A kind of city is paddled section warning mark post and application method
Technical field
The present invention relates to municipal field, specifically a kind of city is paddled section warning mark post and application method.
Background technique
In recent years, urban waterlogging phenomenon is than more serious, although obtaining biggish improvement, when encountering precipitation, city
Section ponding speed is fast, causes certain section water level deeper, and since scene is difficult to arrange warning mark of paddling in time, vehicle, which is strayed into, to be made
At property loss and casualties, especially at night, the phenomenon is than more serious.
Existing suggestion device of paddling mostly uses block the way stake or warning lamp, although have certain prompt effect it can be difficult to
It arranges at the first time, and blocks the way stake or warning lamp is difficult to be arranged in profundal zone, ponding edge can only be arranged in, it can not be clearly
It shows the range and depth in ponding section, and is arranged by people.
Therefore, it is necessary to design a warning mark post for avoiding automobile wading.
Summary of the invention
The object of the present invention is to provide one kind can quickly ponding section be identified and be warned, can show product
The warning mark post of water route segment limit and depth, warning will pass through the effect for section vehicle of paddling in advance.
The technical solution adopted by the present invention to solve the technical problems is:
It provides a kind of city to paddle section warning mark post, including fixed pipe assembly, installation pipe assembly and instruction mark post are total
At the fixed pipe assembly includes the first vertical tube and the mounting flange for being fixed in the first vertical tube bottom end, the first vertical tube week
The first liner plate and symmetrically arranged second liner plate that wall is provided symmetrically vertically, first liner plate and the second liner plate uniformly and
The mistake mutually handed over is arranged in the first vertical tube peripheral wall, the first liner plate vertical direction offer multiple groups equidistant arrangement for install the
First connecting hole of one bolt, first connecting hole offer the first tune through the first vertical tube tube wall, second liner plate
Section slot and the second connecting hole of multiple groups for being symmetrically disposed on first regulating tank two sides and arranging along the vertical direction, described first adjusts
Slot is saved through the first vertical tube tube wall, first regulating tank extends to first vertical tube top and is open end;
The installation pipe assembly includes the second vertical tube, and second vertical tube is equipped with the second bolt of installation close to bottom position
First jack and the second jack for installing the first bolt, the first bolt setting position are opposite with first connecting hole
It answers, the central axis of first jack is arranged in a mutually vertical manner with the second jack center axis, and second vertical tube is close
Top position is equipped with electric appliance box, and the electric appliance box and the second vertical tube common wall are equipped with string holes, and second vertical tube is close to top
Portion position is also equipped with the rope sheave for winding drawstring, is also connected with use on the second vertical tube ontology below the electric appliance box
In the mounting flange of installation push rod device assembly, second vertical tube is equipped with LED display board by mounting rod, and the LED is aobvious
Show that plate is electrically connected with the control section inside the electric appliance box;The second vertical tube peripheral wall vertically offers rectangular configuration
Placing groove, be connected with interior lining panel and lower liner plate on the placing groove both sides of the edge and the second vertical tube inner wall, it is described it is upper in
Liner plate is equipped with clamp close to top position;
The instruction mark post assembly includes bridge, and the bridge includes first end, the second end, third end, the 4th
End, the first end and the second end are equipped with gap and reflection plaster respectively, close to the first end and the second end top
End is respectively provided with the card hole of installation clamp, is respectively provided with peace close to the first end and the second end bottom end
Fill the axis hole of the second bolt;The third end is equipped with buoy mounting groove, is equipped with multiple buoys, institute in the buoy mounting groove
It states buoy mounting groove inner wall and is additionally provided with wiring groove, the buoy mounting groove is connected with the gap;The 4th end installation
There is indicator light, the indicator light is electrically connected with the control section inside the electric appliance box;The bridge top end face is equipped with for connecting
Connect the becket bridle of drawstring;
The clip includes clamping plate and two mounting plates being connected with the clamping plate both ends, and screw passes through the clamping plate
With the junction of two mounting plates, each mounting plate further respectively has the hole for installing third bolt, water level sensor
It is mounted on inside clamping plate, the water level sensor is electrically connected with the control section inside the electric appliance box, and the clamping plate is placed in
It can move up and down in one vertical tube and along the first regulating tank, two groups of third bolts are each passed through hole and the second connecting hole pacifies clip
On the second liner plate;
The push rod device assembly includes motor and the ejector pin that is connected with the motor, and the motor passes through the 4th spiral shell
Bolt is connected with the ring flange of mounting flange, and the motor is electrically connected with the control section inside the electric appliance box;
The bridge, which is mounted in the placing groove, keeps the axis hole Chong Die with first jack, is worn by the second bolt
It crosses axis hole and the first jack hingedly installs the bridge and the second vertical tube, drawing is connected between the becket bridle and the rope sheave
Rope;Second vertical tube bottom end is mounted in bridge, second jack and the coaxial arrangement of the first connecting hole, first bolt
The second jack and the first connecting hole are sequentially passed through, the second vertical tube is made to be connected with bridge.
