CN107265222A - A kind of overhauling elevator device and overhauling elevator control method - Google Patents
A kind of overhauling elevator device and overhauling elevator control method Download PDFInfo
- Publication number
- CN107265222A CN107265222A CN201710405137.9A CN201710405137A CN107265222A CN 107265222 A CN107265222 A CN 107265222A CN 201710405137 A CN201710405137 A CN 201710405137A CN 107265222 A CN107265222 A CN 107265222A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- elevator
- inspection switch
- car
- gate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/0087—Devices facilitating maintenance, repair or inspection tasks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/0043—Devices enhancing safety during maintenance
- B66B5/005—Safety of maintenance personnel
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Abstract
The present invention discloses a kind of overhauling elevator device, used when carrying out cage top overhauling to elevator, including second switch, for transmission range parameter and the operator of time parameter, for the first inspection switch of the enabled instruction for inputting the overhauling elevator device, gate mechanism for monitoring for generating gate action command, for generate car move and by apparatus for controlling elevator control lift car move down the distance that the distance parameter is limited apart from mechanism for monitoring, for timing, the connected state and generation car for monitoring second inspection switch recover instruction and the time supervision mechanism for controlling lift car to return to run location by apparatus for controlling elevator, the present invention also provides a kind of method that overhauling elevator control is carried out using the overhauling elevator device.Using the overhauling elevator device of the present invention, one can be completed to operate elevator to run to maintenance position maintainer, and elevator is returned into normal operating condition after terminating, safer, more efficient.
Description
Technical field
The present invention relates to elevators field, especially a kind of overhauling elevator device and overhauling elevator control method.
Background technology
When elevator needs maintenance, maintenance personal needs car top maintenance lift.In the prior art, it is necessary to which two people coordinate,
One people operates Operation system of elevator in computer room, and another person is commanded by intercom system, car is gone downwards at a slow speed suitably
Hall door is opened behind position, so that climbing up car top carries out maintenance work.Due to needing two people to coordinate, troublesome poeration is less efficient,
In the case where ensureing safety and meeting national regulation, elevator is can control if only needing a maintenance personal and completes related work
Make, will greatly lift operating efficiency.
The content of the invention
It is an object of the invention to provide a kind of overhauling elevator device, it may be such that elevator is automatic in inspecting state when needed
And switch between normal operating conditions.
Another object of the present invention is to provide a kind of method of overhauling elevator control.
The present invention provides a kind of overhauling elevator device, is used when carrying out cage top overhauling to elevator, and the elevator includes elevator
Car, mainboard and the apparatus for controlling elevator being arranged on the mainboard, its feature are:The overhauling elevator device includes first
Inspection switch, gate mechanism for monitoring, apart from mechanism for monitoring, time supervision mechanism, the second inspection switch and operator,
First inspection switch is connected by circuit with the gate mechanism for monitoring, and the gate mechanism for monitoring passes through circuit point
It is not connected with described apart from mechanism for monitoring and the time supervision mechanism, the time supervision mechanism passes through circuit and described second
Inspection switch is connected, and the operator is connected with described apart from mechanism for monitoring and the time supervision mechanism respectively by circuit,
The gate mechanism for monitoring, described pass through circuit and the elevator controlling respectively apart from mechanism for monitoring and the time supervision mechanism
System is connected,
First inspection switch is used for the enabled instruction for inputting the overhauling elevator device;
The gate mechanism for monitoring is used to receive the enabled instruction, generation gate action command and by the gate action command
Pass to the apparatus for controlling elevator, and the enabled instruction is delivered separately to described to supervise apart from mechanism for monitoring and the time
Survey mechanism;
The operator is used for transmission range parameter and time parameter;
It is described to be used to receiving the enabled instruction, generation car move and by the car move apart from mechanism for monitoring
Pass to the apparatus for controlling elevator;
The time supervision mechanism be used to receiving the enabled instruction, timing, the connected state of monitoring second inspection switch,
Generation car recovers instruction and car recovery instruction is passed into the apparatus for controlling elevator.
The gate action command refers to the instruction for controlling the gate of the lift car successively to open and close, the sedan-chair
Railway carriage or compartment move refers to the instruction for controlling the lift car to move down the distance that the distance parameter is limited, and the car refers to
Order refers to control the elevator to carry out quality inspection and then the instruction for controlling the lift car to run to nearest floor.
