CN112528357A - 基于建筑信息模型的预制件和铝模排布模拟建造的方法 - Google Patents

基于建筑信息模型的预制件和铝模排布模拟建造的方法 Download PDF

Info

Publication number
CN112528357A
CN112528357A CN201910820121.3A CN201910820121A CN112528357A CN 112528357 A CN112528357 A CN 112528357A CN 201910820121 A CN201910820121 A CN 201910820121A CN 112528357 A CN112528357 A CN 112528357A
Authority
CN
China
Prior art keywords
model
aluminum
construction
models
concrete prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910820121.3A
Other languages
English (en)
Inventor
辛炯业
田岳龙
鲁海
谭国进
徐书峰
湛振泳
谢亮
陈明明
訾衣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Longyue Construction Engineering Co.,Ltd.
Original Assignee
Guangdong Boyue Intelligent Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Boyue Intelligent Construction Technology Co ltd filed Critical Guangdong Boyue Intelligent Construction Technology Co ltd
Priority to CN201910820121.3A priority Critical patent/CN112528357A/zh
Publication of CN112528357A publication Critical patent/CN112528357A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种基于建筑信息模型的预制件和铝模排布模拟建造的方法,包括以下步骤:步骤一:通过将混凝土预制件的图纸导入Autodesk Revit中,建立混凝土预制件的三维模型,然后对每一块混凝土预制件的模型文件进行保存,本发明,基于建筑信息模型的预制件和铝模排布模拟建造的方法,通过前置建筑信息模型工作,对项目的装配式和铝模进行合理排布,对前期铝模的生产以及数量尺寸进行排布,同时,在预制构件和铝模之间,对铝模孔洞进行提前预判和预留,并通过施工动画进行表达,减少项目现场实施出现的错漏,减少项目成本。