Preferably, the first regulating tank setting is adjusted along the vertical center of the second liner plate, described first
Groove top portion is hatch frame and extends to the second liner plate top end part, and the first adjusting trench bottom is extended to away from the second liner plate bottom
3-5 centimeters;Wherein the second liner plate vertical direction described in another group is equipped with the second regulating tank, and described second to adjust slot length be the
The 1/3-1/2 of two liner plate length, second regulating tank are arranged in the second liner plate close to bottom 3-5 centimeters.
Preferably, second vertical tube top end part is equipped with semi-circular projection structure, the semi-circular projection structure is coated with
Reflectorized material;Lower mouth slot, the lower mouth groove top are symmetrically equipped on the second vertical tube ontology immediately below first jack
Portion extends to immediately below the first jack bottom, and the lower mouth slot extends to two vertical tube bottom ends, when fixed pipe assembly and installing pipe
After assembly connection installation, lower mouth slot can be overlapped with the first regulating tank and the second regulating tank respectively;Two of the placing groove are hung down
Interior lining panel and one group of lower liner plate in one group of the setting of the edge of straight flange respectively symmetrically, upper interior lining panel, which is set to, described in every group leans on
The nearly placing groove top end part, lower liner plate described in every group are disposed in proximity to the placing groove bottom end;The rope sheave is using rolling
Dynamic bearing is installed on the second vertical tube;The clamp is ball head structure.
Preferably, the gap and reflection plaster are arranged in a crossed manner on the first end and the second end, the gap
For rectangular opening;The face of 4th end is arc-shaped surface structure;The bridge is made of ABS or wooden materials, when adopting
When with ABS material, buoy is the hollow structure of injection molding, is equipped with spacing between the adjacent buoy.
Preferably, the mounting flange is installed on the second vertical tube by guide sleeve, the axis of the mounting flange with
The axis is mutually perpendicular to, and the tube wall of second vertical tube corresponds to guide sleeve position equipped with through-hole structure, and the ejector pin is installed on
Inside guide sleeve and ejector pin one end extends in the second vertical tube, and the ejector pin outer cover is equipped with spring.
Preferably, the guide sleeve inner wall is equipped with keyway arrangements, the ejector pin is equipped with bond structure, the guide sleeve and institute
Ejector pin mating connection is stated, the motor output shaft is that screw-driven is connect with the ejector pin, when motor work, the ejector pin energy
It is enough to be moved along bridge direction of the guide sleeve into the second vertical tube, so that ejector pin is pushed bridge until clamp and card hole slippage, make
Bridge is fallen.
Preferably, be equipped with backing plate between the nut of second bolt and the tube wall of the second vertical tube, the backing plate with
The tube wall binding face of second vertical tube is circular arc row structure and fits on the tube wall of the second vertical tube, the backing plate and the second spiral shell
Bolt contacting surface is planar structure.
Preferably, the drawstring is coated with reflectorised paint.
A kind of city is paddled the application method of section warning mark post, 1) multiple warning target bodies are respectively arranged in ponding
The both sides of the road at the both ends in section adjust the packing density of warning target body according to the section gradient;2) according to common automobile
Fording depth, adjusting water level sensor on each warning target body makes the height of water level sensor to the height on the road surface
Value is not more than general-utility car fording depth value and is passed when specifically adjusting the mounting height of water level sensor by clamp adjustment water level
Installation site of the sensor in the first regulating tank, and be fixed in the first vertical tube by third bolt;3) when road surface wherein
When depth of accumulated water is greater than or equal to the height of point warning target body water level sensor, the signal that water level sensor will test is passed
Send to control section, so that motor is worked and drive ejector pin push lever top of the trellis, fall bridge, at the same indicator light flashing and
LED display board shows therefore water level depth clearly can prompt and prevent vehicle pass-through, when water accumulation level continues to rise,
Bridge can be floated by buoy, thereby it is ensured that bridge, which exposes the surface, plays the role of prompt;4) when resetting, pass through rope
Wheel winding drawstring makes to indicate that mark post assembly is placed in the placing groove of installation pipe assembly.
The invention has the advantages that the present invention has the advantages that installation is simple, easy to maintain, it can be according to depth of accumulated water
Mark post indicating range is set, mark post prompt and warning function can be given full play to;The present invention also has that structure is simple, is quick on the draw
The advantages of, it can be carried out automatically falling bar according to depth of accumulated water, in turn, ponding section can be warned at the first time, avoided
Vehicle, which is strayed into, to cause any property loss and casualties.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is general structure schematic diagram provided by the embodiment of the present invention;
Fig. 2 is the left view structural representation of Fig. 1;
Fig. 3 is enlarged structure schematic diagram at the A-A of Fig. 2;
Fig. 4 is totality decomposition texture schematic diagram provided by the embodiment of the present invention;
Fig. 5 is using state structure diagram provided by the embodiment of the present invention;
Fig. 6 is fixing pipe assembly structure schematic diagram provided by the embodiment of the present invention;
Fig. 7 is installing pipe assembly structure schematic diagram provided by the embodiment of the present invention;
Fig. 8 is the other direction structural schematic diagram of Fig. 7;
Fig. 9 is that mark post assembly structure schematic diagram is indicated provided by the embodiment of the present invention;
Figure 10 is the other direction structural schematic diagram of Fig. 9;
Figure 11 is clip structure schematic diagram provided by the embodiment of the present invention;
Figure 12 is enlarged structure schematic diagram at the A of Fig. 3;
Figure 13 is enlarged structure schematic diagram at the b of Fig. 4;
In figure: 100. fixed pipe assemblies, 110. mounting flanges, 120. first vertical tubes, 121. first regulating tanks, 122. second
Regulating tank, 130. first liner plates, 131. first connecting holes, 140. second liner plates, 141. second connecting holes, 200. installing pipes are total
At, 210. second vertical tubes, 211. first jacks, 212. second jacks, 213. lower mouthfuls of slots, 214. placing grooves, 220. electric appliance boxes,
221. string holes, 230. rope sheaves, 240. mounting flanges, 241. guide sleeves, 250. mounting rods, 260.LED display board, liner on 270.
Plate, 271. clamps, 280. lower liner plates, 300. instruction mark post assemblies, 310. bridges, a. first end, b. the second end, c. the
Three ends, the 4th end d., 311. card holes, 312 gap, 313. axis holes, 314. wiring grooves, 320. reflection plasters, 330. becket bridles, 340.
Buoy, 350. indicator lights, 400. clips, 410. mounting plates, 411. holes, 420. clamping plates, 430. screws, 500. first bolts,
600. second bolts, 601. backing plates, 700. third bolts, 800. drawstrings, 900. push rod device assemblies, 901. motors, 902. tops
Pin, 903. springs, 904. the 4th bolts.
Specific embodiment
Above scheme is described further below in conjunction with specific embodiment.It should be understood that these embodiments are for illustrating
The present invention is not intended to limit the scope of the invention.Implementation condition used in the examples can be done according to the condition of specific producer into
One successive step, the implementation condition being not specified are usually the condition in routine experiment.
As shown in Fig. 1-Figure 13, Fig. 1 is general structure schematic diagram provided by the embodiment of the present invention;Fig. 2 is the left view of Fig. 1
Structural schematic diagram;Fig. 3 is enlarged structure schematic diagram at the A-A of Fig. 2;Fig. 4 is that knot is totally decomposed provided by the embodiment of the present invention
Structure schematic diagram;Fig. 5 is using state structure diagram provided by the embodiment of the present invention;Fig. 6 is that the embodiment of the present invention is provided
Fixing pipe assembly structure schematic diagram;Fig. 7 is installing pipe assembly structure schematic diagram provided by the embodiment of the present invention;Fig. 8 is Fig. 7
Other direction structural schematic diagram;Fig. 9 is that mark post assembly structure schematic diagram is indicated provided by the embodiment of the present invention;Figure 10 is figure
9 other direction structural schematic diagram;Figure 11 is clip structure schematic diagram provided by the embodiment of the present invention;Figure 12 is at the A of Fig. 3
Enlarged structure schematic diagram;Figure 13 is enlarged structure schematic diagram at the b of Fig. 4.
In a specific embodiment, a kind of city is provided to paddle section warning mark post, including fixed pipe assembly 100,
Pipe assembly 200 and instruction mark post assembly 300 are installed, the fixed pipe assembly 100 includes the first vertical tube 120 and is fixed in first
The mounting flange 110 of 120 bottom end of vertical tube, the first liner plate 130 that 120 peripheral wall of the first vertical tube is provided symmetrically vertically and right
Claim the second liner plate 140 of setting, first liner plate 130 and the second liner plate 140 uniformly and the mistake mutually handed over to be arranged in first perpendicular
120 peripheral wall of pipe, 130 vertical direction of the first liner plate offer multiple groups equidistant arrangement for installing the first of the first bolt 500
Connecting hole 131, first connecting hole 131 offer the first tune through 120 tube wall of the first vertical tube, second liner plate 140
Section slot 121 and the second connecting hole of multiple groups 141 for being symmetrically disposed on 121 two sides of the first regulating tank and arranging along the vertical direction,
For first regulating tank 121 through 120 tube wall of the first vertical tube, it is perpendicular that first regulating tank 121 extends to described first
120 top of pipe and be open end;
The installation pipe assembly 200 includes the second vertical tube 210, and second vertical tube 210 is equipped with installation close to bottom position
First jack 211 of the second bolt 600 and the second jack 212 for installing the first bolt 500, first bolt 500 are set
Seated position is corresponding with first connecting hole 131, in the central axis of first jack 211 and second jack 212
Mandrel line is arranged in a mutually vertical manner, and second vertical tube 210 is equipped with electric appliance box 220 close to top position, the electric appliance box 220 with
Second vertical tube, 210 common wall is equipped with string holes 221, and second vertical tube 210 is also equipped with close to top position and draws for winding
The rope sheave 230 of rope 800 is also connected on 210 ontology of the second vertical tube of 220 lower section of electric appliance box for installing push rod dress
The mounting flange 240 of assembly 900 is set, second vertical tube 210 is equipped with LED display board 260, the LED by mounting rod 250
Display board 260 is electrically connected with the control section inside the electric appliance box 220;Second vertical tube, 210 peripheral wall is vertically opened
Liner is connected on placing groove 214 equipped with rectangular configuration, 214 both sides of the edge of placing groove and 210 inner wall of the second vertical tube
Plate 270 and lower liner plate 280, the upper interior lining panel 270 are equipped with clamp 271 close to top position;
The instruction mark post assembly 300 includes bridge 310, and the bridge 310 includes first end a, the second end b, the
Three end c, the 4th end d, the first end a and the second end b are respectively equipped with gap 312 and reflection plaster 320, close to described
First end a and the top end part the second end b are respectively provided with the card hole 311 of installation clamp 271, close to the first end a
The axis hole 313 of the second bolt 600 of installation is respectively provided with the bottom end the second end b;The third end c pacifies equipped with buoy
Tankage (not shown) is equipped with multiple buoys 340 in the buoy mounting groove, and the buoy mounting groove inner wall is additionally provided with wiring groove
314, the buoy mounting groove is connected with the gap 312;The 4th end d is equipped with indicator light 350, the indicator light
350 are electrically connected with the control section inside the electric appliance box 220;310 top end face of bridge is equipped with for connection stay cord 800
Becket bridle 330;
The clip 400 includes clamping plate 420 and two mounting plates 410 being connected with 420 both ends of clamping plate, screw
430 pass through the junction of the clamping plate 420 and two mounting plates 410, and each mounting plate 410 further respectively has for installing
The hole 411 of third bolt 700, water level sensor are mounted on inside clamping plate 420, the water level sensor and the electric appliance box 220
Internal control section electrical connection, the clamping plate 420 are placed in the first vertical tube 120 and can move down on the first regulating tank 121
Dynamic, two groups of third bolts 700 are each passed through hole 411 and clip 400 is mounted on the second liner plate 140 by the second connecting hole 141;
The push rod device assembly 900 includes motor 901 and the ejector pin 902 being connected with the motor 901, the electricity
Machine 901 is connected by the 4th bolt 904 with the ring flange of mounting flange 240, in the motor 901 and the electric appliance box 220
The control section in portion is electrically connected;
The bridge 310, which is mounted in the placing groove 214, keeps the axis hole 313 Chong Die with first jack 211, leads to
It crosses the second bolt 600 and hingedly installs the bridge 310 and the second vertical tube 210 across axis hole 313 and the first jack 211, it is described
Drawstring 800 is connected between becket bridle 330 and the rope sheave 230;Second vertical tube, 210 bottom end is mounted in bridge 310, described
Second jack 212 and the coaxial arrangement of the first connecting hole 131, first bolt 500 sequentially pass through the second jack 212 and first and connect
Hole 131 is connect, the second vertical tube 210 is made to be connected with bridge 310.
Preferably, first regulating tank 121 setting is along the vertical center of second liner plate 140, described the
It is hatch frame at the top of one regulating tank 121 and extends to 140 top end part of the second liner plate, 121 bottom of the first regulating tank extends
To away from 140 bottom 3-5 centimeters of the second liner plate;Wherein 140 vertical direction of the second liner plate described in another group is equipped with the second regulating tank
122,122 length of the second regulating tank is the 1/3-1/2 of 140 length of the second liner plate, and second regulating tank 122 setting is the
Two liner plates 140 are close to bottom 3-5 centimeters, it can be seen that, when there is ponding situation, water passes through the first regulating tank 121 and the
Two regulating tanks 122 flow into inside fixed pipe assembly 100, convenient for the installation of water level sensor, meanwhile, make mark post integrally by water
Impact force is smaller, and mark post can be protected to prevent from being washed upside down by water flow, can be improved the structural soundness of mark post entirety.
Preferably, 210 top end part of the second vertical tube is equipped with semi-circular projection structure, the semi-circular projection structure is applied
There is reflectorized material;Lower mouth slot 213, institute are symmetrically equipped on 210 ontology of the second vertical tube immediately below first jack 211
It states and is extended at the top of lower mouth slot 213 immediately below first jack, 211 bottom, the lower mouth slot 213 extends to two vertical tubes, 210 bottom end
Portion, after fixed pipe assembly 100 is connect with installation pipe assembly 200 to be installed, lower mouth slot 213 can respectively with the first regulating tank 121
It is overlapped (as described in figures 1 and 5) with the second regulating tank 122, water is flowed into inside mark post by lower mouth slot 213, keeps mark post whole
Impact force by water is smaller, and mark post can be protected to prevent from being washed upside down by water flow, the edge of two vertical edges of the placing groove 214
Interior lining panel 270 and one group of lower liner plate 280 on one group of setting respectively symmetrically, upper interior lining panel 270 described in every group are disposed in proximity to
214 top end part of placing groove, lower liner plate 280 described in every group is disposed in proximity to 214 bottom end of placing groove, due to second
Structural stability is poor after vertical tube 210 opens up placing groove 214, reinforces connection by interior lining panel 270 and lower liner plate 28, can guarantee
The structural stability of second vertical tube 210;The rope sheave 230 is installed on the second vertical tube 210 using rolling bearing, is convenient for rope sheave
230 rotation, therefore, convenient for falling for bridge 310;The clamp 271 is ball head structure, therefore, is convenient for clamp 271 and card hole
311 are cooperatively connected, and are conducive to the fixation at 310 top of bridge, when bridge 310 is fallen, take off out of card hole 311 convenient for clamp 271
It falls.
