CN107245750A - A kind of copper bar continuous tin plating production line - Google Patents

A kind of copper bar continuous tin plating production line Download PDF

Info

Publication number
CN107245750A
CN107245750A CN201710590518.9A CN201710590518A CN107245750A CN 107245750 A CN107245750 A CN 107245750A CN 201710590518 A CN201710590518 A CN 201710590518A CN 107245750 A CN107245750 A CN 107245750A
Authority
CN
China
Prior art keywords
tin plating
copper bar
unit
cleaning
degreasing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710590518.9A
Other languages
Chinese (zh)
Inventor
陈学明
梅玉春
李兵
刘倩晖
赵阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU RIYUE MACHINERY Co Ltd
Original Assignee
CHANGZHOU RIYUE MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU RIYUE MACHINERY Co Ltd filed Critical CHANGZHOU RIYUE MACHINERY Co Ltd
Priority to CN201710590518.9A priority Critical patent/CN107245750A/en
Publication of CN107245750A publication Critical patent/CN107245750A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D17/00Constructional parts, or assemblies thereof, of cells for electrolytic coating
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D3/00Electroplating: Baths therefor
    • C25D3/02Electroplating: Baths therefor from solutions
    • C25D3/30Electroplating: Baths therefor from solutions of tin

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Electroplating Methods And Accessories (AREA)

Abstract

The present invention relates to tin plating technical field, especially a kind of copper bar continuous tin plating production line, tin plating part upper end is provided with waste gas aspiration channel, is connected with exhaust gas treating tower and carries out purified treatment, the lower end of tin plating part is provided with waste pipe, is connected with water treatment system and carries out purified treatment;Feeding transport portion, which includes, to be put into rickstand by the copper bar after drawing, automatic moves bin and feeding turns over row's roller-conveying device, tin plating part includes the cleaning by degreasing unit being sequentially connected, three-level washing unit I, pickling pretreatment unit, three-level washing unit II, at least one tin plating unit, three-level washing unit III, thermal cleaning unit and hot blast drying case, tin plating efficiency high;Coating is uniform, careful, smooth, smooth;Adhesive force is strong, and corrosion resistance and solderability are good;Due to thermal cleaning, pretreatment and it is tin plating be in the closed state, to be configured with waste gas, wastewater treatment equipment, it is environmentally safe, greatly improve working environment;Automaticity is high.

