CN107246037A - A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course - Google Patents

A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course Download PDF

Info

Publication number
CN107246037A
CN107246037A CN201710674891.2A CN201710674891A CN107246037A CN 107246037 A CN107246037 A CN 107246037A CN 201710674891 A CN201710674891 A CN 201710674891A CN 107246037 A CN107246037 A CN 107246037A
Authority
CN
China
Prior art keywords
stake
regions
classes
region
rectifying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710674891.2A
Other languages
Chinese (zh)
Inventor
顾国荣
刘冬
李晓勇
徐枫
陈晖�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201710674891.2A priority Critical patent/CN107246037A/en
Publication of CN107246037A publication Critical patent/CN107246037A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of rectifying of leaned building structure for stake end sandy soil supporting course, the plane of building bottom plate is divided into tri- regions of A, B, C, a-quadrant is that position region occurs for larger sedimentation, B regions are that position region occurs for smaller sedimentation, and C regions are the regions being located between A, B region;Bottom plate, which is provided with to be uniformly provided with piling hole, each piling hole, is equipped with anchor jacked pile;Prestressing apparatus, and casting concrete are provided with the top of the A classes anchor jacked pile of a-quadrant;A classes anchor jacked pile stake end remains for the permeable hole of water filling in advance;Compressible material, and casting concrete are provided with the top of B, C class anchor jacked pile in B, C region.Building bottom plate is divided into three different regions, each region anchor rod static pressure pile driving construction is carried out in particular order by the present invention according to the situation of sedimentation, and uses different envelope piling method combination water injection methods, returns building and inclines, reaches the effect of correction.