Preferably, as shown in figs. 9-10, the gap 312 and reflection plaster 320 it is arranged in a crossed manner in the first end a and
On the second end b, the gap 312 is rectangular opening, can reduce wind and water to resistance caused by bridge 310, prevent bridge 310
Deformation or damage;The face of the 4th end d is arc-shaped surface structure, is improved beautiful;The bridge 310 uses ABS or wood
Prepared material is made, and when using ABS material, buoy 340 is the hollow structure of injection molding, improves buoyancy and corrosion resistance, adjacent institute
It states and is equipped with spacing between buoy 340, reduce instruction 300 overall weight of mark post assembly, improve the stability of cantilever design, and just
In installation indicator light 350.
Preferably, the mounting flange 240 is installed on the second vertical tube 210 by guide sleeve 241, the mounting flange
240 axis is mutually perpendicular to the axis, and the tube wall of second vertical tube 210 corresponds to 241 position of guide sleeve equipped with through-hole knot
Structure, the ejector pin 902 is installed on 241 inside of guide sleeve and 902 one end of ejector pin extends in the second vertical tube 210, the ejector pin 902
Outer cover is equipped with spring 903.
Preferably, 241 inner wall of guide sleeve is equipped with keyway arrangements, the ejector pin 902 is equipped with bond structure, the guiding
Set 241 is cooperatively connected with the ejector pin 902, and 901 output shaft of motor is that screw-driven is connect with the ejector pin 902, works as electricity
When machine 901 works, the ejector pin 902 can be moved along 310 direction of bridge of the guide sleeve 241 into the second vertical tube 210, be made
Ejector pin 902 pushes bridge 310 until clamp 271 and the slippage of card hole 311, fall bridge 310.
Preferably, being equipped with backing plate 601, institute between the nut of second bolt 600 and the tube wall of the second vertical tube 210
The tube wall binding face for stating backing plate 601 and second vertical tube 210 is circular arc row structure and the tube wall for fitting in the second vertical tube 210
On, the backing plate 601 and 600 contact surface of the second bolt are planar structure, the installation and fixation of the second bolt 600 can be convenient for,
Improve the bonding strength of the second vertical tube 210 and bridge 310.
Preferably, the drawstring 800 is coated with reflectorised paint, when bridge 310 is fallen, the extension of drawstring 800 opens warning
Effect.
A kind of city is paddled the application method of section warning mark post, 1) multiple warning target bodies are respectively arranged in ponding
The both sides of the road at the both ends in section adjust the packing density of warning target body according to the section gradient, can be convenient for surface gathered water
The accurate instruction of depth;2) according to common automobile wading depth, adjust on each warning target body water level sensor to this
The height on point road surface, makes the height value of water level sensor no more than general-utility car fording depth value, specifically adjusts water level sensor
Mounting height when, installation site of the water level sensor in the first regulating tank 121 is adjusted by clip 400, and pass through third
Bolt 700 is fixed in the first vertical tube 120;3) road lighting circuit can be used in warning target body or solar energy is powered,
It can be improved the popularity used and installation effectiveness;4) when wherein depth of accumulated water is greater than or equal to point warning mark post on road surface
When the height of ontology water level sensor, the signal that water level sensor will test is sent to control section, makes the work of motor 901 and band
Dynamic ejector pin 902 pushes 310 top of lever frame, falls bridge 310, while the flashing of indicator light 350 and LED display board 260 are shown
Therefore water level depth clearly can prompt and prevent vehicle pass-through, when water accumulation level continues to rise, bridge 310 can lead to
The floating of buoy 340 is crossed, thereby it is ensured that bridge 310 exposes the surface and plays the role of prompt;5) when resetting, pass through rope sheave 230
Winding drawstring makes to indicate that mark post assembly 300 is placed in the placing groove 214 of installation pipe assembly 200, therefore, has installation letter
Single, advantage easy to maintain can set mark post indicating range according to depth of accumulated water, can give full play to mark post prompt and warning
Effect.
Taking the above-mentioned ideal embodiment according to the present invention as inspiration, through the above description, relevant staff is complete
Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention
Property range is not limited to the contents of the specification, it is necessary to which the technical scope thereof is determined according to the scope of the claim.