Description

基于建筑信息模型的预制件和铝模排布模拟建造的方法
技术领域
本发明涉及建筑领域,特别涉及一种基于建筑信息模型的预制件和铝模排布模拟建造的方法。
背景技术
装配式项目近年来开始运用,为了提高工程质量,推广铝模的使用,因此两者都需要高精度的情况下进行,工程才能达到规定,同时,装配式项目也响应国家号召,推动了绿色建筑的使用。
在装配式项目中,装配式混凝土预制件和铝模组合建造能达到高标准、高精度、高质量的要求,而且基于装配式混凝土预制件和铝模结构,其主要体现于在以下三大好处:快(装配式项目工期快)、净(能减少90%的建筑垃圾)和好(预制构件质量高)的特点。
上述三大好处和铝模结合在预制构件连接节点支模体系的提升,两者高精度运用相结合,对项目更为苛刻,但是,以往项目皆基于传统施工,工人对装配式以及铝模的应用还不成熟,习惯于传统施工的工人,现场出现铝模拼装乱拼,预制构件吊装预留钢筋没提前预留好位置,导致安装对不上位置,导致返工率高,装配精度不足、错误率高等问题。
发明内容
本发明的目的在于提供一种通过动画表达、减少施工错漏的一种基于建筑信息模型的预制件和铝模排布模拟建造的方法。
本发明的目的是这样实现的:
一种基于建筑信息模型的预制件和铝模排布模拟建造的方法:
步骤一:通过将混凝土预制件的图纸导入Autodesk Revit中,建立混凝土预制件的三维模型,然后对每一块混凝土预制件的模型文件进行保存;
步骤二:创建主体结构模型,根据图纸绘制标高、轴网等对模型进行定位,通过图纸依次创建柱、墙、梁、板模型,并将步骤一创建的混凝土预制件模型导入主体结构模型中,通过移动将混凝土预制件放置相对应位置,再将其他现浇的主体进行补充,形成一个完整的模型;
步骤三:选择结构模型进行配筋,通过设置剖面对现浇部分主体进行配筋,同时对需要预埋的水电模型进行布置,通过三维模型对钢筋以及水电预埋的位置进行调整,避免后面封模产生碰撞;
步骤四:对模型进行配模,创建墙体铝模、梁模、K板、铝模阴阳角的模型,并进行参数化控制,根据图纸信息,对铝模进行拼装,隐藏部分现浇模型,在三维视图中绘制背楞以及拉杆,拉杆与背楞高度通过视图剖面调解高度避开钢筋碰撞,同时需要满足背楞安装规范;
步骤五:待铝模、拉杆以及背楞完成后,布置斜撑,将完整模型图纸导出为nwc格式文件备用,接着将nwc格式文件导入navisworks软件中操作;
步骤六:在navisworks软件中,将模型进行构建集归类,在将构件集文件进行动画编辑,从构件吊装、钢筋绑扎、封模、现浇施工顺序进行动画编辑,并将各施工工艺串联成一个完整达到施工交底要求的动画视频。
本发明的有益效果如下:
本发明,基于建筑信息模型的预制件和铝模排布模拟建造的方法,通过前置建筑信息模型工作,对项目的装配式和铝模进行合理排布,对前期铝模的生产以及数量尺寸进行排布,同时,在预制构件和铝模之间,对铝模孔洞进行提前预判和预留,并通过施工动画进行表达,减少项目现场实施出现的错漏,减少项目成本。
附图说明
图1为混凝土预制件示意图。
图2为混凝土预制件定位示意图。
图3为水电和钢筋预埋示意图。
图4为铝模、背楞和斜撑装配示意图。
图5为现浇部分示意图。
具体实施方式
下面结合附图及实施例对本发明作进一步描述:
本发明的目的是这样实现的:
实施例,结合图1到图5所示,一种基于建筑信息模型的混凝土预制件和铝模5排布模拟建造的方法:
步骤一:通过将混凝土预制件1的图纸导入Autodesk Revit中,建立混凝土预制件1的三维模型,然后对每一块混凝土预制件1的模型文件进行保存;
步骤二:创建主体结构模型2,根据图纸绘制标高、轴网等对模型进行定位,通过图纸依次创建柱、墙、梁、板模型,并将步骤一创建的混凝土预制件1模型导入主体结构模型2中,通过移动将混凝土预制件1放置相对应位置,再将其他现浇的主体进行补充,形成一个完整的模型;
步骤三:选择结构模型进行配筋,通过设置剖面对现浇部分主体进行配筋,同时对需要预埋的水电模型进行布置,通过三维模型对钢筋3以及水电4预埋的位置进行调整,避免后面封模产生碰撞;
步骤四:对模型进行配模,创建墙体铝模5、梁模、K板、铝模阴阳角的模型,并进行参数化控制,根据图纸信息,对铝模5进行拼装,隐藏部分现浇模型,在三维视图中绘制背楞6以及拉杆7,拉杆7与背楞6高度通过视图剖面调解高度避开钢筋3碰撞,同时需要满足背楞6安装规范;
步骤五:待铝模5、拉杆7以及背楞6完成后,布置斜撑8,将完整模型图纸导出为nwc格式文件备用,接着将nwc格式文件导入navisworks软件中操作;
步骤六:在navisworks软件中,将模型进行构建集归类,在将构件集文件进行动画编辑,从构件吊装、钢筋3绑扎、封模、现浇施工顺序进行动画编辑,并将各施工工艺串联成一个完整达到施工交底要求的动画视频。
本发明,基于建筑信息模型的混凝土预制件1和铝模5排布模拟建造的方法,通过前置建筑信息模型工作,对项目的装配式和铝模5进行合理排布,对前期铝模5的生产以及数量尺寸进行排布,同时,在预制构件和铝模5之间,对铝模5孔洞进行提前预判和预留,并通过施工动画进行表达,减少项目现场实施出现的错漏,减少项目成本。

Claims (1)

1.一种基于建筑信息模型的预制件和铝模排布模拟建造的方法,其特征在于,包括以下步骤:
步骤一:通过将混凝土预制件的图纸导入Autodesk Revit中,建立混凝土预制件的三维模型,然后对每一块混凝土预制件的模型文件进行保存;
步骤二:创建主体结构模型,根据图纸绘制标高、轴网等对模型进行定位,通过图纸依次创建柱、墙、梁、板模型,并将步骤一创建的混凝土预制件模型导入主体结构模型中,通过移动将混凝土预制件放置相对应位置,再将其他现浇的主体进行补充,形成一个完整的模型;
步骤三:选择结构模型进行配筋,通过设置剖面对现浇部分主体进行配筋,同时对需要预埋的水电模型进行布置,通过三维模型对钢筋以及水电预埋的位置进行调整,避免后面封模产生碰撞;
步骤四:对模型进行配模,创建墙体铝模、梁模、K板、铝模阴阳角的模型,并进行参数化控制,根据图纸信息,对铝模进行拼装,隐藏部分现浇模型,在三维视图中绘制背楞以及拉杆,拉杆与背楞高度通过视图剖面调解高度避开钢筋碰撞,同时需要满足背楞安装规范;
步骤五:待铝模、拉杆以及背楞完成后,布置斜撑,将完整模型图纸导出为nwc格式文件备用,接着将nwc格式文件导入navisworks软件中操作;
步骤六:在navisworks软件中,将模型进行构建集归类,在将构件集文件进行动画编辑,从构件吊装、钢筋绑扎、封模、现浇施工顺序进行动画编辑,并将各施工工艺串联成一个完整达到施工交底要求的动画视频。
CN201910820121.3A 2019-08-31 2019-08-31 基于建筑信息模型的预制件和铝模排布模拟建造的方法 Pending CN112528357A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910820121.3A CN112528357A (zh) 2019-08-31 2019-08-31 基于建筑信息模型的预制件和铝模排布模拟建造的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910820121.3A CN112528357A (zh) 2019-08-31 2019-08-31 基于建筑信息模型的预制件和铝模排布模拟建造的方法

Publications (1)

Publication Number Publication Date
CN112528357A true CN112528357A (zh) 2021-03-19

Family

ID=74974089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910820121.3A Pending CN112528357A (zh) 2019-08-31 2019-08-31 基于建筑信息模型的预制件和铝模排布模拟建造的方法

Country Status (1)

Country Link
CN (1) CN112528357A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114036595A (zh) * 2021-09-30 2022-02-11 北京空间机电研究所 一种航天器复材蜂窝夹层结构板的工装快速建模方法
CN114444176A (zh) * 2021-12-31 2022-05-06 天津鑫裕房屋智能制造股份有限公司 一种基于bim的主体结构施工中木模板的排料算法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103963159A (zh) * 2014-05-07 2014-08-06 浙江省天和建材集团有限公司地铁管片分公司 铝模埋件固定安装机构
AU2014204514A1 (en) * 2009-10-23 2014-08-07 Iconstruct (Aus) Pty Ltd System and method for managing information
AU2014250618A1 (en) * 2007-10-19 2014-11-06 Architectural Polymers LLC Variable angle formliner
CN106284976A (zh) * 2016-09-27 2017-01-04 中国建筑局(集团)有限公司 一种基于Revit的铝合金模板配模方法
CN107023160A (zh) * 2017-04-28 2017-08-08 广东省建科建筑设计院有限公司 一种装配式混凝土剪力墙结构专用铝合金模板
CN107391862A (zh) * 2017-07-28 2017-11-24 中建局集团建设发展有限公司 一种装配式混凝土结构三维协同设计方法
CN107476491A (zh) * 2017-09-28 2017-12-15 深圳市华阳国际工程设计股份有限公司 一种预制保温内填充混凝土墙板及其制造方法
CN108108510A (zh) * 2017-10-27 2018-06-01 广东星层建筑科技股份有限公司 一种基于bim的装配式建筑设计方法及设备
CN109214134A (zh) * 2018-11-05 2019-01-15 长沙远大住工智能科技有限公司 一种预制构件孔洞自动生成方法
CN109753672A (zh) * 2017-11-08 2019-05-14 上海宝冶集团有限公司 基于bim技术的装配式预制混凝土结构工程优化方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2014250618A1 (en) * 2007-10-19 2014-11-06 Architectural Polymers LLC Variable angle formliner
AU2014204514A1 (en) * 2009-10-23 2014-08-07 Iconstruct (Aus) Pty Ltd System and method for managing information
CN103963159A (zh) * 2014-05-07 2014-08-06 浙江省天和建材集团有限公司地铁管片分公司 铝模埋件固定安装机构
CN106284976A (zh) * 2016-09-27 2017-01-04 中国建筑局(集团)有限公司 一种基于Revit的铝合金模板配模方法
CN107023160A (zh) * 2017-04-28 2017-08-08 广东省建科建筑设计院有限公司 一种装配式混凝土剪力墙结构专用铝合金模板
CN107391862A (zh) * 2017-07-28 2017-11-24 中建局集团建设发展有限公司 一种装配式混凝土结构三维协同设计方法
CN107476491A (zh) * 2017-09-28 2017-12-15 深圳市华阳国际工程设计股份有限公司 一种预制保温内填充混凝土墙板及其制造方法
CN108108510A (zh) * 2017-10-27 2018-06-01 广东星层建筑科技股份有限公司 一种基于bim的装配式建筑设计方法及设备
CN109753672A (zh) * 2017-11-08 2019-05-14 上海宝冶集团有限公司 基于bim技术的装配式预制混凝土结构工程优化方法
CN109214134A (zh) * 2018-11-05 2019-01-15 长沙远大住工智能科技有限公司 一种预制构件孔洞自动生成方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
M.RAMESH KANNAN ETC: "Automated constructability rating framework for concrete formwork systems using building information modeling", ASIAN JOURNAL OF CIVIL ENGINEERING, no. 19, pages 387 - 413 *
周彬: "BIM在装配式建筑安装的关键性技术研究与应用", 广东土木与建筑, vol. 26, no. 05, pages 24 - 26 *
张亚伟 等: "BIM技术在铝模深化中的深度应用", 建筑技术, vol. 49, no. 06, pages 669 - 671 *
麻军 等: "海南海口某超高层办公楼暖通BIM设计分析", 绿色建筑, vol. 10, no. 01, pages 57 - 59 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114036595A (zh) * 2021-09-30 2022-02-11 北京空间机电研究所 一种航天器复材蜂窝夹层结构板的工装快速建模方法
CN114036595B (zh) * 2021-09-30 2023-08-29 北京空间机电研究所 一种航天器复材蜂窝夹层结构板的工装快速建模方法
CN114444176A (zh) * 2021-12-31 2022-05-06 天津鑫裕房屋智能制造股份有限公司 一种基于bim的主体结构施工中木模板的排料算法

Similar Documents

Publication Publication Date Title
CN107967399B (zh) 一种基于bim软件的装配式建筑深化设计方法
CN105781064A (zh) 基于bim的地砖铺设施工方法
CN110929328A (zh) 基于bim的混凝土装配式建筑施工方法
Kannan et al. Constructability assessment of climbing formwork systems using building information modeling
CN111400812A (zh) 一种基于bim的装配式结构剪力墙加工图设计方法
CN106284976A (zh) 一种基于Revit的铝合金模板配模方法
CN110287513A (zh) 一种基于bim技术的预埋件施工方法
CN112287448B (zh) 一种基于bim和大数据的装配式建筑深化设计及施工方法
CN112528357A (zh) 基于建筑信息模型的预制件和铝模排布模拟建造的方法
CN110080114A (zh) 一种基于bim技术的可视化预制立柱承台施工方法
CN107330153A (zh) 一种装配式混凝土结构bim模型两级参数化构建方法
CN105279329A (zh) 一种基于bim的样板引路质量管理方法
CN104631826A (zh) 一种基于bim模型的施工总平面布置方法
CN112560134A (zh) 一种基于cad与bim的装配式结构叠合板批量深化设计方法
CN113626911A (zh) 基于第一主应力矢量分布的混凝土3d打印路径优化方法
CN114997584A (zh) 基于bim可视化的高拱坝施工全生命周期动态仿真分析方法
CN111581700A (zh) 基于catia模型添加bim属性并输出bim属性表的方法
CN110541564A (zh) 一种基于bim的煤仓双曲线漏斗施工方法
CN111832113B (zh) 基于bim技术的铝合金模板配模方法
CN104741526B (zh) 一种超大外型砂型及其生产工艺方法
CN107679332A (zh) 基于Tekla平台的输电铁塔BIM模型构建方法
CN112990844A (zh) 一种基于bim的施工方法及管理系统
CN115828376A (zh) 一种基于bim的脚手架设计方法
CN114077765B (zh) 一种基于Dynamo项目数据管理方法、装置、计算机设备
CN116541929A (zh) 室外堆场土建标准化单元参数化bim模型的构建方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20211013

Address after: 528300 2nd floor, No.18 Industrial Avenue, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Longyue Construction Engineering Co.,Ltd.

Address before: 201-21, 2nd floor, East office, No.11 Junye East Road, Beijiao Industrial Park, Shunjiang neighborhood committee, Beijiao Town, Shunde District, Foshan City, Guangdong Province 528300

Applicant before: Guangdong Boyue Intelligent Construction Technology Co.,Ltd.

TA01 Transfer of patent application right