CN107268989A - 管道穿梁套管安装施工方法 - Google Patents
管道穿梁套管安装施工方法 Download PDFInfo
- Publication number
- CN107268989A CN107268989A CN201710474660.7A CN201710474660A CN107268989A CN 107268989 A CN107268989 A CN 107268989A CN 201710474660 A CN201710474660 A CN 201710474660A CN 107268989 A CN107268989 A CN 107268989A
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- pipe
- sleeve
- construction
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
- E04G15/061—Non-reusable forms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
一种管道穿梁套管安装施工方法主要针对层高要求较高或设计层高不宽裕的建筑工程,充分利用量内空置空间,在保证不影响结构的前提下,在结构主次梁中预埋钢套管实现本发明所述目的。本发明所述技术方案的有益效果在于:①与一般施工方案相比较,将管道设置成穿梁安装,极大提高了层面空间,总体上节省了施工成本,同时各专业管线在布局上显得更加清晰、美观;②本施工方法采用楔形套管模具封盖,简单方便,套管的整体长度与梁宽相同,能有效减少施工成本及返修,方便后期管线施工。
Description
技术领域
本涉及建筑施工领域,尤其涉及一种管道穿梁套管安装施工方法。
背景技术
随着当前建筑业的飞速发展,在一些建筑工程中,对空间层面要求较高,尤其表现在高档的商务酒店、办公楼、地下车库等建筑中,在这些建筑中,安装工程涉及多种专业管线,设备众多且呈现立体分层布置,即使能较好的解决各专业综合管线布局的问题,但往往也不能达到吊顶高度的期望值。在工程设计标高已定的情况下,如何尽可能的增加层面空间,就成为工程相关方关注的问题。
按一般施工方案,楼层梁下安装风管,桥架、其下安装喷淋、给水管等,这样梁底的管线至少要占去两层的空间,而对一些设计层高不是很充裕的工程来说,要实现高净高的效果便成为一个难题,结果往往“牺牲”了空间。
由此,通常需要繁杂的设计才能满足业主需要,而同此同时,在施工过程中需要大量的人力、物力和财力才能达到设计需要。
发明内容
本发明针对现有技术的不足,提出了一种管道穿梁套管安装施工方法,该方法与传统施工方案相比较,将管道设置成穿梁安装,将大大提高了层面空间,总体上节省了施工成本,同时各专业管线在布局上显得更加清晰、美观。
一种管道穿梁套管安装施工方法主要针对层高要求较高或设计层高不宽裕的建筑工程,包括如下步骤:
步骤一:套管预制加工;
①根据布线需要,选择不同口径的圆形钢管并根据设计确定每根套管的长度,所述套管的长度比梁宽短5-10毫米;
②利用切管机将钢管切割成设计长度;切割时,当切管机刀片进入钢管一半时进行保持,钢管自旋转多圈后钢管自然断裂形成套管,由此使得钢管管口端面较为整齐;
③在所述套管两端设置套管封盖,套管模具封盖为楔形状,所述套管封盖中心设置有圆孔;
步骤二:对套管进行放样和定位
①标记:根据施工图纸,用油漆在需要安装套管的梁边模板上对称做好标记;
②定位:待楼层模板搭建并固定好以后,拉通线确定套管位置在同一直线上,根据拉好的通线,在安装套管的梁边用钉子做好水平位置标记;
步骤三:套管安放及固定
①待架空梁筋绑扎好后,根据施工图纸安放相应规格的套管;
②根据确定好的套管位置和标高,在梁模板两边采用手电钻钻大于螺杆直径一倍的洞,所述螺杆直径与套管封盖中心圆孔相匹配,将螺杆通过梁模板洞插入套管,并装上与螺杆相配套的螺母进行初步固定;
③检查套管的位置和标高,如果有误差可将螺杆上下左右微调,如果无误,采用扳手拧紧螺母,使套管固定牢靠;
步骤四:楼层浇筑混凝土并进行养护;
步骤五:拆除楼层模版并取出预留的套管封盖。
进一步的,所述套管封盖的截面为楔形状,所述套管封盖封堵套管后套管的整体长度与梁宽相同。
本发明所述技术方案的有益效果在于:①与一般施工方案相比较,将管道设置成穿梁安装,极大提高了层面空间,总体上节省了施工成本,同时各专业管线在布局上显得更加清晰、美观;②本施工方法简单方便,能有效减少施工成本及方便后期管线施工。
具体实施方式
为了使本领域技术人员更好地理解本发明的技术方案,下面结合具体实施例对本发明作进一步的详细说明。
一种管道穿梁套管安装施工方法主要针对层高要求较高或设计层高不宽裕的建筑工程,包括如下步骤:
步骤一:套管预制加工;
①根据布线需要,选择不同口径的圆形钢管并根据设计确定每根套管的长度,所述套管的长度比梁宽短5-10毫米;
②利用切管机将钢管切割成设计长度;切割时,当切管机刀片进入钢管一半时进行保持,钢管自旋转多圈后钢管自然断裂形成套管,由此使得钢管管口端面较为整齐;
③在所述套管两端设置套管封盖,套管模具封盖为楔形状,所述套管封盖中心设置有圆孔;
步骤二:对套管进行放样和定位
①标记:根据施工图纸,用油漆在需要安装套管的梁边模板上对称做好标记;
②定位:待楼层模板搭建并固定好以后,拉通线确定套管位置在同一直线上,根据拉好的通线,在安装套管的梁边用钉子做好水平位置标记;
步骤三:套管安放及固定
①待架空梁筋绑扎好后,根据施工图纸安放相应规格的套管;
②根据确定好的套管位置和标高,在梁模板两边采用手电钻钻大于螺杆直径一倍的洞,所述螺杆直径与套管封盖中心圆孔相匹配,将螺杆通过梁模板洞插入套管,并装上与螺杆相配套的螺母进行初步固定;
③检查套管的位置和标高,如果有误差可将螺杆上下左右微调,如果无误,采用扳手拧紧螺母,使套管固定牢靠;
步骤四:楼层浇筑混凝土并进行养护;
步骤五:拆除楼层模版并取出预留的套管封盖。
更保证施工质量,所述套管封盖的截面为楔形状,所述套管封盖封堵套管后套管的整体长度与梁宽相同。
与传统方案相比,对相同管线施工量,本发明与传统技术方案相比有明显的成本优势,具体如下:
以上对本发明所提供的一种管道穿梁套管安装施工方法进行了详细介绍,本文中应用了实施例对本申请的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本申请的方法及其核心思想;同时,对于本领域的一般技术人员,依据本申请的思想,在具体实施方式及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本申请的限制。
Claims (2)
1.一种管道穿梁套管安装施工方法,其特征在于,所述管道穿梁套管安装施工方法主要针对层高要求较高或设计层高不宽裕的建筑工程,包括如下步骤:
步骤一:套管预制加工;
①根据布线需要,选择不同口径的圆形钢管并根据设计确定每根套管的长度,所述套管的长度比梁宽短5-10毫米;
②利用切管机将钢管切割成设计长度;切割时,当切管机刀片进入钢管一半时进行保持,钢管自旋转多圈后钢管自然断裂形成套管,由此使得钢管管口端面较为整齐;
③在所述套管两端设置套管封盖,套管模具封盖为楔形状,所述套管封盖中心设置有圆孔;
步骤二:对套管进行放样和定位
①标记:根据施工图纸,用油漆在需要安装套管的梁边模板上对称做好标记;
②定位:待楼层模板搭建并固定好以后,拉通线确定套管位置在同一直线上,根据拉好的通线,在安装套管的梁边用钉子做好水平位置标记;
步骤三:套管安放及固定
①待架空梁筋绑扎好后,根据施工图纸安放相应规格的套管;
②根据确定好的套管位置和标高,在梁模板两边采用手电钻钻大于螺杆直径一倍的洞,所述螺杆直径与套管封盖中心圆孔相匹配,将螺杆通过梁模板洞插入套管,并装上与螺杆相配套的螺母进行初步固定;
③检查套管的位置和标高,如果有误差可将螺杆上下左右微调,如果无误,采用扳手拧紧螺母,使套管固定牢靠;
步骤四:楼层浇筑混凝土并进行养护;
步骤五:拆除楼层模版并取出预留的套管封盖。
2.如权利要求1所述的一种管道穿梁套管安装施工方法,其特征在于,所述套管封盖的截面为楔形状,所述套管封盖封堵套管后套管的整体长度与梁宽相同。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710474660.7A CN107268989A (zh) | 2017-06-21 | 2017-06-21 | 管道穿梁套管安装施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710474660.7A CN107268989A (zh) | 2017-06-21 | 2017-06-21 | 管道穿梁套管安装施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107268989A true CN107268989A (zh) | 2017-10-20 |
Family
ID=60069053
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710474660.7A Pending CN107268989A (zh) | 2017-06-21 | 2017-06-21 | 管道穿梁套管安装施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107268989A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109616970A (zh) * | 2018-11-19 | 2019-04-12 | 中国二冶集团有限公司 | 一种pvc过梁线管施工方法 |
CN110173121A (zh) * | 2019-04-19 | 2019-08-27 | 中冶天工集团有限公司 | 一种钢套管快速安装方法 |
CN111173274A (zh) * | 2020-02-19 | 2020-05-19 | 中铁十二局集团建筑安装工程有限公司 | 一种穿斜梁套管制作安装方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3508706A1 (de) * | 1984-06-01 | 1985-12-05 | Ingensiep, geb. Sprünken, Margarethe, 5203 Much | Aussparungskoerper |
CN201079866Y (zh) * | 2007-06-19 | 2008-07-02 | 北京城建建设工程有限公司 | 工具式钢管切断机 |
CN105317230A (zh) * | 2014-08-01 | 2016-02-10 | 中天建设集团有限公司 | 一种梁、墙预埋水平套管固定方法 |
CN105436598A (zh) * | 2015-12-27 | 2016-03-30 | 天津尚吉液压设备有限公司 | 一种自动在线切管装置 |
CN205348757U (zh) * | 2015-11-18 | 2016-06-29 | 曾敏 | 一种带套管定位槽的建筑墙模板 |
CN106223611A (zh) * | 2016-07-22 | 2016-12-14 | 中铁城建集团第三工程有限公司 | 立管预留孔洞模具及其施工方法 |
CN106284403A (zh) * | 2016-08-12 | 2017-01-04 | 中国二十二冶集团有限公司 | 预留孔洞的施工方法 |
CN106468075A (zh) * | 2015-08-18 | 2017-03-01 | 五冶集团上海有限公司 | 一种卫生间管道套管固定方法 |
-
2017
- 2017-06-21 CN CN201710474660.7A patent/CN107268989A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3508706A1 (de) * | 1984-06-01 | 1985-12-05 | Ingensiep, geb. Sprünken, Margarethe, 5203 Much | Aussparungskoerper |
CN201079866Y (zh) * | 2007-06-19 | 2008-07-02 | 北京城建建设工程有限公司 | 工具式钢管切断机 |
CN105317230A (zh) * | 2014-08-01 | 2016-02-10 | 中天建设集团有限公司 | 一种梁、墙预埋水平套管固定方法 |
CN106468075A (zh) * | 2015-08-18 | 2017-03-01 | 五冶集团上海有限公司 | 一种卫生间管道套管固定方法 |
CN205348757U (zh) * | 2015-11-18 | 2016-06-29 | 曾敏 | 一种带套管定位槽的建筑墙模板 |
CN105436598A (zh) * | 2015-12-27 | 2016-03-30 | 天津尚吉液压设备有限公司 | 一种自动在线切管装置 |
CN106223611A (zh) * | 2016-07-22 | 2016-12-14 | 中铁城建集团第三工程有限公司 | 立管预留孔洞模具及其施工方法 |
CN106284403A (zh) * | 2016-08-12 | 2017-01-04 | 中国二十二冶集团有限公司 | 预留孔洞的施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109616970A (zh) * | 2018-11-19 | 2019-04-12 | 中国二冶集团有限公司 | 一种pvc过梁线管施工方法 |
CN110173121A (zh) * | 2019-04-19 | 2019-08-27 | 中冶天工集团有限公司 | 一种钢套管快速安装方法 |
CN111173274A (zh) * | 2020-02-19 | 2020-05-19 | 中铁十二局集团建筑安装工程有限公司 | 一种穿斜梁套管制作安装方法 |
CN111173274B (zh) * | 2020-02-19 | 2021-09-03 | 中铁十二局集团建筑安装工程有限公司 | 一种穿斜梁套管制作安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107268989A (zh) | 管道穿梁套管安装施工方法 | |
CN104264920B (zh) | 超高大曲率圆形螺旋清水楼梯的施工方法 | |
CN103993736A (zh) | 一种剪力墙模板用紧固螺栓 | |
CN106760514A (zh) | 下水管预留洞预埋套管及预埋方法 | |
CN204225493U (zh) | 建筑模板成型结构 | |
CN2786229Y (zh) | 带线槽的墙体砌块 | |
CN208971093U (zh) | 建筑用接线盒精准固定结构 | |
CN202302339U (zh) | 可伸缩可固定防水套管 | |
CN203081321U (zh) | 可在地面上进行天花板钻孔作业的机械装置 | |
CN1111705A (zh) | 建筑工程中使用的组件及其使用方法 | |
CN203891470U (zh) | 一种剪力墙模板用紧固螺栓 | |
CN205846637U (zh) | 内、外砌块中配电箱、线盒直埋装置 | |
CN2858835Y (zh) | 孔道砖 | |
CN207017317U (zh) | 一体成型预制检查井 | |
CN205051282U (zh) | 一种穿墙管线防护密闭结构 | |
CN204001739U (zh) | 一种穿墙建筑连接件 | |
CN204002563U (zh) | 可自动清理石块的打井钻头 | |
CN203475740U (zh) | 一种可更换的防护栏杆 | |
CN202899576U (zh) | 一种新型管道井 | |
CN103290980B (zh) | 与框架结构对接的复层承重隔热悬挑板及制备施工方法 | |
CN201116396Y (zh) | 建筑物管道预留孔制作模具 | |
CN208470713U (zh) | 一种拖拽电缆工具 | |
CN205712910U (zh) | 一种立面的石材干挂安装系统 | |
CN209586903U (zh) | 木结构专用快攻螺钉 | |
CN205558254U (zh) | 一种铝合金木模组合模板体系模板辅助装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171020 |