CN107217609A - A kind of city is paddled section warning mark post and application method - Google Patents

A kind of city is paddled section warning mark post and application method Download PDF

Info

Publication number
CN107217609A
CN107217609A CN201710626732.5A CN201710626732A CN107217609A CN 107217609 A CN107217609 A CN 107217609A CN 201710626732 A CN201710626732 A CN 201710626732A CN 107217609 A CN107217609 A CN 107217609A
Authority
CN
China
Prior art keywords
vertical tube
bridge
mark post
liner plate
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710626732.5A
Other languages
Chinese (zh)
Other versions
CN107217609B (en
Inventor
王俊铎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIZHOU HUANGYAN BAOYE TRAFFIC FACILITLES TECHNOLOGY CO.,LTD.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710626732.5A priority Critical patent/CN107217609B/en
Publication of CN107217609A publication Critical patent/CN107217609A/en
Application granted granted Critical
Publication of CN107217609B publication Critical patent/CN107217609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/40Arrangements responsive to adverse atmospheric conditions, e.g. to signal icy roads or to automatically illuminate in fog; Arrangements characterised by heating or drying means
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/604Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
    • E01F9/615Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings illuminated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/623Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by form or by structural features, e.g. for enabling displacement or deflection
    • E01F9/65Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by form or by structural features, e.g. for enabling displacement or deflection with rotatable, swingable or adjustable signs or signals

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Level Indicators Using A Float (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

Paddled section warning mark post and application method the invention provides a kind of city, including fixed pipe assembly, pipe assembly is installed and mark post assembly is indicated.The present invention has the advantages that to install simple, easy to maintenance, can set mark post indicating range according to depth of accumulated water, can give full play to mark post prompting and warning function;The present invention also has simple in construction, sensitive advantage, can automatically be carried out falling bar according to depth of accumulated water, and then, the very first time ponding section can be warned, it is to avoid vehicle, which is strayed into, to cause any property loss and casualties.

