CN107215765A - Lift shackle - Google Patents
Lift shackle Download PDFInfo
- Publication number
- CN107215765A CN107215765A CN201710452949.9A CN201710452949A CN107215765A CN 107215765 A CN107215765 A CN 107215765A CN 201710452949 A CN201710452949 A CN 201710452949A CN 107215765 A CN107215765 A CN 107215765A
- Authority
- CN
- China
- Prior art keywords
- lifting
- connector
- bearing part
- drag rope
- lifting shackle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Shackle is lifted the invention provides one kind, the lifting shackle includes:Bearing part, connector and plug part;Wherein, bearing part offers manhole;Connector is arranged in manhole;The first end of connector is provided with the first drag rope;Second end of connector offers perforating;Plug part and be arranged in perforating;The one end for plugging part is provided with the second drag rope.The lifting shackle that the present invention is provided will treat that lifting part is connected with bearing part by plugging part and connector, to realize the installation and transport for the treatment of lifting part, operating personnel pull the first drag rope and the second drag rope to treat that lifting part is separated i.e. with bearing part dismounting so that treating that lifting part is separated with hook by ground, to reach the purpose of dismounting lifting, therefore, the dismounting that the lifting shackle can be lifted on ground, the frequency and number of times of the work high above the ground reduced, improve the terseness of construction, not only it is time saving and energy saving but also to ensure that workmen's safety work provides powerful guarantee.
Description
Technical field
The present invention relates to equipment hoisting technical field, shackle is lifted in particular to one kind.
Background technology
Installed in equipment with Transportation Engineering, hoisting large-size equipment belongs to universal phenomenon using lifting shackle lifting.However,
Dismounting lifting shackle after the completion of lifting, in addition it is also necessary to which double ladder is climbed operation, other people coordinate with means of delivery and ensure double ladder
Stabilization, this traditional mode not only labor intensive but also influence personnel personal safety and inefficiency.Meanwhile, operating personnel
Situations such as operating lack of standardization, is likely to result in scaffold unstability, topples over accident, cause casualties.
The content of the invention
In consideration of it, the present invention proposes a kind of lifting shackle, it is intended to solve the problem of existing shackle needs high-rise working.
On one side, the present invention proposes a kind of lifting shackle, and the lifting shackle includes:Bearing part, connector and plug
Part;Wherein, the bearing part is used to treat that lifting part hooks or be hung on the hook of crane;The bearing part offers circle
Through hole;The connector is arranged in the manhole;The first end of the connector is provided with the first drag rope, for leading
Draw the movement of the connector;Second end of the connector offers perforating;The part that plugs is arranged in the perforating
And shelves are located at the first side of the bearing part;Described one end for plugging part is provided with the second drag rope, for drawing described insert
If the movement of part.
Further, above-mentioned lifting shackle, the bearing part includes:Suspension ring and two connecting plates;Wherein, described two companies
Fishplate bar is set up in parallel;The suspension ring are placed in the top of described two connecting plates and are connected with one end of described two connecting plates;
The manhole is arranged at the other end of described two connecting plates.
Further, above-mentioned lifting shackle, the suspension ring are arcuate member.
Further, above-mentioned lifting shackle, the diameters of the suspension ring be more than or equal between described two connecting plates away from
From.
Further, above-mentioned lifting shackle, the suspension ring are integrally formed with described two connecting plates.
Further, above-mentioned lifting shackle, the part that plugs is elastic component.
Further, above-mentioned lifting shackle, the width for plugging part end is more than the width plugged between part end
Degree.
Further, above-mentioned lifting shackle, the first end of the connector is convexly equipped with gear and sets platform, is held for keeping off located at described
Second side of holder.
Further, above-mentioned lifting shackle, the side that the gear sets platform is provided with draw ring, for pulling the connector;
First drag rope and the draw ring are detachably connectable.
Further, above-mentioned lifting shackle, the length for plugging part is more than the thickness of the connector.
The lifting shackle that the present invention is provided, will treat that lifting part is connected with bearing part, passes through by plugging part and connector
Bearing part is hung or is hooked on the hook of crane, and to realize the installation and transport for the treatment of lifting part, operating personnel pass through ground
The first drag rope and the second drag rope is pulled to treat that lifting part is separated i.e. with bearing part dismounting so that treating lifting part and hook
It is separated, to reach the purpose of dismounting lifting, therefore, the dismounting that the lifting shackle can be lifted on ground is reduced
Work high above the ground frequency and number of times, save the use of double ladder, improve the terseness of construction, it is not only time saving and energy saving but also be true
Protect workmen's safety work and provide powerful guarantee.Meanwhile, the lifting shackle manufacture craft is simple, easy to operate, practicality
By force.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantages and benefit is common for this area
Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structural representation provided in an embodiment of the present invention for lifting shackle;
Fig. 2 is the left view structural representation provided in an embodiment of the present invention for lifting shackle;
Fig. 3 is the use state structural representation provided in an embodiment of the present invention for lifting shackle.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing the disclosure in accompanying drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Complete conveys to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and
Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1 to Fig. 3, the lifting shackle can include:Bearing part 1, connector 2 and plug part 3.
Wherein, bearing part 1 can be used for treat that lifting part 4 hooks or be hung on the hook 5 of crane.Specifically, ability
After field technique personnel by steel wire cable 10 it should be appreciated that typically bundled and fixed after the outside of lifting part 4, steel wire cable 10
End (upper end as shown in Figure 3) hook or be hung on the hook 5 of crane.It will be treated by bearing part 1 in the present embodiment
Lifting part 4 is hooked or is hung on hook 5.
Bearing part 1 can offer manhole, and connector 2 can be arranged in manhole.Specifically, bearing part 1
The manhole internal diameter that end (bottom as shown in Figure 1) is opened up is more than the diameter of connector 2, so that connector 2 is arranged in circle
The bottom card of bearing part 1 is set after shape through hole.It will be apparent to a skilled person that tying up located at the steel treated outside lifting part 5
Wire rope 10 is hung between the middle part of connector 2 or end (left and right ends as shown in Figure 1), so that steel wire cable 10
Between the both sides (left and right sides as shown in Figure 1) of bearing part 1.
The first end (left end as shown in Figure 1) of connector 2 is provided with the first drag rope 6, for drawing connector 2
It is mobile.Specifically, the first drag rope 6 can be detachably connectable by draw ring 9 and connector 2, to be pulled on ground
First drag rope 6 can draw the movement (for the position shown in Fig. 1) to the left of connector 2, and then dismantle lifting.
The second end (right-hand member as shown in Figure 1) of connector 2 can offer perforating, and plugging part 3 can be arranged in
Apertured and shelves are located at the first side (right side as shown in Figure 1) of bearing part 1.Specifically, part 3 is plugged through perforating and plugs part
3 two ends (upper and lower ends as shown in Figure 1) are placed in the both sides (both sides up and down as shown in Figure 1) of connector 2, so that card is set
In the first side (right side as shown in Figure 1) of bearing part 1.The card for plugging part 3 for further increase sets power, plugs the length of part 3
More than the thickness of connector 2, the both sides (both sides up and down as shown in Figure 1) of connector 2 are placed in plug the end of part 3.
The one end (lower end as shown in Figure 2) for plugging part 3 is provided with the second drag rope 7, and the shifting of part 3 is plugged for drawing
It is dynamic.Specifically, the second drag rope 7 can with to plug part 3 detachably connectable, operating personnel pass through pulls second on ground
Drag rope 7, which drives, plugs the movement (for the position shown in Fig. 2) downwards of part 3, is torn open so as to plug part 3 with connector 2
Unload separation.
The use installation process of the present embodiment:It will treat that lifting part 4 bundlees fixation by steel wire cable 10 first, then connect
Part 2 is arranged in the manhole of bearing part 1 and by the way that steel wire cable 1 to be hooked between the end of connector 2 and be placed in successively
After between the both sides (left and right sides as shown in Figure 1) of bearing part 1, part 3 will be plugged and be inserted in the perforating of connector 2, with
Make connector 2 by bearing part 1 with treating that lifting part 4 is connected, will treat that lifting part 4 is hung on crane finally by bearing part 1
On hook 5.
The use unloading process of the present embodiment:First part 3 is plugged by pulling the second drag rope 7 to drive downwards (relatively
For the position shown in Fig. 1) it is mobile so that plug part 3 disassembles phase separation with connector 2, then by pulling the first traction
Rope 6 to the left (for position as shown in Figure 1) so that the dismounting of connector 2 and bearing part 1 is separated, is treated simultaneously with follower link 2
Lifting part 4 is separated with bearing part 1 and the dismounting of hook 5, to reach the purpose of dismounting lifting.
As can be seen that the lifting shackle provided in the present embodiment, will treat lifting part 4 with holding by plugging part 3 and connector 2
Holder 1 is connected, and hangs or is hooked on the hook 5 of crane by bearing part 1, to realize installation and the fortune for the treatment of lifting part 5
Defeated, operating personnel pull the first drag rope 6 and the second drag rope 7 to treat that lifting part 4 and bearing part 1 are dismantled point by ground
From to treat lifting part 4 with linking up with 5 phase separations, to reach the purpose of dismounting lifting, therefore, the lifting shackle can be on ground
The dismounting that face is lifted, the frequency and number of times of the work high above the ground reduced, saves the use of double ladder, improves construction
Terseness, it is not only time saving and energy saving but also to ensure that workmen's safety work provides powerful guarantee.Meanwhile, the lifting shackle makes work
Skill is simple, easy to operate, practical.
In the above-described embodiments, bearing part 1 includes:Suspension ring 11 and two connecting plates 12.
Wherein, two connecting plates 12 can be set up in parallel;Suspension ring 11 can be placed in the top of two connecting plates 12, also,
Suspension ring 11 can be connected with one end (upper end as shown in Figure 1) of two connecting plates 12;Manhole can be arranged at two
The other end (lower end as shown in Figure 1) of connecting plate 12.
Specifically, the both sides (left and right two as shown in Figure 1 of the bottom (for the position shown in Fig. 1) of suspension ring 11
Side) it can be connected respectively with one end (upper end as shown in Figure 1) of two connecting plates 12.Lower end (the phase of two connecting plates 12
For the position shown in Fig. 1) coaxial manhole can be provided with.Wherein, suspension ring 11 and two connecting plates 12 can
To be made of one piece, naturally it is also possible to be welded, any restriction is not done in the present embodiment to it.
As can be seen that will treat that lifting part 4 is connected with hook 5 by suspension ring 11 and two connecting plates 12 in the present embodiment,
To realize the lifting and transport for the treatment of lifting part 4.
In the above-described embodiments, suspension ring 11 can be arcuate member.Specifically, suspension ring 11 can be metalwork, also may be used certainly
Think and do not do any restriction in other materials part, the present embodiment to it.Wherein, the hook for ease of hook 5 or hanging, preferably
Ground, the diameter of suspension ring 11 can be more than or equal to the distance between two connecting plates 12.As can be seen that annular element in suspension ring 11
Both contacts area can be increased, to improve the service life of the lifting shackle in order to the hanging of hook by setting.
In the various embodiments described above, plug part 3 can be elastic component, so as to be arranged in connector 2 perforating and
It is fixed on the side (right side as shown in Figure 1) that perforating shelves are located at bearing part 1.Specifically, it can be elasticity gold to plug part 3
Belong to part, naturally it is also possible to be other elastic components, do not do any restriction to it in the present embodiment.Plug the end of part 3 (as shown in Figure 1
Upper and lower ends) width be more than plug the width between the end of part 3 and plug the end of part 3 width be more than plug in the middle of part 3
The width of position, is arranged in perforating and will not actively drop to plug part 3.As can be seen that plugging part 3 in the present embodiment
Setting can to plug part 3 and can plug to be fixed in perforating, and can be achieved under the traction of the second drag rope 7 to moving down
It is dynamic.
In the various embodiments described above, the first end (left end as shown in Figure 1) of connector 2 can be convexly equipped with gear and set platform 8, use
In gear located at the second side (left side as shown in Figure 1) of bearing part 1.Specifically, gear set platform 8 can be whole along the circumference of connector 2
Week is set, to prevent the initiative of connector 2 from moving.Gear, which sets platform 8, to be integrally formed with connector 2, naturally it is also possible to weld
Connect and form, do not do any restriction in this implementation to it.As can be seen that the setting for setting platform 8 by gear in the present embodiment will can be held
Two connecting plates 12 and steel wire cable 10 of holder 1 are arranged in gear and set platform 8 and plug between part 3, can prevent the shifting of connector 2
The lifting and transport of lifting part 4 are treated in dynamic and then influence.
In the above-described embodiments, gear sets the side (right side as shown in Figure 1) of platform 8 and is provided with draw ring 9, for pulling connection
Part 2, the first drag rope 6 and draw ring 9 are detachably connectable.Specifically, for ease of the connection of the first drag rope 6, preferably
Ground, draw ring 9 can be circular metal part, and the first drag rope 6 can be bundled on draw ring 9.As can be seen that leading in the present embodiment
Cross draw ring 9 with the first drag rope 6 to be connected, to improve both contacts area, reduce operating personnel and pull first to draw
The pulling force of rope 6.
In summary, the lifting shackle provided in the present embodiment, will treat lifting part 4 with holding by plugging part 3 and connector 2
Holder 1 is connected, and hangs or is hooked on the hook 5 of crane by bearing part 1, to realize installation and the fortune for the treatment of lifting part 5
Defeated, operating personnel pull the first drag rope 6 and the second drag rope 7 to treat that lifting part 4 and bearing part 1 are dismantled point by ground
From to treat lifting part 4 with linking up with 5 phase separations, to reach the purpose of dismounting lifting, therefore, the lifting shackle can be on ground
The dismounting that face is lifted, the frequency and number of times of the work high above the ground reduced, saves the use of double ladder, improves construction
Terseness, it is not only time saving and energy saving but also to ensure that workmen's safety work provides powerful guarantee.Meanwhile, the lifting shackle makes work
Skill is simple, easy to operate, practical.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.
Claims (10)
1. one kind lifting shackle, it is characterised in that including:Bearing part (1), connector (2) and plug part (3);Wherein,
The bearing part (1) is used to treat that lifting part (4) hooks or be hung on the hook (5) of crane;
The bearing part (1) offers manhole;
The connector (2) is arranged in the manhole;
The first end of the connector (2) is provided with the first drag rope (6), the movement for drawing the connector (2);
Second end of the connector (2) offers perforating;
The part (3) that plugs is arranged in the first side that the perforating and shelves are located at the bearing part (1);
Described one end for plugging part (3) is provided with the second drag rope (7), for drawing the movement for plugging part (3).
2. lifting shackle according to claim 1, it is characterised in that the bearing part (1) includes:Suspension ring (11) and two
Connecting plate (12);Wherein,
Described two connecting plates (12) are set up in parallel;
The suspension ring (11) are placed in the top of described two connecting plates (12) and are connected with one end of described two connecting plates (12)
Connect;
The manhole is arranged at the other end of described two connecting plates (12).
3. lifting shackle according to claim 2, it is characterised in that the suspension ring (11) are arcuate member.
4. lifting shackle according to claim 3, it is characterised in that the diameter of the suspension ring (11) is more than or equal to described
The distance between two connecting plates (12).
5. lifting shackle according to claim 2, it is characterised in that the suspension ring (11) and described two connecting plates (12)
It is integrally formed.
6. lifting shackle according to claim 1, it is characterised in that the part (3) that plugs is elastic component.
7. lifting shackle according to claim 6, it is characterised in that the width for plugging part (3) end is more than described
Plug the width between part (3) end.
8. the lifting shackle according to any one of claim 1 to 7, it is characterised in that
The first end of the connector (2) is convexly equipped with gear and sets platform (8), for keeping off located at the second side of the bearing part (1).
9. lifting shackle according to claim 8, it is characterised in that
The side that the gear sets platform (8) is provided with draw ring (9), for pulling the connector (2);
First drag rope (6) and the draw ring (9) are detachably connectable.
10. the lifting shackle according to any one of claim 1 to 7, it is characterised in that the length for plugging part (3) is big
Thickness in the connector (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710452949.9A CN107215765A (en) | 2017-06-15 | 2017-06-15 | Lift shackle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710452949.9A CN107215765A (en) | 2017-06-15 | 2017-06-15 | Lift shackle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107215765A true CN107215765A (en) | 2017-09-29 |
Family
ID=59949783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710452949.9A Pending CN107215765A (en) | 2017-06-15 | 2017-06-15 | Lift shackle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107215765A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107826959A (en) * | 2017-12-17 | 2018-03-23 | 唐刚 | A kind of quick-release suspension ring |
CN108946445A (en) * | 2018-09-28 | 2018-12-07 | 中石化重型起重运输工程有限责任公司 | A kind of shackle of remote ready removal |
CN109469773A (en) * | 2018-10-31 | 2019-03-15 | 广船国际有限公司 | A kind of supply hose fixing device and method |
CN113023552A (en) * | 2019-12-24 | 2021-06-25 | 中核建中核燃料元件有限公司 | Nuclear fuel related component transfer lifting appliance |
CN113212996A (en) * | 2021-04-20 | 2021-08-06 | 中车太原机车车辆有限公司 | Container coupling device and coupling type container |
CN113338382A (en) * | 2021-06-24 | 2021-09-03 | 上海三一重机股份有限公司 | Hoisting structure and excavator with same |
WO2023071385A1 (en) * | 2021-11-01 | 2023-05-04 | 中国电建集团山东电力建设第一工程有限公司 | Vertical-column hoisting tool, and operating method therefor |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1791326A1 (en) * | 1990-07-20 | 1993-01-30 | Neftyanoj Nii Tekhn Bezopasnos | Gripper pin lock |
CN201545595U (en) * | 2009-05-13 | 2010-08-11 | 中冶天工上海十三冶建设有限公司 | Lifting shackle capable of rapid detachment |
CN203392725U (en) * | 2013-06-05 | 2014-01-15 | 中国石油天然气集团公司 | Hoisting shackle for ground operation |
CN204675621U (en) * | 2015-05-08 | 2015-09-30 | 五冶集团上海有限公司 | A kind of shackle for rapid unhooking in tubing string lifting |
CN204847760U (en) * | 2015-08-11 | 2015-12-09 | 中国葛洲坝集团第二工程有限公司 | Overcome difficulties high altitude and encircle wire rope's device in ground |
-
2017
- 2017-06-15 CN CN201710452949.9A patent/CN107215765A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1791326A1 (en) * | 1990-07-20 | 1993-01-30 | Neftyanoj Nii Tekhn Bezopasnos | Gripper pin lock |
CN201545595U (en) * | 2009-05-13 | 2010-08-11 | 中冶天工上海十三冶建设有限公司 | Lifting shackle capable of rapid detachment |
CN203392725U (en) * | 2013-06-05 | 2014-01-15 | 中国石油天然气集团公司 | Hoisting shackle for ground operation |
CN204675621U (en) * | 2015-05-08 | 2015-09-30 | 五冶集团上海有限公司 | A kind of shackle for rapid unhooking in tubing string lifting |
CN204847760U (en) * | 2015-08-11 | 2015-12-09 | 中国葛洲坝集团第二工程有限公司 | Overcome difficulties high altitude and encircle wire rope's device in ground |
Non-Patent Citations (1)
Title |
---|
吕嘉宾: "《起重工技能》", 31 January 2008, 机械工业出版社 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107826959A (en) * | 2017-12-17 | 2018-03-23 | 唐刚 | A kind of quick-release suspension ring |
CN108946445A (en) * | 2018-09-28 | 2018-12-07 | 中石化重型起重运输工程有限责任公司 | A kind of shackle of remote ready removal |
CN109469773A (en) * | 2018-10-31 | 2019-03-15 | 广船国际有限公司 | A kind of supply hose fixing device and method |
CN109469773B (en) * | 2018-10-31 | 2021-01-12 | 广船国际有限公司 | Supply hose fixing device and method |
CN113023552A (en) * | 2019-12-24 | 2021-06-25 | 中核建中核燃料元件有限公司 | Nuclear fuel related component transfer lifting appliance |
CN113212996A (en) * | 2021-04-20 | 2021-08-06 | 中车太原机车车辆有限公司 | Container coupling device and coupling type container |
CN113338382A (en) * | 2021-06-24 | 2021-09-03 | 上海三一重机股份有限公司 | Hoisting structure and excavator with same |
WO2023071385A1 (en) * | 2021-11-01 | 2023-05-04 | 中国电建集团山东电力建设第一工程有限公司 | Vertical-column hoisting tool, and operating method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107215765A (en) | Lift shackle | |
CN104444762B (en) | Wind power foundation ring overturning device and method for overturning foundation ring by using same | |
CN104818858B (en) | Indoor heavy electrical cabinet hanging method | |
CN203754230U (en) | Track clamp and track lifting device | |
CN215287657U (en) | Lifting appliance for integral hoisting of double-wall steel cofferdam | |
CN205932924U (en) | Upset hoist device | |
CN108439244A (en) | A kind of emergency oil pond cover board magnetic force promotion transfer device | |
CN205442398U (en) | Safe hoist | |
CN204938712U (en) | A kind of trolley board of sintering machine special hanger | |
CN207209766U (en) | A kind of nitric acid bucket boom hoisting | |
CN207001999U (en) | Large tank shape equipment hoisting shoulder pole girder | |
CN112456305A (en) | Linear segmented turning-over method | |
CN201605087U (en) | Goods hoisting device | |
CN205099195U (en) | Can dismantle stirrup hoist and mount cage | |
CN206014242U (en) | A kind of aid for lifting insulator | |
CN106429804B (en) | A kind of high-altitude handling method of heavy pin shaft | |
CN108675108A (en) | A kind of anticreep snap-gauge, crane cable hophornbeam disk anticreep suspender and its hanging method | |
CN211769744U (en) | Hoisting assembly | |
CN215946469U (en) | Lifting appliance assembly for lifting basement equipment in place | |
CN218754569U (en) | Pipeline hoisting fixture | |
CN217535138U (en) | Hoisting device | |
CN207524834U (en) | Track lifts special mould clamp and includes its track hanging device | |
CN216471715U (en) | 150TON multipurpose hanging bar | |
CN206872264U (en) | Lift aid | |
CN211664530U (en) | Integral hoisting sling of straightening machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170929 |