CN104239971B - Spatial load forecasting error evaluation method based on multi-scale spatial resolution - Google Patents

Spatial load forecasting error evaluation method based on multi-scale spatial resolution Download PDF

Info

Publication number
CN104239971B
CN104239971B CN201410452525.9A CN201410452525A CN104239971B CN 104239971 B CN104239971 B CN 104239971B CN 201410452525 A CN201410452525 A CN 201410452525A CN 104239971 B CN104239971 B CN 104239971B
Authority
CN
China
Prior art keywords
cellular
error
class
power supply
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410452525.9A
Other languages
Chinese (zh)
Other versions
CN104239971A (en
Inventor
肖白
穆钢
蒲睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University filed Critical Northeast Dianli University
Priority to CN201410452525.9A priority Critical patent/CN104239971B/en
Publication of CN104239971A publication Critical patent/CN104239971A/en
Application granted granted Critical
Publication of CN104239971B publication Critical patent/CN104239971B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a spatial load forecasting error evaluation method based on the multi-scale spatial resolution. The method is characterized by comprising the steps that a power geographic information system is set, two kinds of load cells are generated under power load spatial resolutions of different scales in the power geographic information system, and the load cells are called cells for short; a load density index method is applied to spatial load forecasting of an area to be measured, and a load forecasting error is calculated according to a predicted value and a real value; based on the multi-scale spatial resolution analysis technology, the affiliation membership between the two kinds of cells is judged by defining variables of the cells, and the spatial error influence value is calculated according to the distance of a certain cell and the other cells and the amplitude error of the load predicated value; the predicated error influence value is compared with a difference value between the capacity of corresponding power equipment or facility and the actual load, an error evaluation index is set, and the spatial load forecasting error is evaluated.

Description

A kind of Spatial Load Forecasting error assessment method based on multiscale space resolution
Technical field
The present invention relates to the Spatial Load Forecasting field in urban distribution network planning, it is a kind of based on multiscale space resolution The Spatial Load Forecasting error assessment method of rate.
Background technology
Spatial Load Forecasting (Spatial Load Forecasting, SLF) as the basis of urban distribution network planning, no Only it needs to be determined that going out the future load size of each cell in urban distribution network planning region in addition it is also necessary to predict dividing of this load Cloth.Only it is improved the accuracy of Spatial Load Forecasting, could more accurately instruct building of transformer station, feeder line, switchgear etc. And if use, make the development of electrical network and run more economical.
Spatial Load Forecasting error refers to predict inclined between the numerical values recited of load and actual load and its spatial distribution Difference, has obvious duality.
If not considering to predict load place locus, and only calculate the relative error of prediction load amplitude, definitely miss Difference, absolute error meansigma methodss (Average Absolute Value, AAV), absolute error root-mean-square valve (Root Mean Square, RMS) to carry out evaluation and foreca effect be then not sufficient.Because traditional forecast error analysis generally believes that load is pre- The amplitude error surveying result is less, and the adverse effect that Power System Planning is caused is also less;But actual SLF result is to power train The impact of system planning is also relevant with the space error predicting the outcome, that is, the size of the error that predicts the outcome and its spatial distribution are to electric power Equipment, the capacity of facility, scale, placement position, the planning of time of putting into operation suffer from large effect.
Content of the invention
It is an object of the present invention to provide a kind of methodological science, rationally, simple, practical one kind is divided based on multiscale space The Spatial Load Forecasting error assessment method of resolution.
Realize the object of the invention be employed technical scheme comprise that, a kind of space load based on multiscale space resolution is pre- Survey error assessment method, it is characterized in that, it comprises the following steps:
1) set up GIS for electric power
In GIS platform, the satellite photo in region to be measured is carried out longitude and latitude registration and forms base figure, with base Figure is position and its supply district figure layer, 10kV feeder line and its supply district figure layer that background sets up secondary substation respectively, supplies Electric office and the supply district figure layer of power supply branch office;
2) electric load spatial resolution
(1) I space-like resolution
The gross area of power supply area is S, and the area of each power supply area is respectively S1, S2..., Sn, n is the total of power supply area Number;Make k1=S1/ S, k2=S2/ S ..., kn=Sn/ S, has rkn={ (1/ (k1S), 1/ (k2S) ..., 1/ (knS)) }, then claim rknFor (k1, k2..., kn) metric space resolution;Now rknIt is an ordered series of numbers, be used for portraying one group of size, irregular such as not Cell, and it is defined as I space-like resolution;
Wherein:S is the gross area of power supply area, S1, S2..., SnIt is respectively the area of each power supply area, n is power supply area Total number, k1, k2..., knIt is respectively the area of each power supply area and the ratio of the power supply area gross area, rknFor (k1, k2..., kn) metric space resolution;
But, for the identical power supply area of different sequences, corresponding I space-like resolution is diverse, this Occur as soon as the problem inconsistent to the spatial resolution statement in same region to be measured;Build during statement SREL for this The vertical uniform rules with regard to power supply area sequence:First, obtain the approximate geometric center (x, y) of each power supply area respectively, with a left side The approximate geometric center of inferior horn power supply area is initial point, sets up rectangular coordinate system;Then, by (x+y), order from small to large will Sort in power supply area;If certain several power supply area (x+y) is equal, by x order from small to large, sorted in power supply area;? Afterwards, ask for I space-like resolution by the sequence of gained power supply area;This method determining spatial resolution solves to same The spatial resolution in individual region to be measured states inconsistent problem, abbreviation WT-XP method;
Wherein:(x, y) is latitude and longitude coordinates in electric power GIS for each power supply area geometric center;
(2) II space-like resolution
The gross area of power supply area is S, and each power supply area such as is at the regular shape of size, square, rectangle or six sides Shape, area is S0, make k=S0/ S, has rk=1/ (kS),
C = r k r k · · · r k r k r k · · · r k · · · · · · · · · · · · r k r k · · · r k m × n
Now rkIt is a numerical value, C is used for portraying the size rule cell such as a group, and is defined as II space-like resolution;
Wherein:S is the gross area of power supply area, S0For the area of the power supply area of the size regular shape such as each, k is each etc. The power supply area area of size regular shape and the ratio of the power supply area gross area, m is the line number of matrix, and n is matrix column number;
3) generate cellular
Divide region to be measured to generate cellular with the supply district of power equipment, facility, power supply unit respectively, and by these Not etc. the cellular of size is not referred to as I class cellular;
According to etc. size regular grid divide region to be measured to generate cellular, and by these cellulars be referred to as II class cellular;
4) ask for space error
With district load density index method, Spatial Load Forecasting is carried out to the II class cellular in region to be measured, and pre- according to its load Measured value and load actual value ask for space error,
E=Ly-Ls(1)
Wherein:E is the error of " region to be measured " cellular load prediction results, and L is cellular load, LsFor region to be measured cellular Load actual value, the actual meaning of behalf, LyFor the predicted load of region to be measured cellular, the meaning of y representative prediction;
5) set up flag variable
In order to judge that certain II class cellular (i, j) belongs to the supply district of which secondary substation, set up flag variable F (i, j), is shown in formula (2),
Wherein:(i, j) is the ranks that II class cellular is located, and i is the line number that II class cellular is located, and j is that II class cellular is located Columns,
F (i, j) is to judge that II class cellular (i, j) belongs to the supply district of which secondary substation and the flag set up Variable;
It is on multiple secondary substation supply districts boundaries in view of some II class cellulars, in order to judge these II classes units Born of the same parents belong to the supply district of which secondary substation, set up corresponding judgment rule:Complete to arrange in secondary substation supply district On the premise of sequence, II class cellular (i, j) is intersected with n secondary substation supply district, and the area of overlapping part is respectively s1, s2..., sn, then
(1) in max { s1, s2..., sn}=siWhen, this II class cellular belongs to the supply district of i-th secondary substation;
(2) in max { s1, s2..., sn}=si=...=sjWhen, this II class cellular belongs to secondary substation supply district row Sequence preceding secondary substation supply district;
Wherein:S is the area of II class cellular and secondary substation supply district overlapping part, s1, s2..., snIt is respectively II Class cellular (i, j) and the 1st, 2 ..., the area of n secondary substation supply district overlapping part, n is the total of secondary substation Number,
si、sjIt is respectively II class cellular (i, j) and the i-th, area of the supply district overlapping part of j secondary substation;
6) build membership probability function
Judge each II class cellular is powered by which secondary substation respectively according to flag variable, statistics any two II class unit The probability whether born of the same parents are powered by same secondary substation, utilization index function pair statistical result is fitted, and then must take office The membership probability function that two II class cellulars of meaning are powered by same secondary substation, is shown in formula (3);
p = f ( d ) = a · e - ( b · d ) 2 - - - ( 3 )
Wherein:P is the probability powered by same secondary substation of cellular (m, n) and cellular (i, j), and f closes for Probability p In the function apart from d, a, b are relevant parameter, and d is the distance between cellular (m, n) and cellular (i, j), and m, i are respectively cellular The line number that (m, n), cellular (i, j) are located, the columns that n, j are respectively cellular (m, n), cellular (i, j) is located;
7) ask for error influence value
According to the space error value of membership probability function f (d) and each II class cellular can obtain II class cellular (m, N) error influence value E (i, j) to any II class cellular (i, j) for the space error, the error influence value E of any cellular (i, j) (i, j) refers to the impact to cellular (i, j) forecast error of the error of all II class cellulars;
E ( i , j ) = Σ m = 1 M Σ n = 1 N [ f ( ( m - i ) 2 + ( n - j ) 2 ) · e ( m , n ) ] / T - - - ( 4 )
T = Σ m = 1 M Σ n = 1 N f ( m 2 + n 2 ) - - - ( 5 )
Wherein:E is Spatial Load Forecasting error influence value, and E (i, j) is the error influence value of any II class cellular (i, j), E (m, n) is the space error of II class cellular (m, n), and T is probability function sum, and M is total line number of II class cellular, and N is II class unit Total columns of born of the same parents;
8) Plan mode based on error influence value
Under the resolution of II space-like, secondary substation transformator specified active for PN, actual load maximum is Pmax, the error influence value of i-th I class cellular is Ei, specified active difference DELTA P with actual load maximum is
Δ P=PN-Pmax(6)
(1) if Ei< Δ P, then illustrate that the error of Spatial Load Forecasting result has exceeded the anti-of secondary substation and has been subject to ability, The Spatial Load Forecasting resultant error of secondary substation will not produce impact to original planning;
(2) if Ei> Δ P, then illustrate that the error of Spatial Load Forecasting result has exceeded the anti-of secondary substation and has been subject to ability, The Spatial Load Forecasting resultant error of this secondary substation will produce considerable influence to original planning, needs to reformulate planning Scheme;
Wherein:PNSpecified active, P for secondary substation transformatormaxFor actual load maximum, Δ P is secondary power transformation The specified active difference with actual load maximum of transformator of standing, EiFor the error influence value of i-th I class cellular, i=1, 2 ..., n, n are the sum of secondary substation.
A kind of Spatial Load Forecasting error assessment method based on multiscale space resolution of the present invention, by setting up WT-XP rule it is achieved that to spatial resolution statement concordance;By defining flag variable, building membership probability function, With multiscale space resolution technique it is achieved that the quantitation that the error of a cellular produces impact to other cellular loads is divided Analysis, has methodological science, rationally, the advantages of simple, practical.
Brief description
Fig. 1 is I class electric load spatial resolution schematic diagram;
Fig. 2 is each I class cellular and its Geometric center coordinates schematic diagram;
Fig. 3 is the II class electric load spatial resolution schematic diagram under large scale;
Fig. 4 is the II class electric load spatial resolution schematic diagram under little yardstick;
Fig. 5 is membership probability function figure;
Fig. 6 is the spatial distribution schematic diagram of error influence value in 2009.
Specific embodiment
Below with drawings and Examples, the invention will be further described.
Reference picture 1- Fig. 6, shows Jilin Chuanying District in Fig. 1, according to secondary substation supply district, with WT-XP Rule statement I space-like resolution:The process realizing WT-XP rule is shown in Fig. 2;II class electric load is shown in Fig. 3 The yardstick of spatial resolution is larger, and resolution is relatively low;Show in Fig. 4 that the yardstick of II class electric load spatial resolution is less, Resolution is higher;Fig. 5 gives distance between two II class cellulars and they are under the jurisdiction of between the probability of an I cellular simultaneously Relation;Fig. 6 gives under the resolution of specified II space-like, SLF resultant error influence values in 2009 of Jilin Chuanying District scope Distribution situation.
A kind of Spatial Load Forecasting error assessment method based on multiscale space resolution of the present invention, walks including following Suddenly:
1) set up GIS for electric power, its English name is Geographic Information System, GIS
In GIS software platform, the satellite photo of Jilin is carried out longitude and latitude registration and forms base figure, with Base figure is position and its supply district figure layer, 10kV feeder line and its supply district figure layer that background sets up secondary substation respectively, Power supply administration and the supply district figure layer of power supply branch office, the powering area of each secondary substation in Jilin Chuanying District, are shown in Table 1;
The powering area of table 1 secondary substation
2) electric load spatial resolution, its English name is Spatial Resolution of Electric Load, SREL
(1) I space-like resolution
First, obtain the approximate geometric center (x, y) of each power supply area respectively, with the approximate geometry of lower left corner power supply area Center is initial point, sets up rectangular coordinate system;Then, by (x+y), sorted in power supply area by order from small to large;If certain several confession Electric cell (x+y) is equal, then by x, sorted in power supply area by order from small to large;It is shown in Table 2;Finally, by gained power supply area I class SREL, r are asked in sequencek7={ 1/7.098,1/4.372,1/4.196,1/2.128,1/2.151,1/2.014,1/ 1.385};
The latitude and longitude coordinates of secondary substation and sequence in table 2 electric power GIS
(2) II space-like resolution
The square net of length of side 0.3km according to the sizes such as 792, asks for II class SREL, that is,
C = 1 / 0.09 1 / 0.09 · · · 1 / 0.09 1 / 0.09 1 / 0.09 · · · 1 / 0.09 · · · · · · · · · · · · 1 / 0.09 1 / 0.09 · · · 1 / 0.09 33 × 24
3) generate cellular
Divide region to be measured to generate I class cellular by the supply district of secondary substation;
Square net according to sizes such as length of sides 0.3km divides region to be measured to generate II class cellular;
4) ask for space error
With district load density index method, Spatial Load Forecasting is carried out to " region to be measured ", and according to its predicted load and bear Lotus actual value asks for space error;
E=Ly-Ls(7)
Wherein:E is the error of " region to be measured " cellular load prediction results, and L is cellular load, LsFor " region to be measured " unit The load actual value of born of the same parents, the actual meaning of behalf, LyFor the predicted load of " region to be measured " cellular, the meaning of y representative prediction Think;Associated loadings data is shown in Table 3~5;
The load actual value (MW) of table 3 Chuanying District II class cellular in 2009
The predicted load (MW) of table 4 Chuanying District II class cellular in 2009
The space error (MW) of table 5 Chuanying District II class cellular in 2009
5) set up flag variable
In order to judge that certain II class cellular (i, j) belongs to the supply district of which secondary substation, set up flag variable F (i,j):
Wherein:(i, j) is the ranks that II class cellular is located, and i is the line number that II class cellular is located, and j is that II class cellular is located Columns,
F (i, j) is to judge that II class cellular (i, j) belongs to the supply district of which secondary substation and the flag set up Variable;
It is on multiple secondary substation supply districts boundaries in view of some II class cellulars, in order to judge these II classes units Born of the same parents belong to the supply district of which secondary substation, set up corresponding judgment rule:Complete to arrange in secondary substation supply district On the premise of sequence, arbitrary II class cellular is intersected with n secondary substation supply district, and the area of overlapping part is respectively S1, S2..., Sn, then
(1) in max { S1, S2..., Sn}=SiWhen, this II class cellular belongs to the supply district of i-th secondary substation;
(2) in max { S1, S2..., Sn}=Si=...=SjWhen, this II class cellular belongs to secondary substation supply district row Sequence preceding secondary substation supply district;
Wherein:S is the area of II class cellular and secondary substation supply district overlapping part,
s1, s2..., snIt is respectively II class cellular (i, j) and 1,2 ..., n secondary substation supply district overlapping part Area, n is the sum of secondary substation;
6) build membership probability function
Judge each II class cellular is powered by which secondary substation respectively according to flag variable, statistics any two II class unit The probability whether born of the same parents are powered by same secondary substation, utilization index function pair statistical result is fitted, and then must take office The membership probability function that two II class cellulars of meaning are powered by same secondary substation, is shown in formula (9);
p = f ( d ) = a · e - ( b · d ) 2 - - - ( 9 )
Wherein:P is the probability powered by same secondary substation of cellular (m, n) and cellular (i, j), and f closes for Probability p In the function apart from d, a, b are relevant parameter, and d is cellular (m, n) and the distance between (i, j), m, i be respectively cellular (m, n), The line number that cellular (i, j) is located, the columns that n, j are respectively cellular (m, n), cellular (i, j) is located;
The relevant parameter of Chuanying District secondary substation probability function in 2009 is shown in Table 6;
The relevant parameter of table 6 probability function
7) ask for error influence value
According to the space error value of membership probability function f (d) and each II class cellular can obtain II class cellular (m, N) II class error influence value E (i, j) to any II class cellular (i, j) for the space error, the error impact of any cellular (i, j) Value E (i, j) refers to the impact to cellular (i, j) forecast error of the error of all II class cellulars;
E ( i , j ) = Σ m = 1 M Σ n = 1 N [ f ( ( m - i ) 2 + ( n - j ) 2 ) · e ( m , n ) ] / T - - - ( 10 )
T = Σ m = 1 M Σ n = 1 N f ( m 2 + n 2 ) - - - ( 11 )
Wherein:E is Spatial Load Forecasting error influence value, and E (i, j) is the error influence value of any II class cellular (i, j), E (m, n) is the space error of II class cellular (m, n), and T is probability function sum, and M is total line number of II class cellular, and N is II class unit Total columns of born of the same parents;
Said method is equally applicable to asking for of 10kV feeder line rank SLF resultant error influence value;
Calculate the error influence value of Chuanying District II class cellular in 2009 using formula (7)~(11), the results are shown in Table 7;
The error influence value (MW) of table 7 Chuanying District II class cellular in 2009
8) Plan mode based on error influence value
Under the resolution of II space-like it is assumed that secondary substation transformator specified active for PN, actual load maximum For Pmax, the error influence value of i-th I class cellular is Ei, then specified active difference DELTA P with actual load maximum be
Δ P=PN-Pmax(12)
(1) if Ei< Δ P, then illustrate that the error of Spatial Load Forecasting result has exceeded the anti-of secondary substation and has been subject to ability, The Spatial Load Forecasting resultant error of secondary substation will not produce impact to original planning;
(2) if Ei> Δ P, then illustrate that the error of Spatial Load Forecasting result has exceeded the anti-of secondary substation and has been subject to ability, The Spatial Load Forecasting resultant error of this secondary substation will produce considerable influence to original planning, needs to reformulate planning Scheme;
Wherein:PNSpecified active, P for secondary substation transformatormaxFor actual load maximum, Δ P is secondary power transformation The specified active difference with actual load maximum of transformator of standing, EiFor the error influence value of i-th I class cellular, i=1, 2 ..., n, n are the sum of secondary substation;
The index of correlation of Chuanying District secondary substation in 2009 is shown in Table 8;
The index of correlation of table 8 Chuanying District secondary substation in 2009
By the interpretation of result to table 8, it can be found that the II class error influence value E of arctic change in 2009iMore than corresponding Specified active difference DELTA P with load actual value, has illustrated the Spatial Load Forecasting resultant error of this secondary substation above-mentioned Anti- beyond corresponding secondary substation is subject to ability, and original planning will be unable to meet the demand of future load.
Only certain embodiments of the present invention has made detailed explanation to present disclosure, but does not limit to the present embodiment, Any obvious change that those skilled in the art are done according to the enlightenment of the present invention, broadly falls into rights protection of the present invention Scope.

Claims (1)

1. a kind of Spatial Load Forecasting error assessment method based on multiscale space resolution, is characterized in that, it includes following Step:
1) set up GIS for electric power
In GIS platform, the satellite photo in region to be measured is carried out longitude and latitude registration and forms base figure, with base figure be Background sets up position and its supply district figure layer, 10kV feeder line and its supply district figure layer of secondary substation, power supply administration respectively And the supply district figure layer of power supply branch office;
2) electric load spatial resolution
(1) I space-like resolution
The gross area of power supply area is S, and the area of each power supply area is respectively S1, S2..., Sn, n is the total number of power supply area; Make k1=S1/ S, k2=S2/ S ..., kn=Sn/ S, has rkn={ (1/ (k1S), 1/ (k2S) ..., 1/ (knS)) }, then claim rknFor (k1, k2..., kn) metric space resolution;Now rknIt is an ordered series of numbers, be used for portraying one group of size, irregular cell such as not, And it is defined as I space-like resolution;
Wherein:S is the gross area of power supply area, S1, S2..., SnIt is respectively the area of each power supply area, n is the total of power supply area Number, k1, k2..., knIt is respectively the area of each power supply area and the ratio of the power supply area gross area, rknFor (k1, k2..., kn) Metric space resolution;
But, for the identical power supply area of different sequences, corresponding I space-like resolution is diverse, and this just goes out Show the problem inconsistent to the spatial resolution statement in same region to be measured;For this during statement spatial resolution Set up the uniform rules with regard to power supply area sequence:First, obtain the approximate geometric center (x, y) of each power supply area respectively, with The approximate geometric center of lower left corner power supply area is initial point, sets up rectangular coordinate system;Then, the order from small to large by (x+y) Sorted in power supply area;If certain several power supply area (x+y) is equal, by x order from small to large, sorted in power supply area;? Afterwards, ask for I space-like resolution by the sequence of gained power supply area;This method determining spatial resolution solves to same The spatial resolution in individual region to be measured states inconsistent problem, abbreviation WT-XP method;
Wherein:(x, y) is latitude and longitude coordinates in electric power GIS for each power supply area geometric center;
(2) II space-like resolution
The gross area of power supply area is S, and each power supply area such as is at the regular shape of size, square, rectangle or hexagon, face Amass and be S0, make k=S0/ S, has rk=1/ (kS),
C = r k r k ... r k r k r k ... r k ... ... ... ... r k r k ... r k m × n
Now rkIt is a numerical value, C is used for portraying the size rule cell such as a group, and is defined as II space-like resolution;
Wherein:S is the gross area of power supply area, S0For the area of the power supply area of the size regular shape such as each, k is the size such as each The power supply area area of regular shape and the ratio of the power supply area gross area, m is the line number of matrix, and n is matrix column number;
3) generate cellular
Divide region to be measured to generate cellular with the supply district of power equipment, facility, power supply unit respectively, and by these The cellular of size is referred to as I class cellular;
According to etc. size regular grid divide region to be measured to generate cellular, and by these cellulars be referred to as II class cellular;
4) ask for space error
With district load density index method, Spatial Load Forecasting is carried out to the II class cellular in region to be measured, and according to its predicted load Ask for space error with load actual value,
E=Ly-Ls(1)
Wherein:E is the error of " region to be measured " cellular load prediction results, and L is cellular load, LsNegative for region to be measured cellular Lotus actual value, the actual meaning of behalf, LyFor the predicted load of region to be measured cellular, the meaning of y representative prediction;
5) set up flag variable
In order to judge that certain II class cellular (i, j) belongs to the supply district of which secondary substation, set up flag variable F (i, j), See formula (2),
Wherein:(i, j) is the ranks that II class cellular is located, and i is the line number that II class cellular is located, and j is the row that II class cellular is located Number,
F (i, j) is that the flag set up to judge II class cellular (i, j) to belong to the supply district of which secondary substation becomes Amount;
It is on multiple secondary substation supply districts boundaries in view of some II class cellulars, in order to judge these II class cellulars genus In the supply district of which secondary substation, set up corresponding judgment rule:Complete sequence in secondary substation supply district Under the premise of, II class cellular (i, j) is intersected with n secondary substation supply district, and the area of overlapping part is respectively s1, s2..., sn, then
(1) in max { s1, s2..., sn}=siWhen, this II class cellular belongs to the supply district of i-th secondary substation;
(2) in max { s1, s2..., sn}=si=...=sjWhen, this II class cellular belongs to the sequence of secondary substation supply district and exists Front secondary substation supply district;
Wherein:S is the area of II class cellular and secondary substation supply district overlapping part, s1, s2..., snIt is respectively II class unit Born of the same parents (i, j) and the 1st, 2 ..., the area of n secondary substation supply district overlapping part, n is the sum of secondary substation,
si、sjIt is respectively II class cellular (i, j) and the i-th, area of the supply district overlapping part of j secondary substation;
6) build membership probability function
Judge each II class cellular is powered by which secondary substation respectively according to flag variable, statistics any two II class cellular is The no probability powered by same secondary substation, utilization index function pair statistical result is fitted, and then obtains any two The membership probability function that individual II class cellular is powered by same secondary substation, is shown in formula (3);
p = f ( d ) = a · e - ( b · d ) 2 - - - ( 3 )
Wherein:P is the probability powered by same secondary substation of cellular (m, n) and cellular (i, j), f be Probability p with regard to away from The distance between from the function of d, a, b are relevant parameter, and d is cellular (m, n) with cellular (i, j), m, i be respectively cellular (m, n), The line number that cellular (i, j) is located, the columns that n, j are respectively cellular (m, n), cellular (i, j) is located;
7) ask for error influence value
Can obtain II's class cellular (m, n) according to the space error value of membership probability function f (d) and each II class cellular Error influence value E (i, j) to any II class cellular (i, j) for the space error, error influence value E (i, j) of any cellular (i, j) Refer to the impact to cellular (i, j) forecast error of the error of all II class cellulars;
E ( i , j ) = Σ m = 1 M Σ n = 1 N [ f ( ( m - i ) 2 + ( n - j ) 2 ) · e ( m , n ) ] / T - - - ( 4 )
T = Σ m = 1 M Σ n = 1 N f ( m 2 + n 2 ) - - - ( 5 )
Wherein:E is Spatial Load Forecasting error influence value, and E (i, j) is the error influence value of any II class cellular (i, j), e (m, N) space error for II class cellular (m, n), T is probability function sum, and M is total line number of II class cellular, and N is II class cellular Total columns;
8) Plan mode based on error influence value
Under the resolution of II space-like, secondary substation transformator specified active for PN, actual load maximum is Pmax, i-th The error influence value of individual I class cellular is Ei, specified active difference DELTA P with actual load maximum is
Δ P=PN-Pmax(6)
(1) if Ei<Δ P, then illustrate that the error of Spatial Load Forecasting result has exceeded the anti-of secondary substation and has been subject to ability, secondary change The Spatial Load Forecasting resultant error in power station will not produce impact to original planning;
(2) if Ei>Δ P, then illustrate that the error of Spatial Load Forecasting result has exceeded the anti-of secondary substation and has been subject to ability, this is secondary The Spatial Load Forecasting resultant error of transformer station will produce considerable influence to original planning, needs to reformulate programme;
Wherein:PNSpecified active, P for secondary substation transformatormaxFor actual load maximum, Δ P is secondary substation change The specified active difference with actual load maximum of depressor, EiFor the error influence value of i-th I class cellular, i=1,2 ..., n, n Sum for secondary substation.
CN201410452525.9A 2014-09-05 2014-09-05 Spatial load forecasting error evaluation method based on multi-scale spatial resolution Active CN104239971B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410452525.9A CN104239971B (en) 2014-09-05 2014-09-05 Spatial load forecasting error evaluation method based on multi-scale spatial resolution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410452525.9A CN104239971B (en) 2014-09-05 2014-09-05 Spatial load forecasting error evaluation method based on multi-scale spatial resolution

Publications (2)

Publication Number Publication Date
CN104239971A CN104239971A (en) 2014-12-24
CN104239971B true CN104239971B (en) 2017-02-08

Family

ID=52227993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410452525.9A Active CN104239971B (en) 2014-09-05 2014-09-05 Spatial load forecasting error evaluation method based on multi-scale spatial resolution

Country Status (1)

Country Link
CN (1) CN104239971B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069538B (en) * 2015-08-26 2018-08-24 国网山东省电力公司经济技术研究院 A kind of Spatial Load Forecasting method based on cell member Growth Model
CN105654208B (en) * 2016-01-13 2022-02-08 东北电力大学 Empirical mode decomposition method for determining maximum value of cellular load in space load prediction
CN106600063B (en) * 2016-12-16 2022-03-18 东北电力大学 Space load prediction method based on fuzzy rough set theory and spatio-temporal information
CN108110756A (en) * 2018-01-10 2018-06-01 国网福建省电力有限公司福州供电公司 Consider the industrial park distribution network planning method of uncertain factor
CN108596369B (en) * 2018-04-06 2021-07-02 东北电力大学 Space load prediction method based on multivariate model and blind number theory
CN109615119B (en) * 2018-11-23 2022-09-20 东北电力大学 Space load prediction method based on rank set pair analysis theory
CN110516849A (en) * 2019-08-02 2019-11-29 国网上海市电力公司 A kind of load classification evaluation of result method based on typical day load curve
CN111612237B (en) * 2020-05-14 2023-06-27 国家电网有限公司 Load space-time distribution prediction method and system for power supply grid

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103258246A (en) * 2013-05-16 2013-08-21 东北电力大学 Method for obtaining load density index based on cellular historical data
CN103544385A (en) * 2013-10-14 2014-01-29 华北电力大学 Multi-scale spatial load predicting method balancing spatial heterogeneity
CN103617564A (en) * 2013-12-04 2014-03-05 国家电网公司 Whole-network load prediction method based on local load predicted value comprehensive evaluation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103258246A (en) * 2013-05-16 2013-08-21 东北电力大学 Method for obtaining load density index based on cellular historical data
CN103544385A (en) * 2013-10-14 2014-01-29 华北电力大学 Multi-scale spatial load predicting method balancing spatial heterogeneity
CN103617564A (en) * 2013-12-04 2014-03-05 国家电网公司 Whole-network load prediction method based on local load predicted value comprehensive evaluation

Also Published As

Publication number Publication date
CN104239971A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104239971B (en) Spatial load forecasting error evaluation method based on multi-scale spatial resolution
Liu et al. Optimal day-ahead charging scheduling of electric vehicles through an aggregative game model
CN112100720B (en) Artificial intelligence city design form layout method for improving wind environment
CN102622503B (en) Urban land change analogy method
CN103258246B (en) A kind of acquiring method of the load density target based on cellular historical data
CN101568127B (en) Method and device for determining traffic distribution in network simulation
CN105160449A (en) Electric automobile charging pile optimization layout method
CN105375461B (en) Active distribution network power supply capacity real time evaluating method based on Predicting Technique
CN109190161B (en) Port city development simulation method based on patch cellular automaton and port city planning
CN106228808A (en) City expressway travel time prediction method based on Floating Car space-time grid data
CN106339779A (en) Evaluation method for distributed power supply configuration scheme in power distribution network
CN104376371B (en) A kind of distribution based on topology is layered load forecasting method
CN104102954B (en) Distributive integrated energy supply system optimal configuration method considering black-start function
CN103116812A (en) Novel converting station stationing method
CN108513305A (en) A kind of the base station selection method, apparatus and equipment of target area
CN110288133A (en) Planning substation automatic addressing method based on distant view year saturation loading distribution map
CN105825295A (en) Space load predication method with consideration of cellular development degree
CN113011720B (en) CA model-based incremental decrement town development boundary defining method
CN112348324B (en) Conflict space identification method, terminal equipment and storage medium
CN108090626A (en) A kind of Meshing Method of distribution net gridding planning
CN113344434B (en) Transformer substation site selection method and system based on artificial intelligence and big data
CN112018757B (en) General calculation case generation method for power distribution network morphological evolution
CN110728403B (en) Rural medium-long term power grid load prediction method
CN112070351A (en) Transformer substation optimal site selection method based on gravity center regression and particle swarm hybrid algorithm
Feng et al. Deep learning algorithm for preliminary siting of substations considering various features in distribution network planning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant