CN107386609B - A dry hanging device for exterior wall decoration stone and its application - Google Patents

A dry hanging device for exterior wall decoration stone and its application Download PDF

Info

Publication number
CN107386609B
CN107386609B CN201710603174.0A CN201710603174A CN107386609B CN 107386609 B CN107386609 B CN 107386609B CN 201710603174 A CN201710603174 A CN 201710603174A CN 107386609 B CN107386609 B CN 107386609B
Authority
CN
China
Prior art keywords
stone
fixed
supporting plate
linkage rod
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710603174.0A
Other languages
Chinese (zh)
Other versions
CN107386609A (en
Inventor
李月成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710603174.0A priority Critical patent/CN107386609B/en
Publication of CN107386609A publication Critical patent/CN107386609A/en
Application granted granted Critical
Publication of CN107386609B publication Critical patent/CN107386609B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an outer wall fitment stone material hangs hoisting accessory futilely, including the loading board, stone material mounting bracket top hangs the mechanism, hoist engine and stone material fixture, the middle part of loading board main panel is provided with the mounting hole, on the top panel of loading board, the top of mounting hole is provided with the hoist engine promptly, the upper and lower both ends of mounting hole are provided with two fixed otic placodes, be provided with the connecting axle between two fixed otic placodes, the latter half cover of connecting axle is equipped with compression spring, its upper portion is provided with stone material mounting bracket top and hangs the mechanism, stone material mounting bracket top is hung the top of mechanism and is provided with the wire winding gyro wheel corresponding with the hoist engine reel, around being equipped with wire rope on the hoist engine reel, wire rope is connected with stone material through wire winding gyro wheel and adds and hold the mechanism. The dry hanging and lifting device for the exterior wall decoration stone and the application thereof have the advantages of reasonable design, simple structure, convenience in lifting and mounting the stone, capability of effectively reducing dust generated during construction, improving the working efficiency and saving a large amount of sealant.

Description

一种外墙装修石材干挂起吊装置及其应用A dry hanging device for exterior wall decoration stone and its application

技术领域Technical field

本发明涉及建筑施工技术领域,尤其涉及一种外墙装修石材干挂起吊装置及其应用。The invention relates to the technical field of building construction, and in particular to a dry hanging lifting device for exterior wall decoration stones and its application.

背景技术Background technique

石材干挂法又名空挂法。是目前墙面装饰中一种新型的施工工艺。该工艺是利用耐腐蚀的螺栓和耐腐蚀的柔性连接件,将花岗石、人造大理石等饰面石材直接挂在建筑结构的外表面或空挂于钢架上,不需再灌浆粘贴。其原理是在主体结构上设置主要受力点,通过金属挂件将石材固定在建筑物上,形成石材装饰幕墙。石材与建筑结构之间留出40~50mm的空腔。用此工艺做成的饰面,在风力和地震力的作用下允许产生适量的变位,以吸收部分风力和地震力,而不致出现裂纹和脱落,当风力和地震力消失后,石材也随结构而复位。现阶段,石材在出厂时,通常在其侧面切割有安装槽,为了达到所需强度,降低运输过程中的损坏率,安装槽的口径较小,在实际施工过程中,由于石材质量大,安装时需要多人互相配合,施工难度高,且石材侧面的安装槽口径过小,很难与挂件对接,绝大多数工作人员在施工现场需要对安装槽进行扩槽,以便于将石材挂于挂件上,人工开槽费时费力,扬尘大,污染空气,同时每个槽口的差异性较大,工程质量难以保证。石材安装槽的口径扩大后,需要使用密封胶对安装槽进行密封,密封胶的使用量大,增加了施工成本。The dry hanging method of stone is also known as the empty hanging method. It is a new construction technology in current wall decoration. This process uses corrosion-resistant bolts and corrosion-resistant flexible connectors to hang granite, artificial marble and other facing stones directly on the outer surface of the building structure or on the steel frame without grouting and pasting. The principle is to set the main stress points on the main structure, and fix the stone on the building through metal pendants to form a stone decorative curtain wall. Leave a 40-50mm cavity between the stone and the building structure. The veneer made by this process allows for an appropriate amount of displacement under the action of wind and earthquake forces to absorb part of the wind and earthquake forces without cracking and falling off. When the wind and earthquake forces disappear, the stone will also follow. structure and reset. At present, when stone leaves the factory, installation slots are usually cut on the sides. In order to achieve the required strength and reduce the damage rate during transportation, the diameter of the installation slot is smaller. In the actual construction process, due to the large quality of the stone, the installation It requires multiple people to cooperate with each other, and the construction is difficult, and the diameter of the installation groove on the side of the stone is too small, making it difficult to connect with the pendant. Most workers need to expand the installation groove at the construction site to facilitate hanging the stone on the pendant. Manual slotting is time-consuming and labor-intensive, raises a lot of dust, and pollutes the air. At the same time, each slot is highly different, making it difficult to guarantee project quality. After the diameter of the stone installation groove is enlarged, sealant needs to be used to seal the installation groove. The use of sealant is large, which increases the construction cost.

发明内容Contents of the invention

本发明的目的在于,克服现有技术的不足之处,提供一种外墙装修石材干挂起吊装置及其应用,其设计合理,结构简单,便于起吊、安装石材,省掉了石材安装槽扩槽这一工序,提升石材强度,能有效降低施工时产生的粉尘,减低工作强度,提高工作效率,同时还能节省大量的密封胶,提升经济效益。The object of the present invention is to overcome the shortcomings of the prior art and provide a dry hanging lifting device for exterior wall decoration stones and its application. The device has a reasonable design, a simple structure, is convenient for lifting and installing stones, and eliminates the need to expand the installation groove of the stone. The process of grooving improves the strength of the stone, can effectively reduce the dust generated during construction, reduce work intensity, improve work efficiency, and at the same time save a large amount of sealant and improve economic benefits.

