CN107240032A - Distribution scheduling intelligence accident prediction establishment processing system - Google Patents
Distribution scheduling intelligence accident prediction establishment processing system Download PDFInfo
- Publication number
- CN107240032A CN107240032A CN201710424946.4A CN201710424946A CN107240032A CN 107240032 A CN107240032 A CN 107240032A CN 201710424946 A CN201710424946 A CN 201710424946A CN 107240032 A CN107240032 A CN 107240032A
- Authority
- CN
- China
- Prior art keywords
- submodule
- data
- accident prediction
- processing system
- scheme
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Abstract
The invention provides a kind of intelligent accident prediction establishment processing system of distribution scheduling, it includes:Accident prediction compiling module, including electric strategy and suggestion submodule, it is screened to all feasible programs, and the electric current of each scheme is measured by testing current submodule, electric strategy and suggestion submodule is excluded to the scheme that can cause line load current overload, in addition to quasi real time remote measurement amount data call submodule and database submodule;Graphics edition module, expand submodule automatically including space, it, which has, expands direction dialog box unit and extended parameter dialog box unit, and user realizes that the editor of space extended parameter, in addition to figure update submodule expanding in direction dialog box unit and extended parameter dialog box unit.The present invention can improve the accuracy of forecasting edited, and significantly reduce the working time of dispatch reserve plan establishment, make power network wiring change or new equipment put into operation after, very can in time update or supplement prediction scheme.
Description
Technical field
The present invention relates to a kind of distribution scheduling forecasting edited technology, in particular to a kind of intelligent accident of distribution scheduling
Forecasting edited processing system.
Background technology
With the continuous propulsion of State Grid Corporation of China's intelligent grid, also carried to dispatching the intelligentized exploitation of system and improving
New requirement is gone out.The requirement of intelligent grid is compareed, the intellectualizing system of current auxiliary tone also needs to further exploitation and perfect, needed
Extension function further is expanded on original intelligent anti-error operation system platform, improved functional.
Meanwhile, in face of the distribution scale expanded day by day, and the complicated Distributing network structure of structure, the complexity of distribution accident prediction
Degree is also improved constantly, and not only needs reasonable arrangement accident mode, the user power utilization of maximum magnitude is more ensured as far as possible.Mesh
Before, this work only relies only on auxiliary tone personnel, is analyzed, worked out with manpower, and operating efficiency is low, and lack of wisdom safety
Check.Therefore, distribution scheduling management is badly in need of being capable of the system of automated intelligent establishment accident prediction solving the work of forecasting edited,
And lift the practicality and safe and reasonable of forecasting edited.But, with being continuously increased for current urban district distribution net equipment, if any increasing
Plus, the change of change equipment and the mode of connection be required for dispatcher to synchronize maintenance updating, daily editor safeguards wide amount
Greatly.The graphic elements that the anti-misoperation system used at present is drawn are in a fixed position after completing, if need to insert newly-increased
Equipment will first must inserted after original figure manually displacement, extremely difficult in the case where current picture has been covered with equipment,
And the mistake in terms of easily being connected in moving process.Therefore, current auxiliary tone is badly in need of to original picture maintenance function
Lifted, improve intelligence degree, realize the automatic distribution that picture is safeguarded.
The content of the invention
In consideration of it, the invention provides a kind of intelligent accident prediction establishment processing system of distribution scheduling, the system can be carried
The accuracy of high forecasting edited, and significantly reduce the working time of dispatch reserve plan establishment, power network wiring is changed or new
After putting equipment in service, it very can in time update or supplement prediction scheme.
The invention provides a kind of intelligent accident prediction establishment processing system of distribution scheduling, it includes:
Accident prediction compiling module, accident prediction compiling module includes falling electric strategy and suggestion submodule, electric strategy and suggestion
Submodule is screened to all feasible programs, and measures by testing current submodule the electric current of each scheme, falls electric approach
Selection submodule is excluded to the scheme that can cause line load current overload, falls electric strategy and suggestion submodule simultaneously in main transformer
Being excluded for the electric same bus of approach powered with our station in the prediction scheme of bus, falls electric strategy and suggestion submodule while also existing
The electric approach that falls that our station is powered in the prediction scheme that two main transformers and two buses stop simultaneously is excluded, and accident prediction compiling module is also
Including quasi real time remote measurement amount data call submodule and database submodule;
Graphics edition module, graphics edition module expands submodule automatically including space, and submodule tool is expanded in space automatically
There are expansion direction dialog box unit and extended parameter dialog box unit, user is expanding direction dialog box unit and extended parameter pair
The editor of space extended parameter is realized in words frame unit, graphics edition module also includes spatial translation submodule and circuit elongates son
Module, spatial translation submodule is directly translated for bus, switch, disconnecting link, word to target direction, and circuit elongates submodule pair
Circuit elongates and typesetting is carried out after elongation, and graphics edition module also includes figure and updates submodule.
Further, above-mentioned quasi real time remote measurement amount data call submodule calls the quasi real time remote measurement of dispatch automated system
Data are measured, when working out quick accident treatment scheme, reference data was used as using the load maximum of nearly one week.
Further, above-mentioned database subsystem module generation prediction scheme or scheme text are stored in database, and at any time for adjusting
Go out and modify and perfect.
Further, data update module is provided with above-mentioned database, data update module has data duplication submodule
Block, data duplication submodule is replicated to data, and data are updated by data update module after new data, the number of duplication
According in the data being inserted into after updating, the data of coincidence are integrated by Data Integration submodule and only retain a, newly add
Data are then reinserted into.
Further, the data that the data of above-mentioned new addition are stored into data Layer submodule, data Layer submodule pass through
Data screening submodule is screened data, and atypical data are marked according to for data markers submodule for screening,
Data screening submodule is screened data according to mark, and the data after screening are re-inserted into database.
Further, above-mentioned figure updates submodule and carried out in plotting program after automatic extended operation, will be corresponding
" automatic a to expand " operation note is stored in more new task, the progress of this more new task can be recalled on " figure renewal " interface
Update.
Further, after the requirement that image update examination & verification submodule updates according to figure is to more new task is audited, then
Start to carry out automatic extended function final renewal.
Further, above-mentioned figure, which updates submodule, has figure recognizing unit, and figure recognizing unit enters road wheel to figure
Profile recognizes that the figure beyond identification range built contour line automatically, and then pattern integrity examination & verification unit was to trimming
Figure carries out integrality examination & verification, does not continue to update if imperfect, completely then continues to update.
The intelligent accident prediction establishment processing system of distribution scheduling provided by the present invention, by using above-mentioned technological means,
It has advantages below compared to prior art:
1) the intelligent establishment of distribution accident prediction is realized, the establishment efficiency of distribution accident prediction is effectively improved, largely
Human resources are liberated, the feasibility and security of accident prediction are effectively improved, it is ensured that can be obtained under the accident conditions of distribution
Quickly respond;
2) possesses the function that automatic extension and figure Automatic Optimal are arranged, when inserting newly-increased graphic elements, it is not necessary to artificial
Intervene original figure, the space size that need to be taken by software differentiation newly added equipment and most rational position are automatically inserted into original
In some pictures, dispatcher's regular maintenance efficiency is improved, correctness is safeguarded in raising, shortens maintenance time, ensure distribution scheduling peace
Entirely.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantages and benefit is common for this area
Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structured flowchart that the intelligent accident prediction of distribution scheduling provided in an embodiment of the present invention works out processing system.
Fig. 2 is that the figure involved by the intelligent accident prediction establishment processing system of distribution scheduling provided in an embodiment of the present invention is compiled
Collect the fundamental diagram of module.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing the disclosure in accompanying drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Complete conveys to those skilled in the art.
Referring to Fig. 1 to Fig. 2, a kind of intelligent accident prediction establishment of distribution scheduling provided in an embodiment of the present invention is shown in figure
Processing system, it includes:Accident prediction compiling module, accident prediction compiling module includes falling electric strategy and suggestion submodule, falls electric
Strategy and suggestion submodule is screened to all feasible programs, and measures by testing current submodule the electric current of each scheme,
Electric strategy and suggestion submodule is excluded to the scheme that can cause line load current overload, and the electric strategy and suggestion submodule that falls is same
When in the prediction scheme of main transformer and bus our station power fall being excluded of the electric same bus of approach, fall electric strategy and suggestion submodule
The electric approach that falls that our station is powered also in the prediction scheme that two main transformers and two buses stop simultaneously simultaneously is excluded, and accident prediction is compiled
Molding block also includes quasi real time remote measurement amount data call submodule and database submodule;Graphics edition module, graphics edition mould
Block expands submodule automatically including space, and submodule is expanded in space automatically has expansion direction dialog box unit and extended parameter pair
Frame unit is talked about, user realizes the volume of space extended parameter expanding in direction dialog box unit and extended parameter dialog box unit
Volume, graphics edition module also includes spatial translation submodule and circuit and elongates submodule, spatial translation submodule for bus, open
Pass, disconnecting link, word are directly translated to target direction, and circuit elongates submodule and circuit is elongated and typesetting is carried out after elongation, are schemed
Shape editor module also includes figure and updates submodule.
The intelligent accident prediction establishment processing system of distribution scheduling that the present embodiment is provided, by using above-mentioned technology hand
Section, it has advantages below compared to prior art:
1) the intelligent establishment of distribution accident prediction is realized, the establishment efficiency of distribution accident prediction is effectively improved, largely
Human resources are liberated, the feasibility and security of accident prediction are effectively improved, it is ensured that can be obtained under the accident conditions of distribution
Quickly respond;
2) possesses the function that automatic extension and figure Automatic Optimal are arranged, when inserting newly-increased graphic elements, it is not necessary to artificial
Intervene original figure, the space size that need to be taken by software differentiation newly added equipment and most rational position are automatically inserted into original
In some pictures, dispatcher's regular maintenance efficiency is improved, correctness is safeguarded in raising, shortens maintenance time, ensure distribution scheduling peace
Entirely.
Referring to Fig. 1, above-mentioned quasi real time remote measurement amount data call submodule calls the quasi real time remote measurement of dispatch automated system
Data are measured, when working out quick accident treatment scheme, using the load maximum of nearly one week as reference data, to improve electricity
Security.
With continued reference to Fig. 1, above-mentioned database subsystem module according to accident treatment scheme, power network early warning prediction scheme and annual accident at
The intelligent reqirement of compilation of reason prediction scheme and treatment principle are stored in database to automatically generate prediction scheme or scheme text, it is possible to
When recall modify, it is perfect, realize the document management of prediction scheme or scheme.
With continued reference to Fig. 1, data update module is provided with above-mentioned database, data update module has data duplication
Module, data duplication submodule is replicated to data, and data are updated by data update module after new data, duplication
Data are inserted into the data after updating, and the data of coincidence are integrated by Data Integration submodule and only retain a, new to add
Data be then reinserted into, the data for being specifically as follows above-mentioned new addition are stored into data Layer submodule, data Layer submodule
Interior data are screened data by data screening submodule, and screening foundation is data markers submodule to atypical number
According to being marked, data screening submodule is screened data according to mark, and the data after screening are re-inserted into data
In storehouse.By using above-mentioned technological means, it is possible to achieve the speed that figure updates, some useless data are quickly abandoned.
Referring to Fig. 1 to Fig. 2, above-mentioned figure updates submodule to be carried out after automatic extended operation in plotting program, will be right
" automatic a to expand " operation note is stored in the more new task answered, this more new task can be recalled on " figure renewal " interface
It is updated.Wherein, during input, direction and the size of expansion can be inputted, and whether circuit arches upward option automatically after expanding;
After the requirement that image update examination & verification submodule updates according to figure is to more new task is audited, then start to expand automatic
Function carries out final renewal.Examination & verification mode is specifically as follows:Above-mentioned figure, which updates submodule, has figure recognizing unit, figure
Recognition unit carries out contour line identification to figure, and the figure beyond identification range is built contour line automatically, and then figure is complete
Property examination & verification unit integrality examination & verification is carried out to the figure trimmed, do not continue to update if imperfect, completely then continue to update.
By using above-mentioned technological means, it is possible to achieve the speed that figure updates, some useless data are quickly abandoned.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.
Claims (8)
1. distribution scheduling intelligence accident prediction establishment processing system, it is characterised in that including:
Accident prediction compiling module, the accident prediction compiling module includes falling electric strategy and suggestion submodule, the electric approach
Selection submodule is screened to all feasible programs, and measures the electric current of each scheme by testing current submodule, described
Electric strategy and suggestion submodule is excluded to the scheme that can cause line load current overload, the electric strategy and suggestion submodule
Block simultaneously the our station in the prediction scheme of main transformer and bus power fall being excluded of the electric same bus of approach, it is described fall electric approach choosing
Submodule is selected while also in two main transformers and two buses while the electric approach that falls that our station is powered in the prediction scheme stopped is excluded, institute
Stating accident prediction compiling module also includes quasi real time remote measurement amount data call submodule and database submodule;
Graphics edition module, the graphics edition module expands submodule automatically including space, and submodule is expanded in the space automatically
Block, which has, expands direction dialog box unit and extended parameter dialog box unit, and user is in the expansion direction dialog box unit and institute
The editor that space extended parameter is realized in extended parameter dialog box unit is stated, the graphics edition module is also flat including space
Move submodule and circuit elongates submodule, the spatial translation submodule is for bus, switch, disconnecting link, word directly to target
Direction is translated, and the circuit elongates submodule and circuit is elongated and typesetting is carried out after elongation, and the graphics edition module is also wrapped
Include figure and update submodule.
2. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 1, it is characterised in that described accurate real
When remote measurement amount data call submodule call the quasi real time distant measurement data of dispatch automated system, working out quick accident treatment
During scheme, reference data was used as using the load maximum of nearly one week.
3. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 1, it is characterised in that the data
Storehouse submodule generation prediction scheme or scheme text are stored in database, and are modified and perfect for recalling at any time.
4. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 3, it is characterised in that the data
Data update module is provided with storehouse, the data update module has data duplication submodule, the data duplication submodule
Data are replicated, data are updated by the data update module after new data, the data of duplication are inserted into more
In data after new, the data of coincidence are integrated by Data Integration submodule and only retain a, and the data newly added are then by again
Insertion.
5. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 4, it is characterised in that newly add
The data that data are stored into data Layer submodule, the data Layer submodule are sieved data by data screening submodule
Atypical data are marked according to for data markers submodule for choosing, screening, and the data screening submodule is according to mark
Data are screened, the data after screening are re-inserted into database.
6. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 1, it is characterised in that the figure
Update submodule to carry out after automatic extended operation in plotting program, " automatic an expansion will be stored in corresponding more new task
Fill " operation note, on " figure renewal " interface can recall this more new task is updated.
7. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 6, it is characterised in that image update
After the requirement that examination & verification submodule updates according to figure is to more new task is audited, then start to carry out automatic extended function
Final renewal.
8. the intelligent accident prediction establishment processing system of distribution scheduling according to claim 6 or 7, it is characterised in that described
Figure, which updates submodule, has figure recognizing unit, and the figure recognizing unit carries out contour line identification to figure, beyond identification
The figure of scope is built contour line automatically, and then pattern integrity examination & verification unit is examined the figure progress integrality trimmed
Core, does not continue to update if imperfect, completely then continues to update.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710424946.4A CN107240032B (en) | 2017-06-07 | 2017-06-07 | Distribution network scheduling intelligent accident plan compiling and processing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710424946.4A CN107240032B (en) | 2017-06-07 | 2017-06-07 | Distribution network scheduling intelligent accident plan compiling and processing system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107240032A true CN107240032A (en) | 2017-10-10 |
CN107240032B CN107240032B (en) | 2020-12-04 |
Family
ID=59986152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710424946.4A Expired - Fee Related CN107240032B (en) | 2017-06-07 | 2017-06-07 | Distribution network scheduling intelligent accident plan compiling and processing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107240032B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101714241A (en) * | 2009-12-03 | 2010-05-26 | 浙江省电力公司 | System for automatically generating single-wire tidal current diagram of large-screen power transmission network during power scheduling |
CN103699707A (en) * | 2012-09-27 | 2014-04-02 | 苏州瑞盈科技有限公司 | Graph space automatic-expansion method for power distribution network |
CN103971205A (en) * | 2014-05-16 | 2014-08-06 | 国家电网公司 | Method for acquiring data for automation generation of power grid accident pre-arranged plan |
CN104616207A (en) * | 2015-01-27 | 2015-05-13 | 中国科学院计算机网络信息中心 | Power grid topological visualization system and power grid topological visualization method |
CN105184442A (en) * | 2015-07-23 | 2015-12-23 | 国网青海省电力公司西宁供电公司 | Power distribution network dispatching management statistical analysis system |
CN105719102A (en) * | 2016-03-16 | 2016-06-29 | 江苏省电力公司常州供电公司 | Intelligentized power grid accident plan processing method |
CN106708984A (en) * | 2016-12-09 | 2017-05-24 | 国网北京市电力公司 | Method, apparatus and system for acquiring basic data of cable channel |
-
2017
- 2017-06-07 CN CN201710424946.4A patent/CN107240032B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101714241A (en) * | 2009-12-03 | 2010-05-26 | 浙江省电力公司 | System for automatically generating single-wire tidal current diagram of large-screen power transmission network during power scheduling |
CN103699707A (en) * | 2012-09-27 | 2014-04-02 | 苏州瑞盈科技有限公司 | Graph space automatic-expansion method for power distribution network |
CN103971205A (en) * | 2014-05-16 | 2014-08-06 | 国家电网公司 | Method for acquiring data for automation generation of power grid accident pre-arranged plan |
CN104616207A (en) * | 2015-01-27 | 2015-05-13 | 中国科学院计算机网络信息中心 | Power grid topological visualization system and power grid topological visualization method |
CN105184442A (en) * | 2015-07-23 | 2015-12-23 | 国网青海省电力公司西宁供电公司 | Power distribution network dispatching management statistical analysis system |
CN105719102A (en) * | 2016-03-16 | 2016-06-29 | 江苏省电力公司常州供电公司 | Intelligentized power grid accident plan processing method |
CN106708984A (en) * | 2016-12-09 | 2017-05-24 | 国网北京市电力公司 | Method, apparatus and system for acquiring basic data of cable channel |
Also Published As
Publication number | Publication date |
---|---|
CN107240032B (en) | 2020-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106204330A (en) | A kind of power distribution network intelligent diagnosis system | |
CN110298553A (en) | A kind of National land space planing method, system and equipment based on GIS | |
CN104992382B (en) | A kind of data fusion method towards power distribution network As-Is Assessment | |
CN104239971B (en) | Spatial load forecasting error evaluation method based on multi-scale spatial resolution | |
CN108736465A (en) | A kind of future-state electric network model construction method and device | |
CN102867091B (en) | The quantitation modification method of a kind of electric network current diagram | |
CN104133443A (en) | Method for automatically generating power grid dispatching operation order through power grid overhaul application forms | |
CN104678960A (en) | Offline type dispatching operation ticket system and method based on field error prevention and simulated ticket training | |
CN110610297B (en) | Medium-voltage distribution network grid planning method | |
CN104036374A (en) | Method for assisting in disposing operating accidents of power grid | |
CN109146253A (en) | A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking | |
CN105606931A (en) | Quantum-genetic-algorithm-based fault diagnosis method for medium-voltage distribution network | |
CN107991902A (en) | A kind of modeling of electric power system of spacecraft and emulation mode | |
CN111461399A (en) | Method for configuring stagnation point coordinates based on fault nonlinear discrete distribution | |
CN107798059A (en) | A kind of NCO meteorological datas structured storage method and apparatus | |
CN108665133B (en) | Method and system for constructing power distribution system operation efficiency evaluation model | |
CN103887792A (en) | Modeling method of low-voltage distribution network with distributed power supply | |
CN107240032A (en) | Distribution scheduling intelligence accident prediction establishment processing system | |
CN106951621A (en) | A kind of simulation optimization method that Plan rescheduling is carried for ship | |
CN114529166A (en) | Power distribution network operation safety risk early warning method and system | |
CN113468649A (en) | BIM design method for rail transit power supply system | |
CN104332992B (en) | Power distribution network looped network figure security verification method | |
CN115563679A (en) | Revit model construction method and system based on metro vehicle segment family library | |
CN111697573B (en) | Power grid section power supply range analysis method based on topology tracking | |
CN110705965A (en) | Method for automatically compiling monitoring information point table |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201204 Termination date: 20210607 |