Description

A kind of city is paddled section warning mark post and application method
Technical field
The present invention relates to municipal field, specifically a kind of city is paddled section warning mark post and application method.
Background technology
In recent years, urban waterlogging phenomenon is than more serious, although obtain larger improvement, still, when running into precipitation, city Section ponding speed is fast, causes certain section water level deeper, and because scene is difficult to arrange warning mark of paddling in time, vehicle, which is strayed into, to be made Into property loss and casualties, especially at night, the phenomenon is than more serious.
Using blocking the way stake or warning lamp more than existing suggestion device of paddling, although with certain prompting effect it can be difficult to The very first time arranges, and blocks the way stake or warning lamp is difficult to be arranged in profundal zone, can only be arranged in ponding edge, it is impossible to clearly The scope and depth in ponding section are shown, and is arranged by people.
Accordingly, it would be desirable to design a warning mark post for avoiding automobile wading.
The content of the invention
It is an object of the invention to provide it is a kind of it is quickly ponding section being identified and be warned, product can be shown The warning mark post of water route segment limit and depth, warning in advance will be by the effect of section vehicle of paddling.
The technical solution adopted for the present invention to solve the technical problems is:
Paddled section warning mark post there is provided a kind of city, including fixed pipe assembly, pipe assembly is installed and mark post assembly, institute is indicated Stating fixed pipe assembly includes the first vertical tube and is fixed in the mounting flange of the first vertical tube bottom, and the first vertical tube perisporium is vertical Provided with symmetrically arranged first liner plate and symmetrically arranged second liner plate, first liner plate and the second liner plate are uniform and mutually hand over Mistake be arranged in the first vertical tube perisporium, the first liner plate vertical direction offer multigroup equidistant arrangement be used for install the first bolt The first connecting hole, first connecting hole through the first vertical tube tube wall, second liner plate offer the first regulating tank and Multigroup second connecting hole for being symmetricly set in the first regulating tank both sides and vertically arranging, first regulating tank is passed through The first vertical tube tube wall is through at, first regulating tank extends to the first vertical tube top and is openend;
The installation pipe assembly includes the second vertical tube, and second vertical tube is close to first of bottom position provided with the second bolt of installation Jack and the second jack for installing the first bolt, the first bolt set location are corresponding with first connecting hole, The central axis of first jack is arranged in a mutually vertical manner with the second jack center axis, and second vertical tube is close to top Position is provided with electric appliance box, and the electric appliance box and the second vertical tube common wall are provided with string holes, and second vertical tube is close to top position The rope sheave being also equipped with for winding drawstring is put, is also associated with being used to pacify on the second vertical tube body below the electric appliance box The mounting flange of push rod device assembly is filled, second vertical tube is provided with LED display board, the LED display board by mounting rod Electrically connected with the control section inside the electric appliance box;The second vertical tube perisporium vertically offers putting for rectangular configuration Groove is put, the standing groove both sides of the edge on the second vertical tube inwall with being connected with interior lining panel and lower liner plate, the upper interior lining panel Dop is provided with close to tip position;
The instruction mark post assembly includes bridge, and the bridge includes first end, the second end, the 3rd end, the 4th end, The first end and the second end are provided with gap and reflection plaster respectively, close to the first end and the second end tip portion The hole clipping for installing dop She You be used for, installation second is respectively provided with close to the first end and the second end bottom The axis hole of bolt;3rd end is provided with cursory mounting groove, and it is multiple cursory to be provided with the cursory mounting groove, described cursory Mounting groove inwall is additionally provided with wiring groove, and the cursory mounting groove is connected with the gap;4th end is provided with instruction Lamp, the indicator lamp is electrically connected with the control section inside the electric appliance box;The bridge top end face, which is provided with, is used for connection stay cord Becket bridle;
The clip includes clamping plate and two installing plates being connected with the clamping plate two ends, and screw passes through the clamping plate and two The junction of individual installing plate, each installing plate further respectively has the hole for installing the 3rd bolt, and level sensor is installed Inside clamping plate, the level sensor is electrically connected with the control section inside the electric appliance box, and the clamping plate is placed in first and erected Pipe is interior and can be moved up and down along the first regulating tank, and two group of the 3rd bolt is each passed through hole and clip is arranged on by the second connecting hole On second liner plate;
The push rod device assembly includes motor and the ejector pin that is connected with the motor, the motor by the 4th bolt with The ring flange of mounting flange is connected, and the motor is electrically connected with the control section inside the electric appliance box;
The bridge, which is arranged in the standing groove, makes the axis hole overlapping with first jack, and axle is passed through by the second bolt The bridge and the second vertical tube are hinged installation by hole and the first jack, and drawstring is connected between the becket bridle and the rope sheave;Institute The second vertical tube bottom is stated in bridge, second jack and the first connecting hole are coaxially disposed, and first bolt is successively Through the second jack and the first connecting hole, the second vertical tube is set to be connected with bridge.
Preferably, first regulating tank is arranged on along the vertical center of the second liner plate, first regulation At the top of groove it is hatch frame and extends to the second liner plate top ends, the first regulation trench bottom is extended to away from the second liner plate bottom 3-5 centimeters;The second liner plate vertical direction is provided with the second regulating tank wherein described in another group, and the second regulation slot length is the The 1/3-1/2 of two liner plate length, second regulating tank is arranged on the second liner plate close to bottom 3-5 centimeters.
Preferably, the second vertical tube top ends are provided with semi-circular projection structure, the semi-circular projection structure is scribbled Reflectorized material;Lower mouth groove, the lower mouth groove top are symmetrically provided with the second vertical tube body immediately below first jack Portion is extended to immediately below the first jack bottom, and the lower mouth groove extends to two vertical tube bottoms, when fixed pipe assembly and installing pipe After assembly connection is installed, lower mouth groove can be overlapped with the first regulating tank and the second regulating tank respectively;Two of the standing groove are hung down Interior lining panel and one group of lower liner plate in one group of the setting of the edge of straight flange respectively symmetrically, upper interior lining panel, which is arranged at, described in every group leans on The nearly standing groove top ends, lower liner plate described in every group is disposed in proximity to the standing groove bottom;The rope sheave is using rolling Dynamic bearing is installed on the second vertical tube;The dop is ball head structure.
Preferably, the gap and reflection plaster are arranged in a crossed manner on the first end and the second end, the gap For rectangular opening;The face of 4th end is arc-shaped surface structure;The bridge is made of ABS or wooden materials, when adopting When using ABS material, it is cursory for injection hollow structure, it is adjacent it is described it is cursory between be provided with spacing.
Preferably, the mounting flange is installed on the second vertical tube by guide sleeve, the axis of the mounting flange with The axis is mutually perpendicular to, and the tube wall correspondence guide sleeve position of second vertical tube is provided with through-hole structure, and the ejector pin is installed on Inside guide sleeve and ejector pin one end is extended in the second vertical tube, and the ejector pin outer cover is equipped with spring.
Preferably, the guide sleeve inwall is provided with keyway arrangements, the ejector pin is provided with bond structure, the guide sleeve and institute Ejector pin mating connection is stated, the motor output shaft is that screw-driven is connected with the ejector pin, when motor works, the ejector pin energy It is enough to be moved along bridge direction of the guide sleeve into the second vertical tube, ejector pin is promoted bridge until dop and hole clipping slippage, make Bridge is fallen.
Preferably, be provided with backing plate between the nut of second bolt and the tube wall of the second vertical tube, the backing plate with The tube wall binding face of second vertical tube is circular arc row structure and fitted on the tube wall of the second vertical tube, the backing plate and the second spiral shell Bolt contacting surface is planar structure.
Preferably, the drawstring scribbles reflectorised paint.
A kind of city paddle section warn mark post application method, 1)Multiple warning target bodies are respectively arranged in ponding The both sides of the road at the two ends in section, the packing density for warning target body is adjusted according to the section gradient;2)According to common automobile Level sensor makes the height of level sensor to the height on the road surface on fording depth, each warning target body of regulation Value is not more than general-utility car fording depth value, during the setting height(from bottom) of specific regulation level sensor, is passed by clamp adjustment water level Installation site of the sensor in the first regulating tank, and be fixed on by the 3rd bolt in the first vertical tube;3)When road surface wherein When depth of accumulated water is more than or equal to the height of point warning target body level sensor, level sensor passes the signal of detection Deliver to control section, make motor work and drive ejector pin promote lever top of the trellis, fall bridge, at the same indicator lamp flicker and LED display board shows water level depth, therefore, it is possible to clearly point out and prevent vehicle pass-through, when water accumulation level continues to rise, Bridge can be by cursory floating, thereby it is ensured that bridge, which surfaces, plays a part of prompting;4)During reset, pass through rope Wheel winding drawstring makes instruction mark post assembly be placed in the standing groove for installing pipe assembly.
The beneficial effects of the invention are as follows the present invention has the advantages that to install simple, easy to maintenance, can be according to depth of accumulated water Mark post indicating range is set, mark post prompting and warning function can be given full play to;The present invention also have it is simple in construction, be quick on the draw Advantage, can automatically be carried out falling bar according to depth of accumulated water, and then, the very first time ponding section can be warned, it is to avoid Vehicle, which is strayed into, to cause any property loss and casualties.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the general structure schematic diagram that the embodiment of the present invention is provided;
Fig. 2 is Fig. 1 left view structural representation;
Fig. 3 is mplifying structure schematic diagram at Fig. 2 A-A;
Fig. 4 is the overall decomposition texture schematic diagram that the embodiment of the present invention is provided;
Fig. 5 is the use state structural representation that the embodiment of the present invention is provided;
Fig. 6 is the fixing pipe assembly structure schematic diagram that the embodiment of the present invention is provided;
Fig. 7 is the installing pipe assembly structure schematic diagram that the embodiment of the present invention is provided;
Fig. 8 is Fig. 7 other direction structural representation;
Fig. 9 is the instruction mark post assembly structure schematic diagram that the embodiment of the present invention is provided;
Figure 10 is Fig. 9 other direction structural representation;
Figure 11 is the clip structure schematic diagram that the embodiment of the present invention is provided;
Figure 12 is mplifying structure schematic diagram at Fig. 3 A;
Figure 13 is mplifying structure schematic diagram at Fig. 4 b;
In figure:100. pipe assembly is fixed, 110. mounting flanges, 120. first vertical tubes, 121. first regulating tanks, 122. second regulations Groove, 130. first liner plates, 131. first connecting holes, 140. second liner plates, 141. second connecting holes, 200. install pipe assembly, 210. second vertical tubes, 211. first jacks, 212. second jacks, 213. lower mouthfuls of grooves, 214. standing grooves, 220. electric appliance boxes, 221. String holes, 230. rope sheaves, 240. mounting flanges, 241. guide sleeves, 250. mounting rods, 260.LED display boards, interior lining panel on 270., 271. dops, 280. lower liner plates, 300. indicate mark post assembly, 310. bridges, a. first ends, b. the second ends, c. the 3rd End, the ends of d. the 4th, 311. hole clippings, 312 gap, 313. axis holes, 314. wiring grooves, 320. reflection plasters, 330. becket bridles, 340. float Drift, 350. indicator lamps, 400. clips, 410. installing plates, 411. holes, 420. clamping plates, 430. screws, 500. first bolts, 600. Second bolt, 601. backing plates, 700. the 3rd bolts, 800. drawstrings, 900. push rod device assemblies, 901. motors, 902. ejector pins, 903. springs, 904. the 4th bolts.
Embodiment
Such scheme is described further below in conjunction with specific embodiment.It should be understood that these embodiments are to be used to illustrate The present invention rather than limitation the scope of the present invention.The implementation condition used in embodiment can be done according to the condition of specific producer into One successive step, unreceipted implementation condition is usually the condition in normal experiment.
As shown in Fig. 1-Figure 13, Fig. 1 is the general structure schematic diagram that the embodiment of the present invention is provided;Fig. 2 is Fig. 1 left view Structural representation;Fig. 3 is mplifying structure schematic diagram at Fig. 2 A-A;Fig. 4 is that overall decompose that the embodiment of the present invention is provided is tied Structure schematic diagram;Fig. 5 is the use state structural representation that the embodiment of the present invention is provided;Fig. 6 is that the embodiment of the present invention is provided Fixing pipe assembly structure schematic diagram;Fig. 7 is the installing pipe assembly structure schematic diagram that the embodiment of the present invention is provided;Fig. 8 is Fig. 7 Other direction structural representation;Fig. 9 is the instruction mark post assembly structure schematic diagram that the embodiment of the present invention is provided;Figure 10 is figure 9 other direction structural representation;Figure 11 is the clip structure schematic diagram that the embodiment of the present invention is provided;Figure 12 is at Fig. 3 A Mplifying structure schematic diagram;Figure 13 is mplifying structure schematic diagram at Fig. 4 b.
Paddled section warning mark post there is provided a kind of city in a kind of specific embodiment, including fixed pipe assembly 100, Pipe assembly 200 is installed and mark post assembly 300 is indicated, the fixed pipe assembly 100 includes the first vertical tube 120 and is fixed in first The mounting flange 110 of the bottom of vertical tube 120, the perisporium of the first vertical tube 120 is provided with symmetrically arranged first liner plate 130 and right vertically Claim the second liner plate 140 set, 130 and second liner plate of the first liner plate 140 mistake that is uniform and mutually handing over is arranged in first and erected The perisporium of pipe 120, the vertical direction of the first liner plate 130 offer multigroup equidistant arrangement be used for install the first bolt 500 first Connecting hole 131, first connecting hole 131 offers the first tune through the tube wall of the first vertical tube 120, second liner plate 140 Section groove 121 and multigroup second connecting hole 141 for being symmetricly set in the both sides of the first regulating tank 121 and vertically arranging, First regulating tank 121 is through the tube wall of the first vertical tube 120, and first regulating tank 121 extends to described first and erected The top of pipe 120 and for openend;
The installation pipe assembly 200 includes the second vertical tube 210, and second vertical tube 210 is close to bottom position provided with installation second First jack 211 of bolt 600 and the second jack 212 for installing the first bolt 500, first bolt 500 set position Put corresponding with first connecting hole 131, the central axis of first jack 211 and the central shaft of the second jack 212 Line is arranged in a mutually vertical manner, and second vertical tube 210 is provided with electric appliance box 220, the electric appliance box 220 and second close to tip position The common wall of vertical tube 210 is provided with string holes 221, and second vertical tube 210 is also equipped with being used to wind drawstring 800 close to tip position Rope sheave 230, be also associated with being used for push rod device is installed total on the body of the second vertical tube 210 of the lower section of the electric appliance box 220 Into 900 mounting flange 240, second vertical tube 210 is provided with LED display board 260 by mounting rod 250, and the LED is shown Plate 260 is electrically connected with the control section inside the electric appliance box 220;The perisporium of second vertical tube 210 is vertically offered The standing groove 214 of rectangular configuration, the both sides of the edge of standing groove 214 on the inwall of the second vertical tube 210 with being connected with interior lining panel 270 With lower liner plate 280, the upper interior lining panel 270 is provided with dop 271 close to tip position;
The instruction mark post assembly 300 includes bridge 310, and the bridge 310 includes first end a, the second end b, the 3rd end Portion c, the 4th end d, the first end a and the second end b are respectively equipped with gap 312 and reflection plaster 320, close to described first End a and the second end b top ends are respectively provided with the hole clipping 311 for installing dop 271, close to the first end a and the Two ends b bottoms are respectively provided with the axis hole 313 for installing the second bolt 600;The 3rd end c is provided with cursory mounting groove (It is not shown), multiple cursory 340 are provided with the cursory mounting groove, and the cursory mounting groove inwall is additionally provided with wiring groove 314, The cursory mounting groove is connected with the gap 312;The 4th end d is provided with indicator lamp 350, the indicator lamp 350 Electrically connected with the control section inside the electric appliance box 220;The top end face of bridge 310 is provided with the rope for connection stay cord 800 Ring 330;
The clip 400 includes clamping plate 420 and two installing plates 410 being connected with the two ends of clamping plate 420, screw 430 Through the junction of the clamping plate 420 and two installing plates 410, each installing plate 410 is further respectively had for installing the The hole 411 of three bolts 700, level sensor is arranged on inside clamping plate 420, in the level sensor and the electric appliance box 220 The control section electrical connection in portion, the clamping plate 420 is placed in the first vertical tube 120 and can moved up and down along the first regulating tank 121, Two group of the 3rd bolt 700 is each passed through the connecting hole 141 of hole 411 and second and clip 400 is arranged on the second liner plate 140;
The push rod device assembly 900 includes motor 901 and the ejector pin 902 being connected with the motor 901, the motor 901 are connected by the 4th bolt 904 with the ring flange of mounting flange 240, inside the motor 901 and the electric appliance box 220 Control section electrical connection;
The bridge 310, which is arranged in the standing groove 214, makes the axis hole 313 overlapping with first jack 211, by the The vertical tube 210 of bridge 310 and second is hinged installation, the becket bridle by two bolts 600 through the jack 211 of axis hole 313 and first Drawstring 800 is connected between 330 and the rope sheave 230;The bottom of second vertical tube 210 is arranged in bridge 310, and described second The connecting hole 131 of jack 212 and first is coaxially disposed, and first bolt 500 sequentially passes through the second jack 212 and the first connecting hole 131, the second vertical tube 210 is connected with bridge 310.
Preferably, first regulating tank 121 is arranged on along the vertical center of second liner plate 140, described Hatch frame is in the top of one regulating tank 121 and extends to the top ends of the second liner plate 140, the bottom of the first regulating tank 121 extension To away from the bottom 3-5 centimeters of the second liner plate 140;The vertical direction of the second liner plate 140 is provided with the second regulating tank wherein described in another group 122, the length of the second regulating tank 122 is the 1/3-1/2 of the length of the second liner plate 140, and second regulating tank 122 is arranged on the Two liner plates 140 are close to bottom 3-5 centimeters, it can be seen that, when there is ponding situation, water passes through the first regulating tank 121 and Two regulating tanks 122 are flowed into inside fixed pipe assembly 100, are easy to the installation of level sensor, meanwhile, make mark post integrally by water Impulsive force is smaller, and mark post can be protected to prevent from being washed upside down by current, it is possible to increase the overall structural soundness of mark post.
Preferably, the top ends of the second vertical tube 210 are provided with semi-circular projection structure, the semi-circular projection structure is applied There is reflectorized material;Lower mouth groove 213, institute are symmetrically provided with the body of the second vertical tube 210 immediately below first jack 211 State the lower top of mouth groove 213 to extend to immediately below the bottom of the first jack 211, the lower mouth groove 213 extends to the bottom of two vertical tube 210 Portion, when fixed pipe assembly 100 with install pipe assembly 200 be connected install after, lower mouth groove 213 can respectively with the first regulating tank 121 Overlapped with the second regulating tank 122(As described in figures 1 and 5), water flowed into inside mark post by lower mouth groove 213, makes mark post overall Impulsive force by water is smaller, and mark post can be protected to prevent from being washed upside down by current, the edge of two vertical edges of the standing groove 214 Interior lining panel 270 and one group of lower liner plate 280 in one group of setting respectively symmetrically, upper interior lining panel 270 is disposed in proximity to described in every group The top ends of standing groove 214, lower liner plate 280 described in every group is disposed in proximity to the bottom of standing groove 214, due to second It is poor that vertical tube 210 opens up structural stability after standing groove 214, is reinforced and connected by interior lining panel 270 and lower liner plate 28, ensure that The structural stability of second vertical tube 210;The rope sheave 230 is installed on the second vertical tube 210 using rolling bearing, is easy to rope sheave 230 rotation, therefore, is easy to falling for bridge 310;The dop 271 is ball head structure, therefore, is easy to dop 271 and hole clipping 311 are connected, and are conducive to the fixation at the top of bridge 310, when bridge 310 is fallen, and are easy to dop 271 to be taken off out of hole clipping 311 Fall.
Preferably, as shown in figs. 9-10, the gap 312 and reflection plaster 320 it is arranged in a crossed manner in the first end a and On the second end b, the gap 312 is rectangular opening, can reduce the resistance that wind and water are caused to bridge 310, prevent bridge 310 Deformation is damaged;The face of the 4th end d is arc-shaped surface structure, is improved attractive in appearance;The bridge 310 uses ABS or wood Prepared material is made, when using ABS material, and cursory 340 hollow structure to be molded improves buoyancy and corrosion resistance, adjacent institute Spacing is provided between stating cursory 340, reduction indicates the overall weight of mark post assembly 300, improves the stability of cantilever design, and just In installation indicator lamp 350.
Preferably, the mounting flange 240 is installed on the second vertical tube 210 by guide sleeve 241, the mounting flange 240 axis is mutually perpendicular to the axis, and tube wall correspondence guide sleeve 241 position of second vertical tube 210 is provided with through hole knot Structure, the ejector pin 902 is installed on the inside of guide sleeve 241 and the one end of ejector pin 902 is extended in the second vertical tube 210, the ejector pin 902 Outer cover is equipped with spring 903.
Preferably, the inwall of guide sleeve 241 is provided with keyway arrangements, the ejector pin 902 is provided with bond structure, the guiding Set 241 is connected with the ejector pin 902, and the output shaft of motor 901 is that screw-driven is connected with the ejector pin 902, works as electricity When machine 901 works, the ejector pin 902 can be moved along the direction of bridge 310 of the guide sleeve 241 into the second vertical tube 210, be made Ejector pin 902 promotes bridge 310 up to dop 271 is slipped with hole clipping 311, falls bridge 310.
Preferably, being provided with backing plate 601, institute between the tube wall of the nut of second bolt 600 and the second vertical tube 210 The tube wall binding face for stating backing plate 601 and second vertical tube 210 is circular arc row structure and fits in the tube wall of the second vertical tube 210 On, the contact surface of 601 and second bolt of backing plate 600 is planar structure, can be easy to the installation and fixation of the second bolt 600, Improve the bonding strength of the second vertical tube 210 and bridge 310.
Preferably, the drawstring 800 scribbles reflectorised paint, when bridge 310 is fallen, the extension of drawstring 800 opens warning Effect.
A kind of city paddle section warn mark post application method, 1)Multiple warning target bodies are respectively arranged in ponding The both sides of the road at the two ends in section, the packing density for warning target body is adjusted according to the section gradient, can be easy to surface gathered water The accurate instruction of depth;2)According to common automobile wading depth, level sensor arrives this on each warning target body of regulation The height on point road surface, makes the height value of level sensor be not more than general-utility car fording depth value, specifically adjusts level sensor Setting height(from bottom) when, installation site of the level sensor in the first regulating tank 121 is adjusted by clip 400, and pass through the 3rd Bolt 700 is fixed in the first vertical tube 120;3)Warning target body can be powered using road lighting circuit or solar energy, The popularity used and installation effectiveness can be improved;4)Mark post is warned when road surface wherein depth of accumulated water is more than or equal to the point During the height of body level sensor, the signal of detection is sent to control section by level sensor, makes the work of motor 901 and band Dynamic ejector pin 902 promotes the top of lever frame 310, falls bridge 310, while the flicker of indicator lamp 350 and LED display board 260 are shown Water level depth, therefore, it is possible to clearly point out and prevent vehicle pass-through, when water accumulation level continues to rise, bridge 310 can lead to Cursory 340 floating is crossed, thereby it is ensured that bridge 310 surfaces and plays a part of prompting;5)During reset, pass through rope sheave 230 Winding drawstring makes instruction mark post assembly 300 be placed in the standing groove 214 for installing pipe assembly 200, therefore, simple with installing Single, advantage easy to maintenance, can set mark post indicating range according to depth of accumulated water, can give full play to mark post prompting and warn Effect.
Using the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property scope is not limited to the content on specification, it is necessary to its technical scope is determined according to right.

Claims (9)

1. a kind of city is paddled, section warns mark post, including fixed pipe assembly, installation pipe assembly and instruction mark post assembly, its feature It is, the fixed pipe assembly includes the first vertical tube and is fixed in the mounting flange of the first vertical tube bottom, first vertical tube Perisporium is provided with symmetrically arranged first liner plate and symmetrically arranged second liner plate vertically, and first liner plate and the second liner plate are uniform And the mistake mutually handed over is arranged in the first vertical tube perisporium, the first liner plate vertical direction, which offers multigroup equidistant arrangement, to be used to install First connecting hole of the first bolt, first connecting hole offers first through the first vertical tube tube wall, second liner plate Regulating tank and multigroup second connecting hole for being symmetricly set in the first regulating tank both sides and vertically arranging, described first Regulating tank is through the first vertical tube tube wall, and first regulating tank extends to the first vertical tube top and is openend;
The installation pipe assembly includes the second vertical tube, and second vertical tube is close to first of bottom position provided with the second bolt of installation Jack and the second jack for installing the first bolt, the first bolt set location are corresponding with first connecting hole, The central axis of first jack is arranged in a mutually vertical manner with the second jack center axis, and second vertical tube is close to top Position is provided with electric appliance box, and the electric appliance box and the second vertical tube common wall are provided with string holes, and second vertical tube is close to top position The rope sheave being also equipped with for winding drawstring is put, is also associated with being used to pacify on the second vertical tube body below the electric appliance box The mounting flange of push rod device assembly is filled, second vertical tube is provided with LED display board, the LED display board by mounting rod Electrically connected with the control section inside the electric appliance box;The second vertical tube perisporium vertically offers putting for rectangular configuration Groove is put, the standing groove both sides of the edge on the second vertical tube inwall with being connected with interior lining panel and lower liner plate, the upper interior lining panel Dop is provided with close to tip position;
The instruction mark post assembly includes bridge, and the bridge includes first end, the second end, the 3rd end, the 4th end, The first end and the second end are provided with gap and reflection plaster respectively, close to the first end and the second end tip portion The hole clipping for installing dop She You be used for, installation second is respectively provided with close to the first end and the second end bottom The axis hole of bolt;3rd end is provided with cursory mounting groove, and it is multiple cursory to be provided with the cursory mounting groove, described cursory Mounting groove inwall is additionally provided with wiring groove, and the cursory mounting groove is connected with the gap;4th end is provided with instruction Lamp, the indicator lamp is electrically connected with the control section inside the electric appliance box;The bridge top end face, which is provided with, is used for connection stay cord Becket bridle;
The clip includes clamping plate and two installing plates being connected with the clamping plate two ends, and screw passes through the clamping plate and two The junction of individual installing plate, each installing plate further respectively has the hole for installing the 3rd bolt, and level sensor is installed Inside clamping plate, the level sensor is electrically connected with the control section inside the electric appliance box, and the clamping plate is placed in first and erected Pipe is interior and can be moved up and down along the first regulating tank, and two group of the 3rd bolt is each passed through hole and clip is arranged on by the second connecting hole On second liner plate;
The push rod device assembly includes motor and the ejector pin that is connected with the motor, the motor by the 4th bolt with The ring flange of mounting flange is connected, and the motor is electrically connected with the control section inside the electric appliance box;
The bridge, which is arranged in the standing groove, makes the axis hole overlapping with first jack, and axle is passed through by the second bolt The bridge and the second vertical tube are hinged installation by hole and the first jack, and drawstring is connected between the becket bridle and the rope sheave;Institute The second vertical tube bottom is stated in bridge, second jack and the first connecting hole are coaxially disposed, and first bolt is successively Through the second jack and the first connecting hole, the second vertical tube is set to be connected with bridge.
The section warning mark post 2. a kind of city as claimed in claim 1 is paddled, it is characterised in that first regulating tank is set Along the vertical center of the second liner plate, hatch frame is in the first regulating tank top and extends to the second liner plate top Portion, the first regulation trench bottom is extended to away from the second liner plate bottom 3-5 centimeters;Wherein the second liner plate is vertical described in another group Direction is provided with the second regulating tank, and the second regulation slot length is the 1/3-1/2 of the second liner plate length, and second regulating tank is set Put in the second liner plate close to bottom 3-5 centimeters.
The section warning mark post 3. a kind of city as claimed in claim 1 is paddled, it is characterised in that the second vertical tube top ends Provided with semi-circular projection structure, the semi-circular projection structure scribbles reflectorized material;Immediately below first jack Symmetrically it is provided with the top of lower mouth groove, the lower mouth groove and is extended to immediately below the first jack bottom on two vertical tube bodies, the lower mouth Groove extends to two vertical tube bottoms, when fixed pipe assembly with install pipe assembly be connected install after, lower mouth groove can be respectively with first Regulating tank and the second regulating tank are overlapped;Liner in one group of the setting of the edge of two vertical edges of the standing groove respectively symmetrically Plate and one group of lower liner plate, upper interior lining panel is disposed in proximity to the standing groove top ends described in every group, lower liner plate described in every group It is disposed in proximity to the standing groove bottom;The rope sheave is installed on the second vertical tube using rolling bearing;The dop is ball Header structure.
The section warning mark post 4. a kind of city as claimed in claim 1 is paddled, it is characterised in that the gap and reflection plaster are handed over Fork is arranged on the first end and the second end, and the gap is rectangular opening;The face of 4th end is circular arc Face structure;The bridge is made of ABS or wooden materials, when using ABS material, the cursory hollow structure for injection, phase It is adjacent it is described it is cursory between be provided with spacing.
The section warning mark post 5. a kind of city as claimed in claim 1 is paddled, it is characterised in that the mounting flange is by leading It is installed on to set on the second vertical tube, the axis of the mounting flange is mutually perpendicular to the axis, the tube wall of second vertical tube Correspondence guide sleeve position is provided with through-hole structure, and the ejector pin is installed on inside guide sleeve and ejector pin one end extends to the second vertical tube Interior, the ejector pin outer cover is equipped with spring.
The section warning mark post 6. a kind of city as claimed in claim 5 is paddled, it is characterised in that the guide sleeve inwall is provided with Keyway arrangements, the ejector pin is provided with bond structure, and the guide sleeve and the ejector pin are connected, the motor output shaft with it is described Ejector pin connects for screw-driven, when motor works, the bridge side that the ejector pin can be along the guide sleeve into the second vertical tube To movement, ejector pin is set to promote bridge until dop and hole clipping slippage, fall bridge.
The section warning mark post 7. a kind of city as claimed in claim 1 is paddled, it is characterised in that the nut of second bolt Backing plate is installed between the tube wall of the second vertical tube, the tube wall binding face of the backing plate and second vertical tube is circular arc row structure And fit on the tube wall of the second vertical tube, the backing plate and the second threaded bolt contacts face are planar structure.
The section warning mark post 8. a kind of city as claimed in claim 1 is paddled, it is characterised in that the drawstring scribbles reflective Paint.
9. a kind of city is paddled, section warns the application method of mark post, it is characterised in that 1)By multiple warning target body difference The both sides of the road at the two ends in ponding section are installed on, the packing density for warning target body is adjusted according to the section gradient;2)According to Level sensor passes water level to the height on the road surface on common automobile wading depth, each warning target body of regulation The height value of sensor is not more than general-utility car fording depth value, during the setting height(from bottom) of specific regulation level sensor, passes through clip Installation site of the level sensor in the first regulating tank is adjusted, and is fixed on by the 3rd bolt in the first vertical tube;3)Work as road When face wherein depth of accumulated water is more than or equal to the height of point warning target body level sensor, level sensor will be examined The signal of survey is sent to control section, motor is worked and drives ejector pin to promote lever top of the trellis, fall bridge, indicates simultaneously Lamp flash and LED display board show water level depth, therefore, it is possible to clearly point out and prevent vehicle pass-through, when water accumulation level after During continuous rising, bridge can be by cursory floating, thereby it is ensured that bridge, which surfaces, plays a part of prompting;4)Reset When, winding drawstring by rope sheave makes instruction mark post assembly be placed in the standing groove for installing pipe assembly.
CN201710626732.5A 2017-07-28 2017-07-28 A kind of city is paddled section warning mark post and application method Active CN107217609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710626732.5A CN107217609B (en) 2017-07-28 2017-07-28 A kind of city is paddled section warning mark post and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710626732.5A CN107217609B (en) 2017-07-28 2017-07-28 A kind of city is paddled section warning mark post and application method

Publications (2)

Publication Number Publication Date
CN107217609A true CN107217609A (en) 2017-09-29
CN107217609B CN107217609B (en) 2019-09-03

Family

ID=59954630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710626732.5A Active CN107217609B (en) 2017-07-28 2017-07-28 A kind of city is paddled section warning mark post and application method

Country Status (1)

Country Link
CN (1) CN107217609B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625303A (en) * 2018-05-22 2018-10-09 许应君 Overpass flood control alarming device
CN110700881A (en) * 2019-10-18 2020-01-17 广州铁路职业技术学院(广州铁路机械学校) Drainage device for railway tunnel
CN110853390A (en) * 2019-11-25 2020-02-28 江苏科创交通安全产业研究院有限公司 Intelligent network connection ponding road section early warning system
CN110920530A (en) * 2019-12-31 2020-03-27 湖北文理学院 Depth recognition device for unmanned driving
GR1009879B (en) * 2019-11-18 2020-12-02 Π. Χατζηδημητρακης Και Σια Εε Warning self-acting bar for safe passage in irish crossings
CN114481898A (en) * 2022-03-19 2022-05-13 河南龙之龙实业有限公司 Complete set of emergency continuous prompt device and prompt method for expressway

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202771621U (en) * 2012-09-11 2013-03-06 清华大学 Water traffic guidance system
CN103182982A (en) * 2011-12-27 2013-07-03 昆达电脑科技(昆山)有限公司 Wading warning device for automobile
CN203364926U (en) * 2013-05-14 2013-12-25 山东科技大学 Water level alarm device for culvert
CN103952987A (en) * 2014-04-22 2014-07-30 万军 Monitoring attention device and system for road comprehensive information
CN205636581U (en) * 2016-04-07 2016-10-12 无锡市政设计研究院有限公司 Water level warning road guardrail
CN205909905U (en) * 2016-07-29 2017-01-25 程梅雪 Road surface water level warning equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103182982A (en) * 2011-12-27 2013-07-03 昆达电脑科技(昆山)有限公司 Wading warning device for automobile
CN202771621U (en) * 2012-09-11 2013-03-06 清华大学 Water traffic guidance system
CN203364926U (en) * 2013-05-14 2013-12-25 山东科技大学 Water level alarm device for culvert
CN103952987A (en) * 2014-04-22 2014-07-30 万军 Monitoring attention device and system for road comprehensive information
CN205636581U (en) * 2016-04-07 2016-10-12 无锡市政设计研究院有限公司 Water level warning road guardrail
CN205909905U (en) * 2016-07-29 2017-01-25 程梅雪 Road surface water level warning equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625303A (en) * 2018-05-22 2018-10-09 许应君 Overpass flood control alarming device
CN110700881A (en) * 2019-10-18 2020-01-17 广州铁路职业技术学院(广州铁路机械学校) Drainage device for railway tunnel
GR1009879B (en) * 2019-11-18 2020-12-02 Π. Χατζηδημητρακης Και Σια Εε Warning self-acting bar for safe passage in irish crossings
CN110853390A (en) * 2019-11-25 2020-02-28 江苏科创交通安全产业研究院有限公司 Intelligent network connection ponding road section early warning system
CN110920530A (en) * 2019-12-31 2020-03-27 湖北文理学院 Depth recognition device for unmanned driving
CN114481898A (en) * 2022-03-19 2022-05-13 河南龙之龙实业有限公司 Complete set of emergency continuous prompt device and prompt method for expressway

Also Published As

Publication number Publication date
CN107217609B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN107217609A (en) A kind of city is paddled section warning mark post and application method
CN108755483A (en) A kind of fixing bracket for traffic lights
CN107761594A (en) A kind of efficient caution device of bridge construction
CN206361578U (en) Novel street lamp for road lighting
CN205743235U (en) A kind of self-supporting anemometer tower
CN208818207U (en) A kind of lightning protection hydrometric cableway current surveying device
CN208009429U (en) A kind of subway civil construction pile pulling device
CN204958494U (en) Sewage adjusting pool's mud cleaning device
CN110453627A (en) Fold road divider
CN201784791U (en) Portable multi-beam side installation platform
CN206697144U (en) A kind of municipal administration direction board for being easy to cleaning
CN106223225B (en) A kind of traffic intersection crosses alarming device
CN205634501U (en) Novel multi -functional earth connection special -purpose vehicle
CN106253814A (en) A kind of photovoltaic anchor floating type waterborne being applicable to high water level difference
CN207007280U (en) A kind of road fording depth suggestion device
CN102561251A (en) Hydrologic monitoring station
CN206569864U (en) A kind of floatation type pit overhaul device
CN206097492U (en) Traffic jams reddens green lamp indicating device based on big data all -in -one
CN205646631U (en) Cable fly line machine
CN215715330U (en) Dustproof curtain structure that integrated illumination sprayed
CN210105475U (en) Electric power rail ground stake
CN106439442A (en) Folding type intelligent traffic condition information acquisition equipment adopting splicing type transverse rod
CN207062816U (en) A kind of bridge construction suggestion device
CN202197074U (en) Floater type cable laying apparatus
CN101265873B (en) Drift stream water turbine generation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190418

Address after: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Applicant after: ANHUI YINGLONG INDUSTRIAL DESIGN Co.,Ltd.

Address before: 125001 Luye Villa, No. 2 Lianyang Road, Lianshan District, Huludao City, Liaoning Province

Applicant before: Wang Junduo

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190807

Address after: 318020 Chengdu Road, Jiangkou Street, Huangyan District, Taizhou City, Zhejiang Province, 28

Applicant after: TAIZHOU HUANGYAN BAOYE TRAFFIC FACILITLES TECHNOLOGY CO.,LTD.

Address before: Ganquan road Shushan District of Hefei City, Anhui Province, 230000 West hillock road to the South Wild Garden commercial office building room B-1512

Applicant before: ANHUI YINGLONG INDUSTRIAL DESIGN Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A warning post and usage method for urban wading road sections

Effective date of registration: 20230404

Granted publication date: 20190903

Pledgee: Zhejiang Taizhou Huangyan Rural Commercial Bank Co.,Ltd.

Pledgor: TAIZHOU HUANGYAN BAOYE TRAFFIC FACILITLES TECHNOLOGY CO.,LTD.

Registration number: Y2023330000659