CN107239906A - Cost Index Study on Estimating and application system - Google Patents

Cost Index Study on Estimating and application system Download PDF

Info

Publication number
CN107239906A
CN107239906A CN201710428191.5A CN201710428191A CN107239906A CN 107239906 A CN107239906 A CN 107239906A CN 201710428191 A CN201710428191 A CN 201710428191A CN 107239906 A CN107239906 A CN 107239906A
Authority
CN
China
Prior art keywords
project
engineering
index
typical
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710428191.5A
Other languages
Chinese (zh)
Inventor
曹外芬
毛凤春
周立鹤
刘文超
刘屾
孙熙胜
李国友
张倩
牧国韬
李建文
张雯婷
包向红
杨丽
张烨
程天泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qujing Power Supply Bureau Yunnan Power Grid Co Ltd
Original Assignee
Qujing Power Supply Bureau Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qujing Power Supply Bureau Yunnan Power Grid Co Ltd filed Critical Qujing Power Supply Bureau Yunnan Power Grid Co Ltd
Priority to CN201710428191.5A priority Critical patent/CN107239906A/en
Publication of CN107239906A publication Critical patent/CN107239906A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of Cost Index Study on Estimating and application system, the system are made up of operation layer, represent layer, data Layer.The system can realize that production project declares informationization;Realize non-technical economy professional Cost Index measuring and calculating quick and precisely;Realize that all kinds of cost estimation standard resources are organically combined;Realize that project operation data multidimensional degree shows and comprehensive application and reduction engineering later maintenance cost.

Description

Cost Index Study on Estimating and application system
Technical field
The present invention relates to a kind of Cost Index Study on Estimating and application system, belong to field of power.
Background technology
The requirement managed with project lean is constantly deepened, and original artificial evaluation method can not adapt to current industry Business is required, therefore it is extremely urgent to set up the scientific production project Cost Index measuring and calculating system of standardization.
Current production project shows the features such as quantity is big, type is more, engineering is scattered, Business Information is not concentrated, non-technical economy Personnel are difficult in the short time quickly, accurately calculate production project estimated amount, and larger resistance is brought to project specificationization management Hinder.Construction costs measuring and calculating workload is big, and data are more, by the way of being manually entered and calculating, and easily produces mistake, and technological transformation is examined Repair that Construction Cost Data amount is huge, data structure is complicated.By the present invention to all production project cost data carry out comb and Refine, work out a set of cost estimation index system for being adapted to all kinds of production projects.
Current production project estimation Main Basiss personal experience is completed, and on the one hand experience and professional knowledge are relatively relied on, On the other hand also lack the evaluation criterion of scientific unity, be unfavorable for company and be managed and control.By this project implementation, respectively The estimation achievement of individual unit can directly upload, be aggregated into upper level unit or department, be easy to superior unit or department to measuring and calculating matter Comprehensive control of amount.
The content of the invention
The purpose of the present invention is not enough for prior art, provides a kind of Cost Index Study on Estimating and application system.
System of the present invention is made up of three major controls:Operation layer, represent layer, data Layer.
The operation layer includes Project Cost measuring and calculating, index library management, collect statistics, index unit price;
The represent layer include Project Cost measuring and calculating, typical history engineering, index library management, standard resource management, collect statistics, Index unit price;
The Project Cost measuring and calculating is, according to typical project content and item types, to position typical index module, finished item group Valency is calculated and general expenses collects, while realize the generation of form, check and export function;
--- typical project content --- key parameter --- representative items entry pair that the index library management is to engineering type The management for the group valency rule answered, representative items entry(And quantity)--- quota, main material, equipment(And quantity)The pipe of corresponding relation Manage, and index storehouse administrative staff are managed and safeguarded to quota, main material, equipment;
The collect statistics are to carry out collect statistics to engineering relevant information from various dimensions;
The index unit price is to look at the detailed expense of each typical project entry;
The data Layer includes engineering essential information, quick estimated data, pre-/settlement data, index storehouse data, standard resource number According to etc.;
The engineering essential information includes newly-built or imports file(It is newly-built in batches)Obtain engineering essential information;
The quick estimated data includes group valency measuring and calculating and obtains estimated data;
The settlement data is into pre-/settlement file;
The index storehouse data are mounting resources;
The standard resource data are built-in system or import resource information;
(1)Project Cost is calculated
In the module, quick group valency is carried out to project that is newly-built or importing, i.e., " by typical project content, key parameter is filled in, System takes typical project entry out of automatically(Comprehensive unit price and quantity), authorized personnel is adjusted to its quantity, and system automatically can Total cost, after the completion of generate form ".
(2)Group valency rule
A) corresponding relation of typical project content --- key parameter;
b)Formulate all key parameters --- typical project entry(Quantity)Matched rule;
c)All typical project entry-standard resources(Comprehensive unit price)Locking relation:
The locking relation of all typical project entries -- building/installation quota, debugging quota, dismounting quota ";
All quotas take expense coefficient, so that it is comprehensive to formulate the buildings of all typical project entries, installation, dismounting, debugging engineering cost Close unit price;
All typical project entries -- equipment, the locking relation of main material.
(3)Report generation
Group valency measuring and calculating is completed, and generates form, and can be exported in EXCEL forms.
System concrete scheme of the present invention is as follows:
The system will use B/S frameworks, and plan is deployed in provincial company information machine room, and by company Intranet, user can be browsed by IE Device accesses and used the system.
This project major function includes:Project Cost measuring and calculating, index library management, collect statistics, index unit price etc..
Cost estimation
It is divided into net power transformation technology innovation project, major network circuit technology innovation project, major network substation equipment maintenance and repair engineering, major network line maintenance engineering, matches somebody with somebody Net project and sundry item.
The standard EXCEL data provided by grassroot project or importing constituent parts, so as to set up one or several project letter Breath.When project is by project name, item types, typical project content, voltage class, construction unit, project type, operation Between, the contents of a project etc. carry out classification and show that there is provided carry out quick search, deletion, form according to key project information to check, in advance The functions such as calculation/estimation file importing.
(1)Group valency measuring and calculating
According to typical project content and item types, typical index module is positioned, starts a group valency measuring and calculating, according to key parameter, is System takes corresponding representative items entry out of automatically(Comprehensive unit price and quantity), authorized personnel is according to engineering practice, to engineering Quantity is adjusted, and system collects expense automatically, after the completion of generate form(Estimation, budget, clearing).
(2)Typical history engineering
In systems, the engineering that group valency calculates completion can be saved as typical project by authorized personnel, same to work out next time During the engineering of type and content, authorized personnel directly invokes as needed, so that repeated workload is avoided, lifting work effect Rate.
Index library management
(A)Index unit price management
Index unit price management module, there is six type index storehouses(Major network power transformation technological transformation Cost Index storehouse, major network circuit technological transformation cost Index storehouse, major network substation equipment maintenance and repair Cost Index storehouse, major network line maintenance Cost Index storehouse, distribution Project Cost index storehouse and other Project Cost index storehouse);Index storehouse administrative staff are according to typical project entry --- quota, main material, equipment corresponding relation, mounting Resource, so that it is determined that in index storehouse the typical project entry of all types of engineerings corresponding expense.
