CN107321924A - A kind of semi-portable double cast gate basin combining structure and combinations thereof application method - Google Patents

A kind of semi-portable double cast gate basin combining structure and combinations thereof application method Download PDF

Info

Publication number
CN107321924A
CN107321924A CN201710383909.3A CN201710383909A CN107321924A CN 107321924 A CN107321924 A CN 107321924A CN 201710383909 A CN201710383909 A CN 201710383909A CN 107321924 A CN107321924 A CN 107321924A
Authority
CN
China
Prior art keywords
basin
pouring basin
pouring
cast gate
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710383909.3A
Other languages
Chinese (zh)
Other versions
CN107321924B (en
Inventor
王洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Kocel Pattern Co Ltd
Original Assignee
Ningxia Kocel Pattern Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Kocel Pattern Co Ltd filed Critical Ningxia Kocel Pattern Co Ltd
Priority to CN201710383909.3A priority Critical patent/CN107321924B/en
Publication of CN107321924A publication Critical patent/CN107321924A/en
Application granted granted Critical
Publication of CN107321924B publication Critical patent/CN107321924B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • B22C9/082Sprues, pouring cups

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The present invention relates to a kind of semi-portable double cast gate basin combining structure used in casting technology field during casting and pouring and combinations thereof application method, the semi-portable double cast gate basin combining structure of the present invention, including the first pouring basin and the second pouring basin being placed in above sand mold, the first cast gate basin bottom part is provided with liquid outlet, the second cast gate basin bottom part is provided with inlet and liquid outlet, the liquid outlet of first pouring basin is connected with the inlet of the second pouring basin by the U being embedded in advance in sand mold, and the liquid outlet of second pouring basin is connected with the sprue of sand mold.In the pouring basin structure of the present invention, first pouring basin is used for the potting syrup that direct access casting ladle is toppled over, the potting syrup flows into the second pouring basin through U with the flow velocity for comparing relatively low, thus the turbulent region in pouring basin is separated with cast advection area, so that overcome in pouring basin because of the turbulent flow can not pushing off the slag and the problem of skimming.

Description

A kind of semi-portable double cast gate basin combining structure and combinations thereof application method
Technical field
The semi-portable double cast gate basin combination used during a kind of of the invention and casting technology field, more particularly to casting and pouring Structure and combinations thereof application method.
Background technology
Pouring basin is arranged on the sand mold of heavy castings, for access from the structure for pouring the potting syrup wrapped.Routine side Method is typically made using the founding of pouring basin mould, and inner surface intensity and heat resistance are all relatively low, are intended for single use, cost is higher.
In the prior art, notification number is the patent specification of the A of CN 103506579 entitled " a kind of pouring basin ", is retouched A kind of scheme of reused semi-portable pouring basin has been stated, using refractory material brick work inside steel framework, and it is auxiliary Help and repeatedly using for pouring basin is realized with ceramic water oral pit, and simplify the maintenance of pouring basin.This form pouring basin is solved The problem of being used for multiple times, but bring than the more serious miscellaneous problem of slag.Due to non-from the molten metal speed under casting ladle freely falling body Chang Gao, causes turbulent flow in the type pouring basin of pond, splashing, volume gas serious, and further results in slag making than more serious, along with casting ladle table The oxidizing slag in face pours into pouring basin, further brings pouring basin molten metal to be mingled with seriously.On the other hand, single pond of pond type pouring basin Flat-bottom structure makes this pouring basin not have being mingled with any pushing off the slag, skimming function, molten metal can be with the metal immersion of turbulent flow Enter die cavity, cause the quality problems being mingled with of casting seriously.
The content of the invention
The present invention in single pond pouring basin cast in the prior art because turbulent flow and can not pushing off the slag, skimming problem and caused by The problem of casting is mingled with serious, there is provided a kind of semi-portable double cast gate basin combining structure and combinations thereof application method, is poured with overcoming Can not pushing off the slag and the problem of skimming because of the turbulent flow in mouthful basin.
First purpose of the present invention is to provide a kind of semi-portable double cast gate basin combining structure, including is placed in above sand mold The first pouring basin and the second pouring basin, the first cast gate basin bottom part is provided with liquid outlet, and the second cast gate basin bottom part is provided with Inlet and liquid outlet, the liquid outlet of first pouring basin and the inlet of the second pouring basin pass through the U that is embedded in advance in sand mold Shape passage is connected, and the liquid outlet of second pouring basin is connected with the sprue of sand mold.
In the pouring basin structure of the present invention, using two pouring basins, the first pouring basin topple over for direct access casting ladle and The potting syrup come, the potting syrup flows into the second pouring basin through U with the flow velocity for comparing relatively low, thus by pouring basin Interior turbulent region separates with cast advection area, it is to avoid the miscellaneous influence of slag that the turbulent flow of freely falling body is brought when potting syrup is toppled over, Meanwhile, the potting syrup in influent stream area is consistent with the direction that slag inclusion floats from bottom to top from U inflow direction, so as to obtain more preferably Scum silica frost effect.
For ease of the installation of pouring basin, the U is the ceramic tube passage being embedded in advance in sand mold, the U-shaped The a port of passage is docked with the liquid outlet of the first pouring basin, another port and the second pouring basin of the U Inlet is docked.
For ease of the feed speed in the second pouring basin of control, the sectional area of the U is the 2 of sprue sectional area ~3 times.
For the reuse of pouring basin, first pouring basin and the second pouring basin are semi-portable pouring basin structure, Including steel outer framework and bottom plate, fire brick layer, the liquid outlet position point of pouring basin are provided with the inside of the housing and on the upside of bottom plate Be not provided with out liquid well, the inlet position of second pouring basin also is provided with feed liquor well, the feed liquor well with Go out the in opposite direction of liquid well, and it is corresponding with liquid flow path direction.
Second object of the present invention also provides a kind of side of being applied in combination of above-mentioned semi-portable double cast gate basin combining structure Method, installs the first pouring basin and the second pouring basin are corresponding with sand mold, is then poured into a mould, by the liquid outlet of the second pouring basin Blocked by cast gate it is stifled, by casting ladle to the first pouring basin add potting syrup, make potting syrup from the first pouring basin through U stream Enter the second pouring basin, extracted when the cast liquid level in the second pouring basin rises to 0.6-0.7 times of pouring basin inner chamber total height Cast gate is stifled to be started to pour into a mould to sprue feed liquor, while adjusting fall liquid speed degree of the casting ladle to the first pouring basin, is kept in two pouring basins Liquid level it is steady until cast terminates, two pouring basins are moved to the displacement more than U diameter respectively, to disconnect two cast gates The passage of basin inlet and each liquid outlet.
