CN107338815A - Underground engineering side wall post-cast strip comprehensive waterproof construction method - Google Patents

Underground engineering side wall post-cast strip comprehensive waterproof construction method Download PDF

Info

Publication number
CN107338815A
CN107338815A CN201710792244.1A CN201710792244A CN107338815A CN 107338815 A CN107338815 A CN 107338815A CN 201710792244 A CN201710792244 A CN 201710792244A CN 107338815 A CN107338815 A CN 107338815A
Authority
CN
China
Prior art keywords
cast strip
post
water
side wall
underground engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710792244.1A
Other languages
Chinese (zh)
Inventor
黄强
林晓林
孙科
于亚冬
贾福生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710792244.1A priority Critical patent/CN107338815A/en
Publication of CN107338815A publication Critical patent/CN107338815A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The invention provides a kind of underground engineering side wall post-cast strip comprehensive waterproof construction method, this method comprises the following steps:Build step by laying bricks or stones, the outboard template for building masonry wall by laying bricks or stones on the outside of post-cast strip to pour as post-cast strip;Light step is received, receipts light of wiping one's face is carried out to the outside metope of masonry wall;Waterproofing step, setting waterproof layer in the outside metope of masonry wall, waterproof layer has double layer water-proof structure to prevent Groundwater infiltration post-cast strip.In the present invention, by four waterproof technologies, i.e. water-tight concrete self waterproofing, steel plate for sealing water, water-repellent paint and waterproof roll, underground engineering side wall post-cast strip can be effectively controlled to seep water, the probability that the infiltration of underground engineering side wall post-cast strip occurs is reduced, reaches comprehensive waterproof effect.

Description

Underground engineering side wall post-cast strip comprehensive waterproof construction method
Technical field
The present invention relates to construction engineering technical field, is integrated in particular to a kind of underground engineering side wall post-cast strip anti- Water construction method.
Background technology
Underground project waterproof is always the details position that unit in charge of construction pays much attention to, because underground engineering is in ground throughout the year Hereinafter, the slightly slack hidden danger that will leave infiltration in work progress.So in design drawing, designer can typically incite somebody to action The Concrete Design that underground engineering construction is poured uses water-tight concrete, and water-tight concrete grade cannot be less than P6.And The post-cast strip of underground engineering is dealt with, and is needed more with caution, if there is infiltration situation, deal with to bother very much, and generation Valency is larger, so requiring that post-cast strip position strength grade of concrete is higher than one grade of shear wall in job specfication.
But the percolation-proof effect only reached when pouring post-cast strip using water-tight concrete is can not to meet actual feelings Condition, after certain time, infiltration situation still occurs in post-cast strip.
The content of the invention
In consideration of it, the present invention proposes a kind of underground engineering side wall post-cast strip comprehensive waterproof construction method, it is intended to after solution Pour the problem of band easily seeps water.
The present invention proposes a kind of underground engineering side wall post-cast strip comprehensive waterproof construction method, and this method includes following step Suddenly:Build step by laying bricks or stones, build the masonry wall of the outboard template to be poured as post-cast strip by laying bricks or stones on the outside of post-cast strip;Light step is received, Receipts light of wiping one's face is carried out to the outside metope of masonry wall;Waterproofing step, set in the outside metope of masonry wall to prevent water from penetrating into The waterproof layer of post-cast strip, waterproof layer have double layer water-proof structure.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, waterproofing step includes:Coating Step, in the outside metope coating water-repellent paint of masonry wall.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, include after sub-step is coated: First laying sub-step, in the outer of the outside metope of the basement shear wall poured in advance and masonry wall coated with water-repellent paint Side wall laying water-proof coiled material.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, post-cast strip be embedded with to prevent Sealing penetrates into the steel plate for sealing water of post-cast strip.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, the height of masonry wall with advance The height of the basement shear wall poured is equal.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, shear wall is by water-tight concrete Pour and form.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, also wrapped after waterproofing step Include:Gluing steps, waterproof layer external pasting to prevent waterproof layer damage protection board.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, also wrapped after gluing steps Include:Formwork step, install to block the template on the inside of post-cast strip on the inside of post-cast strip.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, also include after formwork step: Step is poured, the casting concrete in post-cast strip.
Further, in above-mentioned underground engineering side wall post-cast strip comprehensive waterproof construction method, receiving light step includes:Apply trowel Step, cement mortar is smeared in the outside metope of masonry wall;Second laying sub-step, masonry wall the laying of outside metope to The mesh sheet for preventing cement mortar from ftractureing.
In the present invention, by building masonry wall by laying bricks or stones at post-cast strip position to strengthen the structural stability at post-cast strip, also, The double-deck waterproof construction that outside metope is set, it can effectively prevent the situation that post-cast strip is seeped water from occurring.
Particularly, double-deck waterproof material is water-repellent paint and waterproof roll, and post-cast strip is embedded with to prevent what water from penetrating into Steel plate for sealing water, shear wall are poured by water-tight concrete and formed, by this four waterproof technology, i.e. water-tight concrete self waterproofing, only Water steel plate, cement-based capillary crystalline waterproof coating and modified asphalt waterproof coiled material, poured after can effectively controlling underground engineering side wall Band seeps water, and reduces the probability that the infiltration of underground engineering side wall post-cast strip occurs, reaches comprehensive waterproof effect.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the flow chart of underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention;
Fig. 2 is underground engineering in underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention The front view of side wall post-cast strip;
Fig. 3 is body of building a wall in underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention A-A sectional views;
Fig. 4 is that Ι part is put in underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention Big schematic diagram;
Fig. 5 is waterproofing step in underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention Flow chart;
Fig. 6 is the another flow of underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention Figure;
Fig. 7 is the another flow of underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention Figure;
Fig. 8 is the another flow of underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention Figure;
Fig. 9 is in underground engineering side wall post-cast strip comprehensive waterproof construction method provided in an embodiment of the present invention, receives light step Flow chart.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in accompanying drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, Fig. 1 is the flow for the underground engineering side wall post-cast strip comprehensive waterproof construction method that the present embodiment provides Figure.As illustrated, this method comprises the following steps:
Build step S110 by laying bricks or stones, build the masonry wall of the outboard template to be poured as post-cast strip by laying bricks or stones on the outside of post-cast strip.
Specifically, referring to Fig. 2 and Fig. 3, using 240 × 115 × 53mm ordinary fired brick, along the outside of post-cast strip 2 Build one of masonry wall 1 by laying bricks or stones, the template that the masonry wall 1 can pour as post-cast strip 2.When it is implemented, the height of masonry wall 1 can With equal with the height of the basement shear wall 3 poured in advance.
