CN109653265A - A kind of pile-raft foundation building joint method for correcting error - Google Patents

A kind of pile-raft foundation building joint method for correcting error Download PDF

Info

Publication number
CN109653265A
CN109653265A CN201811588274.1A CN201811588274A CN109653265A CN 109653265 A CN109653265 A CN 109653265A CN 201811588274 A CN201811588274 A CN 201811588274A CN 109653265 A CN109653265 A CN 109653265A
Authority
CN
China
Prior art keywords
stake
class
pile
smaller side
sedimentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811588274.1A
Other languages
Chinese (zh)
Inventor
顾国荣
李晓勇
李明
刘冬
杨明义
陈晖�
王克文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SGIDI Engineering Consulting Group Co Ltd
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
SGIDI Engineering Consulting Group Co Ltd
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SGIDI Engineering Consulting Group Co Ltd, Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical SGIDI Engineering Consulting Group Co Ltd
Priority to CN201811588274.1A priority Critical patent/CN109653265A/en
Publication of CN109653265A publication Critical patent/CN109653265A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of pile-raft foundation buildings to combine method for correcting error comprising: S1, the sedimentation larger side construction C class stake piling in sole plate, and carry out prestressing force envelope stake;S2, the sedimentation smaller side construction A class stake piling in sole plate, and reduce the bearing capacity of the former engineering pile of sedimentation smaller side;S3, smaller side crossed construction B class stake piling is being settled, and is increasing the deformation of sedimentation smaller side;S4, envelope stake is carried out to the stake of A class and the stake of B class.Not only rectifying effect is good by the present invention, correction rate is high but also the safety of Deviation Correction Construction is good.