A) resource is mounted
In index database management module, index storehouse administrative staff mount the corresponding resource of each typical project entry(By norm, it is main Material, equipment), so that the expense of each representative items entry is corresponding with resource expense.
B) formula is set
Each typical project entry includes a variety of expenses, and wherein original equipment cost, device fee of material, projects take, installed Engineering cost, debugging engineering cost and architectural engineering expense and the resource of mounting(By norm, equipment, main material)Expense is corresponding, wherein equipment Purchase commodity, device fee of material respectively with equipment, main material it is monovalent corresponding, projects take, installing engineering expense, debugging engineering cost And architectural engineering expense and corresponding quota correspondence(Quota, installation quota, debugging quota, building is removed to be multiplied by rate by norm and obtain Arrive);And other fees(Project entity's administration fee, survey and design expense, cost of superintendence, basic reserve fund etc.)Then by Ontology engineering expense Coefficient of colligation is multiplied by obtain.
(B)Group valency regulation management
Engineering type --- typical project content --- engineering key parameter --- management of the corresponding relation of representative items entry.
(C)Standard resource is managed
Use unified standard resource(By norm, main material, equipment), administrative staff's upload resource information(Equipment, main material), and to money Safeguarded and updated in source.
A) fix quotas to control production
Check quota information and update resource information, linkage more New Set unit price.
B) main material is managed
In main material management module, administrative staff manage and safeguard main material information valency, and can upload resource information, to update main material Information valency, linkage more New Set unit price.
C) equipment control
In device management module, administrative staff's management and maintained equipment information valency, and resource information can be uploaded, so as to more new equipment Information valency, linkage more New Set unit price.
D) information valency is managed
According to the fluctuation of market situation, the equipment and materials information valency built in system, linkage more New Set unit price are regularly updated.
Beneficial effects of the present invention:
1)Realize that production project declares informationization
By the research and construction to this project, estimation mode is completely free of over, uniform data management and operational mode are realized Project application work is evidence-based;With informatization platform, data sharing and the real-time query of estimation are realized.
)Realize non-technical economy professional Cost Index measuring and calculating quick and precisely
By the construction of this project, the Business Information and Cost Index of all kinds of production projects are combed, incorporation engineering management is actual to be needed Ask, help layman had regulations to abide by when assessing a fee, it is evidence-based, work is rapidly completed, so as to lift operating efficiency.
)Realize that all kinds of cost estimation standard resources are organically combined
Means are turned to information, regional cost estimation index is completed and is docked with cost estimation index, improve regional cost estimation Precision and quality.
)Realize that project operation data multidimensional degree shows and comprehensive application
Required according to management unit from different dimensions statistical engineering investment situation, based on powerful search function, quick, intelligent inspection The resources such as Suo Dingwei project contents, equipment and materials, the man-machine interaction experience of continuous lifting system plays computer techno-stress peculiar Facility sexual clorminance, realization quickly check engineering correlation circumstance.
Multi-layer, various dimensions refinement and maintained equipment, material price, make material price constantly press close to actual value, further Optimize cost estimation result.
)Reduce engineering later maintenance cost
Flexible configuration general expenses calculation formula and underlying parameter, and transferred using intuitively conventional arithmetic and variable, with The maintenance mode of simple, intuitive greatly reduces the cost of later maintenance.
Refinement and extension representative items are constituted, and improve the accuracy that template is taken, and support according to expense size and comb The corresponding main material of representative items, equipment, quota etc. are carried out selection determination by the complexity of reason, and encapsulation forms convenient establishment and taken Sub-assembly.
Embodiment
System of the present invention is made up of three major controls:Operation layer, represent layer, data Layer.
The operation layer includes Project Cost measuring and calculating, index library management, collect statistics, index unit price;
The represent layer include Project Cost measuring and calculating, typical history engineering, index library management, standard resource management, collect statistics, Index unit price;
The Project Cost measuring and calculating is, according to typical project content and item types, to position typical index module, finished item group Valency is calculated and general expenses collects, while realize the generation of form, check and export function;
--- typical project content --- key parameter --- representative items entry pair that the index library management is to engineering type The management for the group valency rule answered, representative items entry(And quantity)--- quota, main material, equipment(And quantity)The pipe of corresponding relation Manage, and index storehouse administrative staff are managed and safeguarded to quota, main material, equipment;
The collect statistics are to carry out collect statistics to engineering relevant information from various dimensions;
The index unit price is to look at the detailed expense of each typical project entry;
The data Layer includes engineering essential information, quick estimated data, pre-/settlement data, index storehouse data, standard resource number According to etc.;
The engineering essential information includes newly-built or imports file(It is newly-built in batches)Obtain engineering essential information;
The quick estimated data includes group valency measuring and calculating and obtains estimated data;
The settlement data is into pre-/settlement file;
The index storehouse data are mounting resources;
The standard resource data are built-in system or import resource information;
Project Cost is calculated
In the module, quick group valency is carried out to project that is newly-built or importing, i.e., " by typical project content, key parameter is filled in, System takes typical project entry out of automatically(Comprehensive unit price and quantity), authorized personnel is adjusted to its quantity, and system automatically can Total cost, after the completion of generate form ".
Group valency rule
A) corresponding relation of typical project content --- key parameter;
b)Formulate all key parameters --- typical project entry(Quantity)Matched rule;
c)All typical project entry-standard resources(Comprehensive unit price)Locking relation:
The locking relation of all typical project entries -- building/installation quota, debugging quota, dismounting quota ";
All quotas take expense coefficient, so that it is comprehensive to formulate the buildings of all typical project entries, installation, dismounting, debugging engineering cost Close unit price;
All typical project entries -- equipment, the locking relation of main material;
Report generation
Group valency measuring and calculating is completed, and generates form, and can be exported in EXCEL forms.

Claims (1)

1. Cost Index Study on Estimating and application system, its feature is in the system is made up of operation layer, represent layer, data Layer;
The operation layer includes Project Cost measuring and calculating, index library management, collect statistics, index unit price;
The represent layer include Project Cost measuring and calculating, typical history engineering, index library management, standard resource management, collect statistics, Index unit price;
The Project Cost measuring and calculating is, according to typical project content and item types, to position typical index module, finished item group Valency is calculated and general expenses collects, while realize the generation of form, check and export function;
--- typical project content --- key parameter --- representative items entry pair that the index library management is to engineering type Management, representative items entry --- quota, main material, the management of equipment corresponding relation, and the index library management for the group valency rule answered Personnel are managed and safeguarded to quota, main material, equipment;
The collect statistics are to carry out collect statistics to engineering relevant information from various dimensions;
The index unit price is to look at the detailed expense of each typical project entry;
The data Layer includes engineering essential information, quick estimated data, pre-/settlement data, index storehouse data, standard resource number According to;
The engineering essential information, which is that batch is newly-built including newly-built or importing file, obtains engineering essential information;
The quick estimated data includes group valency measuring and calculating and obtains estimated data;
The settlement data is into pre-/settlement file;
The index storehouse data are mounting resources;
The standard resource data are built-in system or import resource information;
(1)Project Cost is calculated
In the module, quick group valency is carried out to project that is newly-built or importing, i.e., " by typical project content, key parameter is filled in, System takes typical project entry out of automatically, and authorized personnel is adjusted to its quantity, and system understands total cost automatically, after the completion of generate Form ";
Group valency rule
A) corresponding relation of typical project content --- key parameter;
b)Formulate all key parameters --- the matched rule of typical project entry;
c)All typical project entry-standard resource locking relations:
The locking relation of all typical project entries -- building/installation quota, debugging quota, dismounting quota ";
All quotas take expense coefficient, so that it is comprehensive to formulate the buildings of all typical project entries, installation, dismounting, debugging engineering cost Close unit price;
All typical project entries -- equipment, the locking relation of main material;
Report generation
Group valency measuring and calculating is completed, and generates form, and can be exported in EXCEL forms;
Cost estimation
It is divided into net power transformation technology innovation project, major network circuit technology innovation project, major network substation equipment maintenance and repair engineering, major network line maintenance engineering, matches somebody with somebody Net project and sundry item;
The standard EXCEL data provided by grassroot project or importing constituent parts, so as to set up one or several project information; Mesh passes through project name, item types, typical project content, voltage class, construction unit, project type, production time, project Content carry out classification show there is provided according to key project information carry out quick search, deletion, form check, budget/estimation file Import feature;
(1)Group valency measuring and calculating
According to typical project content and item types, typical index module is positioned, starts a group valency measuring and calculating, according to key parameter, is System takes corresponding representative items entry out of automatically, and authorized personnel is adjusted, system according to engineering practice to engineering quantity Automatically collect expense, after the completion of generate form;
(2)Typical history engineering
In systems, the engineering that group valency calculates completion can be saved as typical project by authorized personnel, same to work out next time During the engineering of type and content, authorized personnel directly invokes as needed, so that repeated workload is avoided, lifting work effect Rate;
Index library management
Index unit price management
Index unit price management module, there is six type index storehouses;Index storehouse administrative staff are according to typical project entry --- quota, Main material, equipment corresponding relation, mount resource, so that it is determined that the corresponding of typical project entry of all types of engineerings is taken in index storehouse With;
A) resource is mounted
In index database management module, index storehouse administrative staff mount the corresponding resource of each typical project entry, so that The expense of each representative items entry is corresponding with resource expense;
B) formula is set
Each typical project entry includes a variety of expenses, and wherein original equipment cost, device fee of material, projects take, installed Engineering cost, debugging engineering cost and architectural engineering expense are corresponding with the resource expense mounted, wherein original equipment cost, device material Take respectively with equipment, main material it is monovalent corresponding, projects take, installing engineering expense, debugging engineering cost and architectural engineering expense and phase The quota correspondence answered;And other fees are then multiplied by coefficient of colligation by Ontology engineering expense and obtained;
Group valency regulation management
Engineering type --- typical project content --- engineering key parameter --- management of the corresponding relation of representative items entry;
(3)Standard resource is managed
Using unified standard resource, administrative staff upload resource information, and resource is safeguarded and updated;
A) fix quotas to control production
Check quota information and update resource information, linkage more New Set unit price;
B) main material is managed
In main material management module, administrative staff manage and safeguard main material information valency, and can upload resource information, to update main material Information valency, linkage more New Set unit price;
C) equipment control
In device management module, administrative staff's management and maintained equipment information valency, and resource information can be uploaded, so as to more new equipment Information valency, linkage more New Set unit price;
D) information valency is managed
According to the fluctuation of market situation, the equipment and materials information valency built in system, linkage more New Set unit price are regularly updated.
CN201710428191.5A 2017-06-08 2017-06-08 Cost Index Study on Estimating and application system Pending CN107239906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710428191.5A CN107239906A (en) 2017-06-08 2017-06-08 Cost Index Study on Estimating and application system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710428191.5A CN107239906A (en) 2017-06-08 2017-06-08 Cost Index Study on Estimating and application system

Publications (1)

Publication Number Publication Date
CN107239906A true CN107239906A (en) 2017-10-10

Family

ID=59986205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710428191.5A Pending CN107239906A (en) 2017-06-08 2017-06-08 Cost Index Study on Estimating and application system

Country Status (1)

Country Link
CN (1) CN107239906A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537412A (en) * 2018-03-19 2018-09-14 国网冀北电力有限公司经济技术研究院 Power distribution network Project Cost processing method and processing device
CN109710649A (en) * 2018-11-14 2019-05-03 中交第二航务工程局有限公司 Circulation material recommended method and system
CN109754187A (en) * 2018-12-17 2019-05-14 广州迈安信息科技有限公司 Project cost index classification and calculation of measured data governing system
CN111414583A (en) * 2020-03-19 2020-07-14 云南电网有限责任公司曲靖供电局 Investment estimation and cost analysis control method for power grid technical improvement maintenance project
CN111898356A (en) * 2020-07-20 2020-11-06 昆明海巍科技有限公司 Engineering cost analysis method and system for reducing repeated workload
CN113506129A (en) * 2021-06-24 2021-10-15 华信咨询设计研究院有限公司 Method for measuring and calculating group client special line service network cost
CN113706314A (en) * 2021-09-07 2021-11-26 南京贝唐建筑集团有限公司 Investment estimation control system based on BIM technology
CN114418611A (en) * 2021-12-15 2022-04-29 北京北咨信息工程咨询有限公司 Weak current construction cost calculation method and device, electronic equipment and storage medium
CN116051164A (en) * 2022-12-29 2023-05-02 北京北咨信息工程咨询有限公司 Construction cost measuring and calculating method, device, equipment and readable storage medium

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537412A (en) * 2018-03-19 2018-09-14 国网冀北电力有限公司经济技术研究院 Power distribution network Project Cost processing method and processing device
CN109710649A (en) * 2018-11-14 2019-05-03 中交第二航务工程局有限公司 Circulation material recommended method and system
CN109754187A (en) * 2018-12-17 2019-05-14 广州迈安信息科技有限公司 Project cost index classification and calculation of measured data governing system
CN111414583A (en) * 2020-03-19 2020-07-14 云南电网有限责任公司曲靖供电局 Investment estimation and cost analysis control method for power grid technical improvement maintenance project
CN111414583B (en) * 2020-03-19 2023-06-02 云南电网有限责任公司曲靖供电局 Investment estimation and cost analysis management and control method for power grid technical improvement maintenance engineering
CN111898356A (en) * 2020-07-20 2020-11-06 昆明海巍科技有限公司 Engineering cost analysis method and system for reducing repeated workload
CN111898356B (en) * 2020-07-20 2021-07-16 昆明海巍科技有限公司 Engineering cost analysis method and system for reducing repeated workload
CN113506129A (en) * 2021-06-24 2021-10-15 华信咨询设计研究院有限公司 Method for measuring and calculating group client special line service network cost
CN113706314A (en) * 2021-09-07 2021-11-26 南京贝唐建筑集团有限公司 Investment estimation control system based on BIM technology
CN114418611A (en) * 2021-12-15 2022-04-29 北京北咨信息工程咨询有限公司 Weak current construction cost calculation method and device, electronic equipment and storage medium
CN116051164A (en) * 2022-12-29 2023-05-02 北京北咨信息工程咨询有限公司 Construction cost measuring and calculating method, device, equipment and readable storage medium
CN116051164B (en) * 2022-12-29 2023-11-28 北京北咨信息工程咨询有限公司 Construction cost measuring and calculating method, device, equipment and readable storage medium

Similar Documents

Publication Publication Date Title
CN107239906A (en) Cost Index Study on Estimating and application system
CN103699966B (en) Various dimensions based on user's request, overall process data managing and control system and management-control method
CN111191878A (en) Abnormal analysis based station area and electric energy meter state evaluation method and system
CN108846691A (en) Regional grain and oil market price monitoring analysing and predicting system and monitoring method
CN107967522A (en) A kind of power grid technological transformation overhaul engineering Cost Management System and its control method
CN106600464A (en) Power grid construction new project cost rapid estimation method based on fuzzy mathematics
CN104615617A (en) Dispatch monitoring information processing system for substation equipment
CN101996364A (en) Method for modifying labor time standard and labor time standard management system
CN105574673A (en) System and method for man-hour management of design company
CN108805429A (en) " one continuous line " hardware and software platform fine-grained management method for taiwan area line loss
CN202907195U (en) Communication base station energy consumption management system
CN101771275B (en) Electric energy monitoring system
TWI811925B (en) Method for planning production capacity allocation and planning apparatus
CN104123588A (en) Comprehensive evaluation system and method of smart distribution grid
CN106529742A (en) Method for predicting typical daily load of power grid by utilizing method for searching daily load rates in database
KR100945523B1 (en) On-line construction management method
CN105741049A (en) Space-time whole process oriented line loss change analysis method
CN210776794U (en) Device for carrying out load analysis and prediction aiming at temperature change
CN117495266A (en) Intelligent digital comprehensive energy production operation management decision-making system and method
CN105373880A (en) Power grid engineering project scheme feedback evaluation and scheme decision system
CN109948926A (en) A kind of highway concrete-bridge maintenance technology Selection Method based on project period
CN109816548A (en) A kind of building energy efficiency management system and method
Xu et al. Study on trade-off of time-cost-quality in construction project based on BIM
CN109797808A (en) Charging method is taken in the water supply of a kind of water conservancy data acquisition control device and regulating flow
CN107045657A (en) Analyzing Total Electricity Consumption calculating system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171010