The pouring procedure of the present invention, potting syrup flows into the second pouring basin from the effect of damming of first pouring basin through U-shaped passage Afterwards, feed speed is substantially controlled, and turbulence level substantially weakens, and the miscellaneous slag in casting ladle is in the first pouring basin on part Floating, the slag content that the potting syrup of the second pouring basin is flowed into from bottom liquid outlet is significantly reduced, then through the second pouring basin scum silica frost at Reason, the slag into sprue is substantially reduced, so that solving existing pouring basin structure potting syrup can not keep off because of heavy turbulence The problem of slag and slagging-off.
It is during to ensure to carry out quicksand type before the firm installation of double cast gate basin structure, cast, sprue and U is pre- It is embedded in the relevant position at the top of sand mold;The sprue mouthful and U interface at the top of sand mold are covered each by after sand mold mould assembly Plastic sheeting, then in each mouth periphery respectively around two to three circle mud bars are placed, then again by the first pouring basin and the second cast gate Basin, which coordinates, to be installed, and makes the liquid outlet of the second pouring basin and down gate is concentric docks, and makes the inlet and second of the first pouring basin The liquid outlet of pouring basin respectively with the port of U is concentric docks;And at the top of the cast gate basin bottom part and upper sand mold between fill in and insert Some wedge-shaped parallels are to ensure that pouring basin is steady.
To improve scum silica frost effect, during cast, the speed of potting syrup is poured into the first pouring basin makes two to pour first quick and back slow, first Liquid level rapid increase in mouthful basin, pulls out that cast gate is stifled to be started to slow down to the first pouring basin degree of falling liquid speed to protect to after sprue feed liquor Hold liquid level in two pouring basins steady.
During to avoid casting ladle from starting to topple over potting syrup into the first pouring basin, potting syrup directly carries out U, cast When, the liquid that fallen into the first pouring basin falls liquid outlet of the liquid o'clock away from the first pouring basin.
Brief description of the drawings
Fig. 1 is the schematic diagram of the semi-portable double cast gate basin combining structure of the present invention.
Wherein, 1 second pouring basin;2 cast gates are blocked up;3 sprues;4 sand molds;5 casting ladles;6 first pouring basins;7 Us;8 Casting die cavity.
Embodiment
Embodiment 1
As shown in figure 1, being the semi-portable double cast gate basin combining structure of the present invention, including it is placed in the first cast gate of the top of sand mold 4 The pouring basin 1 of basin 6 and second, the bottom of the first pouring basin 6 is provided with liquid outlet, and the second cast gate basin bottom part is provided with inlet and liquid outlet, The liquid outlet of first pouring basin 6 is connected with the inlet of the second pouring basin 1 by the U 7 being embedded in advance in sand mold 4, and second The liquid outlet of pouring basin 1 is connected with the sprue 3 of sand mold, and sprue 3 is connected by running gate system passage with casting die cavity 8.
In the structure of the present embodiment, for ease of the installation of pouring basin, U 7 is the ceramics being embedded in advance in sand mold 4 Tube passage, a port of the U is docked with the liquid outlet of the first pouring basin 6, another port of U 7 and the The inlet docking of two pouring basins 1, to connect the first pouring basin and the second pouring basin;For ease of controlling entering to the second pouring basin Liquid speed degree, the sectional area of U 7 is 2~3 times of the sectional area of sprue 3.
The above-mentioned and pouring basin combining structure of the present invention, it is adaptable to, can be direct in the transformation of the pouring basin structure of pool Transformation is carried out by two pool pouring basins structure of the prior art to use, it is not necessary to change original pouring type and pouring basin Master what structure.In the present embodiment, for reduction cast cost, make repeatedly using for pouring basin, the first of this implementation pours Mouth basin 6 and second pouring basin 2 uses the pouring basin knot of semi-portable pouring basin structure, such as A of Publication No. CN 103506579 Fire brick layer, the liquid outlet position point of two pouring basins are provided with the inside of structure, including steel outer framework and bottom plate, housing and on the upside of bottom plate Liquid well is not provided with out, and the inlet position of the second pouring basin also is provided with feed liquor well, and feed liquor well is with going out liquid cast gate The identical setting direction of nest structure is on the contrary, and corresponding with liquid flow path direction.
In the above-mentioned pouring basin structure of the present embodiment, using two pouring basins, the first pouring basin 6 is used for direct access casting ladle 5 potting syrups toppled over, the potting syrup flows into the second pouring basin 1 through U 7 with the flow velocity for comparing relatively low, so Just the turbulent region in pouring basin is separated with cast advection area, it is to avoid the folder that the turbulent flow of freely falling body is brought when potting syrup is toppled over Slag influences, meanwhile, cast advection area(Refer in the second pouring basin and pour flow liquid)Potting syrup from the inflow direction of U 7 under And it is upper consistent with slag inclusion floats direction, so as to obtain more preferable scum silica frost effect.Therefore the above-mentioned double cast gate basin group of the present invention Close the transformation of structure, solve existing pouring basin structure potting syrup because of the heavy turbulence can not pushing off the slag and the problem of slagging-off, improve The quality and qualification rate of casting.
Embodiment 2
Method is applied in combination for above-mentioned semi-portable double cast gate basin combining structure in the present embodiment, specifically, being flowed before cast During sand type, by the relevant position that the upper top of sand mold 4 is embedded in U earthenware of sprue 3;By sand after sand mold mould assembly The interface of sprue 3 at the top of type and the interface of U 7 are covered each by plastic sheeting, are then enclosed respectively in each interface periphery Mud bar is enclosed around placing two to three, after placing in order to pouring basin around sealed interface, prevents from running away during cast;Then again by first The pouring basin 1 of pouring basin 6 and second coordinates alignment to be placed on the top of sand mold 3, make during alignment the liquid outlet of the second pouring basin 1 with it is straight Cast gate is docked with one heart, the inlet of the first pouring basin 6 and the liquid outlet of the second pouring basin 1 is held respectively with two of U 7 Mouth docking with one heart;To make pouring basin steady, filled between cast gate basin bottom part and the top of sand mold 3 and insert some wedge-shaped parallels to prevent cast gate Basin is rocked.Install after pouring basin, carry out cast preparation, the liquid outlet of the second pouring basin 1 is blocked by cast gate stifled 2, then Topple over casting ladle 5 and add potting syrup to the first pouring basin 6, potting syrup is flowed into the second cast gate through U 7 from the first pouring basin 6 Basin 1, extracts cast gate stifled 2 when the cast liquid level in the second pouring basin 1 rises to 0.6-0.7 times of pouring basin inner chamber total height Start to pour into a mould to the feed liquor of sprue 3, while adjusting fall liquid speed degree of the casting ladle 5 to the first pouring basin 6, keep the liquid in two pouring basins Face is steady to terminate until pouring into a mould, and two pouring basins are moved to the displacement more than U diameter respectively, entered with disconnecting two pouring basins The passage of liquid mouthful and each liquid outlet, it is to avoid can not move pouring basin after potting syrup solidification.
Enter the second pouring basin to reduce slag inclusion, during cast, potting syrup is poured into the first pouring basin 6, falling liquid point should be remote From the liquid outlet of the first pouring basin 6, to prevent the turbulent liquid for the slag just fallen to be directly entered U 7;The speed of liquid is by first Slow section gathers control after fast, first makes the liquid level rapid increase in two pouring basins, when the first pouring basin liquid level rises to pouring basin inner chamber During 0.6-0.7 times of total height, pull out cast gate stifled 3 and start to after sprue feed liquor, slow down to the degree of falling liquid speed of the first pouring basin 6 with Keep liquid level in two pouring basins steady.
The pouring procedure of the present invention, potting syrup flows into the second cast gate from the effect of damming of first pouring basin 6 through U-shaped passage 7 After basin 1, feed speed is substantially controlled, and turbulence level substantially weakens, and the miscellaneous slag in casting ladle is inside the first pouring basin 6 Divide and float, slag content is significantly reduced in the potting syrup for flowing into the second pouring basin 1 from bottom liquid outlet, then it is floating through the second pouring basin Slag treatment, the slag into sprue is substantially reduced, thus solve existing pouring basin structure potting syrup because of heavy turbulence nothing The problem of method pushing off the slag and slagging-off.
The double cast gate basin structure of the present invention is not limited to above-mentioned embodiment, and the U for connecting double cast gate basin can be with The interface channel of other structures shape is adjusted to as needed, and the communicating passage can be not only embedded in sand mold, also may be used What is be separately provided in addition with being embedded in is easy in the sand mould structure of two pouring basins of connection or sand mold position, and above-mentioned improvement is this The protection domain of invention.

Claims (8)

1. a kind of semi-portable double cast gate basin combining structure, it is characterised in that including the first pouring basin for being placed in above sand mold and Second pouring basin, the first cast gate basin bottom part is provided with liquid outlet, and the second cast gate basin bottom part is provided with inlet and goes out liquid Mouthful, the liquid outlet of first pouring basin is connected with the inlet of the second pouring basin by the U being embedded in advance in sand mold, institute The liquid outlet of the second pouring basin is stated to connect with the sprue of sand mold.
2. semi-portable double cast gate basin combining structure according to claim 1, it is characterised in that the U is to carry Before be embedded in ceramic tube passage in sand mold, a port of the U is docked with the liquid outlet of the first pouring basin, described Docked with the inlet of the second pouring basin another port of U.
3. semi-portable double cast gate basin combining structure according to claim 1, it is characterised in that section of the U Area is 2~3 times of sprue sectional area.
4. semi-portable double cast gate basin combining structure according to claim 1, it is characterised in that first pouring basin and Second pouring basin is semi-portable pouring basin structure, including steel outer framework and bottom plate, on the inside of the housing and on the upside of bottom plate Provided with fire brick layer, the liquid outlet position of pouring basin is respectively equipped with out liquid well, the inlet position of second pouring basin Feed liquor well also is provided with, the feed liquor well is and corresponding with liquid flow path direction with going out the in opposite direction of liquid well.
5. method is applied in combination in a kind of semi-portable double cast gate basin combining structure described in any one of claim 1-4, it is special Levy and be, install the first pouring basin and the second pouring basin are corresponding with sand mold, then poured into a mould, by going out for the second pouring basin Liquid mouth is blocked stifled by cast gate, is added potting syrup to the first pouring basin by casting ladle, is made potting syrup logical through U-shaped from the first pouring basin Road flows into the second pouring basin, when the cast liquid level in the second pouring basin rises to 0.6-0.7 times of pouring basin inner chamber total height Extract the stifled beginning of cast gate to pour into a mould to sprue feed liquor, while adjusting fall liquid speed degree of the casting ladle to the first pouring basin, keep two cast gates Liquid level in basin is steady until cast terminates, and two move pouring basin to the displacement more than U diameter respectively, to disconnect two The passage of pouring basin inlet and each liquid outlet.
6. method is applied in combination in semi-portable double cast gate basin combining structure according to claim 5, it is characterised in that pour When carrying out quicksand type before note, sprue and U are embedded in the relevant position at the top of upper sand mold;By sand after sand mold mould assembly Sprue at the top of type mouthful and U interface are covered each by plastic sheeting, then each mouth periphery respectively around place two to Three circle mud bars, then the first pouring basin and the second pouring basin are coordinated and installed, and make the second pouring basin and liquid outlet with directly pouring again Mouthful docking with one heart, make the first pouring basin inlet and the second pouring basin port of the liquid outlet respectively with U it is concentric right Connect;And at the top of the cast gate basin bottom part and upper sand mold between fill in and insert some wedge-shaped parallels to ensure that pouring basin is steady.
7. method is applied in combination in semi-portable double cast gate basin combining structure according to claim 5 or 6, its feature exists In, during cast, poured into the first pouring basin the speed of potting syrup make first quick and back slow, first the liquid level in two pouring basins it is quick on Rise, pull out that cast gate is stifled to be started to slow down to after sprue feed liquor to the first pouring basin degree of falling liquid speed to keep liquid level in two pouring basins to put down Surely.
8. method is applied in combination in semi-portable double cast gate basin combining structure according to claim 5 or 6, its feature exists During cast, the liquid that fallen into the first pouring basin falls liquid outlet of the liquid o'clock away from the first pouring basin.
CN201710383909.3A 2017-05-26 2017-05-26 Semi-permanent type double-sprue basin combined structure and combined use method thereof Active CN107321924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710383909.3A CN107321924B (en) 2017-05-26 2017-05-26 Semi-permanent type double-sprue basin combined structure and combined use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710383909.3A CN107321924B (en) 2017-05-26 2017-05-26 Semi-permanent type double-sprue basin combined structure and combined use method thereof

Publications (2)

Publication Number Publication Date
CN107321924A true CN107321924A (en) 2017-11-07
CN107321924B CN107321924B (en) 2020-09-15

Family

ID=60193009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710383909.3A Active CN107321924B (en) 2017-05-26 2017-05-26 Semi-permanent type double-sprue basin combined structure and combined use method thereof

Country Status (1)

Country Link
CN (1) CN107321924B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111250662A (en) * 2020-01-21 2020-06-09 三鑫重工机械有限公司 Contact type casting positioning device for castings
CN113523194A (en) * 2021-07-24 2021-10-22 共享装备股份有限公司 Staggered pouring structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103506579A (en) * 2013-09-18 2014-01-15 宁夏共享集团有限责任公司 Pouring basin
CN103537659A (en) * 2013-11-14 2014-01-29 宁夏共享集团有限责任公司 Slag blocking pouring basin
CN204052803U (en) * 2014-07-18 2014-12-31 天津市宏达铸造厂 A kind of anti-clogging skim gate basin
US20170106434A1 (en) * 2015-10-15 2017-04-20 GM Global Technology Operations LLC Method to improve riser feedability for semi-permanent mold casting of cylinder heads

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103506579A (en) * 2013-09-18 2014-01-15 宁夏共享集团有限责任公司 Pouring basin
CN103537659A (en) * 2013-11-14 2014-01-29 宁夏共享集团有限责任公司 Slag blocking pouring basin
CN204052803U (en) * 2014-07-18 2014-12-31 天津市宏达铸造厂 A kind of anti-clogging skim gate basin
US20170106434A1 (en) * 2015-10-15 2017-04-20 GM Global Technology Operations LLC Method to improve riser feedability for semi-permanent mold casting of cylinder heads

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹瑜强: "《铸造工艺及设备》", 31 January 2008, 机械工业出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111250662A (en) * 2020-01-21 2020-06-09 三鑫重工机械有限公司 Contact type casting positioning device for castings
CN111250662B (en) * 2020-01-21 2021-05-25 三鑫重工机械有限公司 Contact type casting positioning device for castings
CN113523194A (en) * 2021-07-24 2021-10-22 共享装备股份有限公司 Staggered pouring structure
CN113523194B (en) * 2021-07-24 2022-09-06 共享装备股份有限公司 Staggered pouring structure

Also Published As

Publication number Publication date
CN107321924B (en) 2020-09-15

Similar Documents

Publication Publication Date Title
CN206622605U (en) A kind of three machines three stream slab CC tundish
CN101774014B (en) Tundish with baffle wall for vacuum cast ingot
CN104249149B (en) A kind of channel-type sensing heating tundish and its casting method
CN207823871U (en) A kind of 2500LB valves running gate system
CN107321924A (en) A kind of semi-portable double cast gate basin combining structure and combinations thereof application method
CN104107905A (en) Slab continuous casting tundish
CN104815961B (en) A kind of inclined ceramic filter reticulum and use the running gate system of this filter net seat
CN106111906B (en) It is pressurized anti-slag absorbing pouring basin and preparation method thereof
CN102319885A (en) Continuous casting method and device for double-nozzle cast ultra-thick plate blank
CN206535993U (en) Continuous casting flow control molding casting siphon spout device
CN214263877U (en) Slag-absorbing, filtering and separating slag-stopping wall for tundish
CN205869398U (en) Sediment runner basin is prevented inhaling in pressure boost
CN102794445B (en) Slab continuous casting submersed nozzle
KR100907949B1 (en) The casting sprue for large size thin-thickness aluminum alloy
CN109465396B (en) Pouring shunting device for pig casting machine
CN108480605A (en) A kind of tundish used for vacuum ingot casting of the double-deck annular slag weir of band
CN101987356A (en) Transition casting ladle for casting pouring
CN202270954U (en) Continuous casting device of double-water-gap pouring extra thick slab
CN208555961U (en) A kind of tundish used for vacuum ingot casting
CN220805419U (en) Slag-free pouring structure of monocrystalline or directional solidification casting
CN218926164U (en) Pouring system for casting steel castings by using damp mould sand
CN108380848B (en) application method of tundish with double-layer annular slag dam for vacuum ingot casting
JPS6343752A (en) Molten metal vessel providing weir
JP4289476B2 (en) High cleanliness steel casting method
CN101579731A (en) System for casting, draining and gating bronze bell

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 750000 No. 298 South st street, Yinchuan economic and Technological Development Zone, the Ningxia Hui Autonomous Region, China

Applicant after: KOCEL INTELLIGENT EQUIPMENT Co.,Ltd.

Address before: 750000 No. 298 South st street, Yinchuan economic and Technological Development Zone, the Ningxia Hui Autonomous Region, China

Applicant before: NINGXIA KOCEL MOULD Co.,Ltd.

GR01 Patent grant
GR01 Patent grant