本发明所述的一种外墙装修石材干挂起吊装置,包括有承载板、石材安装架顶挂机构、卷扬机和石材夹持机构,所述的承载板为本发明的主体支撑部件,且为一槽形钢体结构,承托板主面板的中部设置有安装孔,在承托板的上面板上,即安装孔的上方设置有卷扬机,安装孔的上下两端,也是承托板主面板的正面设置有两个互相对应的固定耳板,两个固定耳板之间设置有连接轴,连接轴的下半部套设有压力弹簧,其上半部,即压力弹簧的上面设置有石材安装架顶挂机构,石材安装架顶挂机构的顶端设置有与卷扬机卷筒相对应的绕线滚轮,所述的卷扬机卷筒上绕设有钢丝绳,钢丝绳通过绕线滚轮连接有石材夹持机构。The dry hanging lifting device for exterior wall decoration stones according to the present invention includes a load-bearing plate, a stone installation rack top-hanging mechanism, a hoist and a stone clamping mechanism. The load-bearing plate is the main supporting component of the present invention, and is A trough-shaped steel structure. There is a mounting hole in the middle of the main panel of the supporting plate. A winch is installed on the upper panel of the supporting plate, that is, above the mounting hole. The upper and lower ends of the mounting hole are also the main panel of the supporting plate. There are two fixed ear plates corresponding to each other on the front, and a connecting shaft is set between the two fixed ear plates. The lower half of the connecting shaft is equipped with a pressure spring, and the upper part, that is, the pressure spring is equipped with a stone. Mounting frame top hanging mechanism, the top of the stone mounting frame top hanging mechanism is provided with a winding roller corresponding to the winch drum, the winch drum is wound with a steel wire rope, and the steel wire rope is connected to the stone clamping mechanism through the winding roller .

所述的石材安装架顶挂机构包括有顶压联动杆、固定钩联动杆、连接臂和固定钩,所述的固定钩联动杆为“L”形,其长边与承托板主面板的正面相对,竖直向上延伸,其短边为一管型结构,向承托板主面板的背面延伸,所述短边的中部设置有连接通孔,穿设于连接轴上,在固定钩联动杆的短边内设置有固定钩,所述的固定钩通过通孔也穿设于连接轴上,固定钩与承托板之间连接有伸缩弹簧,所述的顶压联动杆的底部设置有一连接槽体,连接轴穿过所述连接槽体,所述的固定钩联动杆短边的底面上设置有连接耳板,连接耳板的下部铰接在顶压联动杆上,固定钩联动杆长边的顶端铰接有连接臂,连接臂与顶压联动杆的上部铰接。The top hanging mechanism of the stone installation frame includes a top pressure linkage rod, a fixed hook linkage rod, a connecting arm and a fixed hook. The fixed hook linkage rod is "L" shaped, and its long side is in line with the main panel of the supporting plate. The front is opposite and extends vertically upward. Its short side is a tubular structure extending toward the back of the main panel of the support plate. A connecting through hole is provided in the middle of the short side, which is passed through the connecting shaft and linked with the fixed hook. A fixed hook is provided in the short side of the rod. The fixed hook is also installed on the connecting shaft through a through hole. A telescopic spring is connected between the fixed hook and the supporting plate. The bottom of the pressing linkage rod is provided with a The connecting trough body has a connecting shaft passing through the connecting trough body. A connecting ear plate is provided on the bottom surface of the short side of the fixed hook linkage rod. The lower part of the connecting ear plate is hinged on the pressing linkage rod. The fixed hook linkage rod is long. The top of the side is hinged with a connecting arm, and the connecting arm is hinged with the upper part of the pressing linkage rod.

所述的顶压联动杆为横杆和竖杆两个部分组成,所述的横杆设置在安装孔内,其杆体上设置有连接槽体,所述的竖杆与承托板的正面相对,竖杆的底端与横杆的一端铰接,其顶端设置有与卷扬机卷筒相对应的绕线滚轮,所述的固定钩联动杆长边的上部与顶压联动杆竖杆的下部之间连接有拉伸弹簧。The top pressure linkage rod is composed of two parts: a horizontal rod and a vertical rod. The horizontal rod is arranged in the installation hole, and a connecting groove is provided on the rod body. The vertical rod is opposite to the front side of the supporting plate. , the bottom end of the vertical rod is hinged with one end of the horizontal rod, and its top is provided with a winding roller corresponding to the winch drum, between the upper part of the long side of the fixed hook linkage rod and the lower part of the vertical rod of the pressing linkage rod A tension spring is attached.

本发明所述的一种外墙装修石材干挂起吊装置及其应用,其设计合理,结构简单,便于起吊、安装石材,省掉了石材安装槽扩槽这一工序,提升石材强度,能有效降低施工时产生的粉尘,减低工作强度,提高工作效率,同时还能节省大量的密封胶,提升经济效益。The dry hanging lifting device for exterior wall decoration stones and its application described in the present invention have reasonable design and simple structure, which are convenient for lifting and installing stones. They save the process of expanding the stone installation grooves, improve the strength of the stones, and can effectively Reduce the dust generated during construction, reduce work intensity, improve work efficiency, and at the same time save a large amount of sealant and improve economic benefits.

