CN106708984A - Method, apparatus and system for acquiring basic data of cable channel - Google Patents
Method, apparatus and system for acquiring basic data of cable channel Download PDFInfo
- Publication number
- CN106708984A CN106708984A CN201611137638.5A CN201611137638A CN106708984A CN 106708984 A CN106708984 A CN 106708984A CN 201611137638 A CN201611137638 A CN 201611137638A CN 106708984 A CN106708984 A CN 106708984A
- Authority
- CN
- China
- Prior art keywords
- data
- collected
- recorded
- recording
- display data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/22—Indexing; Data structures therefor; Storage structures
- G06F16/2228—Indexing structures
- G06F16/2246—Trees, e.g. B+trees
Abstract
The invention discloses a method, an apparatus and a system for acquiring basic data of a cable channel. The method comprises the steps of obtaining collected and recorded data collected and recorded from the scene by a mobile device, wherein the collected and recorded data includes transport check civil engineering data and electric device data; combining the collected and recorded data in an existing database to generate a combined result represented by adopting a change tree; drawing display data of an electric device according to the combined result; and uploading the drawn display data to a business system. According to the method, the apparatus and the system, the technical problems of low accuracy and low working efficiency caused by the fact that existing basic data acquisition of the cable channel depends on manual means are solved.
Description
Technical field
The present invention relates to electric apparatus monitoring field, in particular to a kind of basic data for gathering cable passage
Methods, devices and systems.
Background technology
Special campaigns are serviced in response to Beijing company " five is new ", propulsion Business Process System " upgrading, synergy " is public according to Beijing
Department's cable system lean management is required, verified as handgrip with cable and channel data, comprehensive to improve cable profession basis data matter
Amount, it is ensured that pipeline and cable system lean management module systemic-function application, the comprehensive firing cable specialty base of Beijing company
The special work of plinth data generaI investigation.Total principle is " move forward steadily, give top priority to what is the most important, demonstrating leads, ensures quality ".To cable basis
The collecting work of data is main to collect and record instrument for generaI investigation basis, the generaI investigation of field basic data are that means, the quality of data are supervised and be
Manage three partial contents.
At present, collected and recorded on cable passage basic data, prior art relies primarily on artificial generaI investigation, data quality checking, account
Management etc., with following deficiency:
1. task weight is collected and recorded:Due to the basic data of cable passage, collection capacity is big, wide, collects and records the task of work
It is very heavy;
2. efficiency is collected and recorded low:Because site environment complexity causes that acquisition time is long, operating efficiency reduction, and lack one
Change equipment, on-site personnel is numerous;
3. data mating operation amount is big:When fractional unit Develop Data collects and records work, market, fortune inspection specialty is made without pool
Determine field operation plan, cause "-line-change-case-family of standing " to collect and record and administer and can not simultaneously advance, and do not set up related mechanism pair
Access point carries out unifying identifier.
4. data management and control difficulty is big:Due to lacking effective data integrity, accuracy, checking consistency means, data
Verify and rely on manual site's sampling observation, it is low to verify coverage rate, the quality of data it is difficult to ensure that, or even cause unnecessary scene to do over again.
Cause the degree of accuracy not high for above-mentioned existing cable passage basic data acquisition dependence artificial means and work
The low problem of efficiency, not yet proposes effective solution at present.
The content of the invention
A kind of methods, devices and systems of the basic data for gathering cable passage are the embodiment of the invention provides, with least
Solving existing cable passage basic data acquisition dependence artificial means causes the degree of accuracy not high and ineffective technology
Problem.
A kind of one side according to embodiments of the present invention, there is provided method of the basic data of collection cable passage, bag
Include:Obtain mobile device and collect and record data from what scene was collected and recorded, wherein, collecting and recording data includes:Fortune inspection civil engineering data and electrical equipment
Data;Data will be collected and recorded and integrate with data with existing storehouse, the amalgamation result that generation is levied using change tree table;Drawn according to amalgamation result
The display data of power equipment;The display data of drafting is uploaded to operation system.
Another aspect according to embodiments of the present invention, additionally provides a kind of system of the basic data for gathering cable passage,
Including:At least one collects and records terminal, and data are collected and recorded for what at least one electrical equipment and/or civil engineering object were collected and recorded in scene, its
In, collecting and recording data includes:Fortune inspection civil engineering data and electrical equipment-data;Main website, is communicated with operation system, for that will collect and record
Data integrate with data with existing storehouse, the amalgamation result that generation is levied using change tree table, and draw power equipment according to amalgamation result
Display data;At least one operation system, with master station communication, the display data for receiving main website upload.
Another aspect according to embodiments of the present invention, additionally provides a kind of device of the basic data for gathering cable passage,
Including:Acquisition module, data are collected and recorded for obtaining mobile device from what scene was collected and recorded, wherein, collecting and recording data includes:Fortune inspection civil engineering
Data and electrical equipment-data;First generation module, data with existing storehouse is integrated with for that will collect and record data, and generation is set using change
The amalgamation result of sign;First processing module, the display data for drawing power equipment according to amalgamation result;Uploading module,
For the display data of drafting to be uploaded into operation system.
In embodiments of the present invention, data are collected and recorded from what scene was collected and recorded by obtaining mobile device, wherein, collect and record packet
Include:Fortune inspection civil engineering data and electrical equipment-data;Data will be collected and recorded and integrate with data with existing storehouse, generation will be levied using change tree table
Amalgamation result;The display data of power equipment is drawn according to amalgamation result;The display data of drafting is uploaded to operation system, is reached
To the purpose that cable passage technical data was collected and recorded process automation, reduction later stage operation system workload, it is achieved thereby that
The technique effect of data accuracy and operating efficiency is improved, and then solves existing cable passage basic data acquisition and rely on people
Work means cause the degree of accuracy not high and ineffective technical problem.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair
Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is a kind of method flow diagram of the basic data of collection cable passage according to embodiments of the present invention;
Fig. 2 is that a kind of optional field data according to embodiments of the present invention collects and records preparation flow chart;
Fig. 3 is that a kind of optional field data according to embodiments of the present invention collects and records workflow diagram;
Fig. 4 is a kind of optional data inputting flow chart according to embodiments of the present invention;
Fig. 5 is a kind of optional data quality checking flow chart according to embodiments of the present invention;
Fig. 6 is the method flow diagram of the basic data of a kind of optional collection cable passage according to embodiments of the present invention;
Fig. 7 is that a kind of optional cable pipe network according to embodiments of the present invention collects and records instrument schematic diagram;
Fig. 8 is the functional module signal that a kind of optional cable pipe network according to embodiments of the present invention collects and records instrument
Figure;
Fig. 9 is that one kind according to embodiments of the present invention is optional derives storage fortune inspection schematic diagram data from GIS/PMS;
Figure 10 is a kind of optional data acquisition and recording instrument deployment scheme schematic diagram according to embodiments of the present invention;
Figure 11 is the method flow diagram of the basic data of a kind of optional collection cable passage according to embodiments of the present invention;
Figure 12 is a kind of optional data quality checking flow chart according to embodiments of the present invention;
Figure 13 is according to embodiments of the present invention a kind of optional to the inspection result schematic diagram after data quality checking;
Figure 14 (a) be it is according to embodiments of the present invention it is a kind of it is optional to the inspection result after data quality checking in mobile terminal
Schematic diagram;
Figure 14 (b) be it is according to embodiments of the present invention it is a kind of it is optional to the inspection result after data quality checking in mobile terminal
Schematic diagram;
Figure 15 is a kind of optional artificial quality inspection feedback and tracking schematic diagram according to embodiments of the present invention;
Figure 16 is a kind of system schematic of the basic data of collection cable passage according to embodiments of the present invention;And
Figure 17 is a kind of schematic device of the basic data of collection cable passage according to embodiments of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only
The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection
Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing
Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using
Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or
Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover
Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to
Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product
Or other intrinsic steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of the method for the basic data for gathering cable passage is, it is necessary to say
It is bright, can be held in the such as one group computer system of computer executable instructions the step of the flow of accompanying drawing is illustrated
OK, and, although show logical order in flow charts, but in some cases, can be with different from order herein
Perform shown or described step.
Fig. 1 is a kind of method flow diagram of the basic data of collection cable passage according to embodiments of the present invention, such as Fig. 1 institutes
Show, the method comprises the following steps:
Step S102, obtains mobile device and collects and records data from what scene was collected and recorded, wherein, collecting and recording data includes:Fortune inspection civil engineering
Data and electrical equipment-data.
Specifically, in above-mentioned steps, above-mentioned mobile device can be for collecting and recording fortune inspection civil engineering data and/or electrically setting
The acquisition terminal of standby data, can complete that the fortune inspection civil engineering data professional task such as work well, pipeline, section collects and records collects and records terminal,
Can also be collected and recorded to complete the electrical equipment-data professional tasks such as transformer station, switchyard, ring main unit, be also suitable the said equipment merging
Task is collected and recorded.
Herein it should be noted that being collected and recorded to preferably complete field data, can be done before field data is collected and recorded
Good corresponding data acquisition preparation, Fig. 2 is that a kind of optional field data according to embodiments of the present invention collects and records beam worker
Make flow chart, before gathered data, first can carry out the preparation that field data is collected and recorded according to the preparation flow shown in Fig. 2
Work.Fig. 3 is that a kind of optional field data according to embodiments of the present invention collects and records workflow diagram, as shown in figure 3, carrying out
Data acquisition and recording preparation and after mobile device downloads corresponding task bag, login user selection is corresponding with task bag to be set
Standby to carry out on-site data gathering, the content of collection includes:Photograph taking, sketch draw system, work well conduit information, equipment information collection
Deng, and the data genaration that will be gathered changes tree, it is ensured that after the data of mobile terminal collection are merged into PC ends, merging data has correspondence
.
In a kind of optional embodiment, the Various types of data collected and recorded obtained from scene by mobile device (collecting and recording terminal) can
With determinant attribute (name, ID) editor, mark, the methods such as photo, incidence relation be selected are shot, complete field device name, set
The indispensable attributes such as standby position are collected and recorded, while collecting and recording the field operation evidence such as scene photograph and solidify.Make at the scene of raising
The integrality and objectivity for collecting and recording data are ensure that while industry efficiency.
Further, based on above-described embodiment, above-mentioned mobile device (collecting and recording terminal) can also automatically generate one to set
The change tree of shape configuration shows current database situation of change, checks the original data collected and recorded and submits number to less important work person
According to uniformity, so as to ensure integrality of the data during submission.
Step S104, will collect and record data and integrates with data with existing storehouse, the amalgamation result that generation is levied using change tree table.
Specifically, in above-mentioned steps, after mobile device collects and records data from scene, the scene of terminal submission will be collected and recorded
Collect and record data to imported into the instrument of collecting and recording, and be changed the comparison of tree, the treatment etc. for the treatment of Nuclear Data, generation is using change tree table
The amalgamation result levied.
Step S106, the display data of power equipment is drawn according to amalgamation result.
Specifically, in above-mentioned steps, data with existing storehouse is integrated with data will be collected and recorded, generation is levied using change tree table
After amalgamation result, attribute and logical topology relation are further improved, and the display data of power equipment are drawn according to amalgamation result,
Display data can according to the figure such as scene trajectory diagram, sectional drawing of relevant device of information compilation for collecting and recording.It is a kind of optional
Embodiment in, Fig. 4 is a kind of optional data inputting flow chart according to embodiments of the present invention.
Herein it should be noted that function restriction due to collecting and recording terminal, scene need to only collect and record required attribute, therefore need
The photo to be collected and recorded according to scene in instrument is collected and recorded carries out the perfect of account attribute.
Step S108, operation system is uploaded to by the display data of drafting.
Specifically, in above-mentioned steps, above-mentioned operation system can include:Power network GIS platform, equipment (assets) O&M essence
Beneficial management system (PMS2.0) platform, destructuring platform etc.;According to amalgamation result draw power equipment display data it
Afterwards, the display data of drafting can be uploaded to operation system.
It is logical to cable based on technical scheme disclosed in above-mentioned steps S102 to S108 as a kind of optional implementation method
The task management flow that road basic data is collected and recorded can be with as shown in figure 5, Fig. 5 be according to embodiments of the present invention a kind of optional right
The task management flow chart that cable passage basic data is collected and recorded.
From the foregoing, it will be observed that in the above embodiments of the present application, the basic data at cable passage scene is gathered by mobile device,
And the field data of collection is integrated with into existing database, the amalgamation result that generation is levied using change tree table is adopted according to scene
The display datas such as trajectory diagram, the sectional drawing of data compilation relevant device of record, by being uploaded to operation system after data quality checking, reach
To the purpose that cable passage technical data was collected and recorded process automation, reduction later stage operation system workload, it is achieved thereby that
The technique effect of data accuracy and operating efficiency is improved, and then solves existing cable passage basic data acquisition and rely on people
Work means cause the degree of accuracy not high and ineffective technical problem.
In a kind of optional embodiment, obtain mobile device from scene collect and record collect and record data after, the above method
Can also include:
The attribute that data will be collected and recorded is modified, and corrects the logical topology relation for collecting and recording data, obtains revised adopting
Record data;
Wherein, according to collecting and recording data or the revised display data collected and recorded data, draw power equipment, wherein, display
Data are characterized by painting compilation, and painting compilation includes:Trajectory diagram, sectional drawing, elevation view, wiring diagram and line chart.
In a kind of optional embodiment, obtain mobile device from scene collect and record collect and record data before, such as Fig. 6 institutes
Show, the above method can also comprise the following steps:
Step S602, derives data on stock from operation system;
Step S604, creates according to data on stock and obtains data acquisition and recording task;
Step S606, according to progress indicator, data acquisition and recording task is distributed by region, generates task bag, wherein, task bag bag
Include:Power network space resources data and map slice of data;
Step S608, mobile device is issued to by task bag so that mobile device is collected and recorded according to the task bag scene of carrying out.
Specifically, in above-mentioned steps, above-mentioned operation system can include:Power network GIS platform, equipment (assets) O&M essence
Beneficial management system (PMS2.0) platform, destructuring platform etc.;Above-mentioned data on stock can be including work well information, pipe trench information etc.
Information;After deriving data on stock from operation system, the data acquisition and recording task that obtains is created according to data on stock, and will according to progress
Ask, distributed by region and data acquisition and recording task and generate task bag, task bag is issued to be collected and recorded terminal and carry out field operation, task
Bag data includes corresponding power network space resources data, map slice of data etc..
Used as a kind of optional embodiment, Fig. 7 is that a kind of optional cable pipe network according to embodiments of the present invention is adopted
Record instrument schematic diagram, as shown in fig. 7, this collects and records instrument collects and records instrument (mobile terminal) by collecting and recording management tool (main website) and scene
Two parts are constituted.Data acquisition and recording management tool obtains figure and machine account storage number from power grid GIS/PMS platforms and operation system
According to reference to work plan is collected and recorded, auxiliary is collected and recorded task generation and distributed;After the completion of field data is collected and recorded, checked by data core
Reason specification, aids in performance data quality verification, and confirmation is accurately collected and recorded achievement, carries out achievement and be quickly put in storage.
In a kind of optional embodiment, above-mentioned cable pipe network collect and record instrument support collect and record task management, data compilation,
Collect and record process management, quality of achievement and verify and collect and record the functions such as data syn-chronization;Fig. 8 is according to embodiments of the present invention a kind of optional
Cable pipe network collect and record the high-level schematic functional block diagram of instrument, as shown in figure 8, this collects and records instrument provides task management, data
The functions such as compilation, process management and quality verification, wherein, task management provides acquisition tasks and the function such as creates, distributes;Data are compiled
The functions such as offer machine account attribute management, trajectory diagram, elevation view, wiring diagram, line chart management are provided;Process management is provided and collects and records progress
Management, terminal management, process such as review at the function;Quality verification provides operation conflict and version verification, operation authenticity verification, number
According to functions such as quality verifications.
In a kind of optional embodiment, above-mentioned cable pipe network collects and records instrument and derives storage fortune inspection data from GIS/PMS,
Data on stock includes:The information such as work well information, pipe trench information, Fig. 9 is one kind according to embodiments of the present invention optional from GIS/
PMS derives storage fortune inspection schematic diagram data, after the completion of task bag data is collected and recorded, will verify the power equipment figure number for passing through
Be put in storage to power grid GIS/PMS platforms according to, topological data.
Used as a kind of optional embodiment, using two grades of deployment, deployment is total to be serviced above-mentioned data acquisition and recording instrument deployment way
Device and each branch office's server, Figure 10 are that a kind of optional data acquisition and recording instrument deployment scheme according to embodiments of the present invention is illustrated
Figure, using deployment scheme in whole city's Unified Set, it is ensured that constituent parts to company of city have the good network bandwidth, the network bar of stabilization
Part and open-ended;Server end provides good high availability cluster and data safety precautions.
A kind of optional embodiment, cable expert data quality administration tool function description is as shown in table 1;Mobile terminal is adopted
Record instrumental function description is as shown in table 2.
The cable expert data quality administration tool function of table 1 is described
The mobile terminal of table 2 collects and records instrumental function description
Herein it should be noted that data extraction tool extracts data on stock according to reference format from PMS2.0;Data
Performance data is synchronized to PMS2.0 by storage instrument according to reference format.
In a kind of optional embodiment, above-mentioned data on stock can include:Work well information, pipe trench information, section information,
Substation data, switchyard data and ring main unit data.
In a kind of optional embodiment, before the display data of drafting is uploaded into operation system, as shown in figure 11,
The above method can also include:
Whether step S112, verify display data meets pre-conditioned;
Step S114, if verification display data meets pre-conditioned, determines that display data is the data for allowing to upload.
Specifically, in the above-described embodiments, it is necessary to data before the display data of drafting is uploaded into operation system
Quality inspection is carried out, specifically, constituent parts data need to collect into the work master station of maintenance branch company, it is necessary to right before data submission
The data that constituent parts collect and record establishment carry out data validity, attribute integrality, topological coherence, logical relation correctness, section
Information and actual uniformity etc. are checked, it is ensured that the data objectivity of submission, integrality, uniformity.In a kind of optional embodiment,
Data are carried out with quality inspection can be using the workflow shown in Figure 12, and Figure 12 is a kind of optional number according to embodiments of the present invention
According to quality inspection flow chart.
Herein also, it should be noted that the quality inspection to data mainly includes the following aspects:Logical check, group's inspection
Look into, project management department checks and inspection of company level.Wherein, logical check can be operated by collector and group inspector,
Have nearly 180 inspection projects;Group checks and can be operated by panelists and project team personnel, has nearly 40 and check
Project;Project management department's inspection can be operated by project management department personnel and company inspector, have nearly 130 inspection projects;It is public
Department's level inspection can be operated by company inspector, have 20 remainder inspection projects.
In a kind of optional embodiment, after quality inspection is carried out to data, entity name of the inspection result including false entries,
Entity type, mistake bar number, explanation of error, error description etc., Figure 13 are a kind of optional logarithms according to embodiments of the present invention
According to the inspection result schematic diagram after quality inspection;As shown in figure 13, in inspection result, defect can not only be found, also provides common
The treatment advice and aid of defect.User can choose false entries, the prompting scheme in error description, with operation
Instrument (navigate to trajectory diagram, navigate to directory tree, open attribute, delete entity etc.) corrigendum that false entries are modified.
Further, based on above-described embodiment, used as a kind of preferred embodiment, the quality inspection to data can also provide outer
Industry is verified and correcting mode.For the mistake that surveyor cannot be corrected, error entries can be downloaded to mobile terminal, by field operation
Personnel take scene, are modified after being examined field condition according to quality inspection entry.By opening " unlatching error detection "
Function, according to current location information, automatic equipment of searching in the certain limit of periphery (such as set 50 meters of radiuses) exists terminal
Error in data and defect, and specific mistake displayed on the terminals, defect content and amending advice, outdoor workers can be according to wrong bar
Mesh is modified.Figure 14 (a) and Figure 14 (b) are according to embodiments of the present invention a kind of optional to the inspection knot after data quality checking
Schematic diagram of the fruit in mobile terminal.
Further, based on above-described embodiment, used as a kind of preferred embodiment, the quality inspection to data can also provide mistake
Miss feedback and tracking.For the feedback of the information between data scrutineer and data inputting people.If data scrutineer has found data inputting
There is mistake in the data that people submits to, can be directed to the quality inspection body that there is mistake, fill in explanation of error.Data inputting people just can be by anti-
Feedback tracking system receives the inspection result of data scrutineer, and modifies and feed back, and detailed process is as shown in figure 15, Tu15Shi
A kind of optional artificial quality inspection feedback and tracking schematic diagram according to embodiments of the present invention.
In sum, the above embodiments of the present application can reach following technique effect:
(1) using contents pattern blocked is gathered, acquisition order standardization, beneficial to complete collection site content, reduces secondary
Work probability, reduces cost realizes standardized work;
(2) in Collecting operation, the logical relation of part important element, live mobile terminal direct correlation, solidification, preservation subtract
The workload of industry information processing, improves data accuracy in few later stage;
(3) underground pipe network collects and records instrument with 300 multinomial quality inspections, with abundant the data integrity audit function,
And substantial amounts of logical correctness and logic integrity checking function etc., and the function of quality control with anti-data fabrication and operation
Journey back track function;
(4) partly work with no paper operation;
(5) by mobile phone terminal, the interface facility of PC ends and correlation, before data enter GIS, with automation means many
Individual link carries out quality management and control, and outcome data quality is effectively ensured;It is general that the set solution is applicable not only to large-scale data
Look into, and be very beneficial for regular maintenance renewal, to keep the long-term availability of data, there is provided complete data acquisition and recording is solved
Scheme;
(6) compared with traditional mode pipe network data is gathered, the signal graph acquisition function of instrument is collected and recorded by pipe network, can be proved
The correctness and authenticity of pipeline uniqueness identification work.
It should be noted that the construction of cable passage basic data acquisition and recording system is significant, it will change current
The production pipes such as the drawbacks of existing under manufacturing management system, lifting safety in production, operational management, repair and maintenance, failure real-time processing
The lean level of link is managed, the optimization of every production operation flow is realized, double raisings of the efficiency of management and benefit are finally reached.
It is built will on the whole promote the great-leap-forward development of buried cable and tube profession production management, so as to be capital underground power network
Safe and stable operation establish solid foundation.
Management tool is collected and recorded by application data, it is possible to achieve to what is extracted in power network GIS platform and service application platform
Data on stock carries out examination treatment, and repeated workload is reduced to greatest extent, in strict accordance with three-level inspection system Develop Data into
Fruit check, it is ensured that the integrality of outcome data, the accuracy of position, topology connectivity, attribute information logical sum photo it is complete
Property, realize that flow is collected and recorded in optimization, lift Standardize operation level.
In terms of cable and channel management, realize generating cable system figure, cable passage sectional drawing on the basis of geographical map,
And based on the figure of power cable and passage, topology, machine account, realize cable trace planning application, section displaying, passage
Resource analysis, power supply point are reviewed.
In terms of cable and channel monitoring, basic data generaI investigation has ensured power cable state and passage running environment information
It is complete, and can in time to O&M overhaul management provide defect, failure, incipient fault data.
By the support of data acquisition and recording management automation, acquisition terminal and software standardization, radio frequency recognizing electronic label application
Strengthen information equipment and technical support etc. several aspects, lift data acquisition and recording operating efficiency.
Easily it is noted that power cable and passage digitize census operations based on underground utilities surveying and mapping standard, adopt
With safety and nondestructive, the professional metering system not having a power failure, storage power cable and passage digitlization census operations are completed.GeneraI investigation achievement
Storehouse and displaying are built in electronic form, possesses the systemic platform of PMS2.0 and its unified plan of net company of other country to power cable
And the typing condition of channel data, while setting up the dynamic of information data, real-time servicing mechanism.
(1) present invention, using spatial database control technology, is related to based on geographical graphic during data acquisition and recording
Multi-class data (map vector data, photomap data, power network spatial data, attribute data etc.) belongs to sensitive data,
The information security management and control of data acquisition and recording overall process need to be strengthened.
(2) effective management that the present invention is implemented to built conduit resource, in the deployment of data acquisition and recording management tool is implemented, respectively
Unit will make full use of the data-bias encryption function of instrument to realize the safe encryption of grid equipment spatial data, really
Protect data safety.Collection, transmission and the typing of device space positional information will be carried out using safe and reliable data encryption mode, be prohibited
Only transmit and store by the storage medium of internet and non-security protection, the data that will arbitrarily must not be collected and recorded are replicated, right
Outer announcement and leakage.
(3) in the deployment of data acquisition and recording management tool is implemented, to be done with relevant unit and the personal safe and secret agreement of signing
The management of good authority account, periodic data safety inspection.
(4) during the invention, using " integration of figure number " design principle, installations and facilities data structure is comprehensively excellent
Change, pipeline and cable system production business full process automatization, business specialty broad covered area, advanced technology are ripe, first with the country
Enter level.
In addition it is also necessary to illustrate, the data acquisition and recording management tool that the above embodiments of the present application are provided need to rely on standard
True basic data and topological relation, have completed the number of the area such as Yi Zhuang, maintenance, city cable passage during current pilot
According to census operations, will on buried cable passage hidden trouble investigation and resource investigation work Guo Wang companies, provincial company is studied in depth
While asking, with reference to Beijing's underground utilities resource investigation and informatization reality of work, mainly from comprehensive, integrality,
Accuracy, promptness, five angle objective evaluation power cables of defect elimination rate and passage digitlization census operations development condition.
(1) it is comprehensive
Based on existing cable data on stock, the area such as Beijing Yi Zhuang, maintenance, city is progressively disappeared by data on stock
Change, incremental data supplement is collected and recorded, and realizes whole cable profession basis data census operations.
(2) integrality
Census data includes that cable profession basis equipment is topologically correct, conduit section information is accurate, equipment determinant attribute is complete
It is whole.Such as:Cable title, attribute, phase, state, plan-position, buried depth (or elevation), trend, voltage class, earthing type, rise
Present position, image data etc. in point, flex point, stop, passage;The name attribute of acquisition channel, plan-position, connected relation,
Top buried depth (or elevation), trend, size, type, the position and parameter of management and control and support, image data;Fire wall, work
Name attribute, position, type of well etc.;
(3) accuracy
Measured value is verified, such as work well size, caliber, well depth, coordinate information (plane coordinates or elevation), two is right
Attribute data is verified, such as cable model, photographic intelligence.Cable and passage numeral are proved by above-mentioned a series of verification
Change the basic data guarantee that census operations provides specialty for cable or even the O&M of whole distribution.
(4) promptness
During the area such as Beijing Yi Zhuang, maintenance, city project is carried out, the cable run that newly puts into operation also incorporates this generaI investigation
Scope, has ensured the Up-to-date state of power cable and channel base data.
(5) defect elimination rate
During the generaI investigation of the area such as Beijing Yi Zhuang, maintenance, city, manhole cover damage, cable to discovery are blanked, work well
The defective data such as it is buried to collect and record, is Beijing underground power network production run commander, conditioning maintenance, lean management, section
Huas decision-making provides data supporting, is also to ensure that Beijing underground administration of power networks advanced production operational management mould leading at home
The inevitable requirement of formula, the far-reaching strategy to capital power network wound " internal class " is significant.
Embodiment 2
According to embodiments of the present invention, a kind of system embodiment of the basic data for gathering cable passage is additionally provided.This hair
The method of the basic data of the collection cable passage in bright embodiment 1 can be performed in the system of the embodiment of the present invention 2.
Figure 16 is a kind of system schematic of the basic data of collection cable passage according to embodiments of the present invention, such as Figure 16
Shown, the system includes:At least one collects and records terminal 161, the operation system 165 of main website 163 and at least one.
Wherein, at least one terminal 161 is collected and recorded, at least one electrical equipment and/or civil engineering object is collected and recorded for scene
Data are collected and recorded, wherein, collecting and recording data includes:Fortune inspection civil engineering data and electrical equipment-data;
Main website 163, is communicated with operation system, and data with existing storehouse is integrated with for that will collect and record data, and generation is using change
Change the amalgamation result that tree table is levied, and the display data of power equipment is drawn according to amalgamation result;
At least one operation system 165, with master station communication, the display data for receiving main website upload.
From the foregoing, it will be observed that in the above embodiments of the present application, collecting and recording terminal 161 by least one and gathering cable passage scene
Basic data, the field data of collection integrated with existing database by main website 163, the merging that generation is levied using change tree table
As a result, the display datas such as trajectory diagram, the sectional drawing of data compilation relevant device collected and recorded according to scene, on after data quality checking
At least one operation system 165 is reached, has been reached and cable passage technical data was collected and recorded into process automation, later stage business system is reduced
The purpose of workload of uniting, it is achieved thereby that improving the technique effect of data accuracy and operating efficiency, and then solves existing
Cable passage basic data acquisition relies on artificial means and causes the degree of accuracy not high and ineffective technical problem.
Embodiment 3
According to embodiments of the present invention, a kind of device embodiment of the basic data for gathering cable passage is additionally provided.This hair
The method of the basic data of the collection cable passage in bright embodiment 1 can be performed in the device of the embodiment of the present invention 3.
Figure 17 is a kind of schematic device of the basic data of collection cable passage according to embodiments of the present invention, such as Figure 17
Shown, the device includes:Acquisition module 171, the first generation module 173, first processing module 175 and uploading module 177.
Wherein, acquisition module 171, data are collected and recorded for obtaining mobile device from what scene was collected and recorded, wherein, collect and record packet
Include:Fortune inspection civil engineering data and electrical equipment-data;First generation module 173, data with existing storehouse is integrated with for that will collect and record data,
The amalgamation result that generation is levied using change tree table;First processing module 175, for drawing the aobvious of power equipment according to amalgamation result
Registration evidence;Uploading module 177, for the display data of drafting to be uploaded into operation system.
From the foregoing, it will be observed that in the above embodiments of the present application, acquisition module 171 is used to gather cable passage by mobile device
The basic data at scene, the first generation module 173 is used to for the field data of collection to integrate with existing database, and generation is used
The change amalgamation result levied of tree table, it is the trajectory diagram of the data compilation relevant device that first processing module 175 is collected and recorded according to scene, disconnected
The display datas such as face figure, by after data quality checking, operation system being uploaded to by uploading module 177, have reached cable passage
Technical data collected and recorded process automation, reduced the purpose of later stage operation system workload, it is achieved thereby that improving data accuracy
With the technique effect of operating efficiency, and then solve existing cable passage basic data acquisition and rely on artificial means and cause accurately
Spend not high and ineffective technical problem.
In a kind of optional embodiment, said apparatus also include:Second processing module, the attribute for data will to be collected and recorded
It is modified, and corrects the logical topology relation of data collected and recorded, obtains revised collecting and recording data;Wherein, according to collecting and recording data
Or the revised display data collected and recorded data, draw power equipment, wherein, display data is characterized by painting compilation, paints compilation
Including:Trajectory diagram, sectional drawing, elevation view, wiring diagram and line chart.
In a kind of optional embodiment, said apparatus also include:Output module, for deriving storage from operation system
Data;Creation module, data acquisition and recording task is obtained for being created according to data on stock;Second generation module, for according to progress
Index, data acquisition and recording task is distributed by region, generates task bag, wherein, task bag includes:Power network space resources data and map
Slice of data;Sending module, for task bag to be issued into mobile device so that mobile device is adopted according to the task bag scene of carrying out
Record.
In a kind of optional embodiment, above-mentioned data on stock includes:Work well information, pipe trench information, section information, power transformation
Stand data, switchyard data and ring main unit data.
In a kind of optional embodiment, said apparatus also include:Correction verification module, for verify display data whether symbol
Close pre-conditioned;Determining module, if meeting pre-conditioned for verifying display data, determines that display data is to allow what is uploaded
Data.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment
The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other
Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei
A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual
Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces
Connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit
The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list
Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use
When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially
The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products
Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer
Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or
Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes
Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (11)
1. it is a kind of gather cable passage basic data method, it is characterised in that including:
Obtain mobile device and collect and record data from what scene was collected and recorded, wherein, the data of collecting and recording include:Fortune inspection civil engineering data and electrically
Device data;
The data of collecting and recording are integrated with into data with existing storehouse, the amalgamation result that generation is levied using change tree table;
The display data of power equipment is drawn according to the amalgamation result;
The display data of the drafting is uploaded to operation system.
2. method according to claim 1, it is characterised in that obtain mobile device from scene collect and record collect and record data it
Afterwards, methods described also includes:
The attribute for collecting and recording data is modified, and the logical topology relation of data is collected and recorded described in amendment, after being corrected
Collect and record data;
Wherein, data or the revised display data collected and recorded data, draw the power equipment are collected and recorded according to described, its
In, the display data is characterized by painting compilation, described to paint compilation and include:Trajectory diagram, sectional drawing, elevation view, wiring diagram and list
Line chart.
3. method according to claim 1, it is characterised in that obtain mobile device from scene collect and record collect and record data it
Before, methods described also includes:
Data on stock is derived from the operation system;
Created according to the data on stock and obtain data acquisition and recording task;
According to progress indicator, the data acquisition and recording task is distributed by region, generate task bag, wherein, the task bag includes:Electricity
Net space resources data and map slice of data;
The task bag is issued to the mobile device so that the mobile device carries out the scene according to the task bag
Collect and record.
4. method according to claim 3, it is characterised in that the data on stock includes:Work well information, pipe trench information,
Section information, substation data, switchyard data and ring main unit data.
5. method according to claim 1, it is characterised in that the display data of the drafting is being uploaded to the business
Before system, methods described also includes:
Verify whether meeting for the display data pre-conditioned;
If verifying the display data meets described pre-conditioned, determine that the display data is the data for allowing to upload.
6. it is a kind of gather cable passage basic data system, it is characterised in that including:
At least one collects and records terminal, and data are collected and recorded for what at least one electrical equipment and/or civil engineering object were collected and recorded in scene, its
In, the data of collecting and recording include:Fortune inspection civil engineering data and electrical equipment-data;
Main website, is communicated with operation system, and for the data of collecting and recording to be integrated with into data with existing storehouse, generation is set using change
The amalgamation result of sign, and the display data of power equipment is drawn according to the amalgamation result;
At least one operation system, with the master station communication, the display data for receiving the main website upload.
7. it is a kind of gather cable passage basic data device, it is characterised in that including:
Acquisition module, data are collected and recorded for obtaining mobile device from what scene was collected and recorded, wherein, the data of collecting and recording include:Fortune inspection
Civil engineering data and electrical equipment-data;
First generation module, for the data of collecting and recording to be integrated with into data with existing storehouse, the merging that generation is levied using change tree table
As a result;
First processing module, the display data for drawing power equipment according to the amalgamation result;
Uploading module, for the display data of the drafting to be uploaded into operation system.
8. device according to claim 7, it is characterised in that described device also includes:
Second processing module, the logic that data are collected and recorded for the attribute for collecting and recording data to be modified, and described in amendment is opened up
Relation is flutterred, obtains revised collecting and recording data;
Wherein, data or the revised display data collected and recorded data, draw the power equipment are collected and recorded according to described, its
In, the display data is characterized by painting compilation, described to paint compilation and include:Trajectory diagram, sectional drawing, elevation view, wiring diagram and list
Line chart.
9. device according to claim 7, it is characterised in that described device also includes:
Output module, for deriving data on stock from the operation system;
Creation module, data acquisition and recording task is obtained for being created according to the data on stock;
Second generation module, for according to progress indicator, the data acquisition and recording task being distributed by region, generates task bag, wherein,
The task bag includes:Power network space resources data and map slice of data;
Sending module, for the task bag to be issued into the mobile device so that the mobile device is according to the task
Bag carries out the scene and collects and records.
10. device according to claim 9, it is characterised in that the data on stock includes:Work well information, pipe trench information,
Section information, substation data, switchyard data and ring main unit data.
11. devices according to claim 7, it is characterised in that described device also includes:
Correction verification module, it is pre-conditioned for verifying whether meeting for the display data;
Determining module, if meeting described pre-conditioned for verifying the display data, determines the display data to allow
The data of upload.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611137638.5A CN106708984A (en) | 2016-12-09 | 2016-12-09 | Method, apparatus and system for acquiring basic data of cable channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611137638.5A CN106708984A (en) | 2016-12-09 | 2016-12-09 | Method, apparatus and system for acquiring basic data of cable channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106708984A true CN106708984A (en) | 2017-05-24 |
Family
ID=58936682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611137638.5A Pending CN106708984A (en) | 2016-12-09 | 2016-12-09 | Method, apparatus and system for acquiring basic data of cable channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106708984A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107240032A (en) * | 2017-06-07 | 2017-10-10 | 国网江苏省电力公司常熟市供电公司 | Distribution scheduling intelligence accident prediction establishment processing system |
CN107808236A (en) * | 2017-10-10 | 2018-03-16 | 南方电网科学研究院有限责任公司 | Substation equipment state evaluation system and method |
CN110956348A (en) * | 2018-09-27 | 2020-04-03 | 丰图科技(深圳)有限公司 | Closed area data acquisition task packet generation method and system and closed area data acquisition method |
CN111178854A (en) * | 2020-01-02 | 2020-05-19 | 深圳市康拓普信息技术有限公司 | Electric power underground pipe network general survey system and method |
CN112507262A (en) * | 2020-12-30 | 2021-03-16 | 苏州光格科技股份有限公司 | Cable channel section acquisition and automatic generation method based on handheld terminal |
CN113283040A (en) * | 2021-04-30 | 2021-08-20 | 浙江图维科技股份有限公司 | Method and system for acquiring cable attribute and laying occupation information on site |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1987777A (en) * | 2005-12-19 | 2007-06-27 | 国际商业机器公司 | Computer method and apparatus for activity-based version selection in a configuration management system |
CN103455634A (en) * | 2013-09-24 | 2013-12-18 | 国家电网公司 | Electric power GIS (geographic information system) data collecting system and method based on mobile equipment |
CN104376415A (en) * | 2014-11-17 | 2015-02-25 | 南通中远船务工程有限公司 | Cable book management system |
CN104484836A (en) * | 2014-12-26 | 2015-04-01 | 国家电网公司 | Grid fault decision-making assisting visualization system and method |
CN105608640A (en) * | 2016-01-29 | 2016-05-25 | 厦门亿力吉奥信息科技有限公司 | Power grid equipment data acquisition method and system |
CN105760429A (en) * | 2016-01-29 | 2016-07-13 | 厦门亿力吉奥信息科技有限公司 | Power grid equipment data check method and system thereof |
-
2016
- 2016-12-09 CN CN201611137638.5A patent/CN106708984A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1987777A (en) * | 2005-12-19 | 2007-06-27 | 国际商业机器公司 | Computer method and apparatus for activity-based version selection in a configuration management system |
CN103455634A (en) * | 2013-09-24 | 2013-12-18 | 国家电网公司 | Electric power GIS (geographic information system) data collecting system and method based on mobile equipment |
CN104376415A (en) * | 2014-11-17 | 2015-02-25 | 南通中远船务工程有限公司 | Cable book management system |
CN104484836A (en) * | 2014-12-26 | 2015-04-01 | 国家电网公司 | Grid fault decision-making assisting visualization system and method |
CN105608640A (en) * | 2016-01-29 | 2016-05-25 | 厦门亿力吉奥信息科技有限公司 | Power grid equipment data acquisition method and system |
CN105760429A (en) * | 2016-01-29 | 2016-07-13 | 厦门亿力吉奥信息科技有限公司 | Power grid equipment data check method and system thereof |
Non-Patent Citations (1)
Title |
---|
凌松等: "" 安徽营配贯通数据采录工具的研究与应用"", 《中州煤炭》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107240032A (en) * | 2017-06-07 | 2017-10-10 | 国网江苏省电力公司常熟市供电公司 | Distribution scheduling intelligence accident prediction establishment processing system |
CN107240032B (en) * | 2017-06-07 | 2020-12-04 | 国网江苏省电力公司常熟市供电公司 | Distribution network scheduling intelligent accident plan compiling and processing system |
CN107808236A (en) * | 2017-10-10 | 2018-03-16 | 南方电网科学研究院有限责任公司 | Substation equipment state evaluation system and method |
CN110956348A (en) * | 2018-09-27 | 2020-04-03 | 丰图科技(深圳)有限公司 | Closed area data acquisition task packet generation method and system and closed area data acquisition method |
CN110956348B (en) * | 2018-09-27 | 2023-12-19 | 丰图科技(深圳)有限公司 | Method and system for generating closed area data acquisition task package and closed area data acquisition method |
CN111178854A (en) * | 2020-01-02 | 2020-05-19 | 深圳市康拓普信息技术有限公司 | Electric power underground pipe network general survey system and method |
CN112507262A (en) * | 2020-12-30 | 2021-03-16 | 苏州光格科技股份有限公司 | Cable channel section acquisition and automatic generation method based on handheld terminal |
CN112507262B (en) * | 2020-12-30 | 2024-03-12 | 苏州光格科技股份有限公司 | Method for collecting and automatically generating section of cable channel based on handheld terminal |
CN113283040A (en) * | 2021-04-30 | 2021-08-20 | 浙江图维科技股份有限公司 | Method and system for acquiring cable attribute and laying occupation information on site |
CN113283040B (en) * | 2021-04-30 | 2022-04-12 | 浙江图维科技股份有限公司 | Method and system for acquiring cable attribute and laying occupation information on site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106708984A (en) | Method, apparatus and system for acquiring basic data of cable channel | |
CN102760255B (en) | Underground electric network data management and Electric Power Network Planning system and management method | |
CN103095504B (en) | A kind of wired network infrastructure resource management system | |
CN106446033A (en) | Potential safety hazard information management system and method for underground pipelines | |
CN105320811A (en) | Method for establishing topological connected model of urban underground electricity pipe network | |
CN111027834A (en) | Power cable informatization management system and method based on three-dimensional detection technology | |
CN109710696A (en) | The System and method for the mobile operation of unusual fluctuation is verified for power equipment | |
CN108921239A (en) | Duct size information monitoring system based on two dimensional code | |
CN112036766A (en) | Gridding distribution network service management method and device, computer equipment and storage medium | |
CN105608640A (en) | Power grid equipment data acquisition method and system | |
CN107066500A (en) | A kind of electrical network mass data quality indicator method based on PMS models | |
CN106528943B (en) | A kind of cable shaft data drawing methods | |
US7752234B2 (en) | Method and apparatus for auditing utility poles | |
CN113536505A (en) | Automatic collaborative design system for 10kV and below power distribution network engineering line | |
CN105760429A (en) | Power grid equipment data check method and system thereof | |
CN113722870B (en) | Power grid operation full-space monitoring method, system, equipment and medium | |
CN112288171A (en) | Data processing method, device and system | |
Stoter et al. | A generic approach for 3D SDI in the Netherlands | |
Nasirifard et al. | A crowdsourcing approach for the inference of distribution grids | |
CN116401800A (en) | Verification method and device for primary wiring diagram of smart power grid station | |
CN115577541A (en) | Digital twin identification method and management system for hidden cable pipe network facilities | |
Kamrat | Selected information technology tools supporting for maintenance and operation management electrical grids | |
CN105354657A (en) | Method for matching transformer accounts between power production management system and power marketing management system | |
KR20210074664A (en) | Review method and server of system linkage for renewable energy | |
CN105046586A (en) | Measuring point geographic information management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170524 |
|
RJ01 | Rejection of invention patent application after publication |