Description

A kind of pile-raft foundation building joint method for correcting error
Technical field
The present invention relates to construction engineering technical fields more particularly to a kind of pile-raft foundation building to combine method for correcting error.
Background technique
Engineering is caused due to prospecting, design, construction or environment etc. using the high-rise of pile foundation Pile deviation or damage, bored concrete pile sediment is blocked up, engineering pile Lack of support, building Superstructure Construction or use process Middle generation differential settlement, causes to tilt.
Since skyscraper is from great, it is highly much larger than width, horizontal distortion control requires high, and progress is actively rectified a deviation difficulty Risks are high.The passive rectifying methods such as conventional water jetting, subsoil extraction, preloading forced landing are adapted to tier building more, for using stake The skyscraper of base, such method performance difficulty, jetting and soil digging depth are limited, and are difficult to control building settlement deformation.Therefore It generally rectifies a deviation without high-rise, only carries out strengthening of foundation.
Summary of the invention
The technical issues of in the presence of the present invention mainly solution prior art, to provide, a kind of rectifying effect is good, pacifies The pile-raft foundation building of Quan Xinggao combines method for correcting error.
Above-mentioned technical problem of the invention is mainly to be addressed by following technical proposals:
Pile-raft foundation building provided by the invention combines method for correcting error comprising:
S1, the sedimentation larger side construction C class stake piling in sole plate, and carry out prestressing force envelope stake;
S2, the sedimentation smaller side construction A class stake piling in sole plate, and reduce holding for the former engineering pile for settling smaller side Carry power;
S3, smaller side crossed construction B class stake piling is being settled, and is increasing the deformation of sedimentation smaller side;
S4, envelope stake is carried out to the stake of A class and the stake of B class.
Further, in the step S2, the bearing capacity for reducing the former engineering pile of sedimentation smaller side includes: in A class stake Exhaust pipe and Grouting Pipe are installed, high pressure water injection forms injecting cement paste.
Further, in the step S2, the bearing capacity for reducing the former engineering pile of sedimentation smaller side includes: in A class stake Soil digging is carried out, the soil pressure against piles of former engineering pile are discharged.
Further, in the step S3, the deformation for increasing sedimentation smaller side includes: by counter-force force transmission element and the stake of B class Top is connected, and horizontally installs reversed beam on the counter-force force transmission element, the reversed beam two sides install jack, described thousand The very useful sole plate in sedimentation smaller side of jin presses.
Further, before the step S4 further include: S40, the compressible material of A class stake top setting in sedimentation smaller side Material.
The beneficial effects of the present invention are: prestressing force envelope first is carried out in sedimentation larger side construction C class stake, can control building Settle the deformation of larger side, it is ensured that building safety.Then, in the construction A class stake of sedimentation smaller side and B class stake, and former engineering is reduced The bearing capacity of stake increases the deformation of sedimentation smaller side, and then reduces the relative settlement of building, to reach correction purpose, no Only rectifying effect is good, correction rate is high and the safety of Deviation Correction Construction is good.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the method flow diagram of pile-raft foundation building joint method for correcting error of the invention;
Fig. 2 is the location map of A class of the invention, B class and C class stake holes;
Fig. 3 is cross-sectional view of the Fig. 2 along I-I;
Fig. 4 is cross-sectional view of the Fig. 2 along II-II.
Specific embodiment
The preferred embodiment of the present invention is described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Refering to fig. 1 shown in -4, pile-raft foundation building of the invention combines method for correcting error comprising:
S1, the construction C class stake piling of sedimentation larger side 11 in sole plate 1, and carry out prestressing force envelope stake;
S2, the construction A class stake piling of sedimentation smaller side 12 in sole plate 1, and reduce the former engineering pile 2 of sedimentation smaller side Bearing capacity;
S3, smaller side crossed construction B class stake piling is being settled, and is increasing the deformation of sedimentation smaller side;
S4, envelope stake is carried out to the stake of A class and the stake of B class.In the present invention, the envelope of envelope the stake measure and the stake of C class of the stake of A class and B class stake Stake measure is identical.
In the present invention, first according to the building superstructure of sole plate 1, sedimentation and deformation status and former engineering pile, Arrange A, B, C three classes stake stake position, then, aperture construction A, B, C three classes stake piling on sole plate 1.
In one embodiment of the invention, the bearing capacity for reducing the former engineering pile 2 of sedimentation smaller side 12 includes: in A class Exhaust pipe 3 and Grouting Pipe 4 are installed, high pressure water injection forms injecting cement paste 5 in stake.The excess pore water in deep soil can be increased in this way Pressure disturbs the bearing course at pile end and Pile side soil body of former engineering pile 2.
In another embodiment of the present invention, the bearing capacity for reducing the former engineering pile 2 of sedimentation smaller side 12 includes: in A Soil digging is carried out in class stake, discharges the soil pressure against piles of former engineering pile 2.Holding for the side original engineering pile 2 can be reduced in a short time in this way Power is carried, the relatively rapid sedimentation in the side is made.
Preferably, the deformation for increasing sedimentation smaller side 12 includes: by the top of counter-force force transmission element 6 and the stake of B class in step S3 Be connected, reversed beam 7 be horizontally installed on counter-force force transmission element 6, reversed beam 7 two sides install jack 8, jack 8 for pair The sole plate 1 of sedimentation smaller side 12 presses.In the present invention, by loading jack 8, by the withdrawal resistance pair of B class stake Sole plate 1 presses, and sedimentation smaller side 11 is forced to generate sedimentation and deformation.In the present invention, the sequence of construction of step S2 and S3 can roots It is adjusted according to building status and geological conditions.
Preferably, before step S4 further include: S40, the A class stake top setting compressible material 9 in sedimentation smaller side 12. Building settlement smaller side 12 can be made to continue to generate certain settling amount under upper load effect in this way, further increase correction Efficiency.
The present invention first in the construction C class stake of sedimentation larger side and carries out prestressing force envelope stake, controls the change of building settlement larger side Shape, it is ensured that building safety.Then, in the construction A class stake of sedimentation smaller side and B class stake, and the bearing capacity of former engineering pile is reduced, increased The deformation of smaller side is settled, and then reduces the relative settlement of building, to reach correction purpose, not only rectifying effect is good, entangles The safety of inclined rate height and Deviation Correction Construction is good.
More than, only a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, it is any without The change or replacement that creative work is expected are crossed, should be covered by the protection scope of the present invention.Therefore, protection of the invention Range should be determined by the scope of protection defined in the claims.

Claims (5)

1. a kind of pile-raft foundation building combines method for correcting error characterized by comprising
S1, the sedimentation larger side construction C class stake piling in sole plate, and carry out prestressing force envelope stake;
S2, the sedimentation smaller side construction A class stake piling in sole plate, and reduce the carrying of the former engineering pile of sedimentation smaller side Power;
S3, smaller side crossed construction B class stake piling is being settled, and is increasing the deformation of sedimentation smaller side;
S4, envelope stake is carried out to the stake of A class and the stake of B class.
2. pile-raft foundation building as described in claim 1 combines method for correcting error, which is characterized in that in the step S2, drop The bearing capacity of the former engineering pile of droning drop smaller side includes: that exhaust pipe and Grouting Pipe are installed in A class stake, and high pressure water injection forms note Slurry.
3. pile-raft foundation building as described in claim 1 combines method for correcting error, which is characterized in that in the step S2, drop The bearing capacity of the former engineering pile of droning drop smaller side includes: that soil digging is carried out in A class stake, discharges the Pile side soil pressure of former engineering pile Power.
4. pile-raft foundation building as claimed in claim 3 combines method for correcting error, which is characterized in that in the step S3, increase The deformation of big sedimentation smaller side includes: that will be connected at the top of counter-force force transmission element and B class stake, horizontal on the counter-force force transmission element Ground install reversed beam, the reversed beam two sides install jack, the jack be used for sedimentation smaller side sole plate into Row pressure.
5. pile-raft foundation building as described in claim 1 combines method for correcting error, which is characterized in that before the step S4 also It include: S40, the A class stake top setting compressible material in sedimentation smaller side.
CN201811588274.1A 2018-12-25 2018-12-25 A kind of pile-raft foundation building joint method for correcting error Pending CN109653265A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811588274.1A CN109653265A (en) 2018-12-25 2018-12-25 A kind of pile-raft foundation building joint method for correcting error

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811588274.1A CN109653265A (en) 2018-12-25 2018-12-25 A kind of pile-raft foundation building joint method for correcting error

Publications (1)

Publication Number Publication Date
CN109653265A true CN109653265A (en) 2019-04-19

Family

ID=66116570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811588274.1A Pending CN109653265A (en) 2018-12-25 2018-12-25 A kind of pile-raft foundation building joint method for correcting error

Country Status (1)

Country Link
CN (1) CN109653265A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144983A (en) * 2019-05-17 2019-08-20 中国建筑西南勘察设计研究院有限公司 It is a kind of to control heavy type skyscraper forced-landing tilt correcting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2519542A (en) * 2013-10-23 2015-04-29 Geoinnovations Ltd A jacking device
CN104652842A (en) * 2015-02-15 2015-05-27 上海天演建筑物移位工程股份有限公司 Building integral deviation correcting and raising lifting method and equipment thereof
CN107246037A (en) * 2017-08-09 2017-10-13 上海岩土工程勘察设计研究院有限公司 A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course
CN207121940U (en) * 2017-08-09 2018-03-20 上海岩土工程勘察设计研究院有限公司 A kind of rectifying of leaned building structure for stake end sandy soil supporting course

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2519542A (en) * 2013-10-23 2015-04-29 Geoinnovations Ltd A jacking device
CN104652842A (en) * 2015-02-15 2015-05-27 上海天演建筑物移位工程股份有限公司 Building integral deviation correcting and raising lifting method and equipment thereof
CN107246037A (en) * 2017-08-09 2017-10-13 上海岩土工程勘察设计研究院有限公司 A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course
CN207121940U (en) * 2017-08-09 2018-03-20 上海岩土工程勘察设计研究院有限公司 A kind of rectifying of leaned building structure for stake end sandy soil supporting course

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张继红等: "水上高承台桩基加固纠倾实例分析", 《岩土力学》 *
李今保: "某小高层纠倾加固技术 ", 《工业建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144983A (en) * 2019-05-17 2019-08-20 中国建筑西南勘察设计研究院有限公司 It is a kind of to control heavy type skyscraper forced-landing tilt correcting method

Similar Documents

Publication Publication Date Title
CN103452147B (en) Self-balancing anchor counterweight broken pile forced-landing tilt correcting method
US20220098817A1 (en) Method for constructing structure
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN107059882A (en) Arch anchor net and Anchor-Pile Retaining Structure structure
CN106320737A (en) Integral lifting method for ancient building
CN108867723B (en) Method for correcting inclination of frame structure building and adding underground layer
CN111851523B (en) Settlement deviation prevention method for foundation pit construction
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN106120881A (en) A kind of high-rise correcting and then reinforcing device
CN206829211U (en) The foundation reinforcing structure passively rectified a deviation for building
CN109024719A (en) A kind of side disturbance drop resistance building inclination rectification method
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN109653265A (en) A kind of pile-raft foundation building joint method for correcting error
CN204530723U (en) A kind of foundation pit supporting construction for hole, side
CN106149774B (en) A kind of rectifying of leaned building reinforcement means based on anchor jacked pile envelope stake technology
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN110130423A (en) Existing super high-rise building rectification design method
Yang Application of comprehensive rectification method in rectification of buildings
CN101798823A (en) Construction method of performing remote deviation rectification by passageway method
CN104818736A (en) Precise deviation-rectifying method of large tank ring wall foundation
CN201962689U (en) Building foundation adapting to foundation deformation of worked-out area
KR100789209B1 (en) Land-side protection wall using composite pile connected two piles in a body
WO2022105267A1 (en) Frame structure building rectification method using pile foundation support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419