附图说明Description of the drawings

附图1是本发明所述的一种外墙装修石材干挂起吊装置及其应用的结构示意图。Figure 1 is a schematic structural diagram of a dry hanging lifting device for exterior wall decoration stones according to the present invention and its application.

附图2是本发明所述的一种外墙装修石材干挂起吊装置及其应用的左视结构示意图。Figure 2 is a schematic left structural diagram of a dry hanging lifting device for exterior wall decoration stones according to the present invention and its application.

附图3是本发明所述的一种外墙装修石材干挂起吊装置及其应用的右视结构示意图。Figure 3 is a right structural schematic diagram of a dry hanging device for exterior wall decoration stone and its application according to the present invention.

附图4是本发明所述的一种外墙装修石材干挂起吊装置及其应用的石材夹持机构结构示意图。Figure 4 is a schematic structural diagram of a dry hanging lifting device for exterior wall decoration stones according to the present invention and a stone clamping mechanism used therein.

1—承托板 2—滑轮 3—电机 4—外固定板 5—石材固定架顶挂机构 6—绕线滚轮 7—卷扬机 8—吊臂 9—连接轴 10—安装孔 11—压力弹簧 12—配重杆13—固定耳板 14—顶压联动杆 15—固定钩联动杆 16—连接臂 17—固定钩 18—顶压滚轮 19—石材夹持机构 20—连接耳板 21—固定板 22—驱动齿轮 23—传动齿轮 24—转轴 25—固定夹臂 26—活动夹臂 27—固定环。1—Supporting plate 2—Pulley 3—Motor 4—External fixed plate 5—Stone fixing frame top hanging mechanism 6—Winding roller 7—Wind 8—Handling arm 9—Connecting shaft 10—Mounting hole 11—Pressure spring 12— Counterweight rod 13—fixed ear plate 14—pressing linkage rod 15—fixed hook linkage rod 16—connecting arm 17—fixed hook 18—pressing roller 19—stone clamping mechanism 20—connecting ear plate 21—fixed plate 22— Driving gear 23 - transmission gear 24 - rotating shaft 25 - fixed clamp arm 26 - movable clamp arm 27 - fixed ring.

具体实施方式Detailed ways

现参照附图1、附图2、附图3和附图4,结合具体实施例,说明如下:本发明所述的一种外墙装修石材干挂起吊装置,包括有承载板1、石材安装架顶挂机构5、卷扬机7和石材夹持机构19。所述的承载板1为本发明的主体支撑部件,且为一槽形钢体结构,承托板1主面板的中部设置有安装孔10,在承托板1的上面板上,即安装孔10的上方固定设置有卷扬机7,所述卷扬机7通过导线连接有电源。安装孔10的上下两端,也是承托板1主面板的正面固定设置有两个互相对应的固定耳板13,两个固定耳板13之间设置有连接轴9,连接轴9的下半部套设有压力弹簧11,其上半部,即压力弹簧11的上面设置有石材安装架顶挂机构5。石材安装架顶挂机构5的顶端设置有与卷扬机卷筒相对应的绕线滚轮6,所述的卷扬机卷筒上绕设有钢丝绳,钢丝绳通过绕线滚轮6连接有石材夹持机构19,所述的石材加持机构19用于夹持装修石材。Now with reference to Figure 1, Figure 2, Figure 3 and Figure 4, combined with specific embodiments, the description is as follows: a dry hanging lifting device for exterior wall decoration stone according to the present invention, including a load-bearing plate 1, a stone installation Top hanging mechanism 5, winch 7 and stone clamping mechanism 19. The bearing plate 1 is the main supporting component of the present invention and is a channel-shaped steel structure. The middle part of the main panel of the bearing plate 1 is provided with a mounting hole 10. On the upper panel of the bearing plate 1, there are mounting holes. A hoist 7 is fixedly arranged above the hoist 10, and the hoist 7 is connected to a power supply through wires. The upper and lower ends of the mounting hole 10, which are also the front of the main panel of the supporting plate 1, are fixed with two corresponding fixed ear plates 13. A connecting shaft 9 is provided between the two fixed ear plates 13. The lower half of the connecting shaft 9 The lower part is provided with a pressure spring 11, and its upper half, that is, above the pressure spring 11, is provided with a stone mounting frame top-hanging mechanism 5. The top of the top hanging mechanism 5 of the stone installation frame is provided with a winding roller 6 corresponding to the winding drum. A steel wire rope is wound on the winding drum, and the steel wire rope is connected to the stone clamping mechanism 19 through the winding roller 6. The above-mentioned stone holding mechanism 19 is used to clamp decoration stones.

所述的石材安装架顶挂机构5包括有顶压联动杆14、固定钩联动杆15、连接臂16和固定钩17。所述的固定钩联动杆15为“L”形,其长边与承托板1主面板的正面相对,竖直向上延伸,其短边为一管型结构,向承托板1主面板的背面延伸,所述短边的中部设置有连接通孔,穿设于连接轴9上。在固定钩联动杆15的短边内设置有固定钩17,所述的固定钩17通过通孔也穿设于连接轴9上,固定钩17与承托板1之间连接有伸缩弹簧,固定钩17可以在连接轴9上左右转动,并通过所述伸缩弹簧复位。所述的顶压联动杆14的底部设置有一连接槽体,连接轴9穿过所述连接槽体,所述的固定钩联动杆15短边的底面上固定设置有连接耳板20,连接耳板20的下部铰接在顶压联动杆14上,固定钩联动杆15长边的顶端铰接有连接臂16,连接臂16与顶压联动杆14的上部铰接。The stone installation frame top hanging mechanism 5 includes a top pressure linkage rod 14, a fixed hook linkage rod 15, a connecting arm 16 and a fixed hook 17. The fixed hook linkage rod 15 is "L" shaped, with its long side facing the front of the main panel of the supporting plate 1 and extending vertically upward, and its short side is a tubular structure, facing the main panel of the supporting plate 1. The back side extends, and a connecting through hole is provided in the middle of the short side, passing through the connecting shaft 9 . A fixed hook 17 is provided in the short side of the fixed hook linkage rod 15. The fixed hook 17 is also installed on the connecting shaft 9 through a through hole. A telescopic spring is connected between the fixed hook 17 and the supporting plate 1. The hook 17 can rotate left and right on the connecting shaft 9 and is returned by the telescopic spring. The bottom of the pressing linkage rod 14 is provided with a connecting groove body, the connecting shaft 9 passes through the connecting groove body, the bottom surface of the short side of the fixed hook linkage rod 15 is fixedly provided with a connecting lug plate 20, and the connecting lug plate 20 is fixedly provided on the bottom surface of the short side of the fixed hook linkage rod 15. The lower part of the plate 20 is hinged on the pressing linkage rod 14. The top end of the long side of the fixed hook linkage lever 15 is hinged with a connecting arm 16. The connecting arm 16 is hinged with the upper part of the pressing linkage rod 14.

所述的顶压联动杆14为横杆和竖杆两个部分组成,所述的横杆设置在安装孔10内,其杆体上设置有连接槽体,所述的竖杆与承托板1的正面相对,竖杆的底端与横杆的一端铰接,其顶端设置有与卷扬机卷筒相对应的绕线滚轮6,所述的固定钩联动杆15长边的上部与顶压联动杆14竖杆的下部之间连接有拉伸弹簧。The top pressure linkage rod 14 is composed of two parts: a horizontal rod and a vertical rod. The horizontal rod is arranged in the mounting hole 10, and a connecting groove is provided on the rod body. The vertical rod and the supporting plate 1 The front of the vertical rod is opposite, the bottom end of the vertical rod is hinged with one end of the horizontal rod, and its top is provided with a winding roller 6 corresponding to the winch drum. The upper part of the long side of the fixed hook linkage rod 15 is connected with the pressing linkage rod 14 Tension springs are connected between the lower parts of the vertical rods.

当石材夹持机构19没有载物时,在所述压力弹簧和拉伸弹簧的作用下,使石材安装架顶挂机构5位于连接轴9的上部,从而使固定钩17与石材安装架的横梁处于分离状态,此状态下本发明所述的一种外墙装修石材干挂起吊装置主要是通过顶压联动杆14挂接于石材安装架的横梁上,当石材夹持结构19夹持有装修石材后,在装修石材自身重力的作用下,通过钢丝绳和绕线滚轮6,使顶压联动杆14的竖杆下移,其横杆也会受到竖杆向下的作用力,继而使横杆朝向石材安装架的一端上翘,同时所述竖杆通过连接臂16使连接轴9上的固定钩联动杆15向下移动,从而使固定钩17下移,与石材安装架的横梁挂接,固定钩17与顶压联动杆14的横杆互相配合,使本起吊装置固定于石材安装架的横梁上。施工人员取出装修石材后,安装架顶挂机构5通过压力弹簧和拉伸弹簧复位。When the stone clamping mechanism 19 is not loaded, under the action of the pressure spring and the tension spring, the stone mounting frame top hanging mechanism 5 is located at the upper part of the connecting shaft 9, so that the fixed hook 17 is connected to the cross beam of the stone mounting frame. In the separated state, in this state, the dry hanging device for exterior wall decoration stone according to the present invention is mainly hung on the cross beam of the stone installation frame through the top pressure linkage rod 14. When the stone clamping structure 19 clamps the decoration After the stone is finished, under the action of the gravity of the decoration stone itself, the vertical rod pressing the linkage rod 14 is moved downward through the steel wire rope and the winding roller 6, and its horizontal rod will also be subject to the downward force of the vertical rod, and then the horizontal rod will be moved downward. One end toward the stone installation frame is tilted up, and at the same time, the vertical rod moves the fixed hook linkage rod 15 on the connecting shaft 9 downward through the connecting arm 16, so that the fixed hook 17 moves downward and is connected with the cross beam of the stone installation frame. The fixed hook 17 cooperates with the cross bar of the pressing linkage rod 14 to fix the lifting device on the cross beam of the stone installation frame. After the construction workers take out the decoration stones, the top-hanging mechanism 5 of the mounting frame is restored through the pressure spring and the tension spring.

进一步的,所述的顶压联动杆14的底部,朝向承托板1背面的一端设置有顶压滚轮18。Furthermore, the bottom of the pressing linkage rod 14 is provided with a pressing roller 18 at one end facing the back of the supporting plate 1 .

进一步的,所述的石材夹持机构19包括固定夹臂25、活动夹臂26两个部分组成。所述的固定夹臂25为一“冂”形支架,固定夹臂25的上端设置有导向轮,一侧支臂为固定臂,另一侧支臂的下部铰接有活动夹臂26。活动夹臂26的上部铰接有连接支架,连接支架连接有固定环27,以连接钢丝绳。所述活动夹臂26为椭圆形,其x轴大于y轴,其转动圆心在其椭圆形的下部。卷扬机卷筒内的钢丝绳沿导线轮的底面穿过所述连接支架,与固定环27固定连接。Further, the stone clamping mechanism 19 includes a fixed clamping arm 25 and a movable clamping arm 26. The fixed clamp arm 25 is a "冂"-shaped bracket. The upper end of the fixed clamp arm 25 is provided with a guide wheel. One side of the arm is a fixed arm, and the lower part of the other side of the arm is hinged with a movable clamp arm 26. The upper part of the movable clamping arm 26 is hinged with a connecting bracket, and the connecting bracket is connected with a fixed ring 27 to connect the steel wire rope. The movable clamping arm 26 is elliptical, its x-axis is larger than the y-axis, and its center of rotation is at the lower part of the ellipse. The steel wire rope in the winch drum passes through the connecting bracket along the bottom surface of the wire pulley and is fixedly connected to the fixed ring 27.