Light step S120 is received, receipts light of wiping one's face is carried out to the outside metope of masonry wall.
Specifically, receipts light of wiping one's face is carried out to the outside metope of masonry wall 1, so that outside surface of wall is smooth, Jin Erli In subsequent operation.
Waterproofing step S130, set in the outside metope of masonry wall to prevent water from penetrating into the waterproof layer of post-cast strip, waterproof Layer has double layer water-proof structure.
Specifically, referring to Fig. 4, the outside metope setting waterproof layer 4, Jin Erfang for the masonry wall 1 for receiving light of being wiped one's face in completion Only post-cast strip 2 is seeped water.
In the present embodiment, waterproof layer is set by the outside metope in masonry wall, also, waterproof layer has double-deck waterproof knot Structure, it can effectively prevent the situation that post-cast strip is seeped water from occurring.
Referring to Fig. 5, in one embodiment of the present invention, waterproofing step S130 can include:
Sub-step S510 is coated, in the outside metope coating water-repellent paint of masonry wall.
Specifically, the water-repellent paint 41 for the outside metope coating 1mm thickness for the masonry wall 1 for receiving light of being wiped one's face in completion, specifically During implementation, water-repellent paint 41 can be cement-based capillary crystalline waterproof coating.
First laying sub-step S520, in the outside metope of the basement shear wall poured in advance and coated with water-repellent paint Masonry wall outside metope laying water-proof coiled material.
Specifically, in the outside metope of the basement shear wall 3 poured in advance and masonry coated with water-repellent paint 41 The waterproof roll 42 of the outside metope laying 3mm thickness of wall 1, is rolled up when it is implemented, waterproof roll 42 can be modified asphalt waterproof Material.The negative and positive angle of shear wall 3 and masonry wall 1 needs to add waterproof roll extra play on request, while the overlap joint of waterproof roll 42 Length should meet code requirement.The double layer water-proof structure of waterproof layer 4 is respectively water-repellent paint 41 and waterproof roll 42.
In the present embodiment, waterproof layer is divided into water-repellent paint and waterproof roll, is applied in the outside metope coating waterproof of masonry wall After material, and the equal laying water-proof coiled material of external wall of the outside metope and masonry wall in shear wall, because shear wall can with masonry wall Differential settlement can occur, water-repellent paint, which is used alone, can produce crack, can not prevent Groundwater infiltration, will using waterproof roll The outside metope of shear wall and the external wall of masonry wall cover simultaneously, waterproof effect can be strengthened.
In above-described embodiment, post-cast strip 2 can be embedded with to prevent the steel plate for sealing water 5 that water penetrates into.Shear wall 3 can be by Water-tight concrete, which pours, to be formed, and so, passes through four waterproof technologies, i.e. water-tight concrete self waterproofing, steel plate for sealing water 5, cement base Capillary crystalline waterproof coating material 41 and modified asphalt waterproof coiled material 42, underground engineering side wall post-cast strip 2 can be effectively controlled to ooze Water, the probability that the infiltration of underground engineering side wall post-cast strip 2 occurs is reduced, reaches comprehensive waterproof effect.
Referring to Fig. 6, Fig. 6 is the another stream for the underground engineering side wall post-cast strip comprehensive waterproof construction method that the present embodiment provides Cheng Tu.As illustrated, this method comprises the following steps:
Build step S610 by laying bricks or stones, build the masonry wall of the outboard template to be poured as post-cast strip by laying bricks or stones on the outside of post-cast strip.
Light step S620 is received, receipts light of wiping one's face is carried out to the outside metope of masonry wall.
Waterproofing step S630, set in the outside metope of masonry wall to prevent water from penetrating into the waterproof layer of post-cast strip.
Gluing steps S640, waterproof layer external pasting to prevent waterproof layer damage protection board.
Specifically, outside waterproof layer 4, i.e., outside waterproof roll 42, the thick protection boards 6 of 5mm are pasted, to protect waterproof to roll up Material 42 it is complete.When it is implemented, protection board 6 can be polyphenyl extruded sheet.
It should be noted that build by laying bricks or stones step S610, receive light step S620 and waterproofing step S630 embodiment can So that with reference to above-described embodiment, here is omitted.
In the present embodiment, in waterproof layer external pasting protection board, it can prevent hard sharp objects from crashing through, scratch waterproof layer, And then it ensure that waterproof effect.
Referring to Fig. 7, Fig. 7 is the another stream for the underground engineering side wall post-cast strip comprehensive waterproof construction method that the present embodiment provides Cheng Tu.As illustrated, this method comprises the following steps:
Build step S710 by laying bricks or stones, build the masonry wall of the outboard template to be poured as post-cast strip by laying bricks or stones on the outside of post-cast strip.
Light step S720 is received, receipts light of wiping one's face is carried out to the outside metope of masonry wall.
Waterproofing step S730, set in the outside metope of masonry wall to prevent water from penetrating into the waterproof layer of post-cast strip.
Gluing steps S740, waterproof layer external pasting to prevent waterproof layer damage protection board.
Formwork step S750, install to block the template on the inside of post-cast strip on the inside of post-cast strip.
Specifically, in the inner side supporting module 9 of post-cast strip 3, to block the inner side of post-cast strip 3.When it is implemented, template 9 It can be plank sheathing.
It should be noted that build step S710 by laying bricks or stones, receive light step S720, waterproofing step S730 and gluing steps S740 tool Body embodiment is referred to above-described embodiment, and here is omitted.
In the present embodiment, the inner side supporting module in post-cast strip, to block on the inside of post-cast strip, and then can subsequently it be mixed Solidifying soil pours.
Referring to Fig. 8, Fig. 8 is the another stream for the underground engineering side wall post-cast strip comprehensive waterproof construction method that the present embodiment provides Cheng Tu.As illustrated, this method comprises the following steps:
Build step S810 by laying bricks or stones, build the masonry wall of the outboard template to be poured as post-cast strip by laying bricks or stones on the outside of post-cast strip.
Light step S820 is received, receipts light of wiping one's face is carried out to the outside metope of masonry wall.
Waterproofing step S830, set in the outside metope of masonry wall to prevent water from penetrating into the waterproof layer of post-cast strip.
Gluing steps S840, waterproof layer external pasting to prevent waterproof layer damage protection board.
Formwork step S850, install to block the template on the inside of post-cast strip on the inside of post-cast strip.
Step S860 is poured, the casting concrete in post-cast strip.
Specifically, by job specfication requirement, post-cast strip 2 is poured using microdilatancy type water-tight concrete, and to pouring Concrete is vibrated by job specfication requirement.When it is implemented, pouring the strength grade of the concrete of post-cast strip 2 needs height In the strength grade of concrete of shear wall 3.
It should be noted that build step S810 by laying bricks or stones, receive light step S820, waterproofing step S830, gluing steps S840 and branch Mould step S850 embodiment is referred to above-described embodiment, and here is omitted.
In the present embodiment, post-cast strip is poured using microdilatancy type water-tight concrete, further increases post-cast strip Percolation-proof effect.
Referring to Fig. 9, in one embodiment of the present invention, receiving light step S120 can include:
Sub-step S910 is smeared, cement mortar is smeared in the outside metope of masonry wall.
Specifically, applied using the good cement mortar 7 of advance mixing, the outside metope of the masonry wall 1 to laying Smear, light processing is received to wipe one's face progress masonry wall 1.
Second laying sub-step S920, lays in the outside metope of masonry wall to prevent the mesh sheet of cement mortar cracking.
Specifically, after the intensity of cement mortar 7 meets the requirements, by job specfication requirement masonry wall 1 outside metope Mesh sheet 8 is laid, to prevent water cement mortar 7 from ftractureing.When it is implemented, mesh sheet 8 can be vitreous fibre crack-resistance mesh sheet.
In the present embodiment, in the outside metope laying mesh sheet of masonry wall, to prevent water cement mortar from ftractureing, can further it carry The waterproof effect of high post-cast strip.
To sum up, in the present embodiment, by building masonry wall by laying bricks or stones at post-cast strip position to strengthen the structural stability at post-cast strip, Also, in the double-deck waterproof construction that outer side wall is set, it can effectively prevent the situation that post-cast strip is seeped water from occurring.
Particularly, double-deck waterproof material is water-repellent paint and waterproof roll, and post-cast strip is embedded with to prevent what water from penetrating into Steel plate for sealing water, shear wall are poured by water-tight concrete and formed, by this four waterproof technology, i.e. water-tight concrete self waterproofing, only Water steel plate, cement-based capillary crystalline waterproof coating and modified asphalt waterproof coiled material, poured after can effectively controlling underground engineering side wall Band seeps water, and reduces the probability that the infiltration of underground engineering side wall post-cast strip occurs, reaches comprehensive waterproof effect.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of underground engineering side wall post-cast strip comprehensive waterproof construction method, it is characterised in that comprise the following steps:
Build step by laying bricks or stones, build the masonry wall of the outboard template to be poured as the post-cast strip by laying bricks or stones on the outside of post-cast strip;
Light step is received, receipts light of wiping one's face is carried out to the outside metope of the masonry wall;
Waterproofing step, set in the outside metope of the masonry wall to prevent water from penetrating into the waterproof layer of the post-cast strip, it is described Waterproof layer has double layer water-proof structure.
2. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 1, it is characterised in that described anti- Water step includes:
Sub-step is coated, in the outside metope coating water-repellent paint of the masonry wall.
3. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 2, it is characterised in that described Include after coating sub-step:
First laying sub-step, the outside metope in the basement shear wall poured in advance and the institute coated with the water-repellent paint State the outside metope laying water-proof coiled material of masonry wall.
4. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 1, it is characterised in that
The post-cast strip is embedded with the steel plate for sealing water for preventing water from penetrating into the post-cast strip.
5. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 1, it is characterised in that
The height of basement shear wall of the height of the masonry wall with pouring in advance is equal.
6. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 5, it is characterised in that
The shear wall is poured by water-tight concrete to be formed.
7. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 1, it is characterised in that described Also include after waterproofing step:
Gluing steps, in the waterproof layer external pasting preventing the protection board of waterproof layer damage.
8. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 7, it is characterised in that described Also include after gluing steps:
Formwork step, the template installed to block on the inside of band on the inside of post-cast strip is poured in the rear.
9. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 8, it is characterised in that described Also include after formwork step:
Step is poured, is poured in the rear with interior casting concrete.
10. underground engineering side wall post-cast strip comprehensive waterproof construction method according to claim 1, it is characterised in that described Receiving light step includes:
Sub-step is smeared, cement mortar is smeared in the outside metope of the masonry wall;
Second laying sub-step, lays in the outside metope of the masonry wall to prevent the mesh sheet of cement mortar cracking.
CN201710792244.1A 2017-09-05 2017-09-05 Underground engineering side wall post-cast strip comprehensive waterproof construction method Pending CN107338815A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710792244.1A CN107338815A (en) 2017-09-05 2017-09-05 Underground engineering side wall post-cast strip comprehensive waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710792244.1A CN107338815A (en) 2017-09-05 2017-09-05 Underground engineering side wall post-cast strip comprehensive waterproof construction method

Publications (1)

Publication Number Publication Date
CN107338815A true CN107338815A (en) 2017-11-10

Family

ID=60214836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710792244.1A Pending CN107338815A (en) 2017-09-05 2017-09-05 Underground engineering side wall post-cast strip comprehensive waterproof construction method

Country Status (1)

Country Link
CN (1) CN107338815A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206070A (en) * 2019-05-27 2019-09-06 中国十七冶集团有限公司 A kind of basement wall post-cast strip protection wall construction method
CN111894294A (en) * 2020-07-14 2020-11-06 五冶集团上海有限公司 Protection architecture in basement outer wall post-cast strip
CN112627240A (en) * 2020-12-15 2021-04-09 中建四局贵州投资建设有限公司 Waterproof construction method for outer wall post-cast strip
CN113863387A (en) * 2021-08-28 2021-12-31 安徽朗凯奇建材有限公司 Basement post-cast strip leakage prevention system and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013064246A2 (en) * 2011-11-03 2013-05-10 Wilhelm Wohlsecker Method for a multi-stage joint protection system for wall elements made of concrete components
CN205369320U (en) * 2016-01-25 2016-07-06 广州市第一建筑工程有限公司 Basement post -cast strip leakage protective system
CN105756100A (en) * 2016-01-25 2016-07-13 广州市第建筑工程有限公司 Basement post-pouring belt system and making method thereof
CN106978823A (en) * 2017-05-31 2017-07-25 中国二十冶集团有限公司 Outer wall of basement advanced water-stop post-pouring zone construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013064246A2 (en) * 2011-11-03 2013-05-10 Wilhelm Wohlsecker Method for a multi-stage joint protection system for wall elements made of concrete components
CN205369320U (en) * 2016-01-25 2016-07-06 广州市第一建筑工程有限公司 Basement post -cast strip leakage protective system
CN105756100A (en) * 2016-01-25 2016-07-13 广州市第建筑工程有限公司 Basement post-pouring belt system and making method thereof
CN106978823A (en) * 2017-05-31 2017-07-25 中国二十冶集团有限公司 Outer wall of basement advanced water-stop post-pouring zone construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206070A (en) * 2019-05-27 2019-09-06 中国十七冶集团有限公司 A kind of basement wall post-cast strip protection wall construction method
CN111894294A (en) * 2020-07-14 2020-11-06 五冶集团上海有限公司 Protection architecture in basement outer wall post-cast strip
CN112627240A (en) * 2020-12-15 2021-04-09 中建四局贵州投资建设有限公司 Waterproof construction method for outer wall post-cast strip
CN113863387A (en) * 2021-08-28 2021-12-31 安徽朗凯奇建材有限公司 Basement post-cast strip leakage prevention system and construction method thereof

Similar Documents

Publication Publication Date Title
CN107338815A (en) Underground engineering side wall post-cast strip comprehensive waterproof construction method
CN207597441U (en) A kind of basement side wall horizontal construction joint water proof structure
CN108374566B (en) Repairing process for leakage water on back water surface
CN112252462A (en) Construction method of concrete roof layer waterproof structure
CN106812219A (en) Filling wall top stuff up a crack construction method
CN110805212A (en) Construction method for roof flashing
CN103306439A (en) Pouring technology for implanting high anti-leakage and anti-crack protective layer into roof structure layer
CN110439016A (en) A kind of pile foundation waterproof construction method
CN205875541U (en) Anti -drop's roof waterproof structure
CN110206278A (en) A kind of quick leveling method of wall plastering
KR102072273B1 (en) Construction Method of Water Proof Sheet Having Elasticity
CN109184103A (en) Building masonry wall exempts from plastering construction technique
CN214462853U (en) Self-healing concrete micro-crack repairing structure
CN113481999A (en) Device and method for pouring and repairing 45-degree inclined concrete on cushion layer and smearing internal corners
CN210396008U (en) Vitrified tile paving structure
CN211472948U (en) Novel energy-conserving waterproof building wall
CN210562329U (en) Prevent outer method basement roof and wallboard corner waterproof construction that pastes outward
CN206233385U (en) A kind of basement high-low bay shears mine dam waterproof construction
CN108661087A (en) The waterproof construction and construction method of tower crane in a kind of basement bottom board
CN102733427B (en) Water-proofing and permeability-proofing construction method for coastal civil air-defense constructions
CN219157782U (en) Waterproof and seepage-proof structure of underground space and underground building
CN207296347U (en) A kind of new type scaffold eye plugging structure
CN219794288U (en) Waterproof connection structure of prefabricated outer wall and cast-in-situ floor
CN212358892U (en) Waterproof roll protective layer of roof parapet
CN105297950A (en) Infilled wall and horizontal load-bearing structure gap wall surface crack-controlling construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110

RJ01 Rejection of invention patent application after publication