Description

A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course
Technical field
It is a kind of building for stake sandy soil supporting course specifically the present invention relates to a kind of rectifying of leaned building structure Thing error-correction structure, belongs to rectifying of leaned building technical field.
Background technology
The high-rise in weak soil or other unfavorable geologies area is built in, generally using pile foundation, due to reconnoitring, setting The reason in terms of meter, construction or environment, when there is engineering pile damage or insufficient rigidity, building will be caused to produce uneven heavy Drop, causes to tilt.
Conventional measure is that benefit sets anchor jacked pile progress strengthening of foundation, prevents it from further tilting, or using the side of soil digging Formula is rectified a deviation, but the effect of prior art correction is not often good, is also difficult to during correction real-time according to actual conditions Carry out construction adjustment, ensure while safety and reliability is also more difficult.
The content of the invention
The technical problem to be solved in the invention is:Prior art is entangled by the way of anchor jacked pile to building When partially, the effect of correction is not so good as people's will, is also difficult to carry out construction adjustment in real time according to actual conditions during correction, together When safety and reliability is also more difficult ensures.
The present invention takes following technical scheme:
A kind of rectifying of leaned building structure for stake end sandy soil supporting course, the plane of the building bottom plate 11 is divided into Tri- regions of A, B, C, the a-quadrant is that position region occurs for larger sedimentation, and the B regions are that position occurs for smaller sedimentation Region, the C regions are the regions being located between A, B region;Bottom plate 11 is each to press provided with piling hole 8 is uniformly provided with Stake is equipped with anchor jacked pile 1 at hole 8;Prestressing apparatus 6 is provided with the top of the A classes anchor jacked pile of a-quadrant, and is poured Concrete seven;The A classes anchor jacked pile stake end remains for the permeable hole of water filling in advance;B, C class anchor rod static pressure positioned at B, C region Stake top portion is provided with compressible material 9, and casting concrete 7.
Further, the a-quadrant and B regions are two relative regions, respectively positioned at C regions both sides.
Further, the area equation of the a-quadrant and B regions.
Further, the lower section of building bottom plate 11 is additionally provided with former engineering pile 10.
It is used for the method for correcting error of the rectifying of leaned building structure of stake end sandy soil supporting course described in a kind of claim 1, including Following steps:
A bottom plate 11) is distributed according to building superstructure load assignment, differential settlement situation and former engineering pile 10 Region opens up piling hole, then divides the class of A, B, C tri- stake subregion;
B) construction A classes stake, piling completes to carry out envelope stake using prestressing apparatus 6 at once, then carries out the stake piling of B classes, complete Stake wouldn't be sealed after into piling, the permeable hole reserved by stake end carries out water filling, disturbance stake end sandy soil makes the relatively rapid production in the side Raw certain sedimentation;At the same time, crossed construction C classes stake, sets certain thickness compressible material 9, and use in time in stake top Concrete seven carries out envelope stake;
C) according to monitoring materials, after the building time amount of inclining meets design requirement, certain thickness is set to B classes stake stake top Compressible material 9, and carry out envelope stake.
Further, step B is carried out) and step C) when, the thickness of the compressible material 9 in the piling hole of B classes is big In the stake of C classes.
The beneficial effects of the present invention are:
1) according to the situation of sedimentation, building bottom plate is divided into three different regions, each region anchor rod static pressure pile driving construction Carry out in particular order, and use different envelope piling method combination water injection methods, return building and incline, reach the effect of correction Really;
2) rectifying of leaned building effect preferably, can be implemented to carry out construction adjustment during correction according to actual conditions;
3) while the safety and reliability of Deviation Correction Construction is higher.
Brief description of the drawings
Fig. 1 is the plan of the rectifying of leaned building structure for stake end sandy soil supporting course.
Fig. 2 is the schematic diagram that the stake piling of A classes and horse back prestressing force seal stake.
Fig. 3 is B classes pile driving construction and wouldn't seal the schematic diagram of stake.
Fig. 4 is the stake water filling of B classes, while the schematic diagram of C class pile driving constructions.
Fig. 5 is the schematic diagram of B classes stake envelope stake.
In figure, 1. anchor jacked piles, 2. different type pile bluelines, 3.A classes stake subregion, 4.B classes stake subregion, the stake point of 5.C classes Area, 6. prestressing apparatus, 7. envelope pile concretes, 8. piling holes, 9. compressible materials, 10. former engineering piles, 11. bottom plates.
Embodiment
The present invention is further described with specific embodiment below in conjunction with the accompanying drawings.
Referring to Fig. 1-Fig. 5, a kind of rectifying of leaned building structure for stake end sandy soil supporting course, by the building bottom plate 11 plane is divided into tri- regions of A, B, C, and the a-quadrant is that position region occurs for larger sedimentation, and the B regions are smaller Position region occurs for sedimentation, and the C regions are the regions being located between A, B region;Bottom plate 11 is provided with and is uniformly provided with pressure Anchor jacked pile 1 is equipped with stake hole 8, each piling hole 8;Prestressing force is provided with the top of the A classes anchor jacked pile of a-quadrant Device 6, and casting concrete 7;The A classes anchor jacked pile stake end remains for the permeable hole of water filling in advance;B positioned at B, C region, Compressible material 9, and casting concrete 7 are provided with the top of C classes anchor jacked pile.
In this embodiment, referring to Fig. 1, the a-quadrant and B regions are two relative regions, respectively positioned at C regions two Side.
In this embodiment, referring to Fig. 1, the area equation of the a-quadrant and B regions.
In this embodiment, referring to Fig. 2, the lower section of building bottom plate 11 is additionally provided with former engineering pile 10.
When carrying out the Specific construction of rectifying of leaned building, comprise the following steps:
A bottom plate 11) is distributed according to building superstructure load assignment, differential settlement situation and former engineering pile 10 Region opens up piling hole, then divides the class of A, B, C tri- stake subregion;B) construction A classes stake, piling completes to use prestressing apparatus at once 6 carry out envelope stake, then carry out the stake piling of B classes, stake wouldn't be sealed after completing piling, the permeable hole reserved by stake end carries out water filling, Stake end sandy soil is disturbed, makes the certain sedimentation of the relatively rapid generation in the side;At the same time, crossed construction C classes stake, one is set in stake top Determine the compressible material 9 of thickness, and envelope stake is carried out using concrete seven in time;C) according to monitoring materials, treat that building returns the amount of inclining and expired After sufficient design requirement, certain thickness compressible material 9 is set to B classes stake stake top, and carry out envelope stake.
The beneficial effects of the present invention are:According to the situation of sedimentation, building bottom plate is divided into three different regions, respectively Region anchor rod static pressure pile driving construction is carried out in particular order, and uses different envelope piling method combination water injection methods, makes building Thing, which is returned, to incline, and reaches the effect of correction;Rectifying of leaned building effect preferably, can be implemented to carry out during correction according to actual conditions Construction adjustment;The safety and reliability of Deviation Correction Construction is higher simultaneously.
Above is the preferred embodiments of the present invention, those of ordinary skill in the art can also enter on this basis line translation or Improve, on the premise of the total design of the present invention is not departed from, these conversion or improvement should all belong to claimed Within the scope of.

Claims (6)

1. a kind of rectifying of leaned building structure for stake end sandy soil supporting course, it is characterised in that:
The plane of the building bottom plate (11) is divided into tri- regions of A, B, C, the a-quadrant is that position institute occurs for larger sedimentation In region, the B regions are that position region occurs for smaller sedimentation, and the C regions are the regions being located between A, B region;
Bottom plate (11) is provided with piling hole (8) is uniformly provided with, and each piling hole (8) place is equipped with anchor jacked pile (1);
Prestressing apparatus (6), and casting concrete (7) are provided with the top of the A classes anchor jacked pile of a-quadrant;The A classes anchor pole Static pressed pile stake end remains for the permeable hole of water filling in advance;
Compressible material (9), and casting concrete (7) are provided with the top of B, C class anchor jacked pile in B, C region.
2. it is used for the rectifying of leaned building structure of stake end sandy soil supporting course as claimed in claim 1, it is characterised in that:The A Region and B regions are two relative regions, respectively positioned at C regions both sides.
3. it is used for the rectifying of leaned building structure of stake end sandy soil supporting course as claimed in claim 2, it is characterised in that:The A The area equation in region and B regions.
4. it is used for the rectifying of leaned building structure of stake end sandy soil supporting course as claimed in claim 1, it is characterised in that:It is described to build Build and be additionally provided with former engineering pile (10) below thing bottom plate (11).
5. it is used for the method for correcting error of the rectifying of leaned building structure of stake end sandy soil supporting course, its feature described in a kind of claim 1 It is, comprises the following steps:
A bottom plate (11)) is distributed according to building superstructure load assignment, differential settlement situation and former engineering pile (10) Region opens up piling hole, then divides the class of A, B, C tri- stake subregion;
B) construction A classes stake, piling completes to carry out envelope stake using prestressing apparatus (6) at once, then carries out the stake piling of B classes, completes Stake wouldn't be sealed after piling, the permeable hole reserved by stake end carries out water filling, disturbance stake end sandy soil makes the relatively rapid generation in the side Certain sedimentation;At the same time, crossed construction C classes stake, sets certain thickness compressible material (9), and use in time in stake top Concrete (7) carries out envelope stake;
C) according to monitoring materials, after the building time amount of inclining meets design requirement, certain thickness press is set to B classes stake stake top Compression material (9), and carry out envelope stake.
6. it is used for the method for correcting error of the rectifying of leaned building structure of stake end sandy soil supporting course, its feature as claimed in claim 5 It is:Carry out step B) and step C) when, the thickness of the compressible material (9) in the piling hole of B classes stake is more than C classes.
CN201710674891.2A 2017-08-09 2017-08-09 A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course Pending CN107246037A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710674891.2A CN107246037A (en) 2017-08-09 2017-08-09 A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710674891.2A CN107246037A (en) 2017-08-09 2017-08-09 A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course

Publications (1)

Publication Number Publication Date
CN107246037A true CN107246037A (en) 2017-10-13

Family

ID=60013375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710674891.2A Pending CN107246037A (en) 2017-08-09 2017-08-09 A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course

Country Status (1)

Country Link
CN (1) CN107246037A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653187A (en) * 2018-12-25 2019-04-19 上海勘察设计研究院(集团)有限公司 A method of reducing the uneven traction sedimentation of anchor jacked pile
CN109653265A (en) * 2018-12-25 2019-04-19 上海勘察设计研究院(集团)有限公司 A kind of pile-raft foundation building joint method for correcting error
CN109881723A (en) * 2019-03-20 2019-06-14 上海华铸地基技术有限公司 A kind of comprehensive controllable method for correcting error of anchor jacked pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204590107U (en) * 2015-04-17 2015-08-26 上海岩土工程勘察设计研究院有限公司 Building bidirectional deviation correction ruggedized construction
CN105971039A (en) * 2016-05-10 2016-09-28 山东建筑大学 Method for rectifying deflection of building by digging out soil and pouring water
CN205999947U (en) * 2016-08-30 2017-03-08 中国建筑西南勘察设计研究院有限公司 Thin stake reinforcement soil digging rectification composite foundation
CN106592615A (en) * 2016-11-17 2017-04-26 叶香雄 Deviation rectification construction method for inclined sink
CN207121940U (en) * 2017-08-09 2018-03-20 上海岩土工程勘察设计研究院有限公司 A kind of rectifying of leaned building structure for stake end sandy soil supporting course

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204590107U (en) * 2015-04-17 2015-08-26 上海岩土工程勘察设计研究院有限公司 Building bidirectional deviation correction ruggedized construction
CN105971039A (en) * 2016-05-10 2016-09-28 山东建筑大学 Method for rectifying deflection of building by digging out soil and pouring water
CN205999947U (en) * 2016-08-30 2017-03-08 中国建筑西南勘察设计研究院有限公司 Thin stake reinforcement soil digging rectification composite foundation
CN106592615A (en) * 2016-11-17 2017-04-26 叶香雄 Deviation rectification construction method for inclined sink
CN207121940U (en) * 2017-08-09 2018-03-20 上海岩土工程勘察设计研究院有限公司 A kind of rectifying of leaned building structure for stake end sandy soil supporting course

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王建中: "既有建筑的迫降纠倾", 《山西建筑》, 28 February 2007 (2007-02-28), pages 144 - 145 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653187A (en) * 2018-12-25 2019-04-19 上海勘察设计研究院(集团)有限公司 A method of reducing the uneven traction sedimentation of anchor jacked pile
CN109653265A (en) * 2018-12-25 2019-04-19 上海勘察设计研究院(集团)有限公司 A kind of pile-raft foundation building joint method for correcting error
CN109881723A (en) * 2019-03-20 2019-06-14 上海华铸地基技术有限公司 A kind of comprehensive controllable method for correcting error of anchor jacked pile

Similar Documents

Publication Publication Date Title
CN107090860B (en) Deviation rectifying and reinforcing structure of shallow foundation building and construction method thereof
CN110080318B (en) Deviation rectifying method for local settlement of pile foundation building
CN108343102B (en) Pile foundation settlement reinforcement jacking leveling structure and construction method thereof
CN208996025U (en) A kind of double casing pile foundation construction structures of thick silt layer
CN107246037A (en) A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course
CN202416195U (en) Pier deviation correcting and reinforcing system
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN206408657U (en) Integrated bored concrete pile for static test
CN109138011A (en) Existing building foundation stabilization and method for correcting error
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN207121940U (en) A kind of rectifying of leaned building structure for stake end sandy soil supporting course
CN201581394U (en) Large pile toe grout-injection precast pile
CN101418574B (en) Construction method for reinforcing grade beam
CN104762967A (en) Improved anchor rod static pressure pile sealing device and construction method
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN105821887A (en) Installing method for stand column pile constructed in pebble bed
CN108360369A (en) The road and bridge end of the bridge engaging portion structure of pre- anti-jump vehicle phenomenon
CN111305182A (en) Soft foundation reinforcement construction method
CN110258191B (en) Deviation rectifying and reinforcing method for transverse displacement of high-speed railway roadbed
CN108532624B (en) Chemical tank raft foundation reinforcing structure
CN110820817A (en) Bridge pier stud pile foundation combination deviation rectifying method
CN110685287A (en) Double-row pile foundation pit supporting system with drainage ditch and retaining wall and construction method
CN206829136U (en) A kind of anchor jacked pile envelope pilework of high cushion cap foundation
CN206829147U (en) A kind of combined type shaped steel, slip casting steel pipe bearing diagonal foundation pit enclosure structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171013