Preferably, in addition to position monitoring mechanism, the position monitoring mechanism by circuit respectively with the described first maintenance
Switch and gate mechanism for monitoring connection;The position monitoring mechanism is used to receive the enabled instruction, monitors the elevator
The position of car and the enabled instruction is passed into the gate mechanism for monitoring.The position detecting mechanism includes position sensing
Device, can detect the location of car of the elevator.
Preferably, first inspection switch is arranged in the lift car.
It is further preferred that being provided with control panel in the lift car, first inspection switch is arranged on the behaviour
On vertical panel, existing device is taken full advantage of, structure is attractive in appearance, easy to operate.
Preferably, second inspection switch is located at the top of the lift car.
Preferably, first inspection switch is Self-resetting key switch, both can carry out authentication by key, again
The electric current connected state for changing the overhauling elevator device can be realized by way of unblock, and then generates the mesh of enabling signal
's.The key switch of runback bit function is selected, after can make it that the overhauling elevator device is activated, switch is automatically restored to just
Beginning state, it is not necessary to which maintainer carries out extra recovery operation.
It is further preferred that the position monitoring mechanism, the gate mechanism for monitoring, described apart from mechanism for monitoring and described
Time supervision mechanism is connected on the mainboard.
The overhauling elevator device provided using the present invention, comprise the following steps during overhauling elevator control:
(71)Maintainer inputs the distance parameter to described apart from mechanism for monitoring using the operator, inputs the time
Parameter gives the time supervision mechanism;
(72)Maintainer rests in the lift car on any floor in addition to the bottom;
(73)Maintainer connects first inspection switch, and first inspection switch generates the enabled instruction;
(74)The gate mechanism for monitoring receives the enabled instruction, generation gate action command and by the gate action command
The apparatus for controlling elevator is passed to, the apparatus for controlling elevator is opened the gate of the lift car, left for operator, with
The apparatus for controlling elevator closes the gate of the lift car afterwards;
(75)The enabled instruction is delivered separately to described supervise apart from mechanism for monitoring and the time by the gate mechanism for monitoring
Mechanism is surveyed, step is performed(76)With(761);
(76)It is described to generate car move apart from mechanism for monitoring and the car move is passed into the elevator control
System processed, the apparatus for controlling elevator controls the lift car to move down the distance that the distance parameter is limited, and performs step
(77);
(761)The time supervision mechanism starts timing and monitors the connected state of second inspection switch, in the time
In the time that parameter is limited,
(7611)When the second inspection switch connected state does not change, the time supervision mechanism generation car recovers
Instruct and car recovery instruction is passed into the apparatus for controlling elevator, the apparatus for controlling elevator control elevator is carried out certainly
Inspection, and the lift car is moved into layer nearby, elevator resumes operation;
(7612)When the second inspection switch connected state changes, the time supervision mechanism cuts off timing, and after
The connected state of continuous monitoring second inspection switch, performs step(7613);
(7613)When the second inspection switch connected state changes, step is continued executing with(761);
(77)Maintainer opens hall door, into car top position, changes the connected state of second inspection switch, starts maintenance
Work;
(78)After maintenance terminates, maintainer changes the connected state of second inspection switch, the overhauling elevator dress again
Put execution step(761), maintenance personal leaves service work position in the time interval that the time parameter is limited.
In this overhauling elevator control method, maintainer successively performs step(71)、(72)With(73), now elevator car
Railway carriage or compartment door can be opened, and maintainer walks out elevator, perform step(77);Terminate after service work, perform step(78),
The overhauling elevator device of the present invention will be automatically performed other work.
Another overhauling elevator device provided using the present invention, comprise the following steps during overhauling elevator control:
(81)Maintainer inputs the distance parameter to described apart from mechanism for monitoring using the operator, inputs the time
Parameter gives the time supervision mechanism;
(82)Maintainer connects first inspection switch;
(83)Whether the position monitoring mechanism monitors the location of described lift car in the bottom,
When the position is the bottom, without any operation;
When the position is not the bottom, step is performed(84);
(84)The enabled instruction is passed to the gate mechanism for monitoring by the position monitoring mechanism;
(85)The gate mechanism for monitoring receives the enabled instruction, generation gate action command and by the gate action command
The apparatus for controlling elevator is passed to, the apparatus for controlling elevator is opened the gate of the lift car, left for operator, with
The apparatus for controlling elevator closes the gate of the lift car afterwards;
(86)The enabled instruction is delivered separately to described supervise apart from mechanism for monitoring and the time by the gate mechanism for monitoring
Mechanism is surveyed, step is performed(87)With(871);
(87)It is described to generate car move apart from mechanism for monitoring and the car move is passed into the elevator control
System processed, the apparatus for controlling elevator controls the lift car to move down the distance that the distance parameter is limited, and performs step
(88);
(871)The time supervision mechanism starts timing and monitors the connected state of second inspection switch, in the time
In the time that parameter is limited,
(8711)When the second inspection switch connected state does not change, the time supervision mechanism generation car recovers
Instruct and car recovery instruction is passed into the apparatus for controlling elevator, the apparatus for controlling elevator control elevator is carried out certainly
Inspection, and the lift car is moved into layer nearby, elevator resumes operation;
(8712)When the second inspection switch connected state changes, the time supervision mechanism cuts off timing, and after
The connected state of continuous monitoring second inspection switch, performs step(8713);
(8713)When the second inspection switch connected state changes, step is continued executing with(871);
(88)Maintainer opens hall door, into car top position, changes the connected state of second inspection switch, starts maintenance
Work;
(89)After maintenance terminates, maintainer changes the connected state of second inspection switch, the overhauling elevator dress again
Put execution step(871), maintenance personal left in the time interval that the time parameter is limited work maintenance position.
In this overhauling elevator control method, maintainer successively performs step(81)With(82)If, overhauling elevator dress
Put and be not carried out step(84), then maintainer needs elevator resting in any floor in addition to the bottom, then performs
Step(82), now elevator cab door can open, maintainer walks out elevator, performs step(88);Terminate service work
Afterwards, step is performed(89), overhauling elevator device of the invention will be automatically performed other work.
Beneficial effects of the present invention have:
Using the overhauling elevator device in the present invention, one people of maintainer can just complete operation elevator and run to maintenance position
Put, easily reach elevator car top, elevator is returned to normal running status by maintenance after terminating, it is not necessary to other people cooperation, more
Plus safety, it is more efficient.
Further, add after position monitoring mechanism, elevator overhauling elevator device in the bottom can be avoided to control
Lift car, which is moved down, causes unnecessary accident.
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
Brief description of the drawings
Fig. 1 is each functional module connected mode schematic diagram of embodiment one of the overhauling elevator device of the present invention.
Fig. 2 is each functional module connected mode schematic diagram of embodiment two of the overhauling elevator device of the present invention.
Fig. 3 is control panel schematic diagram in the car of the overhauling elevator device of the present invention.
Fig. 4 is the lift car of the overhauling elevator device control of the present invention in normal operational position schematic diagram.
Fig. 5 is overhauling operating mode position view for the lift car of the overhauling elevator device control of the present invention.
In accompanying drawing, 1:Hoistway;2:Lift car;3:Car top;4:Hall door;5:First inspection switch;6:Position monitoring mechanism;
7:Gate mechanism for monitoring;8:Apart from mechanism for monitoring;9:Time supervision mechanism;10:Second inspection switch;11:Control panel;12:
Operator;13:Apparatus for controlling elevator.
Embodiment
The present invention can be further well understood by the specific embodiment of invention now given below, but they are not
Limitation of the invention.It is to use prior art, known technology means and row not have the part described in detail in specific embodiment
What industry standard was obtained.
Embodiment one
Such as Fig. 1, shown in Fig. 3-Fig. 5, a kind of overhauling elevator device, the electricity in overhauling elevator for controlling to operate in hoistway 1
Used during the position of terraced car 2, elevator also includes mainboard and the apparatus for controlling elevator 13 being arranged on mainboard, the electricity of the present embodiment
Terraced apparatus for examination and repair include operator 12, the first inspection switch 5, the second inspection switch 10, gate mechanism for monitoring 7, apart from monitoring machine
Structure 8 and time supervision mechanism 9, gate mechanism for monitoring 7, apart from mechanism for monitoring 8 and time supervision mechanism 9 are arranged on the mainboard
On, operator 12 located at the elevator computer room in and with apart from mechanism for monitoring 8 and time mechanism for monitoring 9 by connection,
First inspection switch 5 is located in lift car 2 and is connected by circuit with gate mechanism for monitoring 7, and gate mechanism for monitoring 7 passes through line
Road is connected with apart from mechanism for monitoring 8 and time mechanism for monitoring 9 respectively, and time supervision mechanism 9 passes through circuit and the second inspection switch
10 connections, gate mechanism for monitoring 7, apart from mechanism for monitoring 8 and time supervision mechanism 9 pass through circuit with apparatus for controlling elevator 13 respectively
Connection;Second inspection switch 10 is arranged on car top 3(Do not marked in figure), lift car 2 is interior to be provided with control panel 11, the first maintenance
Switch 5 is arranged on the control panel 11, takes full advantage of existing device, structure is attractive in appearance, easy to operate.
Further, the first inspection switch 5 is Self-resetting key switch, respectively including two gears, open position
" ON " and closed position " OFF ", when position of the switch positioned at " ON ", the first inspection switch 5 is in connected state, generates electricity
The enabling signal of terraced apparatus for examination and repair, and the position of " OFF " is then reset into automatically, it is not necessary to maintainer carries out extra recovery
Work, facilitates subsequent operation.
The method for carrying out overhauling elevator control using the overhauling elevator device in the present embodiment is as follows:
(71)Given using the transmission range parameter of operator 12 apart from mechanism for monitoring 8, input time parameter is to time supervision mechanism 9;
(72)Lift car 2 is rested in into any floor in addition to the bottom, for example the 2nd layer;
(73)The first inspection switch 5 is connected, enabled instruction is generated;
(74)Gate mechanism for monitoring 7 receives the enabled instruction, generation gate action command and passes the gate action command
Apparatus for controlling elevator 13 is passed, apparatus for controlling elevator 13 is opened the gate of lift car 2, left for operator, subsequent elevator control
System 13 processed closes the gate of lift car 2;
(75)The enabled instruction is delivered separately to, apart from mechanism for monitoring 8 and time mechanism for monitoring 9, hold by gate mechanism for monitoring 7
Row step(76)With(761);
(76)Car move is generated apart from mechanism for monitoring 8 and the car move is passed into apparatus for controlling elevator
13, the control lift car 2 of apparatus for controlling elevator 13 moves down the distance that the distance parameter is limited, and performs step(77);
(761)Time supervision mechanism 9 starts timing and monitors the connected state of the second inspection switch 10, in time parameter limit
In the fixed time,
(7611)When the connected state of the second inspection switch 10 does not change, the generation car of time supervision mechanism 9 recovers instruction
And car recovery instruction is passed into apparatus for controlling elevator 13, the control elevator of apparatus for controlling elevator 13 carries out self-inspection, and will
Lift car 2 moves to layer nearby, and elevator resumes operation;
(7612)When the connected state of the second inspection switch 10 changes, timing is cut off, and continues to monitor the second inspection switch
10 connected state, performs step(7613);
(7613)When the connected state of the second inspection switch 10 changes, step is continued executing with(761);
(77)Maintainer opens hall door 4, into the position of car top 3, changes the connected state of the second inspection switch 10, starts maintenance
Work;
(78)After maintenance terminates, change the connected state of the second inspection switch 10 again, overhauling elevator device performs step
(761), maintenance personal leaves service work position in the time interval that the time parameter is limited.
In this overhauling elevator control method, maintainer successively performs step(71)、(72)With(73), now elevator car
The door in railway carriage or compartment 2 can be opened, and maintainer walks out lift car 2, perform step(77);Terminate after service work, perform step
(78), overhauling elevator device of the invention will be automatically performed other work.
Embodiment two
As Figure 2-Figure 5, a kind of overhauling elevator device, the elevator car in overhauling elevator for controlling to operate in hoistway 1
Used during the position in railway carriage or compartment 2, including the first inspection switch 5, position monitoring mechanism 6, gate mechanism for monitoring 7, apart from mechanism for monitoring 8,
Time supervision mechanism 9, the second inspection switch 10 and operator 12, operator 12 are supervised in the computer room of the elevator and with distance
Mechanism 8 and time mechanism for monitoring 9 are surveyed by connection, the first inspection switch 5 is located in lift car 2 and passes through circuit and position
Put mechanism for monitoring 6 to connect, position monitoring mechanism 6 is connected by circuit with gate mechanism for monitoring 7, gate mechanism for monitoring 7 passes through line
Road is connected with apart from mechanism for monitoring 8 and time mechanism for monitoring 9 respectively, and time supervision mechanism 9 passes through circuit and the second inspection switch
10 connections;Second inspection switch 10 is arranged on car top 3(Do not marked in figure), lift car 2 is interior to be provided with control panel 11, the first inspection
Repair switch 5 to be arranged on the control panel 11, take full advantage of existing device, structure is attractive in appearance, easy to operate.
Further, the first inspection switch 5 is Self-resetting key switch, respectively including two gears, open position
" ON " and closed position " OFF ", when position of the switch positioned at " ON ", the first inspection switch 5 is in connected state, generates electricity
The enabling signal of terraced apparatus for examination and repair, and the position of " OFF " is then reset into automatically, it is not necessary to maintainer carries out extra recovery
Work, facilitates subsequent operation.
The method for carrying out overhauling elevator control using the overhauling elevator device in the present embodiment is as follows:
(81)Given using the transmission range parameter of operator 12 apart from mechanism for monitoring 8, input time parameter is to time supervision mechanism 9;
(82)Connect the first inspection switch 5;
(83)Whether the location of the monitoring of position monitoring mechanism 6 lift car 2 is in the bottom, when the position is located at the bottom
When, without any operation;When the position is not the bottom, such as the 2nd layer, step is performed(84);
(84)Enabled instruction is passed to gate mechanism for monitoring 7 by position monitoring mechanism 6;
(85)Gate mechanism for monitoring 7 receives the enabled instruction, generation gate action command and passes the gate action command
Apparatus for controlling elevator 13 is passed, apparatus for controlling elevator 13 is opened the gate of the lift car 2, left for operator, then electricity
Terraced control system 13 closes the gate of the lift car 2;
(86)The enabled instruction is delivered separately to, apart from mechanism for monitoring 8 and time mechanism for monitoring 9, hold by gate mechanism for monitoring 7
Row step(87)With(871);
(87)Car move is generated apart from mechanism for monitoring 8 and the car move is passed into apparatus for controlling elevator
13, the control lift car 2 of apparatus for controlling elevator 13 moves down the distance that the distance parameter is limited, and performs step(88);
(871)Time supervision mechanism 9 starts timing and monitors the connected state of the second inspection switch 10, in time parameter limit
In the fixed time,
(8711)When the connected state of the second inspection switch 10 does not change, the generation car of time supervision mechanism 9 recovers instruction
And car recovery instruction is passed into apparatus for controlling elevator 13, the control elevator of apparatus for controlling elevator 13 carries out self-inspection, and will
Lift car 2 moves to layer nearby, and elevator resumes operation;
(8712)When the connected state of the second inspection switch 10 changes, timing is cut off, and continues to monitor the second inspection switch
10 connected state, performs step(8713);
(8713)When the connected state of the second inspection switch 10 changes, step is continued executing with(871);
(88)Maintainer opens hall door 4, into the position of car top 3, changes the connected state of the second inspection switch 10, starts maintenance
Work;
(89)After maintenance terminates, change the connected state of the second inspection switch 10 again, overhauling elevator device performs step
(871), maintenance personal leaves service work position in the time interval that the time parameter is limited.
In this overhauling elevator control method, maintainer successively performs step(81)With(82)If, overhauling elevator dress
Put and be not carried out step(84), then maintainer need lift car 2 resting in any floor in addition to the bottom, then
Perform step(82), now the door of lift car 2 can open, maintainer walks out elevator, performs step(88);Terminate inspection
Repair after work, perform step(89), overhauling elevator device of the invention will be automatically performed other work.
Above disclosed is only the preferred embodiments of the present invention, can not limit the right of the present invention with this certainly
Scope, therefore the equivalent variations made according to scope of the present invention patent, still belong to the scope that the present invention is covered.
Claims (10)
1. a kind of overhauling elevator device, is used when carrying out cage top overhauling to elevator, the elevator includes lift car, mainboard and set
Put the apparatus for controlling elevator on the mainboard, it is characterised in that:The overhauling elevator device includes the first inspection switch, gate
Mechanism for monitoring, apart from mechanism for monitoring, time supervision mechanism, the second inspection switch and operator,
First inspection switch is connected by circuit with the gate mechanism for monitoring, and the gate mechanism for monitoring passes through circuit point
It is not connected with described apart from mechanism for monitoring and the time supervision mechanism, the time supervision mechanism passes through circuit and described second
Inspection switch is connected, and the operator is connected with described apart from mechanism for monitoring and the time supervision mechanism respectively by circuit,
The gate mechanism for monitoring, described pass through circuit and the elevator controlling respectively apart from mechanism for monitoring and the time supervision mechanism
System is connected,
First inspection switch is used for the enabled instruction for inputting the overhauling elevator device;
The gate mechanism for monitoring is used to receive the enabled instruction, generation gate action command and by the gate action command
Pass to the apparatus for controlling elevator, and the enabled instruction is delivered separately to described to supervise apart from mechanism for monitoring and the time
Survey mechanism;
The operator is used for transmission range parameter and time parameter;
It is described to be used to receiving the enabled instruction, generation car move and by the car move apart from mechanism for monitoring
Pass to the apparatus for controlling elevator;
The time supervision mechanism be used to receiving the enabled instruction, timing, the connected state of monitoring second inspection switch,
Generation car recovers instruction and car recovery instruction is passed into the apparatus for controlling elevator.
2. overhauling elevator device according to claim 1, it is characterised in that:Also include position monitoring mechanism, the position
Mechanism for monitoring is connected with first inspection switch and the gate mechanism for monitoring respectively by circuit;The position monitoring mechanism
Monitored for receiving the enabled instruction, the position of the monitoring lift car and the enabled instruction being passed into the gate
Mechanism.
3. overhauling elevator device according to claim 1, it is characterised in that:First inspection switch is arranged on the electricity
In terraced car.
4. overhauling elevator device according to claim 1, it is characterised in that:Control panel is provided with the lift car,
First inspection switch is arranged on the control panel.
5. according to any described overhauling elevator devices of claim 1-4, it is characterised in that:First inspection switch is runback
Position key switch.
6. overhauling elevator device according to claim 1, it is characterised in that:Second inspection switch is located at the elevator
The top of car.
7. overhauling elevator device according to claim 2, it is characterised in that:The position monitoring mechanism, gate prison
Survey mechanism, described be connected to apart from mechanism for monitoring and the time supervision mechanism on the mainboard.
8. overhauling elevator device according to claim 1, it is characterised in that:The operator is arranged on the machine of the elevator
In room.
9. a kind of method that overhauling elevator device using described in claim 1 carries out overhauling elevator control, comprises the following steps:
(71)Maintainer inputs the distance parameter to described apart from mechanism for monitoring using the operator, inputs the time
Parameter gives the time supervision mechanism;
(72)Maintainer rests in the lift car on any floor in addition to the bottom;
(73)Maintainer connects first inspection switch, and first inspection switch generates the enabled instruction;
(74)The gate mechanism for monitoring receives the enabled instruction, generation gate action command and by the gate action command
The apparatus for controlling elevator is passed to, the apparatus for controlling elevator is opened the gate of the lift car, left for operator, with
The apparatus for controlling elevator closes the gate of the lift car afterwards;
(75)The enabled instruction is delivered separately to described supervise apart from mechanism for monitoring and the time by the gate mechanism for monitoring
Mechanism is surveyed, step is performed(76)With(761);
(76)It is described to generate car move apart from mechanism for monitoring and the car move is passed into the elevator control
System processed, the apparatus for controlling elevator controls the lift car to move down the distance that the distance parameter is limited, and performs step
(77);
(761)The time supervision mechanism starts timing and monitors the connected state of second inspection switch, in the time
In the time that parameter is limited,
(7611)When the second inspection switch connected state does not change, the time supervision mechanism generation car recovers
Instruct and car recovery instruction is passed into the apparatus for controlling elevator, the apparatus for controlling elevator control elevator is carried out certainly
Inspection, and the lift car is moved into layer nearby, elevator resumes operation;
(7612)When the second inspection switch connected state changes, the time supervision mechanism cuts off timing, and after
The connected state of continuous monitoring second inspection switch, performs step(7613);
(7613)When the second inspection switch connected state changes, step is continued executing with(761);
(77)Maintainer opens hall door, into car top position, changes the connected state of second inspection switch, starts maintenance
Work;
(78)After maintenance terminates, maintainer changes the connected state of second inspection switch, the overhauling elevator dress again
Put execution step(761), maintenance personal leaves service work position in the time interval that the time parameter is limited.
10. a kind of method that overhauling elevator device using described in claim 2 carries out overhauling elevator control, including following step
Suddenly:
(81)Maintainer inputs the distance parameter to described apart from mechanism for monitoring using the operator, inputs the time
Parameter gives the time supervision mechanism;
(82)Maintainer connects first inspection switch;
(83)Whether the position monitoring mechanism monitors the location of described lift car in the bottom,
When the position is the bottom, without any operation;
When the position is not the bottom, step is performed(84);
(84)The enabled instruction is passed to the gate mechanism for monitoring by the position monitoring mechanism;
(85)The gate mechanism for monitoring receives the enabled instruction, generation gate action command and by the gate action command
The apparatus for controlling elevator is passed to, the apparatus for controlling elevator is opened the gate of the lift car, left for operator, with
The apparatus for controlling elevator closes the gate of the lift car afterwards;
(86)The enabled instruction is delivered separately to described supervise apart from mechanism for monitoring and the time by the gate mechanism for monitoring
Mechanism is surveyed, step is performed(87)With(871);
(87)It is described to generate car move apart from mechanism for monitoring and the car move is passed into the elevator control
System processed, the apparatus for controlling elevator controls the lift car to move down the distance that the distance parameter is limited, and performs step
(88);
(871)The time supervision mechanism starts timing and monitors the connected state of second inspection switch, in the time
In the time that parameter is limited,
(8711)When the second inspection switch connected state does not change, the time supervision mechanism generation car recovers
Instruct and car recovery instruction is passed into the apparatus for controlling elevator, the apparatus for controlling elevator control elevator is carried out certainly
Inspection, and the lift car is moved into layer nearby, elevator resumes operation;
(8712)When the second inspection switch connected state changes, the time supervision mechanism cuts off timing, and after
The connected state of continuous monitoring second inspection switch, performs step(8713);
(8713)When the second inspection switch connected state changes, step is continued executing with(871);
(88)Maintainer opens hall door, into car top position, changes the connected state of second inspection switch, starts maintenance
Work;
(89)After maintenance terminates, maintainer changes the connected state of second inspection switch, the overhauling elevator dress again
Put execution step(871), maintenance personal left in the time interval that the time parameter is limited work maintenance position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710405137.9A CN107265222B (en) | 2017-05-31 | 2017-05-31 | Elevator maintenance device and elevator maintenance control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710405137.9A CN107265222B (en) | 2017-05-31 | 2017-05-31 | Elevator maintenance device and elevator maintenance control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107265222A true CN107265222A (en) | 2017-10-20 |
CN107265222B CN107265222B (en) | 2023-04-14 |
Family
ID=60064373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710405137.9A Active CN107265222B (en) | 2017-05-31 | 2017-05-31 | Elevator maintenance device and elevator maintenance control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107265222B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114014118A (en) * | 2021-11-16 | 2022-02-08 | 日立电梯(上海)有限公司 | Elevator car roof safe access control method and system and storage medium |
CN114644262A (en) * | 2022-03-17 | 2022-06-21 | 上海三菱电梯有限公司 | Elevator system and elevator system control method |
CN115009947A (en) * | 2022-06-20 | 2022-09-06 | 永大电梯设备(中国)有限公司 | Protection method for overhauling and resetting elevator car roof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003002553A (en) * | 2001-06-15 | 2003-01-08 | Mitsubishi Electric Building Techno Service Co Ltd | Operation device and its operation method for maintenance of elevator |
CN201942374U (en) * | 2010-12-31 | 2011-08-24 | 上海永大电梯设备有限公司 | Automatic positioning operation control device for elevator |
CN103359559A (en) * | 2012-04-06 | 2013-10-23 | 株式会社日立制作所 | Elevator having operation switching system |
CN204384640U (en) * | 2014-12-17 | 2015-06-10 | 西子奥的斯电梯有限公司 | A kind of Novel car top repair and maintenance system |
CN205527222U (en) * | 2016-04-19 | 2016-08-31 | 山东博尔特电梯有限公司 | Elevator car roof maintenance device |
CN206088633U (en) * | 2016-02-23 | 2017-04-12 | 广东日创电梯有限公司 | Infrared elevator cab space operation safety protection system |
CN206901519U (en) * | 2017-05-31 | 2018-01-19 | 江南嘉捷电梯股份有限公司 | A kind of overhauling elevator device |
-
2017
- 2017-05-31 CN CN201710405137.9A patent/CN107265222B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003002553A (en) * | 2001-06-15 | 2003-01-08 | Mitsubishi Electric Building Techno Service Co Ltd | Operation device and its operation method for maintenance of elevator |
CN201942374U (en) * | 2010-12-31 | 2011-08-24 | 上海永大电梯设备有限公司 | Automatic positioning operation control device for elevator |
CN103359559A (en) * | 2012-04-06 | 2013-10-23 | 株式会社日立制作所 | Elevator having operation switching system |
CN204384640U (en) * | 2014-12-17 | 2015-06-10 | 西子奥的斯电梯有限公司 | A kind of Novel car top repair and maintenance system |
CN206088633U (en) * | 2016-02-23 | 2017-04-12 | 广东日创电梯有限公司 | Infrared elevator cab space operation safety protection system |
CN205527222U (en) * | 2016-04-19 | 2016-08-31 | 山东博尔特电梯有限公司 | Elevator car roof maintenance device |
CN206901519U (en) * | 2017-05-31 | 2018-01-19 | 江南嘉捷电梯股份有限公司 | A kind of overhauling elevator device |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114014118A (en) * | 2021-11-16 | 2022-02-08 | 日立电梯(上海)有限公司 | Elevator car roof safe access control method and system and storage medium |
CN114644262A (en) * | 2022-03-17 | 2022-06-21 | 上海三菱电梯有限公司 | Elevator system and elevator system control method |
CN114644262B (en) * | 2022-03-17 | 2023-08-01 | 上海三菱电梯有限公司 | Elevator system and elevator system control method |
CN115009947A (en) * | 2022-06-20 | 2022-09-06 | 永大电梯设备(中国)有限公司 | Protection method for overhauling and resetting elevator car roof |
CN115009947B (en) * | 2022-06-20 | 2024-01-23 | 永大电梯设备(中国)有限公司 | Protection method for repairing and resetting elevator car roof |
Also Published As
Publication number | Publication date |
---|---|
CN107265222B (en) | 2023-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107265222A (en) | A kind of overhauling elevator device and overhauling elevator control method | |
CN105775946B (en) | A kind of apparatus for controlling elevator and method | |
CN109368434A (en) | A kind of elevator control system with video surveillance | |
CN105129559B (en) | Elevator hoistways part detection device and its method | |
CN110412962B (en) | Promotion centralized control system that accuse is many | |
CN108439115B (en) | Intelligent safety maintenance system for elevator without machine room and control method thereof | |
CN112978533B (en) | Automatic rescue system and rescue method for elevator people trapping fault | |
CN104401877B (en) | Four rope grab fully automatic operation monitoring system and its synchronisation control means | |
CN107226405B (en) | Operating system is kept out of the way in elevator immersion | |
CN106829678A (en) | Multifunctional elevator car accidental movement protection system and method | |
CN206901519U (en) | A kind of overhauling elevator device | |
CN107473044A (en) | A kind of elevator device and method with function of overcoming difficulties automatically | |
CN106744095A (en) | Hand-held type multifunctional intelligent operation apparatus | |
CN104444643B (en) | Elevator control system and method | |
CN110589653A (en) | Intelligent escaping elevator, independent escaping device thereof and intelligent elevator escaping method | |
CN103130065B (en) | Elevator operation management system | |
KR101352610B1 (en) | Elevator controlling system apparatus | |
CN110526064B (en) | Function testing device for elevator car accidental movement protection system | |
CN112408140A (en) | System and method applied to elevator control reminding and fault diagnosis | |
CN110255310B (en) | Remote elevator monitoring system and method for cooperatively monitoring property data | |
CN107601198B (en) | Elevator | |
CN206798891U (en) | One kind is used for elevator safety escape control system | |
CN107657860A (en) | A kind of elevator safety experiences training set | |
CN108689257A (en) | A kind of building hoist control system | |
CN107207197B (en) | Elevator control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180419 Address after: 215122 Suzhou Industrial Park, Jiangsu, the only new road, No. 28 Applicant after: SJEC Corp. Address before: 215122 Suzhou Industrial Park, Suzhou Province, the only new road, No. 28, Jiangsu Applicant before: SJEC Corp. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |