CN107239912A - A kind of enterprise product design data management system based on PLM platforms - Google Patents

A kind of enterprise product design data management system based on PLM platforms Download PDF

Info

Publication number
CN107239912A
CN107239912A CN201710542881.3A CN201710542881A CN107239912A CN 107239912 A CN107239912 A CN 107239912A CN 201710542881 A CN201710542881 A CN 201710542881A CN 107239912 A CN107239912 A CN 107239912A
Authority
CN
China
Prior art keywords
product
design
version
parts
analogue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710542881.3A
Other languages
Chinese (zh)
Inventor
褚景春
吴兵
贾冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian United Power Technology Co Ltd
Original Assignee
Guodian United Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian United Power Technology Co Ltd filed Critical Guodian United Power Technology Co Ltd
Priority to CN201710542881.3A priority Critical patent/CN107239912A/en
Publication of CN107239912A publication Critical patent/CN107239912A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Manufacturing & Machinery (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of enterprise product design data management system based on PLM platforms, including product design BOM management modules, digital-to-analogue management module, design alteration management module and product configuration management module.Product design BOM management modules are used to enter edlin to product base parts and components progress class definition, parts attribute of a relation, parts version and standard component version;Digital-to-analogue management module includes management logarithmic mode in itself with CAD collaborative design methods;The changing process that design alteration management module is used for deisgn product is managed, and includes the issue and change of product design data;Product configuration management module is used for the option that the whole product configuration of customer selecting is supplied to according to the market demand.The present invention realizes the unified management of product design data by product design data management and practical application, design department is realized improvement remodeling in new product, greatly shorten the research and development of products cycle simultaneously, cost of implementation is reduced, and is also mitigated working strength, is saved design time.

Description

A kind of enterprise product design data management system based on PLM platforms
Technical field
The invention belongs to data management system, and in particular to a kind of enterprise product design data management based on PLM platforms System.
Background technology
As enterprise uses the application of advanced design and manufacture means, particularly information technology in the industrial production, greatly The big research and development of products ability and the market competitiveness for improving enterprise.At the same time, the design data in R & D of complex and Volatile growth trend, especially enterprise is presented when to some part develop with production development in technical documentation information, Generally require to undergo multiple design phases, to ensure that the achievement in research in each stage is not damaged by, generally require and set up multiple texts Shelves preserve come the design studies content to this part, will so be caused confusion when being modified to design data, most It is effective version which not can determine that eventually, so as to cause the integrality it cannot be guaranteed that data, simultaneously for design alteration management and Product configuration management it is also proposed challenge.
As can be seen here, above-mentioned existing product design data management system has obviously still suffered from inconvenience and defect, and urgently It is further improved.How a kind of new enterprise product design data management system based on PLM platform is founded, as working as Preceding industry pole needs improved target.
The content of the invention
In view of the above-mentioned problems, it is an object of the invention to provide a kind of enterprise product design data management based on PLM platforms Product design data can be realized effective management, so as to avoid the deficiencies in the prior art by system.
In order to solve the above-mentioned technical problem, the present invention provides a kind of enterprise product design data management based on PLM platforms System, including product design BOM management modules, digital-to-analogue management module, design alteration management module and product configuration management module, Wherein:
The product design BOM management modules, are carried out for the base parts and components to product in enterprise product design Class definition, parts attribute of a relation editor, parts version editor and standard component version editor;
The digital-to-analogue management module, including logarithmic mode in itself management and CAD collaborative design methods management, wherein conduct The carrier of the Back ground Information of parts is described, a digital-to-analogue can correspond to multiple parts, but a part there can only be a number Mould or no digital-to-analogue;
The design alteration management module, for the changing process of deisgn product, the changing process of the product includes production The issue of product design data and change procedure;
The product configuration management module, the choosing for being supplied to the whole product configuration of customer selecting according to the market demand , wherein config option is arranged on product line, model or product.
As a modification of the present invention, it is fixed that the product design BOM management modules include the classification of product base parts and components Foster son's module, parts attribute of a relation editor submodule, parts version editor submodule, standard component version editor's submodule;
Wherein, the product base parts and components class definition submodule, for using and managing requirement according to parts Define the base categories of parts;
Parts attribute of a relation editor's submodule, in specific BOM contexts, in specific assembly Under, edlin, at least 1 are entered to number of parts;And in specific assembly context, to determining to sort between part at the same level Relation;
Parts version editor's submodule, the serial number edit version number for according to AA, AB, AC, AD ...;
Standard component version editor's submodule, for being managed based on the product standard part on PLM platforms by standard component Member is managed, and standard component digital-to-analogue only one of which version 00, and 00 version is directly covered during modification.
Further improve, the management of described logarithmic mode in itself includes digital-to-analogue attribute definition, digital-to-analogue version and life cycle Management, digital-to-analogue issue and change management.
Further improve, the digital-to-analogue includes big version and small version, the big version, for being reflected in product development The digital-to-analogue design point of different phase in journey, the big version needs to examine, issue after can just escalate into new big version;It is described Small version, the tracking for being reflected in historical record in some big version design process, the small version can create multiple, and not Need examination & approval.
Further improve, the changing process management of the deisgn product includes design alteration flow scheme design, ECR process encodings And definition, ECO process encodings and definition.
Further improve, the changing process of the product includes according to design alteration reason:Issued parts, The change of change, market and demand of marketing during the change of digital-to-analogue and engineering drawing, site operation.
Further improve, the product configuration management includes product platform definition, configuration rule and product BOM output.
The present invention has advantages below:
Enterprise product design data management system of the invention based on PLM platforms, realizes the unification of product design data Management, it is ensured that uniqueness, controllability, observability, validity and the retrospective of digital product data;Pass through product design data Management and practical application, have reached product configuration management, design department can be made to realize improvement remodeling in new product, while can pole It is big to shorten the research and development of products cycle, cost of implementation reduction.The working strength of designer can also be mitigated simultaneously, design time is saved.
Enterprise product design data management system of the invention based on PLM platforms realizes the various objects related to part Application, examination & verification, version management are completed in same system, and can set up association to related design documentation, are built with product knot Structure is the single product data source of core, strengthens the shared of data and reuses, and can realize the product number of enterprise in the process According to label examine, digital-to-analogue management, design alteration, product BOM rapid configuration.
Brief description of the drawings
Above-mentioned is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, below With reference to accompanying drawing, the present invention is described in further detail with embodiment.
Fig. 1 is the structural representation of the enterprise product design data management system of the invention based on PLM platforms.
Embodiment
Referring to the drawings shown in 1, the enterprise product design data management system of the invention based on PLM platforms, including product are set Count BOM management (EBOM) module, digital-to-analogue management module, design alteration management module, product configuration management module.
Product design BOM management modules, for designing enterprise product in the base parts and components of product carry out classifying fixed Justice, parts attribute of a relation editor, parts version editor and standard component version editor.It includes the classification of product base parts and components Define submodule, parts attribute of a relation editor submodule, parts version editor submodule, standard component version editor's submodule Block;Wherein, product base parts and components class definition submodule can define parts according to the requirement that uses and manage of parts Base categories, classification is as follows:Machine components, electric parts, standard component (part containing welding standard) and metal sheet etc., machinery zero Part is divided into EC parts and exploitation part again, and EC parts are exactly the part for needing to design and issue.
The parts attribute of a relation, is divided into supplier's equivalent parts of part:In PLM platforms " manufacture equivalent parts/mutually Change part " function, be exactly " supplier's equivalent parts ", by the addition of the reciprocity Part No. part of supplier wherein, while requiring pair Deng part attribute be provider companies part.Parts attribute of a relation editor's submodule, in specific above and below BOM Wen Zhong, under specific assembly, edlin, at least 1 are entered to number of parts;And in specific assembly context, it is right Ordering relation is determined between part at the same level;It can be inputted when building BOM:10,20,30 ..., such numeral is from small to large System can be ranked up.Enter edlin in the BOM Powerview that attribute in other relations can be in PLM platforms.
Parts version editor's submodule, the serial number increase version number for according to AA, AB, AC, AD ....Parts Reach after issued state, if modification, phase transition, can generate new version.Old version can retain, and fail parts It can also check, failure and parts embody in life cycle.
Standard component version editor's submodule, for being managed based on the product standard part on PLM platforms, by standard component pipe Reason person manages, and remaining personnel can only browse and use, it is impossible to change.Standard component digital-to-analogue only one of which version 00, directly covers during modification The version of lid 00, standard component completes examination & verification outside system, creates in systems after standard component, parts is created in systems, and close Connection correspondence standard component digital-to-analogue.
The digital-to-analogue management module includes the management and the management of CAD collaborative design methods of logarithmic mode in itself, is retouched wherein being used as The carrier of the Back ground Information of parts is stated, a digital-to-analogue can correspond to multiple parts, but a part cannot be correspondingly multiple Digital-to-analogue, can only there is a digital-to-analogue or no digital-to-analogue;There is the part of digital-to-analogue, correspondence part embodies in " association part ".
For the ease of management, digital-to-analogue version point big version and small version.Big version, for being reflected in product development process In, the digital-to-analogue design point of different phase.Big version can not arbitrarily upgrade, and big version needs examination & approval, after version issue, repaiies again New big version could be generated when changing.Small version (Version), for being reflected in some big version design process, history note The tracking of record;Small version can create multiple according to actual needs, and small version need not be examined.Big version (Revision) and small Relation between version (Version):Big version includes multiple small versions.The specific physical file of small version correspondence, big version It is the set of small version.Key step is as follows:
1. in ENOVIA, a newly-built part applies for a Part No., and this component assembly is arrived into corresponding product Among EBOM levels;
ENOVIA is selected in AutoCAD>Newly-built order, selects a template, already present part is filled on the right on the left side Number;
2. inserting the title of part, start design;
ENOVIA in 3.AutoCAD>Preserve>Activation is whole, preserves the currently active document designed;
4. part is preserved into a certain working space;
5. system can carry out EBOM synchronizations, or create corresponding EBOM parts;
6. walking ECO, digital-to-analogue is first issued, part is issued afterwards.
The design alteration management module, the changing process for deisgn product is managed, and the changing process of the product includes The issue of product design data and change procedure;The main covering product design data of deisgn product changing process management (digital-to-analogue, Parts, design associated documents etc.) issue, change procedure, remaining changing process performs not in PLM system.Become by design More reason, the changing process of the product is broadly divided into following a few classes:The change of issued parts, digital-to-analogue and engineering drawing; Change during site operation;Market and the change of marketing demand.Design alteration is divided into two classes:First kind change refers to design number According to changing process/such as:Clerical error change is corrected, increases drawing translator of English, the design details of version part is risen, but not changed Part No., or newly-generated new part, change EBOM structures, such as BOM are increased, delete, changed.The system is flat by PLM ECO (change perform flow) in platform realizes change, it is not necessary to ECR (flow is asked in change).Equations of The Second Kind change refers to product hair Due to the requirement of lower dept after cloth, or, it is necessary to carry out changing process to deisgn product the reason for market.This changing process In, realized in the present system to the flow before change issue since modification application list.The system passes through the ECR/ in PLM platforms ECO realizes change.
The change key step following steps of the ECR/ECO:
1. create ECR/ECO (the change person of accepting puts question to people);
2. complete《Change suggestion is single》, system is checked in, this document life cycle label is completed and examines;
3. ECR is created, addition《Change suggestion is single》Into ECR " Reference Documents (reference documents) ";
4. examining regulation according to label, create Route, selection label examine personnel (selection label examine template);
5. the scheme of change submits node (" change scheme establishment-> examination & verifications " Route);
6. change scheme works out (design engineer);
7. completing change scheme, system is checked in, change scheme document life label is completed and examines;
8. change scheme document is added in ECR " reference documents ", modification will be involved the need in change scheme Digital-to-analogue, parts are added in ECR " AffectedItems (influence content) ".Turn the stage for digital-to-analogue, parts, directly The digital-to-analogue in stage, parts will be needed to turn to be added in ECR " Affected Items (influence content) ";
9. the task of completion, and submit;
10. system submits examination & verification automatically;
11. a pair submission content carries out integrality examination & verification;
12. the task of completion, fills in opinion, then submits;If problematic return " change scheme establishment ";
13. system automatic lifting state is to " change scheme submit " (mark change scheme, which is submitted, to be completed);And automatic start " pre-authentication passes through " Route works;
14. assess node (" pre-authentication passes through " Route);
15. pre-authentication passes through (relevant speciality minister countersign);
16. whether passing through according to the countersign of the result of change scheme, and fill in opinion.If necessary to increase into flow Associated documents, the engineer for being responsible for the ECR by technique center is responsible for addition;
17. pass through rear, system automatic lifting state to " assessment " (mark, which is assessed, to be completed);And automatic start is "-> batches before meeting It is accurate " Route;
18. evaluation node (" countersign->Approval " Route) countersign (manufacturing technology portion, buying Department of Commerce, technique center, battalion Pin company, the countersign of other departments) change scheme is evaluated according to content above;
Responsible engineer is responsible for collecting opinion, completes《Deisgn product/change evaluation table》, system is checked in,《Design production Product/change evaluation table》File life cycle label are finished the trail into;It is added in ECR " reference documents ";
19. all departments personnel complete countersign, system is automatically for approval;
20. ratifying examining content, ratify change scheme, or return or terminate ECR, change is terminated;
Ratify change scheme, system automatic lifting state to " evaluation " (mark evaluation is completed);
Automatic start 21. " starting change " Route, creates ECO (" starting change " Route)
Start change (design engineer).Create ECO (ECO flows detailed description), system automatic lifting state to " establishment ECO " (mark creates ECO and completed);
22. change is completed, automatic after the completion of ECO to promote state to " change is completed ".
The product configuration management module, the option for being supplied to the whole product configuration of customer selecting according to the market demand, Wherein config option is arranged on product line, model or product.Client selects the whole of needs according to configuration feature config option Blower fan is prepared.Following information is exported on PLM platforms by the system:Product line/sub-product line is set up, blower fan model is set up, Related product BOM and project simultaneously confirm feature object title (enterprise needs to provide the naming rule of configuration feature), feature class Type (acquiescence is configuration feature), feature description (descriptive information to the configuration feature for being supplied to client) are selected according to configuration feature , particular module is chosen, satisfactory characteristic module BOM is automatically configured out.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, this Art personnel make a little simple modification, equivalent variations or modification using the technology contents of the disclosure above, all fall within this hair In bright protection domain.

Claims (7)

1. a kind of enterprise product design data management system based on PLM platforms, it is characterised in that including product design BOM pipes Module, digital-to-analogue management module, design alteration management module and product configuration management module are managed, wherein:
The product design BOM management modules, classify for the base parts and components to product in enterprise product design Definition, parts attribute of a relation editor, parts version editor and standard component version editor;
The digital-to-analogue management module, including logarithmic mode in itself management and CAD collaborative design methods management, wherein as description The carrier of the Back ground Information of parts a, digital-to-analogue can correspond to multiple parts, but a part can only have a digital-to-analogue or Person does not have digital-to-analogue;
The design alteration management module, the changing process for deisgn product is managed, and the changing process of the product includes production The issue of product design data and change procedure;
The product configuration management module, the option for being supplied to the whole product configuration of customer selecting according to the market demand, its Middle config option is arranged on product line, model or product.
2. the enterprise product design data management system according to claim 1 based on PLM platforms, it is characterised in that institute Stating product design BOM management modules includes product base parts and components class definition submodule, parts attribute of a relation editor's submodule Block, parts version editor submodule, standard component version editor's submodule;
Wherein, the product base parts and components class definition submodule, for using and managing requirement definition according to parts The base categories of parts;
Parts attribute of a relation editor's submodule, it is right under specific assembly in specific BOM contexts Number of parts enters edlin, at least 1;And in specific assembly context, to determining ordering relation between part at the same level;
Parts version editor's submodule, the serial number edit version number for according to AA, AB, AC, AD ...;
Standard component version editor's submodule, for being entered based on the product standard part on PLM platforms by standard component keeper Row management, and standard component digital-to-analogue only one of which version 00, directly cover 00 version during modification.
3. the enterprise product design data management system according to claim 1 based on PLM platforms, it is characterised in that institute The management of the logarithmic mode stated in itself includes digital-to-analogue attribute definition, digital-to-analogue version and life cycle management, digital-to-analogue issue and change pipe Reason.
4. the enterprise product design data management system according to claim 3 based on PLM platforms, it is characterised in that institute Stating digital-to-analogue includes big version and small version, and the big version, the digital-to-analogue for being reflected in different phase in product development process is set Meter state, the big version needs to examine, issue after can just escalate into new big version;The small version, for being reflected in certain The tracking of historical record in individual big version design process, the small version can create multiple, and need not examine.
5. the enterprise product design data management system according to claim 1 based on PLM platforms, it is characterised in that institute State deisgn product changing process management include design alteration flow scheme design, ECR process encodings and definition, ECO process encodings and Definition.
6. the enterprise product design data management system according to claim 5 based on PLM platforms, it is characterised in that institute The changing process of product is stated, is included according to design alteration reason:It is issued parts, the changing of digital-to-analogue and engineering drawing, existing The change of change, market and demand of marketing in the work progress of field.
7. the enterprise product design data management system according to claim 1 based on PLM platforms, it is characterised in that institute Stating product configuration management includes product platform definition, configuration rule and product BOM output.
CN201710542881.3A 2017-07-05 2017-07-05 A kind of enterprise product design data management system based on PLM platforms Pending CN107239912A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710542881.3A CN107239912A (en) 2017-07-05 2017-07-05 A kind of enterprise product design data management system based on PLM platforms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710542881.3A CN107239912A (en) 2017-07-05 2017-07-05 A kind of enterprise product design data management system based on PLM platforms

Publications (1)

Publication Number Publication Date
CN107239912A true CN107239912A (en) 2017-10-10

Family

ID=59991285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710542881.3A Pending CN107239912A (en) 2017-07-05 2017-07-05 A kind of enterprise product design data management system based on PLM platforms

Country Status (1)

Country Link
CN (1) CN107239912A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108881405A (en) * 2018-05-30 2018-11-23 郑州云海信息技术有限公司 It is a kind of for researching and developing the information transfer system and method between multiple production plants
CN109035060A (en) * 2018-07-19 2018-12-18 西安昆仑工业(集团)有限责任公司 A kind of structured processes management system and management method
CN109901872A (en) * 2019-03-12 2019-06-18 江苏睿孜星智控科技有限公司 A kind of IT application in enterprises series of products version pipe control method
CN110889582A (en) * 2019-10-10 2020-03-17 中国第一汽车股份有限公司 Method for realizing PBOM visualization based on Teamcenter
CN110889579A (en) * 2019-08-27 2020-03-17 四川航天长征装备制造有限公司 MBOM technical state management and control method based on baseline
CN110992001A (en) * 2019-12-04 2020-04-10 鸿利智汇集团股份有限公司 Product design process management method
CN111143337A (en) * 2019-12-04 2020-05-12 中国航空工业集团公司西安飞行自动控制研究所 Method for improving data quality in product data management system
CN112347084A (en) * 2020-12-01 2021-02-09 广州辰创科技发展有限公司 Intelligent PCB BOM generation method and system
CN113626479A (en) * 2021-08-12 2021-11-09 奇瑞汽车股份有限公司 Data integration method of engineering change management system and BOM system
CN115130699A (en) * 2022-08-09 2022-09-30 南京维拓科技股份有限公司 BOM matching calculation and rule requirement identification method based on heavy-duty car industry
CN115576904A (en) * 2022-10-09 2023-01-06 北京凯锐远景科技有限公司 IDS three-dimensional model analysis method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101515308A (en) * 2009-03-31 2009-08-26 上海同济同捷科技股份有限公司 Data management system for vehicle products and collaborative design method thereof
CN102831505A (en) * 2012-08-20 2012-12-19 南京徐工汽车制造有限公司 Management system and management method for enterprise information
CN102915490A (en) * 2011-06-29 2013-02-06 通用电气公司 Automated system for digitized product management
CN103164573A (en) * 2013-01-18 2013-06-19 浙江大丰体育设备有限公司 Product data management (PDM) design system
CN103593727A (en) * 2013-10-25 2014-02-19 长安标致雪铁龙汽车有限公司 Car manufacturing BOM management method and management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101515308A (en) * 2009-03-31 2009-08-26 上海同济同捷科技股份有限公司 Data management system for vehicle products and collaborative design method thereof
CN102915490A (en) * 2011-06-29 2013-02-06 通用电气公司 Automated system for digitized product management
CN102831505A (en) * 2012-08-20 2012-12-19 南京徐工汽车制造有限公司 Management system and management method for enterprise information
CN103164573A (en) * 2013-01-18 2013-06-19 浙江大丰体育设备有限公司 Product data management (PDM) design system
CN103593727A (en) * 2013-10-25 2014-02-19 长安标致雪铁龙汽车有限公司 Car manufacturing BOM management method and management system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
程鹏: "汽车研究院PDM系统项目实施", 《中国优秀硕士学位论文全文数据库·信息科技辑》 *
邓心伟: "面向大批量定制的产品数据管理方法研究及其应用", 《中国优秀硕士学位论文全文数据库·信息科技辑》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108881405A (en) * 2018-05-30 2018-11-23 郑州云海信息技术有限公司 It is a kind of for researching and developing the information transfer system and method between multiple production plants
CN109035060A (en) * 2018-07-19 2018-12-18 西安昆仑工业(集团)有限责任公司 A kind of structured processes management system and management method
CN109901872A (en) * 2019-03-12 2019-06-18 江苏睿孜星智控科技有限公司 A kind of IT application in enterprises series of products version pipe control method
CN110889579A (en) * 2019-08-27 2020-03-17 四川航天长征装备制造有限公司 MBOM technical state management and control method based on baseline
CN110889579B (en) * 2019-08-27 2023-06-30 四川航天长征装备制造有限公司 MBOM technical state control method based on base line
CN110889582A (en) * 2019-10-10 2020-03-17 中国第一汽车股份有限公司 Method for realizing PBOM visualization based on Teamcenter
CN111143337A (en) * 2019-12-04 2020-05-12 中国航空工业集团公司西安飞行自动控制研究所 Method for improving data quality in product data management system
CN111143337B (en) * 2019-12-04 2023-04-28 中国航空工业集团公司西安飞行自动控制研究所 Method for improving data quality in product data management system
CN110992001A (en) * 2019-12-04 2020-04-10 鸿利智汇集团股份有限公司 Product design process management method
CN112347084A (en) * 2020-12-01 2021-02-09 广州辰创科技发展有限公司 Intelligent PCB BOM generation method and system
CN113626479A (en) * 2021-08-12 2021-11-09 奇瑞汽车股份有限公司 Data integration method of engineering change management system and BOM system
CN115130699A (en) * 2022-08-09 2022-09-30 南京维拓科技股份有限公司 BOM matching calculation and rule requirement identification method based on heavy-duty car industry
CN115130699B (en) * 2022-08-09 2024-05-21 南京维拓科技股份有限公司 BOM optional calculation and regulation requirement identification method based on heavy-duty car industry
CN115576904A (en) * 2022-10-09 2023-01-06 北京凯锐远景科技有限公司 IDS three-dimensional model analysis method
CN115576904B (en) * 2022-10-09 2023-08-11 北京凯锐远景科技有限公司 IDS three-dimensional model analysis method

Similar Documents

Publication Publication Date Title
CN107239912A (en) A kind of enterprise product design data management system based on PLM platforms
Bag et al. Examining the role of dynamic remanufacturing capability on supply chain resilience in circular economy
Vinodh et al. AHP‐based lean concept selection in a manufacturing organization
Song et al. Early contractor involvement in design and its impact on construction schedule performance
US6819967B2 (en) Relational database for producing bill-of-materials from planning information
EP1862956A1 (en) Systems and methods for assignment generation in a value flow environment
Deshmukh et al. Fuzzy analytic hierarchy process (FAHP) for green supplier selection in Indian industries
Moon et al. Dynamic control of construction supply chain to improve labor performance
Gaikwad et al. An application of Six Sigma to reduce supplier quality cost
Maull et al. Special feature. The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control
Narwane et al. Risks to big data analytics and blockchain technology adoption in supply chains
KR101398923B1 (en) System for reviewing rule-based bim model using quality check items
Booker et al. Designing for assembly quality: strategies, guidelines and techniques
Golabchi et al. Leveraging BIM for automated fault detection in operational buildings
Shishank et al. Outsourcing: decision-making methods and criteria during design and engineering
Sjarifudin et al. Implementation of six sigma approach for increasing quality formal men’s jackets in the garment industry
US6850904B2 (en) Relational database for producing bill-of-materials from planning information
Moayeri et al. BIM-based model for quantifying the design change time ripple effect
Dixit et al. Identification and modelling of the various factors affecting the productivity of FMS
US7231361B2 (en) Method, system, and storage medium for utilizing excess and surplus inventory
Jrade et al. Computer-integrated system for estimating the costs of building projects
Ma et al. An integrated approach to identify function components for product redesign based on analysis of customer requirements and failure risk
Hermans et al. Quality management in the new product development: A PPAP approach
Yang et al. Applying mass customization to the production of industrial steam turbines
Varisco et al. From production planning flows to manufacturing operation management KPIs: Linking ISO18828 & ISO22400 standards

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171010

WD01 Invention patent application deemed withdrawn after publication