CN107380910A - Hoisting bracket for hospital's logistics system - Google Patents
Hoisting bracket for hospital's logistics system Download PDFInfo
- Publication number
- CN107380910A CN107380910A CN201710600188.7A CN201710600188A CN107380910A CN 107380910 A CN107380910 A CN 107380910A CN 201710600188 A CN201710600188 A CN 201710600188A CN 107380910 A CN107380910 A CN 107380910A
- Authority
- CN
- China
- Prior art keywords
- hoisting bracket
- cantilever
- girder
- suspension
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000725 suspension Substances 0.000 claims abstract description 62
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 230000033228 biological regulation Effects 0.000 abstract description 4
- 238000009434 installation Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- 238000009408 flooring Methods 0.000 description 3
- 230000005571 horizontal transmission Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000012567 medical material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G21/00—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors
- B65G21/10—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors movable, or having interchangeable or relatively movable parts; Devices for moving framework or parts thereof
- B65G21/12—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors movable, or having interchangeable or relatively movable parts; Devices for moving framework or parts thereof to allow adjustment of position of load-carrier or traction element as a whole
Abstract
The invention provides a kind of hoisting bracket for hospital's logistics system, hospital's logistics system includes carrier and the transfer assembly on the carrier;The hoisting bracket includes suspension bracket, the girder being extended along before and after direction of transfer, the front and rear removable suspension rod being fixed on below the girder, the vertical nut for being arranged at the vertical screw of the boom foot and being sheathed on the vertical screw periphery and being engaged with the vertical screw.The vertical nut Relative vertical screw rod is rotated to adjust the height and position of the carrier;The suspension bracket includes the first cantilever for being horizontally arranged at interval of left and right and the second cantilever and the horizontal screw bolt being transversely fixed between first cantilever and the second cantilever, and the girder can be in moving left and right regulation on horizontal screw bolt.Hoisting bracket Stability Analysis of Structures of the present invention, the position adjustment in three directions in top to bottom, left and right, front and rear can be realized, do over again, reduce the cost on a large scale caused by reducing construction error.
Description
Technical field
The present invention relates to flow conveying apparatus technical field, more particularly to a kind of lifting branch for hospital's logistics system
Frame.
Background technology
Modern hospital construction scale tends to maximize, and the handling of goods and materials such as numerous medicines, apparatus and consumptive material is also progressively in hospital
Lean and intellectuality are moved towards, medical material requires the characteristics of high, traditional carrying method gesture with more conveying is ageing in institute
It must be difficult to meet the demand.In recent years, automatic material flow induction system has also gradually been popularized in the use of hospital internal, typically
Mainly include two kinds of box logistics and small rail car logistics.Specifically, hospital's logistics system is mainly by horizontal transmission line and vertical
Increase line two parts form, and the installation problem encountered and technical requirements of horizontal transmission line are higher, existing hospital's logistics system
The horizontal transmission line of system is mostly installed using hoisting bracket.
The backbar and use that traditional hoisting bracket includes being fixedly mounted on suspension rod below flooring, is installed on below suspension rod
To carry out the screw rod of upper-lower height regulation.Above-mentioned hoisting bracket in-site installation and dismounting inconvenience, to scene positioning and unwrapping wire requirement
It is higher;And it is only capable of carrying out upper-lower height regulation, and the adjustment of horizontal direction can not be carried out.
In consideration of it, it is necessary to provide a kind of new hoisting bracket for hospital's logistics system.
The content of the invention
It is an object of the invention to provide a kind of hoisting bracket for hospital's logistics system, Stability Analysis of Structures, in-site installation
It is convenient;And the position adjustment in three directions in top to bottom, left and right, front and rear can be realized, done over again on a large scale caused by reducing construction error,
Reduce cost.
For achieving the above object, the invention provides a kind of hoisting bracket for hospital's logistics system, the doctor
Institute's logistics system includes carrier and the transfer assembly on the carrier;The hoisting bracket includes suspension bracket, edge passes
The girder being extended before and after direction is sent, front and rear removable the suspension rod below the girder be fixed on and be arranged at the suspension rod bottom
The vertical screw in portion;The suspension bracket includes the first cantilever for being horizontally arranged at interval of left and right and the second cantilever and transversely fixed
Horizontal screw bolt between first cantilever and the second cantilever, the girder is between the first cantilever and the second cantilever and institute
Spacing of the girder transverse width less than first cantilever and the second cantilever is stated, the horizontal screw bolt passes through the girder, described
Suspension bracket also includes being sheathed on the horizontal screw bolt and the respectively horizontal nut at left and right sides of girder;The hoisting bracket also wraps
Include the vertical nut for being sheathed on the vertical screw periphery and being engaged with the vertical screw, the vertical nut Relative vertical
Screw rod is rotated to adjust the height and position of the carrier.