Description

A kind of copper bar continuous tin plating production line
Technical field
The present invention relates to tin plating technical field, especially a kind of copper bar continuous tin plating production line.
Background technology
Copper bar is, as carrier is conductively connected, to there is a large amount of extensive uses for electrician, electric power, electric industrial circle, There are a large amount of extensive uses.To prevent the oxidation of copper bar, conductance is improved, coating is carried out to copper bar surface or connecting portion.Copper Arrange surface oxidation-resistant surface treatment automatic production line:By arranging on automatically, entering row, ultrasonic degreasing, cleaning, electrolytic degreasing, painting Plate, clean, drying up, the row's of turning over pile, paving barrier paper etc., it is automatic to carry out.
Automatic assembly line combines the production line constituted by mechanical part and coating part, changes old tin plating technique Defect and deficiency, the production line are worked under the situation of closing, and the water of cleaning process can be recycled, and micro waste gas can be received Collection processing.The discharge without waste water and waste gas compared with old technique.Because production process is continuous moving, overlay coating, color and luster, Brightness is uniform, changes the big defect of the coating of current unevenness, shade deviation in rack plating.Mechanical part reduces work by a relatively large margin Intensity and safety production environment.
The content of the invention
The technical problem to be solved in the present invention is:There is provided a kind of tin plating efficiency high, coating for the deficiency for overcoming in the prior art Uniformly, careful, smooth, smooth, adhesive force is strong, corrosion resistance and the good copper bar continuous tin plating production line of solderability.
The technical solution adopted for the present invention to solve the technical problems is:A kind of copper bar continuous tin plating production line, with from Feeding transport portion, tin plating part and blanking windrow part are set gradually from left to right, and described tin plating part upper end is provided with Waste gas aspiration channel, waste gas aspiration channel is connected with exhaust gas treating tower and carries out purified treatment, and the lower end of tin plating part is provided with waste water Pipeline, waste pipe is connected with water treatment system and carries out purified treatment;
The feeding transport portion include by needed after drawing carry out electroplating surfaces with tin copper bar be put into rickstand, from The copper bar that dynamic shifting bin and feeding are turned on row's roller-conveying device, the rickstand is moved on to copper bar by moving bin automatically Expect on the row's of turning over roller-conveying device and copper bar is edge-on, feeding turns over row's roller-conveying device and edge-on copper bar is sent into tin plating dress Put;
The blanking windrow part includes turning device, blanking roller-conveying device and material stocking device, the blanking The row's of turning over roller-conveying device will complete tin plating copper bar and is laid flat by turning device and the copper bar after being laid flat be slipped into material stocking device And be transferred from finished product by loop wheel machine.
It is pre- that the tin plating part includes the cleaning by degreasing unit being sequentially connected from left to right, three-level washing unit I, pickling Processing unit, three-level washing unit II, at least one tin plating unit, three-level washing unit III, thermal cleaning unit and hot blast blow Feed device, cleaning by degreasing unit, three-level washing unit I, pickling are installed at dry case, the charging aperture of the cleaning by degreasing unit The discharging opening that pretreatment unit, three-level wash unit III, thermal cleaning unit and hot blast drying case is mounted on passive feeding dress Put, the discharging opening of three-level washing unit II and tin plating unit, which is provided with passive feed device I, passive feed device I, connects cloudy Pole pole plate simultaneously allows cathode current on the copper bar band passed through, and cathode plate is connected with power cathode.
Further, in order to carry out two road electrolytic degreasings, oil removing to copper bar, described cleaning by degreasing unit includes sink And degreasing tank, the left end of the sink is provided with feed device, and copper bar feeding sink is carried out ungrease treatment by feed device, Degreasing tank carries out being provided with passive feed device on the right side of oil removal treatment, sink and degreasing tank to the copper bar after degreasing.
Further, in order to carry out the cleaning of copper bar surface slight oxidation thing in tin plating take a step forward, it is ensured that copper bar enters Surface cleaning during plating, described pickling pretreatment unit includes pretreatment tank, and it is light that the pretreatment tank carries out surface to copper bar The cleaning of low-level oxidation, the rear and front end of the pretreatment tank is equipped with return flume, and the bottom of return flume passes through return pipe and setting Electrode water washing cylinder in pretreatment tank lower end is connected, and the bottom of pretreatment tank is provided with the water inlet pipe being connected with electrode water washing cylinder.
Further, it is tin plating using three sections of progress in order to ensure electroplating efficiency and plating uniformity, the thickness of coating, institute The tin plating unit stated, which includes, is at least provided with a plate, plate in plane on pot, the cell body of pot It is connected with positive source, the lower end of pot is provided with heat exchanger and tin plating liquid storage cylinder, heat exchanger and plating for refrigeration Tin liquid storage cylinder is connected by pipeline with pot respectively.
Further, in order to ensure the cleaning on copper bar surface, described three-level washing unit I, three-level washing unit II with And three-level washing unit III includes rinsing bowl, the copper bar after processing is carried out cleaning treatment, the washing by the rinsing bowl The rear and front end of groove is equipped with return flume II, and the bottom of return flume II is washed by return pipe with being arranged on the three-level of rinsing bowl lower end Cylinder is connected, and the bottom of rinsing bowl is provided with the water inlet pipe being connected with three-level water washing cylinder.
Further, the rear and front end of described sink and degreasing tank is mounted on returning on return flume I, return flume I Water pipe is connected with the washing tank installed in sink lower end, and sink and oil removing trench bottom are connected by water inlet pipe and washing tank Connect.
The beneficial effects of the invention are as follows:1) the tin plating efficiency high of the present invention;2) coating is uniform, careful, smooth, smooth;3) it is attached Put forth effort strong, corrosion resistance and solderability are good;4) due to thermal cleaning, pretreatment and it is tin plating be to carry out in the closed state, it is and supporting There are waste gas, wastewater treatment equipment, it is environmentally safe, greatly improve working environment;5) automaticity is high.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the fore-end structural representation of the present invention;
Fig. 2 is the center section structural representation of the present invention;
Fig. 3 is the tail portion structural representation of the present invention;
Fig. 4 is Fig. 1 top view;
Fig. 5 is Fig. 2 top view;
Fig. 6 is Fig. 3 top view;
Fig. 7 is the schematic diagram of the water treatment system of the present invention.
1. waste gas aspiration channel in figure, 2. exhaust gas treating towers, 3. water treatment systems, 4. rickstands, 5. move on bins, 6. automatically Expect the row's of turning over roller-conveying device, 7. sinks, 8. degreasing tanks, 10. feed devices, 11. passive feed devices, 12. passive feedings Device I, 13. turning devices, 14. blanking roller-conveying devices, 15. material stocking devices, 16. pretreatment tanks, 17. pots, 18. heat Exchanger, 19. tin plating liquid storage cylinders, 20. rinsing bowls, 21. return flumes, 22. electrode water washing cylinders, 23. return flumes II, 24. tertiary effluents Wash cylinder, 25. return flumes I, 26. washing tanks.
Embodiment
Presently in connection with accompanying drawing and preferred embodiment, the present invention is further illustrated.These accompanying drawings are simplified signal Figure, only illustrates the basic structure of the present invention in a schematic way, therefore it only shows the composition relevant with the present invention.
A kind of copper bar continuous tin plating production line as shown in Fig. 1~7, mainly moves bin, feeding by rickstand 4, automatically and turns over Arrange roller-conveying device, cleaning by degreasing unit, three-level washing unit I, pickling pretreatment unit, three-level washing unit II, tin plating Unit, three-level washing unit III, thermal cleaning unit, hot blast drying case, turn over arranging device 13, blanking rollgang 14, material stocking device 15th, the auxiliary equipment such as exhaust gas treating tower and water treatment system is constituted.
First, the copper bar for needing to carry out electroplating surfaces with tin after drawing is put into rickstand, by moving the vacuum on bin automatically Sucker suck and move on to feeding turns over row roller-conveying device 6, the copper bar kept flat is automatically edge-on, and rollgang be fed into it is tin plating Partial cleaning by degreasing unit.
After the feed device 10 of cleaning by degreasing unit is connected to sensor signal, the passive feeding deflector roll in feed device 10 Step up automatically with active-feeding deflector roll, conveyed to front haulage, and carry out two road electrolytic degreasings, oil removing and three-level cleaning, complete clear Wash process.
Pickling pretreatment unit, three-level washing unit II are to carry out copper bar surface slight oxidation thing for tin plating take a step forward Cleaning and tertiary effluent are rinsed, and are further ensured that surface cleaning when copper bar enters plating, and passive feed device I connects with cathode power Connect, cathode current on copper bar band;
Copper bar with cathode current enters tin plating three sections of progress of unit, that segmentation is carried out primarily to ensureing plating effect Rate and plating uniformity, the thickness of coating;
After plating clean, be by three-level wash unit III will plate apply during the surface raffinate that band comes from pot 17 Mild acid wash neutralize;Thermal cleaning section, is the raffinate that surface comes from the middle band of pot 17 during further plating is applied Mild acid wash is neutralized, and copper bar is maintained certain temperature, so that rear road is dried up.
To remove the subsidiary moisture content in surface after tin-coated copper draining cleaning, blown using hot blast, dry main method, exclude copper bar surface Moisture content, it is to avoid surface is easily adhered dust and other impurities.
The tin plating copper bar of completion is delivered to blanking windrow and is partially completed after conveying, and turning device 13 puts edge-on copper bar Flat, and slip on rubber pulley material stocking device 15, material stocking device 15 can be according to the thickness of copper bar, and often inputting a copper bar can root Be automatically adjusted the height at splicing position according to setting numerical value, it is ensured that finished product copper bar slip into during impulsive force in minimum zone It is interior, prevent damage.
The application is controlled using electric control system simultaneously, and electric control system is by switch board 1, control box 2. Operating system point plating applies part and mechanical part.Plating, which applies every section of part, draw-gear, and draw-gear is connect by photoelectric sensor By with send signal, be operated.Electrical control cubicles can set the electric current of coating bath, voltage and ensure that equipment and production technology are normally carried out.
In process of production due to volatile matter containing trace acidic in pot 17, a small amount of acid mist can be produced after heating, is passed through After waste gas aspiration channel 1 is collected, it is delivered to exhaust gas treating tower 2 and carries out purified treatment, it is to avoid pollution environment.
It is defeated by waste pipe due to solution containing trace acidic in the rinse water after pickling pretreatment unit and tin plating unit Deliver to water treatment system and carry out purified treatment, it is to avoid pollution environment.
Production process is as follows:
Copper bar continuous tin plating production line, is that rickstand 4 is pushed outwardly by cylinder first, copper bar is lifted on rickstand 4 Air cylinder board and backer between, rickstand 4 resets, on rickstand 4 clamping cylinder clamp, after making copper parallel with rickstand 4 immediately Unclamp, produce negative pressure through vacuum generator by compressed air, copper bar is adsorbed, by servomotor and ball screw auxiliary driving, by heap The copper bar of bin 4 moves to feeding and turned on row's roller-conveying device 6, and copper bar is overturn into edge-on → degreasing caustic wash unit → tertiary effluent Wash the tin plating unit in road of I → pickling of unit pretreatment unit → three-level washing unit II → tri- → three-level washing III → hot water of unit clear Wash the upset of unit → hot blast drying case → blanking roller-way and be laid flat copper bar → copper bar sideslip discharging to stacker → finished product distancing, herein During the waste gas that produces, extracted by air intake device and be delivered to exhaust gas treating tower 2 and handle, waste water is delivered to wastewater treatment equipment Purified, the water after purification can return to rinse bath and be continuing with.
The advantage of this patent is:The defect and deficiency of old tin plating technique are changed, the production line is the situation in closing Lower work, the water of cleaning process is discharged after can be recycled or being handled through water treatment system, and collection is handled micro waste gas online. The discharge without waste water and waste gas compared with old technique.Labor intensity and safety production environment are reduced by a relatively large margin.Copper bar is in plating Traveled at the uniform speed during tin, continuously across processes such as cleaning by degreasing, pretreatment (pickling), cleaning, tin plating, cleaning, hot blast dryings To complete tin plating work, it therefore, it can carry out under higher current density.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art Scholar can understand present disclosure and be carried out, and it is not intended to limit the scope of the present invention, all according to the present invention The equivalent change or modification that Spirit Essence is made, should all cover within the scope of the present invention.

Claims (6)

1. a kind of copper bar continuous tin plating production line, with set gradually from left to right feeding transport portion, tin plating part and under Stockpile material part, it is characterised in that:Described tin plating part upper end is provided with waste gas aspiration channel (1), and waste gas aspiration channel (1) is with giving up Gas disposal tower (2) connects and carries out purified treatment, and the lower end of tin plating part is provided with waste pipe, waste pipe and water process system System (3) connects and carries out purified treatment;
The feeding transport portion include by needed after drawing carry out electroplating surfaces with tin copper bar be put into rickstand (4), from It is dynamic to move bin (5) and feeding turns over copper bar on row's roller-conveying device (6), the rickstand (4) by moving bin (5) automatically Copper bar is moved on into feeding and turns on row's roller-conveying device (6) and copper bar is edge-on, feeding turns over row's roller-conveying device (6) will be edge-on Copper bar be sent to tinning stack;
The blanking windrow part includes turning device (13), blanking roller-conveying device (14) and material stocking device (15), The blanking is turned over row's roller-conveying device (14) and will completed after tin plating copper bar is laid flat and will be laid flat by turning device (13) Copper bar slips into material stocking device (14) and is transferred from finished product by loop wheel machine.
The tin plating part includes the cleaning by degreasing unit being sequentially connected from left to right, three-level washing unit I, pickling pretreatment Unit, three-level washing unit II, at least one tin plating unit, three-level washing unit III, thermal cleaning unit and hot blast drying case, Feed device (10), cleaning by degreasing unit, three-level washing unit I, pickling are installed at the charging aperture of the cleaning by degreasing unit The discharging opening that pretreatment unit, three-level wash unit III, thermal cleaning unit and hot blast drying case is mounted on passive feeding dress Put (11), the discharging opening of three-level washing unit II and tin plating unit is provided with passive feed device I (12), passive feed device I (12) cathode plate is connected on and cathode current on the copper bar band passed through is allowed, cathode plate is connected with power cathode.
2. a kind of copper bar continuous tin plating production line according to claim 1, it is characterised in that:Described cleaning by degreasing unit Including sink (7) and degreasing tank (8), the left end of the sink (7) is provided with feed device (10), and feed device (10) will Copper bar feeding sink (7) carry out ungrease treatment, degreasing tank (8) to after degreasing copper bar carry out oil removal treatment, sink (7) and Passive feed device (11) is installed on the right side of degreasing tank (8).
3. a kind of copper bar continuous tin plating production line according to claim 1, it is characterised in that:Described pickling pretreatment is single Member includes pretreatment tank (16), and the pretreatment tank (16) carries out the cleaning of surface slight oxidation, the pretreatment tank to copper bar (16) rear and front end is equipped with return flume (21), return flume (21) bottom is by return pipe and is arranged on pretreatment tank (16) Electrode water washing cylinder (22) connection of lower end, the bottom of pretreatment tank (16) is provided with the water inlet pipe being connected with electrode water washing cylinder (22).
4. a kind of copper bar continuous tin plating production line according to claim 1, it is characterised in that:Described tin plating unit includes Have and a plate is at least installed on pot (17), the cell body of pot (17) in plane, plate and power supply are just Pole is connected, and the lower end of pot (17) is provided with heat exchanger (18) and tin plating liquid storage cylinder (19) for refrigeration, heat exchanger (18) connected respectively by pipeline with pot (17) with tin plating liquid storage cylinder (19).
5. a kind of copper bar continuous tin plating production line according to claim 1, it is characterised in that:Described three-level washing unit Ith, three-level washing unit II and three-level washing unit III include rinsing bowl (20), and the rinsing bowl (20) is by after processing Copper bar carries out cleaning treatment, and the rear and front end of the rinsing bowl (20) is equipped with return flume II (23), return flume II (23) bottom Connected by return pipe with being arranged on the three-level water washing cylinder (24) of rinsing bowl (20) lower end, the bottom of rinsing bowl (20) is provided with and three The water inlet pipe of level water washing cylinder (24) connection.
6. a kind of copper bar continuous tin plating production line according to claim 1, it is characterised in that:Described sink (7) and Return pipe and be arranged on sink (7) that the rear and front end of degreasing tank (8) is mounted on return flume I (25), return flume I (25) Washing tank (26) connection of lower end, sink (7) and degreasing tank (8) bottom are connected by water inlet pipe with washing tank (26).
CN201710590518.9A 2017-07-19 2017-07-19 A kind of copper bar continuous tin plating production line Pending CN107245750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710590518.9A CN107245750A (en) 2017-07-19 2017-07-19 A kind of copper bar continuous tin plating production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710590518.9A CN107245750A (en) 2017-07-19 2017-07-19 A kind of copper bar continuous tin plating production line

Publications (1)

Publication Number Publication Date
CN107245750A true CN107245750A (en) 2017-10-13

Family

ID=60014047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710590518.9A Pending CN107245750A (en) 2017-07-19 2017-07-19 A kind of copper bar continuous tin plating production line

Country Status (1)

Country Link
CN (1) CN107245750A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179459A (en) * 2018-02-24 2018-06-19 徐善刚 Copper bar electrolytic tinning slot and the tin plating production equipment of full-automatic copper bar
CN108711545A (en) * 2017-10-30 2018-10-26 江苏伯乐达照明电器有限公司 Neon bulb filament surface handles automatic assembly line
CN111270294A (en) * 2020-03-30 2020-06-12 江西勇骏实业有限公司 Tin coating system and tin coating process for copper bus

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102703959A (en) * 2012-06-21 2012-10-03 周建元 Copper bar continuous travelling tinning method and equipment
CN103114317A (en) * 2011-11-17 2013-05-22 天津市大港镀锌厂 Novel electroplating process
CN204298498U (en) * 2014-11-20 2015-04-29 江苏华鹏智能电气股份有限公司 Copper bar electroplating assembly line
CN205711019U (en) * 2016-06-03 2016-11-23 蒙玛特(天津)铜业有限公司 A kind of electrolytic tinning device
CN205803625U (en) * 2016-07-20 2016-12-14 四川诺尔电气有限公司 A kind of copper bar is walked about tinning stack continuously
CN106702469A (en) * 2015-08-07 2017-05-24 大全集团有限公司成套分公司 Two-end tin-plating automatic production line
CN207259628U (en) * 2017-07-19 2018-04-20 常州日月机械有限公司 Copper bar continuous tin plating production line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114317A (en) * 2011-11-17 2013-05-22 天津市大港镀锌厂 Novel electroplating process
CN102703959A (en) * 2012-06-21 2012-10-03 周建元 Copper bar continuous travelling tinning method and equipment
CN204298498U (en) * 2014-11-20 2015-04-29 江苏华鹏智能电气股份有限公司 Copper bar electroplating assembly line
CN106702469A (en) * 2015-08-07 2017-05-24 大全集团有限公司成套分公司 Two-end tin-plating automatic production line
CN205711019U (en) * 2016-06-03 2016-11-23 蒙玛特(天津)铜业有限公司 A kind of electrolytic tinning device
CN205803625U (en) * 2016-07-20 2016-12-14 四川诺尔电气有限公司 A kind of copper bar is walked about tinning stack continuously
CN207259628U (en) * 2017-07-19 2018-04-20 常州日月机械有限公司 Copper bar continuous tin plating production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王大力: "重点行业清洁生产工作指南", 广东科技出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108711545A (en) * 2017-10-30 2018-10-26 江苏伯乐达照明电器有限公司 Neon bulb filament surface handles automatic assembly line
CN108179459A (en) * 2018-02-24 2018-06-19 徐善刚 Copper bar electrolytic tinning slot and the tin plating production equipment of full-automatic copper bar
CN111270294A (en) * 2020-03-30 2020-06-12 江西勇骏实业有限公司 Tin coating system and tin coating process for copper bus
CN111270294B (en) * 2020-03-30 2023-08-25 江西勇骏实业有限公司 Tin coating system and tin coating process of copper bus

Similar Documents

Publication Publication Date Title
CN107245750A (en) A kind of copper bar continuous tin plating production line
CN109423685B (en) Container coating method and container coating system
CN207259628U (en) Copper bar continuous tin plating production line
CN205429109U (en) A prebreaker for handling waste lead -acid storage battery
US9505034B2 (en) Electrode washing method and system
CN206986298U (en) Steel wire continuous zinc coating production line
CN103658099A (en) Fully-automatic water aqua ultrasonic cleaner
CN104190961A (en) Novel machine tool
CN111647912A (en) Electrolytic refining's metal sheet secondary washing device
CN207193412U (en) Copper strips continuous tin plating production line
KR101470301B1 (en) Surface machining including washing device and washing method for foreign matter of machined parts
CN203648907U (en) Fully-automatic water aqua ultrasonic cleaning machine
CN201954920U (en) Automatic blow-drying device
CN203625480U (en) Efficient barrel plating cleaning system
CN107385498A (en) Copper bar is tin plating to use cylinder groove and the tin plating production equipment of full-automatic copper bar and method
CN202705549U (en) Electroplating washing air-drying device
CN110813875A (en) Plastic recycling and cleaning device
CN206570386U (en) A kind of steel pipe hot-dip galvanizing automatic production line
CN202768149U (en) Cleaning center for flexibile robot
CN206567279U (en) Bus surface-treatment line
CN2153557Y (en) Automatic electroplating machinery
CN105177693A (en) Pickling bath acid mist recovery system
CN108179459A (en) Copper bar electrolytic tinning slot and the tin plating production equipment of full-automatic copper bar
CN111098152B (en) Metal wire online processing equipment
CN211587802U (en) Ultrasonic degreasing device for small-caliber copper alloy pipes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171013