进一步的,所述的承托板1上板面的两端分别设置有固定吊臂8,固定吊臂8上设置有滚轮。Furthermore, fixed booms 8 are respectively provided at both ends of the upper surface of the supporting plate 1, and rollers are provided on the fixed booms 8.

进一步的,所述的承托板1主面板的两端分别设置有安装孔,安装孔内设置有滑轮2。Furthermore, mounting holes are provided at both ends of the main panel of the supporting plate 1, and pulleys 2 are provided in the mounting holes.

进一步的,所述的承托板1上面板的一端设置有固定板21,承托板1主面板上设置有与固定板21相对应的外固定板4,所述的固定板21与外固定板4之间具有一定间距,外固定板4上设置有电机3,电机3通过导线连接有电源,所述的电机3的输出轴穿过外固定板4,并设置在外固定板4与固定板21之间的空间内,电机3的输出轴上连接有驱动齿轮22。所述的承托板1主面板上设置有连接孔,连接孔内设置有轴承,轴承内设置有转轴24,所述的转轴24的一端设置在外固定板4与固定板21之间的空间内,且连接有与驱动齿轮22相啮合的传动齿轮23,转轴24的另一端穿过承托板1的主面板连接有传动轮,承托板1主面板背面的一端设置有与传动轮相对应的从动轮。所述的固定钩17与石材安装架的横梁处于分离状态时,启动电机3,通过驱动轮和传动轮,即可使本起吊装置在石材安装架的横梁上横向移动,当固定钩17触碰到石材安装架的竖梁时,固定钩17以连接轴9为轴转动,从而使本起吊装置顺利通过石材安装架的竖梁,通过竖梁后在所述伸缩弹簧的作用下使固定钩17复位。Further, one end of the upper panel of the supporting plate 1 is provided with a fixing plate 21, and the main panel of the supporting plate 1 is provided with an outer fixing plate 4 corresponding to the fixing plate 21. The fixing plate 21 is connected to the outer fixing plate. There is a certain distance between the plates 4. A motor 3 is provided on the outer fixed plate 4. The motor 3 is connected to a power supply through a wire. The output shaft of the motor 3 passes through the outer fixed plate 4 and is arranged between the outer fixed plate 4 and the fixed plate. In the space between 21, a driving gear 22 is connected to the output shaft of the motor 3. The main panel of the supporting plate 1 is provided with a connection hole, a bearing is provided in the connection hole, a rotating shaft 24 is provided in the bearing, and one end of the rotating shaft 24 is arranged in the space between the outer fixed plate 4 and the fixed plate 21 , and is connected to a transmission gear 23 that meshes with the driving gear 22. The other end of the rotating shaft 24 passes through the main panel of the supporting plate 1 and is connected to a transmission wheel. One end of the back of the main panel of the supporting plate 1 is provided with a transmission wheel corresponding to of driven wheel. When the fixed hook 17 is separated from the cross beam of the stone installation frame, start the motor 3, and through the driving wheel and transmission wheel, the lifting device can move laterally on the cross beam of the stone installation frame. When the fixed hook 17 touches When reaching the vertical beam of the stone installation frame, the fixed hook 17 rotates with the connecting shaft 9 as the axis, so that the lifting device can smoothly pass through the vertical beam of the stone installation frame. After passing the vertical beam, the fixed hook 17 is moved by the telescopic spring under the action of the telescopic spring. reset.

进一步的,所述的承托板1下面板的两端连接有配重杆13,配重杆13的底端设置有滚轮,所述的承托板1主面板正面的两端设置有磁吸部,其背面的两端设置有结构相同的磁吸部。Furthermore, the two ends of the lower panel of the supporting plate 1 are connected with a counterweight rod 13, the bottom end of the counterweight rod 13 is provided with rollers, and the two ends of the front surface of the main panel of the supporting plate 1 are provided with magnetic suction devices. part, and magnetic suction parts with the same structure are provided at both ends of its back.

本发明所述的一种外墙装修石材干挂起吊装置的应用方法为:首先是通过固定钩17和顶压联动杆14将本起吊装置固定在石材安装架的横梁上,用一连接绳沿滚轮的底面穿过固定吊臂8,并将连接绳固定于石材安装架上,防止本起吊装置掉落。当石材夹持机构19没有载物,固定钩17与石材安装架的横梁处于分离状态时,可以对本起吊装置的位置进行调整,启动电机3,即可调整本起吊装置横向位置,到达所需位置后,关闭电机3。通过石材夹持机构19夹住装修石材,启动卷扬机7,将装修石材提升到所需的位置,关闭卷扬机7,施工人员进行安装。The application method of the dry hanging lifting device for exterior wall decoration stone according to the present invention is as follows: first, the lifting device is fixed on the beam of the stone installation frame through the fixed hook 17 and the top pressure linkage rod 14, and a connecting rope is used along the The bottom surface of the roller passes through the fixed boom 8, and the connecting rope is fixed on the stone mounting frame to prevent the lifting device from falling. When the stone clamping mechanism 19 has no load and the fixed hook 17 is separated from the crossbeam of the stone installation frame, the position of the lifting device can be adjusted. By starting the motor 3, the lateral position of the lifting device can be adjusted to reach the desired position. Finally, turn off motor 3. The decoration stone is clamped by the stone clamping mechanism 19, the winch 7 is started, the decoration stone is lifted to the required position, the winch 7 is closed, and the construction personnel install it.

本发明所述的一种外墙装修石材干挂起吊装置及其应用,其设计合理,结构简单,便于起吊、安装石材,省掉了石材安装槽扩槽这一工序,提升石材强度,能有效降低施工时产生的粉尘,减低工作强度,提高工作效率,同时还能节省大量的密封胶,提升经济效益。The dry hanging lifting device for exterior wall decoration stones and its application described in the present invention have reasonable design and simple structure, which are convenient for lifting and installing stones. They save the process of expanding the stone installation grooves, improve the strength of the stones, and can effectively Reduce the dust generated during construction, reduce work intensity, improve work efficiency, and at the same time save a large amount of sealant and improve economic benefits.

Claims (9)

1.一种外墙装修石材干挂起吊装置,包括有承托板(1)、石材安装架顶挂机构(5)、卷扬机(7)和石材夹持机构(19),所述的承托板(1)为本发明的主体支撑部件,且为一槽形钢体结构,其特征在于:承托板(1)主面板的中部设置有安装孔(10),在承托板(1)的上面板上,即安装孔(10)的上方设置有卷扬机(7),安装孔(10)的上下两端,也是承托板(1)主面板的正面设置有两个互相对应的固定耳板(13),两个固定耳板(13)之间设置有连接轴(9),连接轴(9)的下半部套设有压力弹簧(11),其上半部,即压力弹簧(11)的上面设置有石材安装架顶挂机构(5),石材安装架顶挂机构(5)的顶端设置有与卷扬机卷筒相对应的绕线滚轮(6),所述的卷扬机卷筒上绕设有钢丝绳,钢丝绳通过绕线滚轮(6)连接有石材夹持机构(19);1. A dry hanging lifting device for exterior wall decoration stones, including a supporting plate (1), a stone mounting rack top-hanging mechanism (5), a winch (7) and a stone clamping mechanism (19). The supporting plate The plate (1) is the main supporting component of the present invention and is a channel-shaped steel structure. It is characterized in that: the middle part of the main panel of the supporting plate (1) is provided with a mounting hole (10). A winch (7) is provided on the upper panel, that is, above the mounting hole (10), and two corresponding fixing lugs are provided on the upper and lower ends of the mounting hole (10), which is also the front of the main panel of the supporting plate (1). plate (13), and a connecting shaft (9) is provided between the two fixed ear plates (13). The lower half of the connecting shaft (9) is covered with a pressure spring (11), and its upper half is the pressure spring (11). 11) is provided with a stone mounting frame top-hanging mechanism (5), and the top of the stone mounting frame top-hanging mechanism (5) is provided with a winding roller (6) corresponding to the winch drum. There is a steel wire rope around it, and the steel wire rope is connected to the stone clamping mechanism (19) through the winding roller (6); 所述的石材安装架顶挂机构(5)包括有顶压联动杆(14)、固定钩联动杆(15)、连接臂(16)和固定钩(17),所述的固定钩联动杆(15)为“L”形,其长边与承托板(1)主面板的正面相对,竖直向上延伸,其短边为一管型结构,向承托板(1)主面板的背面延伸,所述短边的中部设置有连接通孔,穿设于连接轴(9)上,在固定钩联动杆(15)的短边内设置有固定钩(17),所述的固定钩(17)通过通孔也穿设于连接轴(9)上,固定钩(17)与承托板(1)之间连接有伸缩弹簧,所述的顶压联动杆(14)的底部设置有一连接槽体,连接轴(9)穿过所述连接槽体,所述的固定钩联动杆(15)短边的底面上设置有连接耳板(20),连接耳板(20)的下部铰接在顶压联动杆(14)上,固定钩联动杆(15)长边的顶端铰接有连接臂(16),连接臂(16)与顶压联动杆(14)的上部铰接。The top hanging mechanism (5) of the stone installation frame includes a top pressure linkage rod (14), a fixed hook linkage rod (15), a connecting arm (16) and a fixed hook (17). The fixed hook linkage rod (17) 15) is "L" shaped, its long side is opposite to the front of the main panel of the supporting plate (1), and extends vertically upward. Its short side is a tubular structure, extending to the back of the main panel of the supporting plate (1). , a connecting through hole is provided in the middle of the short side, which is passed through the connecting shaft (9), and a fixed hook (17) is provided in the short side of the fixed hook linkage rod (15). The fixed hook (17) ) is also penetrated on the connecting shaft (9) through a through hole, a telescopic spring is connected between the fixed hook (17) and the supporting plate (1), and a connecting groove is provided at the bottom of the pressure linkage rod (14) body, the connecting shaft (9) passes through the connecting groove body, the bottom surface of the short side of the fixed hook linkage rod (15) is provided with a connecting ear plate (20), and the lower part of the connecting ear plate (20) is hinged on the top On the pressing linkage rod (14), the top of the long side of the fixed hook linkage rod (15) is hinged with a connecting arm (16), and the connecting arm (16) is hinged with the upper part of the pressing linkage rod (14). 2.根据权利要求1所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的顶压联动杆(14)为横杆和竖杆两个部分组成,所述的横杆设置在安装孔(10)内,其杆体上设置有连接槽体,所述的竖杆与承托板(1)的正面相对,竖杆的底端与横杆的一端铰接,其顶端设置有与卷扬机卷筒相对应的绕线滚轮(6),所述的固定钩联动杆(15)长边的上部与顶压联动杆(14)竖杆的下部之间连接有拉伸弹簧。2. A dry hanging lifting device for exterior wall decoration stones according to claim 1, characterized in that: the top pressure linkage rod (14) is composed of a horizontal rod and a vertical rod, and the horizontal rod It is arranged in the installation hole (10), and its rod body is provided with a connecting groove. The vertical rod is opposite to the front of the supporting plate (1). The bottom end of the vertical rod is hinged with one end of the horizontal rod, and its top is provided with a A winding roller (6) corresponding to the winding drum, a tension spring is connected between the upper part of the long side of the fixed hook linkage rod (15) and the lower part of the vertical rod of the pressing linkage rod (14). 3.根据权利要求2所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的顶压联动杆(14)的底部,朝向承托板(1)背面的一端设置有顶压滚轮(18)。3. A dry hanging device for exterior wall decoration stones according to claim 2, characterized in that: the bottom of the top pressure linkage rod (14) is provided with a top at one end facing the back of the supporting plate (1). Press roller (18). 4.根据权利要求1所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的石材夹持机构(19)包括固定夹臂(25)、活动夹臂(26)两个部分组成,所述的固定夹臂(25)为一“冂”形支架,固定夹臂(25)的上端设置有导向轮,一侧支臂为固定臂,另一侧支臂的下部铰接有活动夹臂(26),活动夹臂(26)的上部铰接有连接支架,连接支架连接有固定环(27),以连接钢丝绳,所述活动夹臂(26)为椭圆形,其x轴大于y轴,其转动圆心在其椭圆形的下部。4. A dry hanging device for exterior wall decoration stones according to claim 1, characterized in that: the stone clamping mechanism (19) includes two fixed clamping arms (25) and movable clamping arms (26). It consists of parts. The fixed clamp arm (25) is a "冂" shaped bracket. The upper end of the fixed clamp arm (25) is provided with a guide wheel. One side of the arm is a fixed arm, and the lower part of the other side of the arm is hinged. Movable clamping arm (26), the upper part of the movable clamping arm (26) is hinged with a connecting bracket, and the connecting bracket is connected with a fixed ring (27) to connect the wire rope. The movable clamping arm (26) is oval, and its x-axis is larger than The y-axis has its center of rotation at the lower part of its ellipse. 5.根据权利要求1所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的承托板(1)上板面的两端分别设置有固定吊臂(8),固定吊臂(8)上设置有滚轮。5. A dry hanging lifting device for exterior wall decoration stones according to claim 1, characterized in that: both ends of the upper surface of the supporting plate (1) are respectively provided with fixed booms (8), which are fixed. The boom (8) is provided with rollers. 6.根据权利要求1所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的承托板(1)主面板的两端分别设置有安装孔,安装孔内设置有滑轮(2)。6. A dry hanging lifting device for exterior wall decoration stones according to claim 1, characterized in that: mounting holes are respectively provided at both ends of the main panel of the supporting plate (1), and pulleys are provided in the mounting holes. (2). 7.根据权利要求1所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的承托板(1)上面板的一端设置有固定板(21),承托板(1)主面板上设置有与固定板(21)相对应的外固定板(4),所述的固定板(21)与外固定板(4)之间具有一定间距,外固定板(4)上设置有电机(3),所述的电机(3)的输出轴穿过外固定板(4),并设置在外固定板(4)与固定板(21)之间的空间内,电机(3)的输出轴上连接有驱动齿轮(22),所述的承托板(1)主面板上设置有连接孔,连接孔内设置有轴承,轴承内设置有转轴(24),所述的转轴(24)的一端设置在外固定板(4)与固定板(21)之间的空间内,且连接有与驱动齿轮(22)相啮合的传动齿轮(23),转轴(24)的另一端穿过承托板(1)的主面板连接有传动轮,承托板(1)主面板背面的一端设置有与传动轮相对应的从动轮。7. A dry hanging device for exterior wall decoration stones according to claim 1, characterized in that: one end of the upper panel of the supporting plate (1) is provided with a fixed plate (21), and the supporting plate (1) ) The main panel is provided with an outer fixing plate (4) corresponding to the fixing plate (21). There is a certain distance between the fixing plate (21) and the outer fixing plate (4). A motor (3) is provided. The output shaft of the motor (3) passes through the outer fixing plate (4) and is arranged in the space between the outer fixing plate (4) and the fixing plate (21). The motor (3) A driving gear (22) is connected to the output shaft, a connecting hole is provided on the main panel of the supporting plate (1), a bearing is provided in the connecting hole, a rotating shaft (24) is provided in the bearing, and the rotating shaft (24) is installed in the connecting hole. One end of 24) is arranged in the space between the outer fixed plate (4) and the fixed plate (21), and is connected to a transmission gear (23) meshed with the driving gear (22), and the other end of the rotating shaft (24) passes through The main panel of the supporting plate (1) is connected with a transmission wheel, and one end of the back side of the main panel of the supporting plate (1) is provided with a driven wheel corresponding to the transmission wheel. 8.根据权利要求1所述的一种外墙装修石材干挂起吊装置,其特征在于:所述的承托板(1)下面板的两端连接有配重杆,配重杆的底端设置有滚轮,所述的承托板(1)主面板正面的两端设置有磁吸部,其背面的两端设置有结构相同的磁吸部。8. A dry hanging device for exterior wall decoration stones according to claim 1, characterized in that: both ends of the lower panel of the supporting plate (1) are connected with counterweight rods, and the bottom end of the counterweight rod Rollers are provided. The two ends of the main panel of the supporting plate (1) are provided with magnetic suction parts, and the two ends of the back surface are provided with magnetic suction parts with the same structure. 9.如权利要求1所述的一种外墙装修石材干挂起吊装置的应用方法,其特征在于:首先是通过固定钩(17)和顶压联动杆(14)本起吊装置固定在石材安装架的横梁上,用一连接绳沿滚轮的底面穿过固定吊臂(8),并将连接绳固定于石材安装架上,防止本起吊装置掉落,当石材夹持机构(19)没有载物,固定钩(17)与石材安装架的横梁处于分离状态时,可以对本起吊装置的位置进行调整,启动电机(3),即可调整本起吊装置横向位置,到达所需位置后,关闭电机(3),通过石材夹持机构(19)夹住装修石材,启动卷扬机(7),将装修石材提升到所需的位置,关闭卷扬机(7),施工人员进行安装。9. The application method of a dry hanging lifting device for exterior wall decoration stone as claimed in claim 1, characterized in that: first, the lifting device is fixed on the stone installation through a fixed hook (17) and a top pressure linkage rod (14). On the crossbeam of the frame, use a connecting rope to pass through the fixed boom (8) along the bottom surface of the roller, and fix the connecting rope on the stone installation frame to prevent the lifting device from falling. When the stone clamping mechanism (19) is not loaded When the fixed hook (17) is separated from the crossbeam of the stone installation frame, the position of the lifting device can be adjusted. Start the motor (3) to adjust the lateral position of the lifting device. After reaching the desired position, turn off the motor. (3), clamp the decoration stone through the stone clamping mechanism (19), start the winch (7), lift the decoration stone to the required position, close the winch (7), and the construction personnel will install it.
CN201710603174.0A 2017-07-22 2017-07-22 A dry hanging device for exterior wall decoration stone and its application Expired - Fee Related CN107386609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710603174.0A CN107386609B (en) 2017-07-22 2017-07-22 A dry hanging device for exterior wall decoration stone and its application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710603174.0A CN107386609B (en) 2017-07-22 2017-07-22 A dry hanging device for exterior wall decoration stone and its application

Publications (2)

Publication Number Publication Date
CN107386609A CN107386609A (en) 2017-11-24
CN107386609B true CN107386609B (en) 2023-09-08

Family

ID=60336049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710603174.0A Expired - Fee Related CN107386609B (en) 2017-07-22 2017-07-22 A dry hanging device for exterior wall decoration stone and its application

Country Status (1)

Country Link
CN (1) CN107386609B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281455A (en) * 2018-11-07 2019-01-29 山东港基建设集团有限公司 A kind of vertical patch block device of construction facilitating feeding
CN111058604B (en) * 2019-12-28 2021-05-18 上海美凯龙装饰工程集团有限公司 Construction method for dry hanging of building decoration facing stone

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103255892A (en) * 2013-05-09 2013-08-21 陈发城 Installing device of veneers or stone curtain walls and construction method for dry hanging veneers or stone curtain walls
CN205616495U (en) * 2016-05-11 2016-10-05 浙江中升建设有限公司 Hoist device for building small -size
CN208039763U (en) * 2017-07-22 2018-11-02 李月成 A kind of exterior wall finishing stone material dry suspending boom hoisting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103255892A (en) * 2013-05-09 2013-08-21 陈发城 Installing device of veneers or stone curtain walls and construction method for dry hanging veneers or stone curtain walls
CN205616495U (en) * 2016-05-11 2016-10-05 浙江中升建设有限公司 Hoist device for building small -size
CN208039763U (en) * 2017-07-22 2018-11-02 李月成 A kind of exterior wall finishing stone material dry suspending boom hoisting

Also Published As

Publication number Publication date
CN107386609A (en) 2017-11-24

Similar Documents

Publication Publication Date Title
CN213171204U (en) Construction equipment hoisting device
CN205653092U (en) Tower crane of band plate material bracket
CN218619838U (en) Steel pipe truss hoist and mount auxiliary device
CN107386609B (en) A dry hanging device for exterior wall decoration stone and its application
CN112343223A (en) Curtain wall mounting device
CN108483212A (en) Cladding glass installation self-control electric hoist hanger system and its hanging method
CN211664592U (en) Template suspender device
CN208844900U (en) A suspension mechanism for hanging baskets
CN112938843A (en) Liftable suspension mechanism for high-altitude operation hanging basket
CN215711332U (en) Wall panel hoisting frame
CN211949525U (en) A hanging hanging basket device
CN201785135U (en) Lifting bracket for installation
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN211733774U (en) Liftable suspension mechanism for high-altitude operation hanging basket
CN211733663U (en) Building hoisting device
CN201678398U (en) High-rise indoor object-suspending device
CN208039763U (en) A kind of exterior wall finishing stone material dry suspending boom hoisting
CN210973649U (en) Lifting device for construction machinery
CN210505314U (en) Hoisting device for civil air defense equipment installation
CN115744669A (en) Curtain wall hoisting device and installation construction method thereof
CN214141329U (en) A high-efficiency auxiliary device for prefabricated flue lifting
CN119409054A (en) Assembly equipment for beam-mounted curtain wall glass and use method thereof
CN223088857U (en) Steel structure fixing frame for reinforcing type house interior decoration
CN219990926U (en) Hoisting tool for steel structural member
CN207245143U (en) A kind of fixation elevating mechanism painted for external wall of house

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230908