As a further improvement on the present invention, two suspension brackets of the suspension bracket two-by-two in suspension bracket described in one group and each group are in
Left and right is horizontally arranged at interval;The girder relative set is two, and the carrier and transfer assembly are transversely located at two institutes
State between girder.
As a further improvement on the present invention, the suspension rod and vertical screw are also arranged to one group two-by-two, described in each group
Two suspension rods and vertical screw in suspension rod and vertical screw are respectively arranged on two girders.
As a further improvement on the present invention, the hoisting bracket also includes extending laterally and to support the carrier
Support bar, the vertical screw is located at the lower section of the support bar through the support bar and the vertical nut.
As a further improvement on the present invention, the hoisting bracket also include being arranged at the vertical nut and support bar it
Between U-shaped supporting plate.
As a further improvement on the present invention, the hoisting bracket also includes front and rear extension and is fixed on the support bar
Wire casing.
As a further improvement on the present invention, the suspension rod includes supporting downwards compressing plate, positioned at master above girder
Suspension rod main body below beam, the connecting plate for being formed at suspension rod body top and to connect the locking for compressing plate and connecting plate
Bolt.
It is as a further improvement on the present invention, described that to compress plate rectangular and in the same size with connecting plate;The locking
Bolt is arranged to four and is respectively adjacent to the four drift angles setting for compressing plate and connecting plate.
As a further improvement on the present invention, the reinforcement of inverted triangle shape is also formed between the suspension rod main body and connecting plate
Plate.
As a further improvement on the present invention, the reinforcing plate is arranged to four pieces and uniform along the week side of boss of the suspension rod main body
Arrangement.
The beneficial effects of the invention are as follows:Using hoisting bracket of the present invention, the first cantilever of the suspension bracket and the second cantilever energy
Enough stabilizations are attached on flooring or building crossbeam, and Stability Analysis of Structures is reliable, and in-site installation is convenient.The vertical screw and vertical nut
It is engaged and can be achieved to adjust above and below carrier, the horizontal screw bolt is engaged the left and right position that can realize girder with horizontal nut
Adjustment is put, and the suspension rod can move forward and backward in girder.Thereby, the hoisting bracket can realize simultaneously up and down, left and right,
The position adjustment in front and rear three directions, done over again on a large scale caused by reducing construction error, reduce spillage of material and shorten construction week
Phase, effectively reduce cost.
Brief description of the drawings
Fig. 1 is the structural representation of hoisting bracket of the present invention;
Fig. 2 is the view that hoisting bracket of the present invention is applied to hospital's logistics system;
Fig. 3 is the partially laterally schematic diagram that hoisting bracket of the present invention is applied to hospital's logistics system;
Fig. 4 is the mplifying structure schematic diagram of a-quadrant in Fig. 3.
Embodiment
Below with reference to embodiment shown in the drawings, the present invention will be described in detail.But the embodiment is not intended to limit
The present invention, structure that one of ordinary skill in the art is made according to the embodiment, method or conversion functionally are wrapped
Containing within the scope of the present invention.
Refer to the structural representation that Fig. 1 is the hoisting bracket 100 that the present invention is used for hospital's logistics system.The lifting branch
Frame 100 include suspension bracket 1, along the girder 2 being extended before and after direction of transfer, front and rear removable be fixed on the lower section of girder 2
Suspension rod 3, the vertical screw 4 for being arranged at the bottom of suspension rod 3 and be sheathed on the periphery of vertical screw 4 and with the vertical screw
The 4 vertical nuts 5 being engaged.
The suspension bracket 1 includes the first cantilever 11 for being horizontally arranged at interval of left and right and the second cantilever 12 and transversely fixed
Horizontal screw bolt 13 between the cantilever 12 of the first cantilever 11 and second.The cross section of the girder 2 is rectangular and it is located at
Between first cantilever 11 and the second cantilever 12, the transverse width of the girder 2 is less than the cantilever 12 of the first cantilever 11 and second
Spacing, the horizontal screw bolt 13 passes through the girder 2, and the suspension bracket 1 also includes being sheathed on the horizontal screw bolt 13 and respectively
Two horizontal nuts 14 positioned at the left and right sides of girder 2.Two horizontal nuts 14 are born against in the girder 2
Both sides are with the right position of the fixation girder 2.The suspension bracket 1 is also included to by the cantilever 12 of the first cantilever 11 and second
The mounting screw 15 being fixedly installed on building body, herein, the cantilever 12 of the first cantilever 11 and second be respectively equipped with to
Few two mounting screws 15.
With reference to shown in Fig. 2 to Fig. 4, hospital's logistics system includes carrier 201 and on the carrier 201
Transfer assembly.The transfer assembly includes some left and right and extends laterally the rollers 202 of setting, and some rollers 202 are along biography
Send and arrange successively before and after direction.Herein, the roller 202 is arranged to the consistent spring pressing-in type rotary drum of specification.The roller 202
Be arranged to juxtaposed two row in left and right, to form two separate transfer passages, the conveying directions of two transfer passages on the contrary,
And then effectively improve the circulation efficiency of medical material.Except this, the left and right sides of each row roller 202 is additionally provided with to surpass upwards
Go out the guardrail 203 of the roller 202.Hospital's logistics system also has the storage tank that specification matches with the transfer assembly
204。
In the present embodiment, two suspension brackets 1 in suspension bracket 1 described in one group and each group are horizontal in left and right two-by-two for the suspension bracket 1
To interval setting;The relative set of girder 2 is two, and the carrier 201 and transfer assembly are transversely positioned at described in two
Between girder 2.The suspension rod 3 and vertical screw 4 are also arranged to one group two-by-two, in suspension rod 3 described in each group and vertical screw 4
Two suspension rods 3 and vertical screw 4 are arranged and are respectively arranged on two girders 2 in horizontal.
The hoisting bracket 100 also includes extending laterally and to support the support bar 6 of the carrier 201, described to hang down
Straight screw rod passes through the support bar 6 about 4, the vertical nut 5 is located at the lower section of the support bar 6.The vertical phase of nut 5
Realization is rotated to vertical screw 4 to move up and down, and then adjusts the height and position of the carrier 201.Preferably, the suspension rod branch
Frame 100, which also has, is sheathed on the vertical screw 4 and positioned at the ' of fixing nut 5 of the top of support bar 6, the position of the support bar 6
Regulation is locked when completing by the ' of fixing nut 5.
The suspension rod 3 include support downwards above girder 2 compress plate 31, the suspension rod main body 32 below girder 2,
It is formed at the connecting plate 33 at the top of suspension rod main body 32 and to connect the clamping screw 34 for compressing plate 31 and connecting plate 33.Institute
State that to compress plate 31 rectangular and in the same size with connecting plate 33;The clamping screw 34 is arranged to four and is respectively adjacent to described
Four drift angles for compressing plate 31 and connecting plate 33 are set.Preferably, the plate 31 that compresses is disposed as square with connecting plate 33
And the suspension rod main body 32 is located at the center of the connecting plate 33.To improve between the connecting plate 33 and suspension rod main body 32
Structural strength, the suspension rod 3 also include the reinforcing plate 35 being formed between the suspension rod main body 32 and connecting plate 33.The reinforcement
Plate 35 is in inverted triangle shape, and the reinforcing plate 35 is arranged to four pieces, the week side of boss of the reinforcing plate 35 along the suspension rod main body 32
It is uniformly distributed and each piece of reinforcing plate 35 is connected to the axis line position of the connecting plate 33.
As a further improvement on the present invention, the hoisting bracket 100 also includes front and rear extension and is fixed on the support
Wire casing 7 on bar 6.The wire casing 7 is located at the side of the transfer assembly, and the wire casing 7 is beneficial to all kinds of in hospital's logistics system
The placement fixation of cable and later stage repair and maintenance.
Preferably, the hoisting bracket 100 also includes being arranged at the vertical U-shaped support between nut 5 and support bar 6
Plate 8(Shown in Fig. 4), the height of the U-shaped supporting plate 8 is suitable with the height of the support bar 6.The U-shaped supporting plate 8 is effectively kept away
Exempt from support bar 6 and abrasion deformation caused by the directly inconsistent friction of vertical nut 5.
In summary, using hoisting bracket 100 of the present invention, the first cantilever 11 and the second cantilever 12 of the suspension bracket 1 can
Stable to be attached on flooring or building crossbeam, Stability Analysis of Structures is reliable, and in-site installation is convenient.The vertical screw 4 and vertical nut 5
It is engaged i.e. achievable carrier to adjust about 201, the horizontal screw bolt 13 is engaged with horizontal nut 14 can realize girder 2
Right position adjustment, and when the suspension rod 3 needs front and rear adjust, being unclamped by the fastening bolt 34 can be by the suspension rod
The 3 front and back position adjustment for sliding into commitment positions, the locking of fastening bolt 34 being completed to suspension rod 3 again front and rear on girder 2.
Thereby, the hoisting bracket 100 can realize the position adjustment in three directions in top to bottom, left and right, front and rear simultaneously, reduce construction error
Caused by do over again on a large scale, reduce spillage of material simultaneously shorten construction period, effectively reduce cost.
It should be appreciated that although the present specification is described in terms of embodiments, not each embodiment only includes one
Individual independent technical scheme, this narrating mode of specification is only that those skilled in the art will should say for clarity
For bright book as an entirety, the technical scheme in each embodiment may also be suitably combined to form those skilled in the art can
With the other embodiment of understanding.
Those listed above is a series of to be described in detail only for feasibility embodiment of the invention specifically
Bright, they simultaneously are not used to limit the scope of the invention, all equivalent implementations made without departing from skill spirit of the present invention
Or change should be included in the scope of the protection.
Claims (10)
1. a kind of hoisting bracket for hospital's logistics system, hospital's logistics system includes carrier and held installed in described
Transfer assembly on carrier, it is characterised in that:The hoisting bracket includes suspension bracket, the master being extended along before and after direction of transfer
Beam, front and rear removable it be fixed on the suspension rod below the girder and be arranged at the vertical screw of the boom foot;The suspension bracket
The first cantilever and the second cantilever that are horizontally arranged at interval including left and right and transversely it is fixed on first cantilever and second outstanding
Horizontal screw bolt between arm, the girder is between the first cantilever and the second cantilever and the girder transverse width is less than described
The spacing of first cantilever and the second cantilever, the horizontal screw bolt pass through the girder, and the suspension bracket also includes being sheathed on the water
Flat screw rod and the respectively horizontal nut at left and right sides of girder;The hoisting bracket also includes being sheathed on outside the vertical screw
The vertical nut that vertical screw described in Zhou Bingyu is engaged, the vertical nut Relative vertical screw rod are rotated to adjust the carrying
The height and position of frame.
2. hoisting bracket according to claim 1, it is characterised in that:Suspension bracket suspension bracket described in one group and each group two-by-two
In two suspension brackets in left and right be horizontally arranged at interval;The girder relative set is two, carrier and the transfer assembly edge
It is laterally positioned between two girders.
3. hoisting bracket according to claim 2, it is characterised in that:The suspension rod and vertical screw are also arranged to two-by-two one
Group, two suspension rods and vertical screw in suspension rod described in each group and vertical screw are respectively arranged on two girders.
4. hoisting bracket according to claim 3, it is characterised in that:The hoisting bracket also include extend laterally and to
The support bar of the carrier is supported, the vertical screw is located at the support bar through the support bar and the vertical nut
Lower section.
5. hoisting bracket according to claim 4, it is characterised in that:The hoisting bracket is also described vertical including being arranged at
U-shaped supporting plate between nut and support bar.
6. hoisting bracket according to claim 4, it is characterised in that:The hoisting bracket also includes front and rear extension and fixed
Wire casing on the support bar.
7. hoisting bracket according to claim 1, it is characterised in that:The suspension rod includes supporting above girder downwards
Compress plate, the suspension rod main body below girder, the connecting plate for being formed at suspension rod body top and described compress plate to connect
With the clamping screw of connecting plate.
8. hoisting bracket according to claim 7, it is characterised in that:It is described to compress that plate and connecting plate be rectangular and size
Unanimously;The clamping screw is arranged to four and is respectively adjacent to the four drift angles setting for compressing plate and connecting plate.
9. hoisting bracket according to claim 7, it is characterised in that:It is also formed between the suspension rod main body and connecting plate
The reinforcing plate of inverted triangle shape.
10. hoisting bracket according to claim 9, it is characterised in that:The reinforcing plate is arranged to four pieces and hung along described
The week side of boss of bar main body is uniformly arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710600188.7A CN107380910A (en) | 2017-07-21 | 2017-07-21 | Hoisting bracket for hospital's logistics system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710600188.7A CN107380910A (en) | 2017-07-21 | 2017-07-21 | Hoisting bracket for hospital's logistics system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107380910A true CN107380910A (en) | 2017-11-24 |
Family
ID=60336502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710600188.7A Pending CN107380910A (en) | 2017-07-21 | 2017-07-21 | Hoisting bracket for hospital's logistics system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107380910A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109013114A (en) * | 2018-10-16 | 2018-12-18 | 天津市精美特表面技术有限公司 | A kind of automobile parts spray coating hanging equipment |
CN113213171A (en) * | 2020-01-21 | 2021-08-06 | 爱思开海力士有限公司 | Conveyor and method for operating same |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6183184B1 (en) * | 1996-09-30 | 2001-02-06 | Murata Machinery, Ltd. | Work transport system |
JP2010095898A (en) * | 2008-10-16 | 2010-04-30 | Ihi Corp | Trussed setting beam |
JP2011157184A (en) * | 2010-02-01 | 2011-08-18 | Daifuku Co Ltd | Article storage facility |
CN102530553A (en) * | 2010-11-04 | 2012-07-04 | 村田自动化机械有限公司 | Transport system and transport method |
CN106573733A (en) * | 2014-08-16 | 2017-04-19 | 艾森曼欧洲公司 | Conveyor device for transportation structures |
CN206278602U (en) * | 2016-12-07 | 2017-06-27 | 上海嘉峥机械有限公司 | A kind of clipping suspended structure installed for Automatic Conveying line |
CN207497503U (en) * | 2017-07-21 | 2018-06-15 | 艾信智慧医疗科技发展(苏州)有限公司 | For the hoisting bracket of hospital's logistics system |
-
2017
- 2017-07-21 CN CN201710600188.7A patent/CN107380910A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6183184B1 (en) * | 1996-09-30 | 2001-02-06 | Murata Machinery, Ltd. | Work transport system |
JP2010095898A (en) * | 2008-10-16 | 2010-04-30 | Ihi Corp | Trussed setting beam |
JP2011157184A (en) * | 2010-02-01 | 2011-08-18 | Daifuku Co Ltd | Article storage facility |
CN102530553A (en) * | 2010-11-04 | 2012-07-04 | 村田自动化机械有限公司 | Transport system and transport method |
CN106573733A (en) * | 2014-08-16 | 2017-04-19 | 艾森曼欧洲公司 | Conveyor device for transportation structures |
CN206278602U (en) * | 2016-12-07 | 2017-06-27 | 上海嘉峥机械有限公司 | A kind of clipping suspended structure installed for Automatic Conveying line |
CN207497503U (en) * | 2017-07-21 | 2018-06-15 | 艾信智慧医疗科技发展(苏州)有限公司 | For the hoisting bracket of hospital's logistics system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109013114A (en) * | 2018-10-16 | 2018-12-18 | 天津市精美特表面技术有限公司 | A kind of automobile parts spray coating hanging equipment |
CN113213171A (en) * | 2020-01-21 | 2021-08-06 | 爱思开海力士有限公司 | Conveyor and method for operating same |
US11401111B2 (en) | 2020-01-21 | 2022-08-02 | SK Hynix Inc. | Conveyor apparatus and operating method thereof |
CN113213171B (en) * | 2020-01-21 | 2022-12-20 | 爱思开海力士有限公司 | Conveyor and method for operating same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631810B (en) | High altitude moving hanging basket system and construction method | |
CN107380910A (en) | Hoisting bracket for hospital's logistics system | |
CN109051834A (en) | A kind of superimposed sheet integral hoisting system | |
CN207497503U (en) | For the hoisting bracket of hospital's logistics system | |
CN113733341B (en) | Automatic binding system for reinforcing steel bars | |
CN212245882U (en) | Hoist device of prefabricated stair board of assembled | |
CN209692302U (en) | A kind of suspension type bus structure | |
CN208889071U (en) | A kind of loading system suitable for armored concrete beam test practical teaching | |
CN205740022U (en) | A kind of heliostat mounting hanger | |
CN205329549U (en) | Corbel frame device is deposited to steel case roof beam temporarily | |
CN107642049A (en) | A kind of device and its installation method changed for main rope of suspension bridge cord clip | |
CN209169914U (en) | It broadens the cable suspension and support of section for pipe gallery | |
CN208220977U (en) | A kind of mounting rack of plant area's wind-driven generator | |
CN208589757U (en) | A kind of Combined type cable bracket | |
CN210049120U (en) | Hanging basket for prestress tensioning of high-pier highway cover beam | |
CN208413558U (en) | A kind of elevator framework | |
CN208325261U (en) | A kind of cover board transport installation vehicle | |
CN207131092U (en) | Floor concrete casting operation platform is built in a kind of room | |
CN208937792U (en) | A kind of multi-quantity spacing reflection mirror mounting frame | |
CN109339553A (en) | It is a kind of to build firm electric power tower device | |
CN207497880U (en) | Lift car through bracket | |
CN208849710U (en) | A kind of photovoltaic system | |
CN209635782U (en) | A kind of easy device for the installation of indoor disk cabinet | |
CN204643670U (en) | Split type arm tower crane Shears structure | |
CN220519987U (en) | Bearing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |