CN107217563B - A kind of renovation technique of bridge pavement - Google Patents

A kind of renovation technique of bridge pavement Download PDF

Info

Publication number
CN107217563B
CN107217563B CN201710649335.XA CN201710649335A CN107217563B CN 107217563 B CN107217563 B CN 107217563B CN 201710649335 A CN201710649335 A CN 201710649335A CN 107217563 B CN107217563 B CN 107217563B
Authority
CN
China
Prior art keywords
bridge
glass fiber
step groove
layer
steel mesh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710649335.XA
Other languages
Chinese (zh)
Other versions
CN107217563A (en
Inventor
李爱军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Municipal Engineering Co.,Ltd.
Original Assignee
李爱军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李爱军 filed Critical 李爱军
Priority to CN201710649335.XA priority Critical patent/CN107217563B/en
Publication of CN107217563A publication Critical patent/CN107217563A/en
Application granted granted Critical
Publication of CN107217563B publication Critical patent/CN107217563B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/005Methods or materials for repairing pavings

Abstract

The invention discloses a kind of renovation techniques of bridge pavement, the present invention is arranged to step groove to damaged part, and steel mesh and glass fiber grid are set in major diameter groove, steel mesh and glass fiber grid can be very good repair materials and bridge fastening to be an entirety in this way, it prevents from repairing falling off for position after repairing, and also set up i shaped steel item, I-shaped steel bar can further strengthen the fastening effect to damaged part, epoxy resin primer layer is arranged in the present invention on step groove cell wall, in this way, can be enhanced repair after and former bridge wall combination tightness, prevent the removing at contact connectio, and it can prevent water from flowing into the gap of bridge reparation, the configuration of the present invention is simple, effect is good after reparation, later period is not necessarily to periodic maintenance, maintenance, reduce maintenance of surface cost.

Description

A kind of renovation technique of bridge pavement
Technical field
The present invention relates to a kind of renovation techniques of bridge pavement, belong to technical field of road construction.
Background technique
Currently, not only vehicle is made to jolt when local damage occurs in bridge pavement, but also the vibration to bridge can be aggravated It is dynamic, cause bridge crack occur, in addition, the local damage of bridge pavement also results in silt inflow, in addition hot weather and cold Freeze the erosion of weather, it is long and long it, the service life of bridge can be seriously affected.Once there is breakage in bridge pavement at present, often Repair materials directly are laid in breakage, although this method is simple, to the depth dug under breakage when being repaired due to bridge Spend limited, and the repair materials due to breakage and bridge original road surface are easy to produce removing, after use soon, are still easy It falls off, in this way, traditional renovation technique does not only result in, repairing effect is poor, causes the waste of rehabilitation cost, also seriously affects bridge The secondary damage on beam road surface influences the normal pass of traffic.
The present invention is in view of the above problems, provide a kind of renovation technique of bridge pavement, to improve bridge pavement reparation Service life and reliability.
Summary of the invention
To achieve the above object, the invention provides the following technical scheme: a kind of renovation technique of bridge pavement, feature exist In comprising following steps:
(1) distressed pavements are checked using ground supersonic inspection device, mark bridge specific damaged part and Damaged size;
(2) jet-bedding or grooving are carried out according to the bridge failure position of label and damaged size using road surface repairing device, And the shape of jet-bedding or grooving is made to be step groove, the major diameter slot position of step groove is in the lower section of minor diameter slot, ladder The radian of the bottom surface radian of groove and the bridge position here is adapted, and then step groove is polished using grinding apparatus dry Only;
(3) glass fiber grid being of moderate size is placed in the major diameter slot of step groove, and the surface area of glass fiber grid is big In the area of minor diameter slot, less than the area of major diameter slot, steel mesh then is laid in major diameter slot, it is desirable that steel mesh is located at The top of the glass fiber grid;The center of the steel mesh and glass fiber grid is provided with the slip casting protruded into for grouting equipment Hole;
(4) grouting equipment is protruded into the injected hole of center of steel mesh and glass fiber grid, injection slurry is injected into glass In step groove below fine grid, until filling, it is laid with one layer of injection slurry above steel mesh at once later;
(5) it is laid with one layer of epoxy resin primer layer in the top of injection slurry, and is coated on the surrounding cell wall of step groove One layer of epoxy resin primer layer;
(6) when epoxy resin half curdled appearance of primer layer, it is laid with one layer of screed above it;
(7) before to screed solidification, it is compacted, it is to be solidified later it is good after, one layer of drip is laid on screed Green concrete topping, is compacted using compacting machine;
(8) it polishes repair place, and using the flatness on Road surface level instrument detection repair place surface, wait be polishing to When required flatness, the renovation technique to bridge pavement can be completed.
Further, preferably, being disposed with multiple I-shaped steel bars on the glass fiber grid, on the I-shaped steel bar Under cross the glass fiber grid gate hole setting, and glass fiber grid and steel mesh installation after, I-shaped steel bar is weldingly fixed on On steel mesh.
Further, preferably, the I-shaped steel bar and steel mesh are all made of 20# steel.
Further, preferably, in the step (5), one layer of asphalt mixtures modified by epoxy resin is coated on the surrounding cell wall of step groove When rouge primer layer, first the cell wall of step groove is heated.
Further, preferably, rubble containing 20-30cm particle size in mortar used in the screed, Stone containing 8-15cm particle size in the asphalt concrete pavement.
Further, preferably, in the step (7), before screed solidification, when being compacted to it, emphasis pair It is compacted at the contact connectio of the step groove of mortar and bridge pavement.
Further, preferably, in the step (2), road surface repairing device is punching apparatus, drilling device or cutting Equipment when processing step groove, processes major diameter slot using grinding apparatus, the groove depth of major diameter slot is 5-12cm, minor diameter The groove depth of slot is depending on the breakage of bridge pavement.
Further, preferably, the hole of the steel mesh is greater than the hole of the glass fiber grid.
Further, preferably, protruding into the screed setting, the I-shaped steel bar above the I-shaped steel bar Lower section protrude into grouting layer setting.
Further, preferably, the injection slurry of the grouting layer expands injection slurry using water-proof type.
Compared with prior art, the beneficial effects of the present invention are:
The present invention is arranged to step groove to damaged part, and steel mesh and glass fiber grid are arranged in major diameter groove, Steel mesh and glass fiber grid can be very good repair materials and bridge fastening to be an entirety in this way, prevent reparation portion after repairing Position falls off, and also sets up i shaped steel item, and I-shaped steel bar can further strengthen the fastening effect to damaged part, this Epoxy resin primer layer is arranged in invention on step groove cell wall, in this way, can be enhanced repair after and former bridge wall combination it is tight Solidity prevents the removing at contact connectio, and can prevent water from flowing into the gap of bridge reparation, the configuration of the present invention is simple, Effect is good after reparation, and the later period without periodic maintenance, maintenance, reduces maintenance of surface cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of present invention bridge pavement to be repaired;
Fig. 2 is a kind of reparation structural schematic diagram of the renovation technique of bridge pavement of the present invention;
Wherein, 1, damaged part, 2, step groove, 3, steel mesh, 4, glass fiber grid, 5, I-shaped steel bar, 6, injected hole, 7, epoxy resin primer layer, 8, screed, 9, asphalt concrete pavement.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of renovation technique of bridge pavement, which is characterized in that Itself the following steps are included:
(1) distressed pavements are checked using ground supersonic inspection device, marks 1 He of specific damaged part of bridge Damaged size;
(2) jet-bedding or grooving are carried out according to the bridge failure position of label and damaged size using road surface repairing device, And the shape of jet-bedding or grooving is made to be step groove 2, the major diameter slot position of step groove 2 is in the lower section of minor diameter slot, rank The radian of the bottom surface radian of terraced groove and the bridge position here is adapted, and then step groove is polished using grinding apparatus Completely;
(3) glass fiber grid 4 being of moderate size is placed in the major diameter slot of step groove, and the surface area of glass fiber grid 4 Greater than the area of minor diameter slot, less than the area of major diameter slot, steel mesh then is laid in major diameter slot, it is desirable that steel mesh position In the top of the glass fiber grid;The center of the steel mesh 3 and glass fiber grid 4 is provided with the note protruded into for grouting equipment Starch hole 6;
(4) grouting equipment is protruded into the injected hole 6 of the center of steel mesh 4 and glass fiber grid 3, injection slurry is injected In step groove below glass fiber grid, until filling, it is laid with one layer of injection slurry above steel mesh at once later;
(5) it is laid with one layer of epoxy resin primer layer 7 in the top of injection slurry, and is coated on the surrounding cell wall of step groove One layer of epoxy resin primer layer 7;
(6) when epoxy resin half curdled appearance of primer layer, it is laid with one layer of screed 8 above it;
(7) before to screed solidification, it is compacted, it is to be solidified later it is good after, one layer of drip is laid on screed Green concrete topping 9, is compacted using compacting machine;
(8) it polishes repair place, and using the flatness on Road surface level instrument detection repair place surface, wait be polishing to When required flatness, the renovation technique to bridge pavement can be completed.
In the present embodiment, such as Fig. 2, multiple I-shaped steel bars, the i shaped steel are disposed on the glass fiber grid Item crosses the gate hole setting of the glass fiber grid up and down, and after glass fiber grid and steel mesh installation, I-shaped steel bar is welded solid It is scheduled on steel mesh.
In order to improve welding performance and comprehensive performance, the I-shaped steel bar and steel mesh are all made of 20# steel.
In order to guarantee the binding performance of contact position, in the step (5), one is coated on the surrounding cell wall of step groove When layer epoxy resin primer layer, first the cell wall of step groove is heated.
As preferable one embodiment, in order to guarantee the ability to bear and planarization on road surface, institute in the screed Rubble containing 20-30cm particle size in the mortar used contains 8-15cm particle size in the asphalt concrete pavement Stone.
Moreover, it is noted that in the step (7), before screed solidification, when being compacted to it, emphasis To being compacted at the contact connectio of the step groove of mortar and bridge pavement.In the step (2), road surface repairing device is punching Hole equipment, drilling device or cutting equipment when processing step groove, process major diameter slot, major diameter slot using grinding apparatus Groove depth be 5-12cm, the groove depth of minor diameter slot is depending on the breakage of bridge pavement.
In order to guarantee connective stability, the hole of the steel mesh is greater than the hole of the glass fiber grid, described I-shaped The screed setting is protruded into above steel bar, protrudes into grouting layer setting below the I-shaped steel bar.In order to guarantee waterproof The injection slurry of effect, the grouting layer expands injection slurry using water-proof type.
The present invention is arranged to step groove to damaged part, and steel mesh and glass fiber grid are arranged in major diameter groove, Steel mesh and glass fiber grid can be very good repair materials and bridge fastening to be an entirety in this way, prevent reparation portion after repairing Position falls off, and also sets up i shaped steel item, and I-shaped steel bar can further strengthen the fastening effect to damaged part, this Epoxy resin primer layer is arranged in invention on step groove cell wall, in this way, can be enhanced repair after and former bridge wall combination it is tight Solidity prevents the removing at contact connectio, and the configuration of the present invention is simple, effect is good after reparation, and the later period is not necessarily to periodic maintenance, maintenance, Reduce maintenance of surface cost.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of renovation technique of bridge pavement, which is characterized in that itself the following steps are included:
(1) distressed pavements are checked using ground supersonic inspection device, marks specific damaged part and the breakage of bridge Size;
(2) jet-bedding or grooving are carried out according to the bridge failure position of label and damaged size using road surface repairing device, and made The shape for obtaining jet-bedding or grooving is step groove, and the major diameter slot position of step groove is in the lower section of minor diameter slot, step groove Bottom surface radian and the radian of bridge position here be adapted, then step groove is polished using grinding apparatus clean;
(3) glass fiber grid being of moderate size is placed in the major diameter slot of step groove, and the surface area of glass fiber grid is greater than small Then the area of diameter groove is laid with steel mesh in major diameter slot less than the area of major diameter slot, it is desirable that steel mesh is located at described The top of glass fiber grid;The center of the steel mesh and glass fiber grid is provided with the injected hole protruded into for grouting equipment;
(4) grouting equipment is protruded into the injected hole of center of steel mesh and glass fiber grid, injection slurry is injected into glass lattice In step groove below grid, until filling, it is laid with one layer of injection slurry above steel mesh at once later;
(5) it is laid with one layer of epoxy resin primer layer in the top of injection slurry, and coats one layer on the surrounding cell wall of step groove Epoxy resin primer layer;
(6) when epoxy resin half curdled appearance of primer layer, it is laid with one layer of screed above it;
(7) before to screed solidification, it is compacted, it is to be solidified later it is good after, it is mixed that one layer of pitch is laid on screed Solidifying soil surface layer, is compacted using compacting machine;
(8) it polishes repair place, and using the flatness on Road surface level instrument detection repair place surface, wait needed for being polishing to When flatness, the renovation technique to bridge pavement can be completed;
Multiple I-shaped steel bars are disposed on the glass fiber grid, which crosses the glass fiber grid up and down Gate hole setting, and after glass fiber grid and steel mesh installation, I-shaped steel bar is weldingly fixed on steel mesh;The i shaped steel Item and steel mesh are all made of 20# steel.
2. a kind of renovation technique of bridge pavement according to claim 1, it is characterised in that: in the step (5), When coating one layer of epoxy resin primer layer on the surrounding cell wall of step groove, first the cell wall of step groove is heated.
3. a kind of renovation technique of bridge pavement according to claim 1, it is characterised in that: used in the screed Mortar in the rubble containing 20-30cm particle size, the stone containing 8-15cm particle size in the asphalt concrete pavement Son.
4. a kind of renovation technique of bridge pavement according to claim 1, it is characterised in that: in the step (7), to Before screed solidification, when being compacted to it, emphasis at the contact connectio of the step groove of mortar and bridge pavement to pressing It is real.
5. a kind of renovation technique of bridge pavement according to claim 1, it is characterised in that: in the step (2), road surface Prosthetic appliance is punching apparatus, drilling device or cutting equipment, when processing step groove, processes major diameter using grinding apparatus The groove depth of slot, major diameter slot is 5-12cm, and the groove depth of minor diameter slot is depending on the breakage of bridge pavement.
6. a kind of renovation technique of bridge pavement according to claim 1, it is characterised in that: the hole of the steel mesh is big In the hole of the glass fiber grid.
7. a kind of renovation technique of bridge pavement according to claim 1, it is characterised in that: the I-shaped steel bar it is upper Side protrudes into the screed setting, protrudes into grouting layer setting below the I-shaped steel bar.
8. a kind of renovation technique of bridge pavement according to claim 7, it is characterised in that: the injection slurry of the grouting layer Injection slurry is expanded using water-proof type.
CN201710649335.XA 2017-08-02 2017-08-02 A kind of renovation technique of bridge pavement Active CN107217563B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710649335.XA CN107217563B (en) 2017-08-02 2017-08-02 A kind of renovation technique of bridge pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710649335.XA CN107217563B (en) 2017-08-02 2017-08-02 A kind of renovation technique of bridge pavement

Publications (2)

Publication Number Publication Date
CN107217563A CN107217563A (en) 2017-09-29
CN107217563B true CN107217563B (en) 2019-04-05

Family

ID=59954961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710649335.XA Active CN107217563B (en) 2017-08-02 2017-08-02 A kind of renovation technique of bridge pavement

Country Status (1)

Country Link
CN (1) CN107217563B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681053A (en) * 2020-12-08 2021-04-20 江苏现代路桥有限责任公司 Maintenance material for uneven surface of structure and use method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2412252C3 (en) * 1974-03-14 1978-10-26 Reinhard 5461 Windhagen Wirtgen Process for repairing a road surface course and machine for carrying out the process
CN102251454B (en) * 2011-04-27 2013-07-24 杭州市市政设施监管中心 Process for quickly repairing semi-rigid substrate damage of asphalt pavement
CN202323614U (en) * 2011-07-13 2012-07-11 长沙必特工程技术有限责任公司 Novel pavement pit hole repairing structure
KR101302308B1 (en) * 2011-07-30 2013-09-03 윤종식 Method of Repairing an ASCON Pavement and Structure of The Same
CN202969227U (en) * 2012-07-02 2013-06-05 长沙必特工程技术有限责任公司 Novel pavement pit repairing structure
CN202787044U (en) * 2012-09-12 2013-03-13 浙江八咏公路工程有限公司 Longitudinal crack treatment structure for bituminous concrete pavement
CN103882789B (en) * 2014-04-17 2017-01-04 上海陆桥市政工程有限公司 A kind of road or the renovation technique of bridge pavement

Also Published As

Publication number Publication date
CN107217563A (en) 2017-09-29

Similar Documents

Publication Publication Date Title
CN101676492B (en) Method for repairing asphalt pavement cracks
KR101036277B1 (en) Expansion joint waterproof material of structure including road and bridge, and constructing method of expansion joint part using this
CN104343077A (en) Asphalt concrete pavement reflection crack treatment method
CN107476205A (en) A kind of modulus type expansion joint rapid-maintenance changes construction method
CN108316089A (en) It is a kind of that road surface method is repaired using plain concrete and reinforced concrete
CN107217563B (en) A kind of renovation technique of bridge pavement
US10329719B1 (en) Composition and method for surface repair
KR101217077B1 (en) Construction method for pavement structure
CN103603373A (en) Prefabricated inspection well and road construction method involving inspection well
CN103898925A (en) Installation method for anti-sedimentation well cover
CN202969227U (en) Novel pavement pit repairing structure
KR100786357B1 (en) Reinforcement equipment and method for joint of concrete paved road
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN102787549B (en) Method for mending longitudinal/transverse single cracks of asphalt concrete pavement
CN205134126U (en) Half flexible bituminous paving basic unit structure
CN209837057U (en) Concrete brick for roadbed slope protection structure
Liu et al. Study on cement concrete pavement treatment methods of common damage diseases
Putri et al. Experimental study on use of reclaimed asphalt pavement as aggregate substitution for flexible pavement
CN208055793U (en) A kind of structure using plain concrete and reinforced concrete repairing road
CN105887614A (en) Asphalt pavement prefabricated block repairing pit slot structure and construction process thereof
KR102001210B1 (en) Reinforcement method for slope
CN207211896U (en) A kind of transforming plant main transformer oil sump wall precast concrete is hollow to bear down on one
CN109577183A (en) The anti-ponding structure in overhead bridge floor edge and construction
CN214423206U (en) Road and bridge crack reinforcing and repairing structure
CN212316587U (en) Quick repair structure of airport bituminous pavement disease in extremely cold freeze thawing area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211222

Address after: 276800 municipal test building, No. 279, Linyi Road, Rizhao City, Shandong Province

Patentee after: Rizhao Municipal Engineering Co.,Ltd.

Address before: 235000 room 407, building 2, No.9 Minsheng Road, Xinhua lane, Xiangshan District, Huaibei City, Anhui Province

Patentee before: Li Aijun

TR01 Transfer of patent right