2011
CN104517008B (zh) 基于bim的剪力墙边缘构件参数化设计方法
CN107341290B (zh) 基于bim的梁板预制与现浇结构工程量提取系统及方法
CN109147045A (zh) 基于拓扑分区的城市片区地质三维自动建模方法
JP2001357088A (ja) パラメトリック機能を有する3次元モデリングシステムと、同システムによるパラメータ編集方法
Park BIM-based parametric design methodology for modernized Korean traditional buildings
CN108427784A (zh) 基于bim的装配式工艺设计数据处理方法及装置
CN107292038A (zh) 一种叠合板预制构件的参数化建模生产方法
CN106844867A (zh) 装配式建筑设计方法及装置
CN113449365A (zh) 一种装配式建筑信息模型设计平台
CN115510545A (zh) 一种基于bim的三维建筑模型拆分处理方法
CN107229794A (zh) 一种cae和vr的模型构建系统及其管理方法
CN108416076A (zh) 一种基于bim技术的装配式建筑设计方法
CN113626911A (zh) 基于第一主应力矢量分布的混凝土3d打印路径优化方法
Goes et al. Design coordination with Building Information Modeling: a case study
KR20140124942A (ko) 3ds Max를 이용한 가상 건축물 설계 시스템
Afzal et al. Systematic investigation of interoperability issues between BIM and BEM
WO2021042585A1 (zh) 一种建筑构件的 cdm 建模方法
Karhu Product model based design of precast facades
CN116029035A (zh) 基于cad图形的装配式建筑构件的生产文件生成方法及应用
JP2005018673A (ja) 工程表作成支援方法
Xiao et al. Model analysis and optimization of BIM technology in high-rise shear wall residential structure
CN113870383A (zh) 建筑图纸的自动排板方法和装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant