CN107297579B - One tower desulfurization regeneration tower construction method - Google Patents

One tower desulfurization regeneration tower construction method Download PDF

Info

Publication number
CN107297579B
CN107297579B CN201710763815.9A CN201710763815A CN107297579B CN 107297579 B CN107297579 B CN 107297579B CN 201710763815 A CN201710763815 A CN 201710763815A CN 107297579 B CN107297579 B CN 107297579B
Authority
CN
China
Prior art keywords
tower
tower section
section
desulfurization
segmentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710763815.9A
Other languages
Chinese (zh)
Other versions
CN107297579A (en
Inventor
王建海
于建云
朱建军
李青文
岳继龙
张初东
张树桐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Engineering Second Construction Corp
Original Assignee
China Chemical Engineering Second Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Engineering Second Construction Corp filed Critical China Chemical Engineering Second Construction Corp
Priority to CN201710763815.9A priority Critical patent/CN107297579B/en
Publication of CN107297579A publication Critical patent/CN107297579A/en
Application granted granted Critical
Publication of CN107297579B publication Critical patent/CN107297579B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Abstract

The present invention relates to a tower desulfurization regeneration tower construction methods, it is according to tower internals support construction and tower outer platform position, desulfurizing barrel is segmented, measure platform is grouped desulfurizing tower tower segmentation cylinder, welds as group using tower internals support construction itself and tower outer platform.Ground by regenerate tower section attachment be all installed in place, using lifting support system integral hoisting, group to, welding.It is easy to operate since each segment body and attachment are installed ground is prefabricated, restricted clearance is rationally utilized, high altitude operation is reduced, lifting machine and artificial is saved, reduces construction cost, shorten the construction period, ensure that construction quality and construction safety.

Description

One tower desulfurization regeneration tower construction method
Technical field
The present invention relates to construction installation methods, specifically coke-oven plant's desulfurization regeneration tower fabrication and installation construction method.
Background technique
In recent years, due to the high speed development of China's economic, the continuous construction of industrial building, environmental pollution is increasingly serious, is Slow down the pollution to environment, country goes into overdrive to supervise environmental protection facility, and time limit is required to renovate, and old factory's environmental protection facility is more Newly, new factory's environmental protection facility perfect it is particularly important.Therefore, many desulfurizing items are transformed or create every year.Currently, desulfurization is again There are mainly two types of the construction methods of raw tower.One is prefabricated tower is segmented using scene, segmental hoisting is in place, and tower outer platform follows Installation, the lifting installation of regenerator piece housing, shell carry out the method construction of regenerator internal-external accessory installation again after being installed;Separately One is the installation of desulfurization tower section main unit preform is carried out using live flip-chip method, the installation of desulfurization tower section internal-external accessory regenerates tower section Shell lifting installation, shell carry out the method construction of regenerator internal-external accessory installation again after being installed.Therefore, geographical at the scene Environmental condition is limited, and in the case that the duration is tight, in the improvement project of desulphurization system, can desulfurization regeneration tower smooth, on schedule complete Show particularly important at construction.
Summary of the invention
The technical problem to be solved in the present invention is to provide an a kind of tower desulfurization regeneration tower construction methods, at least up to reach Reduce high altitude operation content, shortens the purpose of construction period.
In order to solve the above technical problems, the scheme that the present invention uses is:
One tower desulfurization regeneration tower construction method, comprising steps of
The segmentation tower section segmentation of desulfurization tower section is determined according to the position of desulfurization tower section tower outer platform and Ta Nei internals support construction Position, and barrel designs typesetting is segmented to desulfurization tower section on this basis;Desulfurization tower section is segmented shell rolling and welding, and Tower outer platform and Ta Nei internals support construction are installed at the scene;
Time ordered pair desulfurizing tower section segmentation tower section lifting group is installed to, welding by segmentation, utilizes tower outer platform and Ta Nei internals Support construction as segmentation tower section group to, welding when measure platform;
Prefabricated regeneration tower section main body, then at the scene to regeneration tower section main body group to, welding, and to regeneration tower section inside and outside it is attached The prefabricated installation of part;
Lifting support system is made and installs, the lifting support system includes lifting support construction and lifting lug, described to hang Cartridge support structure includes at least two support rods arranged in a crossed manner, the support rod both ends and the fixed company of regeneration tower section main body cylinder wall It connects, the lifting lug is fixedly connected with support boom end, and lifting lug connects hoisting rope;Tower section will be regenerated using above-mentioned lifting support system Integral hoisting is in place, then group to, welding.
Further, 500mm- is arranged below group butt welding mouth in the measure platform of each segmentation tower section of the desulfurization tower section The position of 1500mm.
Further, the lifting lug passes through regeneration tower section tower top and is connected with tower top.
Further, first prefabricated group of tower section main body lower section 1-1.5m height cylinder of regeneration is to desulfurization tower section top section segmentation tower Section is lifted simultaneously with top section segmentation tower section, is organized pair.
Further, platform railing is set on the outside of the desulfurization tower section tower outer platform.
The present invention is segmented desulfurizing barrel according to tower internals support construction and tower outer platform position, utilizes tower itself Internals support construction and tower outer platform, to measure platform, are grouped desulfurizing tower tower segmentation cylinder, weld as group.On ground Will regeneration tower section attachment be all installed in place, using lifting support system integral hoisting, group to, welding.
It is easy to operate since each segment body and attachment are installed ground is prefabricated, restricted clearance is rationally utilized, is subtracted High altitude operation is lacked, has saved lifting machine with manually, reduce construction cost, shorten the construction period, ensure that construction quality And construction safety.
Detailed description of the invention
Attached drawing herein is used to provide to further explanation of the invention, constitutes part of this application, of the invention shows Meaning property embodiment and its explanation are used to explain the present invention, not constitute improper limitations of the present invention.
Fig. 1 is that desulfurizing tower is segmented tower section schematic diagram in the embodiment of the present invention.
Fig. 2 is the elevation that tower section lifting support system is regenerated in the embodiment of the present invention.
Fig. 3 is the top view that tower section lifting support system is regenerated in the embodiment of the present invention.
In figure, 1- desulfurization tower section is segmented cylinder, 2- tower outer platform, 3- internals support construction, and 4- regenerates tower section main body, and 5- hangs Cartridge support structure, 6- lifting lug, 7- hoisting rope, 8- regenerate tower section tower top, 9- platform railing.
Specific embodiment
In order to make those skilled in the art better understand the present invention, below in conjunction with reference attached drawing and in conjunction with the embodiments to this Further clear, complete explanation is made in invention.It should be noted that in the absence of conflict, embodiment in the application and Feature in embodiment can be combined with each other.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.Unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " shall be understood in a broad sense, example Such as, it may be fixed connection or may be dismantle connection, or integral connection;It can be directly connected, it can also be in Between medium be indirectly connected.For the ordinary skill in the art, above-mentioned term can be understood at this by concrete condition Concrete meaning in invention.
The problem of for the transformation of an existing tower desulfurization regeneration tower, efficiently feasible construction method how to be taken to close Reason shortens the construction period using the live confined space, reduces large-scale hoisting machinery investment, and economy expense captures regenerator Section lifting problem, smoothly completes desulfurization regeneration tower construction on schedule.
Based on this, a kind of typical embodiment of the present invention provides a tower desulfurization regeneration tower construction method, comprising steps of
Desulfurization tower section
Mainly by studying desulfurization regeneration tower installation diagram in detail, refinement is carried out to desulfurization tower section.According to desulfurizing tower The position of section tower outer platform 2 and Ta Nei internals support construction 3 determines that desulfurization tower section is segmented tower section division position, both can guarantee each Segmentation can guarantee that the attachment on each segmentation tower section is all installed on ground convenient for prefabricated.And on this basis to desulfurizing tower Section segmentation cylinder 1 designs typesetting, the length and width of plate is determined according to the height of each segmentation cylinder, by refinement requirement Purchase material.Desulfurization tower section segmentation cylinder 1 rolls and welding, a segmentation tower section have multiple segmentation Cylinder assemblies welding and At.And tower outer platform 2 and Ta Nei internals support construction 3 are installed at the scene.
Time ordered pair desulfurizing tower section segmentation tower section lifting group is installed to, welding by segmentation, utilizes tower outer platform 2 and Ta Nei internals Support construction 3 as segmentation tower section group to, welding when measure platform.In each segmental hoisting group clock synchronization, on measure platform It is operated, adjusts the installation verticality of tower, group pair, welding.
Regenerate tower section
The shell and internal-external accessory for regenerating tower section are completed in erecting bed by Design Requirement Drawing.
Prefabricated regeneration tower section main body 4, the regeneration tower section main body refer to its cylinder, then at the scene to regeneration tower section main body 4 Group to, welding, and to regeneration the prefabricated installation of tower section internal-external accessory;
Consider that regenerator diameter is big, barrel wall thickness makes in tower before lifting and installs lifting support system.It is described to hang Filling support system includes lifting support construction 5 and lifting lug 6, and the lifting support construction includes at least two supports arranged in a crossed manner Bar, the support rod both ends are fixedly connected with regeneration 4 barrel of tower section main body, and the lifting lug 6 is fixedly connected with support boom end, are hung Ear 6 connects hoisting rope 7;Using above-mentioned lifting support system will regenerate tower section integral hoisting it is in place, then group to, welding.
Desulfurizing barrel is segmented according to tower internals support construction and tower outer platform position, refinement, utilizes tower Internals support construction itself and tower outer platform, to measure platform, are grouped desulfurizing tower tower segmentation cylinder, weld as group.In Ground by regenerate tower section attachment be all installed in place, using lifting support system integral hoisting, group to, welding.Due to each segmentation Main body and attachment are installed ground is prefabricated, easy to operate, are rationally utilized restricted clearance, are reduced high altitude operation, save Lifting machine and artificial, construction quality is guaranteed, the safety of operator is guaranteed.
In a preferred embodiment, the measure platform setting of each segmentation tower section of the desulfurization tower section is in group pair The position of 500mm-1500mm below weld bond, it is ensured that the installed height mark of desulfurization tower section platform and internals support after being installed It is consistent with original design.
In a preferred embodiment, the lifting lug 6 passes through regeneration tower section tower top 8 and is connected with tower top 8.Make Stress when lifting reaches regeneration column overhead by lifting lug and reaches regenerator cylinder by support construction, it is ensured that regenerator when lifting Stability.
In a preferred embodiment, consideration is big in high altitude operation difficulty with the link position group clock synchronization of regenerator, In the case that especially desulfurization tower top is ellipse head, first prefabricated group of regeneration tower section main body lower section 1-1.5m height cylinder de- to arriving Sulphur tower section top section segmentation tower section is lifted simultaneously with top section segmentation tower section, organize pair, need to only weld the regeneration tower section main body lower section and Tower section main body rest part is regenerated, since their diameters are just as can further decrease high altitude operation difficulty and workload.
In a preferred embodiment, platform railing 9 is set on the outside of the desulfurization tower section tower outer platform 2, provides and applies Work safety.
Claimed technical solution is described further below in conjunction with a specific embodiment.
Embodiment
Certain company's coke oven gas desulfurization system renovates engineering, mainly since former system desulfurization index is not up to standard, By the transformation to three desulfurization regeneration towers and process pipe, it is made to meet environmental protection index requirement.Desulfurization tower section barrel diameter 6.4m, high 35.5m regenerate tower section barrel diameter 9.4m, high 10m, overall height about 45.5m.The original coke-stove gas one of the engineering Tower gas desulfurizer, since equipment corrosion and other reasons, desulfurization index are up to standard.It is divided to original device to two phase engineerings Do not stop production dismounting (phase is transformed two desulfurization regeneration towers, and the second phase is transformed third platform desulfurization regeneration tower), in original There is the position of device to be updated transformation.Be updated the engineering of transformation since the engineering belongs to not stop production, execution conditions by It limits extremely serious, is mainly reflected in that construction space is narrow, must not influence normally to produce, the duration is nervous, project amount is big, measure cost The features such as high.
The construction technology process of the present embodiment:
The prefabricated installation of desulfurizing tower bottom plate-desulfurization tower section segmentation refinement-desulfurization tower section is segmented cylinder typesetting-desulfurization It is flat outside tower section shell rolling-transport to erecting bed-desulfurization tower section segmentation Cylinder assembly welding-desulfurization tower section segmentation cylinder The prefabricated installation of platform railing-desulfurization tower section segmentation body inner member support prefabricated installation-desulfurization tower section be respectively segmented tower section lifting group to, Welding-regeneration tower section shell rolling-transport to erecting bed-regeneration tower section main body group is to attached inside and outside, welding-regeneration tower section The prefabricated installation of part-regeneration tower section lifting support system design, production, installation-regeneration tower section integral hoisting, group to, weld- Desulfurization regeneration tower IMM algorithm.
As shown in Figure 1, refinement is carried out to desulfurization tower section, according to desulfurization tower section tower outer platform 2 and tower internals support knot 3 position of structure determines desulfurization tower section tower section cut-point in conjunction with site environment, desulfurization tower section segmentation cylinder 1 is carried out typesetting, by typesetting Size purchases material, and outer prefabricated place rolls at the construction field (site), and welding completes desulfurization tower section and is segmented cylinder at the construction field (site) Body 1;Prefabricated installation tower outer platform 2, platform railing 9 and tower internals support construction 3, then desulfurization tower section tower section is successively hung in order Fill welding.
As shown in Figures 2 and 3, outer prefabricated place rolls the regeneration tower section main body 4 at the construction field (site), at the construction field (site) Welding, regeneration tower section main body lower section 1.2m long cylinder is first welded with desulfurization tower section top Cylinder assembly, then prefabricated installation tower Internal-external accessory, designs and produces installation lifting support construction 5 and 4 lifting lug 6, and lifting support construction 5 uses the steel pipe cross of Φ 325 Intersect production, lifting support construction 5 and regeneration tower section main body cylinder inner wall are welded to connect, then lifting lug 6 is passed through regenerator top plate, is worn The welded connecting of lifting support construction 5 is crossed, forms lifting support system, lifting lug 6 is connect with lifting wirerope with snap ring, by regenerator Section integral hoisting it is in place, group to, welding.
The scope of protection of present invention is not limited to the above specific embodiment, to those skilled in the art, this Invention can there are many deformation and change, it is all design of the invention within principle it is made it is any modification, improve and be equal Replacement should be all included within protection scope of the present invention.

Claims (2)

1. a tower desulfurization regeneration tower construction method, comprising steps of
Desulfurization tower section segmentation tower section point is determined according to the position of internals support construction (3) in desulfurization tower section tower outer platform (2) and tower Position is cut, and typesetting is designed to desulfurization tower section segmentation cylinder (1) on this basis;Desulfurization tower section segmentation cylinder (1) rolls and group To welding, and internals support construction (3) in tower outer platform (2) and tower is installed at the scene;
Time ordered pair desulfurizing tower section segmentation tower section lifting group is installed to, welding by segmentation, utilizes internals branch in tower outer platform (2) and tower Support structure (3) as segmentation tower section group to, welding when measure platform;The measure of each segmentation tower section of the desulfurization tower section is flat The position of 500mm-1500mm below group butt welding mouth is arranged in platform;
Prefabricated regeneration tower section main body (4), then at the scene to regeneration tower section main body (4) group to, welding, regenerate tower section main body lower section First prefabricated group of 1-1.5m height cylinder to desulfurization tower section top section segmentation tower section, lifting, organize pair simultaneously with top section segmentation tower section, And to the regeneration prefabricated installation of tower section internal-external accessory;
Lifting support system is made and installs, the lifting support system includes lifting support construction (5) and lifting lug (6), described Lifting support construction includes at least two support rods arranged in a crossed manner, the support rod both ends and regeneration tower section main body (4) barrel It is fixedly connected, the lifting lug (6) is fixedly connected with support boom end, and lifting lug (6) passes through regeneration tower section tower top (8) and and tower top (8) it is connected;Lifting lug (6) connects hoisting rope (7);It is using above-mentioned lifting support system that regeneration tower section integral hoisting is in place, Then group to, welding.
2. according to the method described in claim 1, it is characterized by: setting platform column on the outside of the desulfurization tower section tower outer platform (2) Bar (9).
CN201710763815.9A 2017-08-30 2017-08-30 One tower desulfurization regeneration tower construction method Active CN107297579B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710763815.9A CN107297579B (en) 2017-08-30 2017-08-30 One tower desulfurization regeneration tower construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710763815.9A CN107297579B (en) 2017-08-30 2017-08-30 One tower desulfurization regeneration tower construction method

Publications (2)

Publication Number Publication Date
CN107297579A CN107297579A (en) 2017-10-27
CN107297579B true CN107297579B (en) 2019-11-05

Family

ID=60132273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710763815.9A Active CN107297579B (en) 2017-08-30 2017-08-30 One tower desulfurization regeneration tower construction method

Country Status (1)

Country Link
CN (1) CN107297579B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113199116A (en) * 2021-04-21 2021-08-03 中国化学工程第三建设有限公司 Method for welding aluminum fractionating tower in cold box in assembling mode
CN115283990B (en) * 2022-07-22 2023-09-19 中国化学工程第六建设有限公司 Large-scale equipment aerial pairing hoisting method
CN115446490A (en) * 2022-09-29 2022-12-09 中国二十冶集团有限公司 Assembling equipment and assembling method of granulating tower

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004025235A (en) * 2002-06-25 2004-01-29 Daio Paper Corp Cladding-by-welding device for inner surface of bottom part of tower vessel, and cladding-by-welding method using the device
CN101347703A (en) * 2008-09-12 2009-01-21 中国第十七冶金建设有限公司 Installation technique of metallurgical gas desulfuration absorbing tower
CN101698894A (en) * 2009-10-26 2010-04-28 中国十七冶建设有限公司 High-altitude segmented in-position installation method for blast-furnace hot-air surrounding pipes
CN105397351A (en) * 2015-12-02 2016-03-16 中国化学工程第十四建设有限公司 Onsite vertical mounting method for segmentally-prefabricated tower body
CN106237782A (en) * 2016-08-22 2016-12-21 上海二十冶建设有限公司 The modularity installation method of active carbon desulfurization denitration adsorption tower

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004025235A (en) * 2002-06-25 2004-01-29 Daio Paper Corp Cladding-by-welding device for inner surface of bottom part of tower vessel, and cladding-by-welding method using the device
CN101347703A (en) * 2008-09-12 2009-01-21 中国第十七冶金建设有限公司 Installation technique of metallurgical gas desulfuration absorbing tower
CN101698894A (en) * 2009-10-26 2010-04-28 中国十七冶建设有限公司 High-altitude segmented in-position installation method for blast-furnace hot-air surrounding pipes
CN105397351A (en) * 2015-12-02 2016-03-16 中国化学工程第十四建设有限公司 Onsite vertical mounting method for segmentally-prefabricated tower body
CN106237782A (en) * 2016-08-22 2016-12-21 上海二十冶建设有限公司 The modularity installation method of active carbon desulfurization denitration adsorption tower

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
解决大中型干燥塔塔体在现场施工中的组对与安装问题;王刚;《机械设计与制造》;20030831(第04期);第84页 *

Also Published As

Publication number Publication date
CN107297579A (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN107297579B (en) One tower desulfurization regeneration tower construction method
CN106395628A (en) Hoisting and overhead-assembling method for sections of heavy tower equipment
CN205058277U (en) Prefabricated T girder iron muscle mould
CN100480398C (en) Self-hoisting construction method and furnace top crane for general overhaul of blast furnace
CN104594201B (en) A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel
CN109028119A (en) A kind of anti-corrosion chimney and its construction method of installation
CN203336093U (en) Coal gas down-flow tube in blast furnace system
CN104196246B (en) A kind of multidirectional stressed structure partial of continuous trusse evacuates lifting construction method in situ
CN203640247U (en) Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN101956372B (en) Quick construction method for No. 0 section of prestressed concrete beam type bridge
CN103075602A (en) Chimney expansion joint
CN102825414A (en) Manipulator handlebar welding module
CN116518149A (en) Pairing translation installation method for large-diameter dust removal pipeline of steel structure factory building roof
CN110562387A (en) construction method of floating oil storage platform pipe bundle unit
CN204022864U (en) The hanging ladder of welding converter flue
CN209923970U (en) Bailey beam fixing device for suspension pipeline
CN108820594B (en) Large-scale oil storage tank top plate manufacturing tool, top plate manufacturing method and tank top mounting method
CN109850765B (en) In-beam medium pipeline protection device for crane beam replacement and use method thereof
CN205216819U (en) Petrochemical engineering tower
CN110761199A (en) Quick detachable is from interim insurance buttress of garrulous type
CN216358924U (en) Desulfurization absorption tower top promotes structure
CN205088575U (en) Top of tower constructional device is crossed to suspension bridge continuous type catwalk track cable
CN214287445U (en) Arrangement structure of acid gas removal equipment
CN208717915U (en) A kind of prefabrication and lifting steel bar framework
CN203533585U (en) Temporary chimney capable of being dismantled and reused

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant