CN107244550A CN201710605387.7A CN201710605387A CN107244550A CN 107244550 A CN107244550 A CN 107244550A CN 201710605387 A CN201710605387 A CN 201710605387A CN 107244550 A CN107244550 A CN 107244550A
Authority
CN
China
Prior art keywords
ingot
long
sawing
circle
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710605387.7A
Other languages
Chinese (zh)
Other versions
CN107244550B (en
Inventor
阳伟生
孙选能
熊文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Keli Industrial Technology Ltd By Share Ltd
Original Assignee
Guangdong Keli Industrial Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Keli Industrial Technology Ltd By Share Ltd filed Critical Guangdong Keli Industrial Technology Ltd By Share Ltd
Priority to CN201710605387.7A priority Critical patent/CN107244550B/en
Publication of CN107244550A publication Critical patent/CN107244550A/en
Application granted granted Critical
Publication of CN107244550B publication Critical patent/CN107244550B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/90Devices for picking-up and depositing articles or materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D59/00Accessories specially designed for sawing machines or sawing devices
    • B23D59/006Accessories specially designed for sawing machines or sawing devices for removing or collecting chips
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/44Arranging and feeding articles in groups by endless belts or chains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/50Stacking one article, or group of articles, upon another before packaging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B57/00Automatic control, checking, warning, or safety devices
    • B65B57/20Applications of counting devices for controlling the feed of articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G61/00Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Attitude Control For Articles On Conveyors (AREA)
  • Specific Conveyance Elements (AREA)

Abstract

The invention discloses a kind of intelligent production line length ingot automatic sawing, cutting and packing method, including:Circle ingot casting is delivered to sawing main frame from casting well, alignment stage, the row's of pushing away storage ingot machine, translation reclaimer and feeding roller table conveyer successively;Material head sawing processing is carried out to circle ingot casting;Circle ingot casting after to being handled through material head sawing carries out fixed length processing;Circle ingot casting after to being handled through fixed length carries out the sawing processing of material tail, wherein, the circle ingot casting after expecting tail sawing processing is long ingot.Using the present invention, participated in without manpower, sawing quality height, low cost of labor, homogeneous steady quality, safe and reliable, production is compared with rate height.

Description

A kind of intelligent production line length ingot automatic sawing, cutting and packing method
Technical field
The present invention relates to mechanical engineering technical field, more particularly to a kind of intelligent production line length ingot automatic sawing, cutting and packaging Method.
Background technology
At present, the metal billet sawing of China also rests on female using traditional band-saw machine tool or circular saw machine as work Machine, is carried out in the way of manually lifting, carrying feeding and clamping, after sawing finished product also need manually to carry out stamp, carrying, packaging, The work such as weigh, technique backwardness, low production efficiency, the labor strength of sawing are big, artificial demand cost is high, and sawing quality is not Stable, there is serious environmental pollution and noise pollution in the recovery that sawdust and cutting fluid can not be clean in time in addition, even more important , it is artificial to operate due to being influenceed by workman's muscle power, intelligence and mood, there is the potential safety hazard that can not prevent.In addition, logical Often it is required for that ingot casting is put into homogeneous furnace progress homogenize process in batch.Ingot casting is every in order to ensure before homogeneous furnace is entered Root ingot casting is heated evenly unanimously in stove, is required for entering ingot casting after the completion of the folded stacking of between-line spacing homogeneous reactor, homogeneous needs pair again Originally stacking is successively decomposed.At present, this stacking stacking and decomposition stacking work of China are all by manually by driving To complete.Artificial operation generally existing ingot casting arranges uneven, low production efficiency, cause that energy waste is serious, homogeneous quality not It is stable, and there is stack layer and problems and the great potential safety hazard such as easily collapse.
The content of the invention
The technical problems to be solved by the invention are that there is provided a kind of sawing quality is high, cost of labor is low, homogeneous quality is steady Fixed, safe and reliable intelligent production line length ingot automatic sawing, cutting and packing method.
In order to solve the above-mentioned technical problem, the invention provides a kind of intelligent production line length ingot automatic sawing, cutting and packaging side Method, including:
A, stores ingot machine, translation reclaimer and feeding roller table conveyer from casting well, alignment stage, the row of pushing away successively by circle ingot casting and is delivered to saw Cut main frame;
B, material head sawing processing is carried out to circle ingot casting;
C, fixed length processing is carried out to the circle ingot casting after material head sawing processing;
D, to being handled through fixed length after circle ingot casting carry out material tail sawing processing, wherein, the circle ingot casting after expecting tail sawing processing is Long ingot.
As the improvement of such scheme, the step A includes:
A1, circle ingot casting input:Will circle ingot casting from casting well be hung in alignment stage so that circle ingot casting one end come into line, by circle ingot casting put On to the row's of pushing away storage ingot machine and ingot casting marshalling will be justified by Tui Pai mechanisms;
A2, circle ingot casting arrangement conveying:The row of pushing away stores ingot machine and circle ingot casting is delivered into translation reclaimer successively by carrier chain rail;
A3, circle ingot casting translation feeding:Translation feeder will circle ingot casting from the row of pushing away storage ingot machine on one by one translate remove and move into On the conveying roller for expecting roller conveyor;
A4, the feeding roller table conveying of circle ingot casting:Feeding roller table conveyer conveys circle ingot casting toward sawing main frame direction.
As the improvement of such scheme, the step B includes:
B1, circle ingot casting sawing:The circle ingot casting for reaching sawing main frame is continued to convey forward along approach table, when the material head of circle ingot casting Length reaches approach table after setting length and stops conveying, and sawing main frame compressed oil cylinder saws down material head after circle ingot casting is pressed, Sawing main frame compressed oil cylinder is retracted, and continues to convey forward after approach table;
B2, material head lifting:Material head is delivered to material head elevator by the incline device of rollgang, and by material head elevator by material head Lifting is transported in material frame;
B3, metal fillings collects compound stalk forming automatically:Aluminium skimmings and dust produced in sawing process are collected and block is pressed into.
As the improvement of such scheme, the step C includes:Circle ingot casting after being handled through first time sawing is conveyed in roller-way Under the operation of machine, sawing face rushes at the fixed length head for being built-in with character code seat, and fixed length head connects cushion cylinder, and cushion cylinder is in circle ingot casting Collision under it is passive shrink until static, then cushion cylinder extend out to specified location and moved back with promoting fixed length head to make to justify ingot casting again To specified location, sawing main frame compressed oil cylinder presses circle ingot casting to complete fixed length;Complete after fixed length process, cushion cylinder is returned Put on contracting, fixed length head to extreme higher position, cushion cylinder stretches out again, is ready for fixed length stamp next time.
As the improvement of such scheme, the step D includes:
D1, long ingot sawing:Sawing main frame will be handled through fixed length after circle ingot casting material tail saw under;
D2, material head lifting:Material tail under saw is transported to material head elevator, and material head lifting is transported into material by material head elevator Inframe;
D3, metal fillings collects compound stalk forming automatically:Aluminium skimmings and dust produced in sawing process are collected and block is pressed into.
As the improvement of such scheme, also include after the step D:
E, carries out stacking stacking processing to the circle ingot casting after expecting tail sawing processing;
F, the circle ingot casting after handling stacked stacking carries out homogenization;
G, un-heaping processing is carried out to the circle ingot casting after homogenization.
As the improvement of such scheme, the step E includes:
E1, long ingot translates feeding:By translate unloader by long ingot from roller conveyor by root take out and be equably placed into On the carrier chain rail for storing ingot transfer machine;
E2, long ingot stores ingot transfer:After the number of the arrangement of long ingot on carrier chain rail reaches setting quantity, the deceleration of ingot transfer machine is store The long ingot of entire row is delivered on parting bead by motor driving carrier chain rail, and parting bead is mutually perpendicular to constitute the long ingot group of row pattern with long ingot, Parting bead is arranged on parting bead bearing support;
E3, long ingot stacks stacking:Automatic stacker captures long ingot group and long ingot group is delivered into long ingot by manipulator stores ingot frame It is upper to be stacked.
As the improvement of such scheme, the step F includes:Composite skip by stacked stacking handle after long ingot group from Taken out on long ingot storage ingot frame and be transported to homogeneous furnace and carry out homogenization, composite skip pulls out the long ingot after homogenization equal Matter stove is simultaneously transported on long ingot storage ingot frame.
As the improvement of such scheme, the step G includes:
G1, the long ingot un-heaping of homogeneous:Automatic stacker captures long ingot group by manipulator, by the long ingot group after homogenization from length Take out and be placed on storage ingot transfer machine carrier chain rail by row on ingot storage ingot frame, parting bead is placed on below carrier chain rail to depart from Long ingot;
G2, the long ingot arrangement conveying of homogeneous:The long ingot of the good entire row of un-heaping is delivered to by root by the carrier chain rail for storing ingot transfer machine Translate feeder;
G3, the long ingot translation feeding of homogeneous:Long ingot is taken out and translated by root by translating feeder and be transported to roller conveyor On conveying roller;
G4, the long ingot roller-way conveying of homogeneous:Roller conveyor conveys long ingot toward direction beyond the automatic stacker domain of walk, passes through Long ingot is transported to specified location by light curtain control.
As the improvement of such scheme, also include after the step G:
H, the long ingot translation feeding arrangement of homogeneous:By translate unloader by long ingot from roller conveyor by root take out and equably On the carrier chain rail for being placed into storage ingot transfer machine, after the number of the arrangement of long ingot on carrier chain rail reaches packaging setting quantity, storage The long ingot of entire row is delivered on enlacement packaging machine by the reducing motor driving carrier chain rail of ingot transfer machine;
I, the long ingot enlacement packaging of homogeneous:Long ingot entire row on carrier chain rail is taken out and is positioned over and tied up by the yoke of enlacement packaging machine In the polygon frame of packing machine, it is stacked with layer, after the long ingot number of plies loaded on yoke reaches packaging layer, bundle Prick packing machine and long ingot is subjected to enlacement packaging;
J, finished product arrangement conveying:Moving cart is by the long ingot after enlacement packaging from being taken out in polygon frame and being transported to storage ingot On the carrier chain rail of favourable turn, the reducing motor driving carrier chain rail of storage ingot transfer machine will package phase of the long ingot toward enlacement packaging machine Opposite direction is conveyed, and obtains long ingot product.
Implement the present invention, have the advantages that:
Production line length ingot automatic sawing, cutting of the invention intelligent and packing method by aluminum alloy round ingot since being hung out casting well to long ingot Packaging terminates, middle all process steps(Such as the row's of pushing away storage ingot, storage ingot transfer, translation loading and unloading material, roller-way conveying, long ingot sawing, material head and Expect that tail recovery, sawing aluminium skimmings stack un-heaping, long ingot enlacement packaging etc. after collecting briquetting recovery, stacking stacking, homogeneous)Realize Intellectuality, is participated in without manpower, greatly reduces cost of labor, and production efficiency is high, sawing and homogeneous steady quality;
The present invention can carry out evenly spaced stacking stacking to circle ingot casting, it is ensured that every ingot casting is heated evenly unanimously in stove, is protected Demonstrate,prove homogeneous quality;
During the present invention is to the long ingot enlacement packaging of homogeneous, by the yoke of strapper, by storage ingot transfer machine carrier chain rail The long ingot of homogeneous, entire row is taken out and is sent in the polygon frame of strapper, successively stacks in layer, when the number of plies that yoke is loaded is arrived After the number of plies needed up to packaging, long ingot is carried out enlacement packaging by long ingot enlacement packaging machine, reaches height compared with rate, high-quality, it is not necessary to It is artificial to be lifted, transported by root with driving, so that solving artificial operation generally existing ingot casting arranges uneven, low production efficiency, The problems such as energy waste is serious, homogeneous quality is unstable, while also avoid the safety that artificial stack layer collapses and caused Accident.
Brief description of the drawings
Fig. 1 is intelligent production line length ingot automatic sawing, cutting of the invention and the first embodiment flow chart of packing method;
Fig. 2 is intelligent production line length ingot automatic sawing, cutting of the invention and the second embodiment flow chart of packing method;
Fig. 3 is intelligent production line length ingot automatic sawing, cutting of the invention and the 3rd embodiment flow chart of packing method;
Fig. 4 is intelligent production line length ingot automatic sawing, cutting of the invention and the fourth embodiment flow chart of packing method;
Fig. 5 is intelligent production line length ingot automatic sawing, cutting of the invention and the production line structure chart of packing method;
Fig. 6 is H direction views in Fig. 5;
Fig. 7 is K direction views in Fig. 5;
Fig. 8 is P direction views in Fig. 5;
Fig. 9 is the structural representation of the row's of pushing away storage ingot machine in the present invention;
Figure 10 is the structural representation of feeding roller table conveyer in the present invention;
Figure 11 is the structural representation of sawing main frame in the present invention;
Figure 12 is the structural representation of automatic stacker in the present invention.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with accompanying drawing It is described in detail on step ground.Only this is stated, the side such as the up, down, left, right, before and after of the invention that occurs in the text or will appear from, inside and outside Position word, only on the basis of the accompanying drawing of the present invention, it is not the specific restriction to the present invention.
Referring to Fig. 1, Fig. 1 shows that the first of intelligent production line length ingot automatic sawing, cutting of the invention and packing method implements Example, including:
A, ingot machine is store by circle ingot casting from casting well, alignment stage, the row of pushing away successively(Referring to Fig. 9), translation reclaimer and feeding roller table conveying Machine(Referring to Figure 10)It is delivered to sawing main frame(Referring to Figure 11).
Wherein, the step A includes:
A1, circle ingot casting input:Will circle ingot casting from casting well be hung in alignment stage so that circle ingot casting one end come into line, by circle ingot casting put On to the row's of pushing away storage ingot machine and ingot casting marshalling will be justified by Tui Pai mechanisms.Specifically, entire row is justified into ingot casting to hang to right from casting well On neat platform, by alignment stage, the circle ingot casting that height is differed carries out one end and come into line, and is then placed on the row's of pushing away storage ingot machine, the row's of pushing away storage Entire row is justified ingot casting marshalling by ingot machine by Tui Pai mechanisms, it is ensured that in the parallel conveying of carrier chain rail.
A2, circle ingot casting arrangement conveying:The row of pushing away stores ingot machine and circle ingot casting is delivered into translation reclaimer successively by carrier chain rail. Specifically, the circle ingot casting on the row's of pushing away storage ingot machine is conveyed by carrier chain rail toward translation reclaimer direction, until first round ingot casting Reach that translation reclaimer position stops, when translation reclaimer takes first round ingot casting away, carrier chain rail is again by second circle Ingot casting is delivered to translation reclaimer feeding position, so circulation.
A3, circle ingot casting translation feeding:Circle ingot casting is store to translate one by one on ingot machine and removes and translate by translation feeder from the row of pushing away Onto the conveying roller of feeding roller table conveyer.Specifically, the V-block that two pieces on translation feeder are moved in parallel, by circle casting Ingot from the row's of pushing away storage ingot machine removed one by one by translation, and translation is transported on the conveying roller of feeding roller table conveyer, and then V-block is retracted Second feeding, so circulation are carried out to origin-location.
A4, the feeding roller table conveying of circle ingot casting:Feeding roller table conveyer conveys circle ingot casting toward sawing main frame direction.
It should be noted that, feeding roller table conveyer is by frame, reducing motor, chain-drive mechanism, V-type roller, peace The compositions such as full shield, ranging controlling apparatus.Meanwhile, feeding roller table conveyer is to drive Chain conveyer to drive V using reducing motor Type roller turn, round ingot casting is conveyed by V-type roller turn, and with automatic speed regulation, automatic range, automatic off-position device.
B, material head sawing processing is carried out to circle ingot casting.
Wherein, the step B includes:
B1, circle ingot casting sawing:The circle ingot casting for reaching sawing main frame is continued to convey forward along approach table, when the material head of circle ingot casting Length reaches approach table after setting length and stops conveying, and sawing main frame compressed oil cylinder saws down material head after circle ingot casting is pressed, Sawing main frame compressed oil cylinder is retracted, and continues to convey forward after approach table.
Specifically, circle ingot casting continues to convey forward after reaching the approach table of sawing main frame, and circle ingot casting surface, which drives, installs Code wheel in approach table is rotated, and code wheel is connected with encoder, and the rotation number of turns of code wheel is sampled as encoder joins Number, to control material head length.Approach table stops conveying, sawing main frame compressed oil cylinder after material head length reaches setting length After circle ingot casting is tightly pushed down, under sawing main frame saws the poor material head of material and shape, sawing main frame compressed oil cylinder is retracted, defeated Enter and continue to convey forward after roller-way, promote material head to be admitted to the collection of material head elevator.
B2, material head lifting:Material head is delivered to material head elevator by the incline device of rollgang, and will by material head elevator Material head lifting is transported in material frame c.
B3, metal fillings collects compound stalk forming automatically:Aluminium skimmings and dust produced in sawing process are collected and pressed It is blocking.
C, fixed length processing is carried out to the circle ingot casting after material head sawing processing.
Wherein, the step C includes:Circle ingot casting after being handled through first time sawing is under the operation of roller conveyor, saw Tangent plane rushes at the fixed length head for being built-in with character code seat, and fixed length head connection cushion cylinder, cushion cylinder is passive under the collision of circle ingot casting Shrink until static, then cushion cylinder extend out to specified location and moved back with promoting fixed length to make to justify ingot casting to specified location again, Sawing main frame compressed oil cylinder presses circle ingot casting to complete fixed length;Complete after fixed length process, cushion cylinder retraction, on fixed length head Pendulum, concedes round ingot casting by space, is put on fixed length head to extreme higher position, cushion cylinder stretches out again, is ready for next time Fixed length stamp.
D, to being handled through fixed length after circle ingot casting carry out material tail sawing processing, wherein, the circle after expecting tail sawing processing is cast Ingot is long ingot.
Wherein, the step D includes:
D1, long ingot sawing:Sawing main frame will be handled through fixed length after circle ingot casting material tail saw under.
D2, material head lifting:Material tail under saw is transported to material head elevator, and material head is lifted into conveying by material head elevator Into material frame c.
D3, metal fillings collects compound stalk forming automatically:Aluminium skimmings and dust produced in sawing process are collected and pressed It is blocking.
It should be noted that circle ingot casting is after fixed length is completed, sawing main frame carries out sawing to the material tail of circle ingot casting, saws down Saw blade and fixed length head between one section of round ingot casting be long ingot, saw under material tail be sent to material head elevator collect.Wherein, Expect that the sawing step of tail is identical with the sawing step of material head, collected automatically by sawing main frame, material head elevator and metal fillings The equipment such as briquetting forming machine to complete, reclaimed and aluminium skimmings are collected and are pressed into block and recovery automatically by long ingot sawing, material head.
Referring to Fig. 2, Fig. 2 shows that the second of intelligent production line length ingot automatic sawing, cutting of the invention and packing method implements Example, from unlike the first embodiment described in Fig. 1, in the present embodiment, also including after the step D:
E, carries out stacking stacking processing to the circle ingot casting after expecting tail sawing processing.
Wherein, the step E includes:
E1, long ingot translates feeding:By translate unloader by long ingot from roller conveyor by root take out and be equably placed into On the carrier chain rail for storing ingot transfer machine.Specifically, long ingot is taken out and conveyed by translation unloader from roller conveyor by root puts On the carrier chain rail for putting storage ingot transfer machine, because encoder is installed in translation reclaimer, by encoder sampling parameters, for controlling Make long ingot and be placed on the position arrangement of storage ingot transfer machine chain uniformly.
E2, long ingot stores ingot transfer:After the number of the arrangement of long ingot on carrier chain rail reaches setting quantity, storage ingot transfer machine The long ingot of entire row is delivered on parting bead by reducing motor driving carrier chain rail, and parting bead is mutually perpendicular to constitute the long ingot of row pattern with long ingot Group, parting bead is arranged on parting bead bearing support b.Specifically, the long ingot for translating unloader taking-up is arranged in a row by carrier chain rail, After long ingot number of the arrangement is reached the quantity of setting by translation unloader, long ingot stores ingot transfer machine reducing motor drive chain rail, will The long ingot of entire row, which is transported to be placed with behind the position of parting bead, to be stopped, and below the long ingot of entire row, is placed with parting bead bearing support b, parting bead supporting Frame b is placed with the parting bead perpendicular with long ingot.
E3, long ingot stacks stacking:Automatic stacker(Referring to Figure 12)Long ingot group is captured and long ingot group is defeated by manipulator Deliver to and stacked on long ingot storage ingot frame a.Specifically, automatic stacker captures marshalling on all parting beads by manipulator Long ingot is taken out, and walking is sent on the long ingot storage ingot frame a specified, is stacked with layer, until stacking number reaches setting After the number of plies, then it is sent on another the long ingot storage ingot frame a specified.
F, the circle ingot casting after handling stacked stacking carries out homogenization.
Wherein, the step F includes:Long ingot group after composite skip handles stacked stacking is store on ingot frame a from long ingot Take out and be transported to homogeneous furnace and carry out homogenization, after homogenization, composite skip pulls out the long ingot after homogenization equal Matter stove is simultaneously transported on long ingot storage ingot frame a.
G, un-heaping processing is carried out to the circle ingot casting after homogenization.
Wherein, the step G includes:
G1, the long ingot un-heaping of homogeneous:Automatic stacker captures long ingot group by manipulator, by the long ingot group after homogenization from length Take out and be placed on storage ingot transfer machine carrier chain rail by row on ingot storage ingot frame a, parting bead is placed on below carrier chain rail with de- From long ingot.It should be noted that the step G1 is identical with step E3 principle.
G2, the long ingot arrangement conveying of homogeneous:It is by the carrier chain rail for storing ingot transfer machine that the long ingot of the good entire row of un-heaping is defeated by root Deliver to translation feeder.Specifically, the long ingot of the good entire row of un-heaping is passed through the past translation feeder side of carrier chain rail by storage ingot transfer machine To conveying, until long ingot reaches translation feeder position by root.It should be noted that the step G2 and step E2 principle phase Together.
G3, the long ingot translation feeding of homogeneous:By translate feeder by long ingot taken out by root and translate be transported to roller-way convey On the conveying roller of machine.It should be noted that the step G3 is identical with step E1 principle.
G4, the long ingot roller-way conveying of homogeneous:Roller conveyor conveys long ingot toward direction beyond the automatic stacker domain of walk, Long ingot is transported into specified location by light curtain control to stop.It should be noted that the step G4 and step A3 principle It is identical.Correspondingly, when long ingot is conveyed on rollgang, fed distance is controlled by light curtain, it is ensured that the aluminium ingot end after whole pile packaging Face is concordant.
Referring to Fig. 3, Fig. 3 shows the 3rd implementation of intelligent production line length ingot automatic sawing, cutting of the invention and packing method Example, from unlike the second embodiment described in Fig. 2, in the present embodiment, also including after the step G:
H, the long ingot translation feeding arrangement of homogeneous:By translate unloader by long ingot from roller conveyor by root take out and equably On the carrier chain rail for being placed into storage ingot transfer machine, after the number of the arrangement of long ingot on carrier chain rail reaches packaging setting quantity, storage The long ingot of entire row is delivered on enlacement packaging machine by the reducing motor driving carrier chain rail of ingot transfer machine.
Specifically, long ingot is taken out by root by translating unloader, and conveys the carrier chain rail for being placed into storage ingot transfer machine On, encoder statistics radical is installed on translation unloader, when the long ingot radical on storage ingot transfer machine carrier chain rail reaches that packaging is set After fixed radical, ingot transfer machine reducing motor drive chain rail is store, carrier chain rail conveys the long ingot of entire row toward strapper packaging direction, Stopping is postponed when the long ingot of entire row reaches enlacement packaging seat in the plane.It should be noted that the step H and the principle phase of step E1, E2 Together.
I, the long ingot enlacement packaging of homogeneous:Long ingot entire row on carrier chain rail is taken out and is positioned over by the yoke of enlacement packaging machine In the polygon frame of enlacement packaging machine, it is stacked with layer, when the long ingot number of plies loaded on yoke reaches packaging layer Afterwards, long ingot is carried out enlacement packaging by enlacement packaging machine.
J, finished product arrangement conveying:Long ingot after enlacement packaging is taken out and is transported to from polygon frame by moving cart d On the carrier chain rail for storing ingot transfer machine, the reducing motor driving carrier chain rail of storage ingot transfer machine will package long ingot toward enlacement packaging The opposite direction conveying of machine, obtains long ingot product.It should be noted that the step J is identical with step E2 principle.
With reference to specifically embodiment, the present invention is described in further detail.
The 4th reality of intelligent production line length ingot automatic sawing, cutting of the invention and packing method is shown referring to Fig. 4 ~ 8, Fig. 4 ~ 8 Apply example.
S1, circle ingot casting input;
S2, circle ingot casting arrangement conveying;
S3, circle ingot casting translation feeding;
S4, the feeding roller table conveying of circle ingot casting;
S5, circle ingot casting sawing;
S6, material head lifting;
S7, metal fillings collects briquetting forming machine automatically;
S8, circle ingot casting fixed length;
S9, long ingot sawing;
S10, long ingot translates feeding;
S11, long ingot stores ingot transfer;
S12, long ingot stacks stacking;
S13, homogenization;
S14, the long ingot un-heaping of homogeneous;
S15, the long ingot arrangement conveying of homogeneous;
S16, the long ingot translation feeding of homogeneous;
S17, the long ingot roller-way conveying of homogeneous;
S 18, the long ingot translation feeding arrangement of homogeneous;
S 19, the long ingot enlacement packaging of homogeneous;
S 20, finished product arrangement conveying.
From the foregoing, it will be observed that the intelligent production line length ingot automatic sawing, cutting of the present invention and packing method are hung by aluminum alloy round ingot from casting well Go out to start to long ingot packaging to terminate, middle all process steps(Such as row's of pushing away storage ingot, the transfer of storage ingot, translation loading and unloading material, roller-way conveying, length Un-heaping, long ingot, which are stacked, after ingot sawing, material head and the recovery of material tail, the recovery of sawing aluminium skimmings collection briquetting, stacking stacking, homogeneous ties up bag Dress etc.)Intellectuality is realized, is participated in without manpower, greatly reduce cost of labor, production efficiency is high, sawing and homogeneous matter Amount is stable;The present invention can carry out evenly spaced stacking stacking to circle ingot casting, it is ensured that every ingot casting is heated evenly unanimously in stove, Ensure homogeneous quality;During the present invention is to the long ingot enlacement packaging of homogeneous, by the yoke of strapper, by storage ingot transfer machine conveying The long ingot of homogeneous on chain rail, entire row is taken out and is sent in the polygon frame of strapper, successively stacks in layer, when yoke is loaded The number of plies reach packaging need the number of plies after, long ingot enlacement packaging machine by long ingot carry out enlacement packaging, reach height compared with rate, it is high-quality Amount, it is not necessary to artificial with driving a vehicle by root lifting, transport, so that solving artificial operation generally existing ingot casting arranges uneven, life Produce efficiency low, the problems such as energy waste is serious, homogeneous quality is unstable collapse and made while also avoid artificial stack layer Into security incident.
Described above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as Protection scope of the present invention.

Claims (10)

1. a kind of intelligent production line length ingot automatic sawing, cutting and packing method, it is characterised in that including:
A, stores ingot machine, translation reclaimer and feeding roller table conveyer from casting well, alignment stage, the row of pushing away successively by circle ingot casting and is delivered to saw Cut main frame;
B, material head sawing processing is carried out to circle ingot casting;
C, fixed length processing is carried out to the circle ingot casting after material head sawing processing;
D, to being handled through fixed length after circle ingot casting carry out material tail sawing processing, wherein, the circle ingot casting after expecting tail sawing processing is Long ingot.
2. intelligent production line length ingot automatic sawing, cutting as claimed in claim 1 and packing method, it is characterised in that the step A includes:
A1, circle ingot casting input:Will circle ingot casting from casting well be hung in alignment stage so that circle ingot casting one end come into line, by circle ingot casting put On to the row's of pushing away storage ingot machine and ingot casting marshalling will be justified by Tui Pai mechanisms;
A2, circle ingot casting arrangement conveying:The row of pushing away stores ingot machine and circle ingot casting is delivered into translation reclaimer successively by carrier chain rail;
A3, circle ingot casting translation feeding:Translation feeder will circle ingot casting from the row of pushing away storage ingot machine on one by one translate remove and move into On the conveying roller for expecting roller conveyor;
A4, the feeding roller table conveying of circle ingot casting:Feeding roller table conveyer conveys circle ingot casting toward sawing main frame direction.
3. intelligent production line length ingot automatic sawing, cutting as claimed in claim 1 and packing method, it is characterised in that the step B includes:
B1, circle ingot casting sawing:The circle ingot casting for reaching sawing main frame is continued to convey forward along approach table, when the material head of circle ingot casting Length reaches approach table after setting length and stops conveying, and sawing main frame compressed oil cylinder saws down material head after circle ingot casting is pressed, Sawing main frame compressed oil cylinder is retracted, and continues to convey forward after approach table;
B2, material head lifting:Material head is delivered to material head elevator by the incline device of rollgang, and by material head elevator by material head Lifting is transported in material frame;
B3, metal fillings collects compound stalk forming automatically:Aluminium skimmings and dust produced in sawing process are collected and block is pressed into.
4. intelligent production line length ingot automatic sawing, cutting as claimed in claim 1 and packing method, it is characterised in that the step C includes:
Circle ingot casting after being handled through first time sawing is under the operation of roller conveyor, and sawing face, which is rushed at, is built-in with determining for character code seat Long head, fixed length head connection cushion cylinder, cushion cylinder is passive under the collision of circle ingot casting to be shunk until static, then cushion cylinder Extend out to specified location again and moved back with promoting fixed length head to make to justify ingot casting to specified location, sawing main frame compressed oil cylinder will circle ingot casting it is tight Press to complete fixed length;
Complete after fixed length process, cushion cylinder retraction, put on fixed length head to extreme higher position, cushion cylinder stretches out again, prepares Carry out fixed length stamp next time.
5. intelligent production line length ingot automatic sawing, cutting as claimed in claim 1 and packing method, it is characterised in that the step D includes:
D1, long ingot sawing:Sawing main frame will be handled through fixed length after circle ingot casting material tail saw under;
D2, material head lifting:Material tail under saw is transported to material head elevator, and material head lifting is transported into material by material head elevator Inframe;
D3, metal fillings collects compound stalk forming automatically:Aluminium skimmings and dust produced in sawing process are collected and block is pressed into.
6. intelligent production line length ingot automatic sawing, cutting as claimed in claim 1 and packing method, it is characterised in that the step Also include after D:
E, carries out stacking stacking processing to the circle ingot casting after expecting tail sawing processing;
F, the circle ingot casting after handling stacked stacking carries out homogenization;
G, un-heaping processing is carried out to the circle ingot casting after homogenization.
7. intelligent production line length ingot automatic sawing, cutting as claimed in claim 6 and packing method, it is characterised in that the step E includes:
E1, long ingot translates feeding:By translate unloader by long ingot from roller conveyor by root take out and be equably placed into On the carrier chain rail for storing ingot transfer machine;
E2, long ingot stores ingot transfer:After the number of the arrangement of long ingot on carrier chain rail reaches setting quantity, the deceleration of ingot transfer machine is store The long ingot of entire row is delivered on parting bead by motor driving carrier chain rail, and parting bead is mutually perpendicular to constitute the long ingot group of row pattern with long ingot, Parting bead is arranged on parting bead bearing support;
E3, long ingot stacks stacking:Automatic stacker captures long ingot group and long ingot group is delivered into long ingot by manipulator stores ingot frame It is upper to be stacked.
8. intelligent production line length ingot automatic sawing, cutting as claimed in claim 6 and packing method, it is characterised in that the step F includes:Long ingot group after composite skip handles stacked stacking is taken out from long ingot storage ingot frame and is transported to homogeneous furnace progress Long ingot after homogenization is pulled out homogeneous furnace and is transported to long ingot and store on ingot frame by homogenization, composite skip.
9. intelligent production line length ingot automatic sawing, cutting as claimed in claim 6 and packing method, it is characterised in that the step G includes:
G1, the long ingot un-heaping of homogeneous:Automatic stacker captures long ingot group by manipulator, by the long ingot group after homogenization from length Take out and be placed on storage ingot transfer machine carrier chain rail by row on ingot storage ingot frame, parting bead is placed on below carrier chain rail to depart from Long ingot;
G2, the long ingot arrangement conveying of homogeneous:The long ingot of the good entire row of un-heaping is delivered to by root by the carrier chain rail for storing ingot transfer machine Translate feeder;
G3, the long ingot translation feeding of homogeneous:Long ingot is taken out and translated by root by translating feeder and be transported to roller conveyor On conveying roller;
G4, the long ingot roller-way conveying of homogeneous:Roller conveyor conveys long ingot toward direction beyond the automatic stacker domain of walk, passes through Long ingot is transported to specified location by light curtain control.
10. intelligent production line length ingot automatic sawing, cutting as claimed in claim 6 and packing method, it is characterised in that the step Also include after rapid G:
H, the long ingot translation feeding arrangement of homogeneous:By translate unloader by long ingot from roller conveyor by root take out and equably On the carrier chain rail for being placed into storage ingot transfer machine, after the number of the arrangement of long ingot on carrier chain rail reaches packaging setting quantity, storage The long ingot of entire row is delivered on enlacement packaging machine by the reducing motor driving carrier chain rail of ingot transfer machine;
I, the long ingot enlacement packaging of homogeneous:Long ingot entire row on carrier chain rail is taken out and is positioned over and tied up by the yoke of enlacement packaging machine In the polygon frame of packing machine, it is stacked with layer, after the long ingot number of plies loaded on yoke reaches packaging layer, bundle Prick packing machine and long ingot is subjected to enlacement packaging;
J, finished product arrangement conveying:Moving cart is by the long ingot after enlacement packaging from being taken out in polygon frame and being transported to storage ingot On the carrier chain rail of favourable turn, the reducing motor driving carrier chain rail of storage ingot transfer machine will package phase of the long ingot toward enlacement packaging machine Opposite direction is conveyed, and obtains long ingot product.
CN201710605387.7A 2017-07-24 2017-07-24 A kind of intelligent production wire length ingot automatic sawing, cutting and packing method Active CN107244550B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710605387.7A CN107244550B (en) 2017-07-24 2017-07-24 A kind of intelligent production wire length ingot automatic sawing, cutting and packing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710605387.7A CN107244550B (en) 2017-07-24 2017-07-24 A kind of intelligent production wire length ingot automatic sawing, cutting and packing method

Publications (2)

Publication Number Publication Date
CN107244550A true CN107244550A (en) 2017-10-13
CN107244550B CN107244550B (en) 2019-11-15

Family

ID=60015434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710605387.7A Active CN107244550B (en) 2017-07-24 2017-07-24 A kind of intelligent production wire length ingot automatic sawing, cutting and packing method

Country Status (1)

Country Link
CN (1) CN107244550B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108945925A (en) * 2018-07-02 2018-12-07 聊城信源集团有限公司 A kind of aluminium alloy round cast ingot intelligence storing and transporting system
CN111215695A (en) * 2020-03-04 2020-06-02 佛山市法比澳挤压机械科技有限公司 Automatic aluminum bar cutting, stacking and unstacking production line
CN113909976A (en) * 2021-10-27 2022-01-11 江苏恒力组合机床有限公司 Short material collecting device for numerical control sawing of steel rail

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202123359U (en) * 2011-04-29 2012-01-25 马运喜 Automatic saw cutting equipment for aluminum bars
CN202824221U (en) * 2012-07-30 2013-03-27 佛山市通润热能科技有限公司 Automation aluminum bar production line
CN202861535U (en) * 2012-08-30 2013-04-10 江苏依斯曼智能机械科技有限公司 Automatic sawing production line
US20130276602A1 (en) * 2012-04-06 2013-10-24 Isomi Washio Sawing machine and cutting method of a sawing machine
CN105083657A (en) * 2015-08-14 2015-11-25 佛山市科立工业设备有限公司 Automatic sawing and packaging technology for circular ingots

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202123359U (en) * 2011-04-29 2012-01-25 马运喜 Automatic saw cutting equipment for aluminum bars
US20130276602A1 (en) * 2012-04-06 2013-10-24 Isomi Washio Sawing machine and cutting method of a sawing machine
CN202824221U (en) * 2012-07-30 2013-03-27 佛山市通润热能科技有限公司 Automation aluminum bar production line
CN202861535U (en) * 2012-08-30 2013-04-10 江苏依斯曼智能机械科技有限公司 Automatic sawing production line
CN105083657A (en) * 2015-08-14 2015-11-25 佛山市科立工业设备有限公司 Automatic sawing and packaging technology for circular ingots

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108945925A (en) * 2018-07-02 2018-12-07 聊城信源集团有限公司 A kind of aluminium alloy round cast ingot intelligence storing and transporting system
CN108945925B (en) * 2018-07-02 2024-03-15 聊城信源集团有限公司 Intelligent storage and transportation system for aluminum alloy round ingot casting
CN111215695A (en) * 2020-03-04 2020-06-02 佛山市法比澳挤压机械科技有限公司 Automatic aluminum bar cutting, stacking and unstacking production line
CN111215695B (en) * 2020-03-04 2020-08-11 佛山市法比澳挤压机械科技有限公司 Automatic aluminum bar cutting, stacking and unstacking production line
CN113909976A (en) * 2021-10-27 2022-01-11 江苏恒力组合机床有限公司 Short material collecting device for numerical control sawing of steel rail
CN113909976B (en) * 2021-10-27 2022-08-30 江苏恒力组合机床有限公司 Short material collecting device for numerical control sawing of steel rail

Also Published As

Publication number Publication date
CN107244550B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN107297541A (en) A kind of short ingot automatic sawing, cutting of intelligent production line and packing method
CN212501286U (en) Aluminum long rod sawing and stacking bundling production line
CN111215695B (en) Automatic aluminum bar cutting, stacking and unstacking production line
CN107244550B (en) A kind of intelligent production wire length ingot automatic sawing, cutting and packing method
CN108820904B (en) Automatic stacking device and method for magnesium alloy
CN113060349A (en) Full-automatic brick packaging method
CN111319936A (en) Aluminum bar saw cutting and stacking flexible production line
CN107984025A (en) A kind of aluminium automatic sawing, cutting assembly line and its sawing method
CN113772436A (en) Production line for semi-automatically packaging standard bricks and hollow bricks and double-stacking method
CN216426054U (en) High-order hacking machine
CN111115248A (en) Keel stacking device
CN211846108U (en) Automatic logistics system for sawing and stacking aluminum alloy square bars
CN110937353B (en) Automatic logistics system for sawing and stacking of square aluminum alloy bars
CN105083657B (en) A kind of round ingot casting automatic sawing, cutting technology of the package
CN212501277U (en) Aluminum short rod fixed-length sawing and stacking packaging production line
CN110949754B (en) Scrap aluminum briquetting stacking mechanism and stacking method
CN217707962U (en) Automatic pile up neatly package system of double-chuck
CN113104473B (en) Aluminum bar processing packaging and heating transmission method of automatic production line
CN216736522U (en) Gantry type full-automatic stacker crane
CN212399845U (en) Log processing and treating system capable of improving efficiency and reducing number of workers
CN111284061B (en) Aluminum square tube waste treatment equipment and treatment method thereof
CN216736521U (en) Low-position full-automatic stacker crane
CN211619296U (en) Keel stacking device
CN211727672U (en) Plate shearing machine with material receiving function
CN211224200U (en) A conveyer for apple processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant