CN107201828A - A kind of uncompacted restorative procedure of prestress hole path pressure grouting - Google Patents

A kind of uncompacted restorative procedure of prestress hole path pressure grouting Download PDF

Info

Publication number
CN107201828A
CN107201828A CN201710472293.7A CN201710472293A CN107201828A CN 107201828 A CN107201828 A CN 107201828A CN 201710472293 A CN201710472293 A CN 201710472293A CN 107201828 A CN107201828 A CN 107201828A
Authority
CN
China
Prior art keywords
breather pipe
glue
uncompacted
drilling
path pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710472293.7A
Other languages
Chinese (zh)
Other versions
CN107201828B (en
Inventor
郭保林
何韬
康宏伟
邢浩
甘鹏
李昱岐
刘新权
姜瑞双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Changda Highway Co ltd
Qingdao Linchuan Engineering Technology Consulting Co ltd
Shandong Highway & Bridge Construction Co ltd
First Engineering Co Ltd of CCCC Third Highway Engineering Co Ltd
Original Assignee
QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd filed Critical QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
Priority to CN201710472293.7A priority Critical patent/CN107201828B/en
Publication of CN107201828A publication Critical patent/CN107201828A/en
Application granted granted Critical
Publication of CN107201828B publication Critical patent/CN107201828B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Abstract

The invention discloses a kind of uncompacted restorative procedure of prestress hole path pressure grouting, including:Several drillings are opened up at the crack of prestress hole pipeline outer wall;A breather pipe is set respectively in each drilling;The breather pipe exposed parts that lowest part is on locus are connected with vavuum pump, the gas outlet of vavuum pump is connected with filling the first container of drier self-indicating, breather pipe in remaining each drilling is by flexible pipe and fills the second container of the drier that changes colour and is connected, by vavuum pump by the moisture emptying in prestressed pore passage;Glue-injection base is installed at each breather pipe, by glue-injection base of the glue-injecting pump at the breather pipe of lowest part epoxy grouting resin is injected into prestressed pore passage successively;Until filling epoxy grouting resin by the glue-injection base at last breather pipe.Repair uncompacted to hole path pressure grouting is realized using the present invention, it is to avoid the corrosion of presstressed reinforcing steel in duct, improve the durability and security of prestressed structure.

Description

A kind of uncompacted restorative procedure of prestress hole path pressure grouting
Technical field
The invention belongs to field of engineering technology, more particularly to a kind of uncompacted restorative procedure of prestress hole path pressure grouting.
Background technology
Post tensioning structure is the structure type commonly used in civil engineering, the quality and compaction rate pair of hole path pressure grouting The corrosion regularity influence of steel strand wires is very big under high-stress state.The ratio of mud is low, good fluidity, ungauged regions, and no bleeding etc. is all high The necessary condition of quality mud jacking.It is that mud jacking is closely knit in guarantee duct that the quality of circulation mud jacking and grout outlet slurry, which meets and required, has Efficacious prescriptions method.
Some grouting material qualities are unqualified, under low water-cement ratio (0.26~0.28), are unsatisfactory for the fluidity requirement of specification (10~17s), during specific mud jacking, operating personnel improve the fluidity of slurries often through the increase ratio of mud, and this Slurries bleeding will be caused.Water is lower than the density of cement by 2/3, secretes the eminence that the Free water is gathered in prestressed pore passage.
Prestressed structure is during its wet curing, and part curing water may be accumulated in duct, in hole path pressure grouting mistake One channel mud jacking is employed in journey, and does not wait until that the valve of grout outlet is just closed in even slurry outflow, causes certain limit under anchor Interior slurry is rich in air and Free water.In anchorage dead astern, duct only have presstressed reinforcing steel and without grouting material, thereafter one In sector hole road, the ratio of mud is distributed from infinity to design load, and has been not excluded for a sector hole road and there was only water and without grouting material.Such as Shown in Fig. 1 of Figure of description, the figure shows a kind of uncompacted structure chart of prestress hole path pressure grouting, anchorage 1 in the figure Dead astern is presstressed reinforcing steel and the main fill area 2 filled by air in duct gap, is presstressed reinforcing steel and hole close to the fill area 2 The fill area 3 that the main grouting material by high water-cement ratio in road gap is filled, the rear of fill area 3 is only presstressed reinforcing steel and duct gap master The fill area 4 to be filled by qualified grouting material.
Under the conditions of subzero temperature, Free water freezing and expansion causes concrete to be ftractureed along duct direction, and environment temperature rises to positive temperature When, ice-out Cheng Shui is oozed out by the crack on prestress hole pipeline outer wall, and carries the calcium hydroxide in grouting material to structure Surface, meets the carbon dioxide in air and generates white calcium carbonate.Crack is once form, and the moisture, oxygen in air will Presstressed reinforcing steel surface readily is arrived at, accelerates it to corrode, so as to have a strong impact on the durability and security of prestressed structure.
In mechanization relatively advanced today, prestressed structure speed of application is very fast, such as box beam from it is prefabricated, be lifted into Post-cast strip pours completion, that is, time of 3~4 months.But above mentioned problem, which has to pass through winter subzero temperature, can just be exposed again, For that must just can not take measures that hole path pressure grouting is implemented to repair on the spot for the prestressed structure got off of unloading.And it is current, Not yet there is corresponding technology.As can be seen here, prior art awaits further improving.
The content of the invention
In view of above-mentioned existing construction quality lowly causes the serious consequence that structure durability is reduced, the invention provides one kind The uncompacted restorative procedure of prestress hole path pressure grouting, to ensure the durability and security of prestressed structure.
The technical solution adopted in the present invention is:
A kind of uncompacted restorative procedure of prestress hole path pressure grouting, this method comprises the following steps:
Step 1, several drillings are opened up along fracture length direction at the crack of prestress hole pipeline outer wall, each drilling with The endoporus of prestressed pore passage is connected;
Step 2, it is the inner wall cleaning of each drilling is clean, it is ensured that without dust, chip;
Step 3, from the breather pipe being adapted with drilling and quantity is equal, setting one is described logical respectively in each drilling Tracheae, and each breather pipe be installed to drilling in after, each breather pipe need to retain certain exposed size;
Step 4, surface-closed is carried out to the non-drilled region of prestressed pore passage fracture faces using adhesive;
Step 5, it will be connected on locus in the breather pipe exposed parts of lowest part with vavuum pump, vavuum pump goes out Gas port is connected with filling the first container of drier self-indicating, when vavuum pump is opened, in the prestressed pore passage being connected with vavuum pump The Free water of bore portion gasifies discharge under suction function, and is discharged into air after the first container;Ventilation in remaining each drilling Pipe is connected by flexible pipe with filling the second container of discoloration drier;
Step 6, when the drier self-indicating in the first container no longer changes colour because making moist, by vavuum pump and on locus Breather pipe at height second from the bottom is connected, and repeat the above steps 5, the moisture emptying in prestressed pore passage;
Step 7, the exposed parts of each breather pipe are cut away, glue-injection base is installed at each breather pipe afterwards, passes through injecting glue Pump injects epoxy grouting resin into prestressed pore passage from the glue-injection base on locus at the breather pipe in lowest part;
Step 8, the glue-injection base on locus at the breather pipe at height third from the bottom is stayed in start after plastic emitting, Stop to the glue-injection base injecting glue on locus at the breather pipe in lowest part, then by glue-injecting pump from space bit Put the glue-injection base at the breather pipe at height second from the bottom and epoxy grouting resin is injected into crack;By that analogy, Until filling epoxy grouting resin by the glue-injection base at last breather pipe;
Step 9, after epoxy grouting resin solidification and after reaching the intensity of design requirement, by the glue on prestressed pore passage surface And the glue-injection base at each breather line is polished off.
The internal diameter of each drilling is 10~15mm.
The distance between drilling described in adjacent two is 20~40cm.
In the step 2, the method cleaning drill hole inner wall of pressure-air is passed through using to each drill.
In the step 3, breather pipe is bonded on drill hole inner wall by using adhesive.
The adhesive is epoxy resin.
Each breather pipe is stainless steel tube.
The bottom of each breather pipe need to be flush with prestressed pore passage inwall.
By adopting the above-described technical solution, having the beneficial effect that acquired by the present invention:
1st, using the present invention, can by the system using hydrolysis product of cement as binder materials, by negative pressure by it is unnecessary from By water discharge, now the serious binder materials bigger than normal of the ratio of mud ftractures so as to form connectivity gap because of dehydration, is then injected into Epoxy resin adhesive is as packing material, and the communication gap filled up between solid particle is realized to hole path pressure grouting leakiness Reparation, it is to avoid the corrosion of presstressed reinforcing steel in duct, improve the durability and security of prestressed structure.
2nd, present invention is particularly suitable for causing structural concrete to be ftractureed along prestressed pore passage because hole path pressure grouting bleeding freezes The reparation of infiltration.
Brief description of the drawings
Fig. 1 shows a kind of uncompacted structure chart of prestress hole path pressure grouting.
Fig. 2 is that vavuum pump of the present invention makes Free water gasify under suction function a kind of view of discharge.
Fig. 3 is prestressed pore passage injecting glue distribution schematic diagram in the present invention.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, but the present invention is not limited to These embodiments.
As shown in Figures 2 and 3, a kind of uncompacted restorative procedure of prestress hole path pressure grouting, this method comprises the following steps:
Step 1, several drillings 8 are opened up along fracture length direction at the crack of the outer wall of prestressed pore passage 7, respectively drills 8 Endoporus with prestressed pore passage 7 is connected.The internal diameter of each drilling 8 is between 10mm, 12mm, 15mm or 10~15mm Any number.Drilling the distance between 8 described in adjacent two is any number between 20cm, 30cm, 40cm or 20~40cm.Respectively The bottom of the drilling 8 need to be flush with the inwall of prestressed pore passage 7.
Step 2, it is the inner wall cleaning of each drilling 8 is clean, it is ensured that without dust, chip etc..Lead to using to each drilling 8 Enter the method cleaning drill hole inner wall of pressure-air.Certainly, the method for cleaning drilling 8 is not limited only to empty by being blown into high pressure The method of gas, can also take other measure cleaning drill hole inner walls, as long as ensuring in drilling 8 without dust, chip etc..
Step 3, from the breather pipe being adapted with drilling 8 and quantity is equal, set respectively described in one in each drilling 8 Breather pipe, and each breather pipe be installed to drilling 8 in after, each breather pipe need to retain certain exposed size.Each breather pipe is equal For stainless steel tube.And the bottom of each breather pipe need to be flush with the inwall of prestressed pore passage 7.When breather pipe is installed, it can pass through Breather pipe is bonded on 8 inwalls of drilling using adhesives such as epoxy resin.
Step 4, surface envelope is carried out to the non-drilled region of the fracture faces of prestressed pore passage 7 using adhesives such as epoxy resin Close.
Step 5, the breather pipe exposed parts that lowest part is on locus are connected with vavuum pump 9, vavuum pump 9 Gas outlet is connected with filling the first container 10 of drier self-indicating, when vavuum pump 9 is opened, the prestressing force being connected with vavuum pump 9 The Free water of the bore section of duct 7 gasifies discharge under suction function, and is discharged into air after the first container 10;Remaining respectively drills Breather pipe in 8 is connected by flexible pipe with filling the second container 6 of discoloration drier.Second container 6 is connected with breather line 5 It is logical.
Step 6, when the drier self-indicating in the first container 10 no longer changes colour because making moist, by vavuum pump 9 and in space bit Put the breather pipe at the height second from the bottom to be connected, repeat the above steps 5, until the moisture row in prestressed pore passage 7 Only.
Step 7, the exposed parts of each breather pipe are cut away, glue-injection base is installed at each breather pipe afterwards, passes through injecting glue Pump 11 injects epoxy grouting tree into prestressed pore passage 7 from the glue-injection base on locus at the breather pipe in lowest part Fat.The epoxy grouting resin need to select low viscosity, the product of high intensity.
Step 8, the glue-injection base on locus at the breather pipe at height third from the bottom is stayed in start after plastic emitting, Stop to the glue-injection base injecting glue on locus at the breather pipe in lowest part, then by glue-injecting pump 11 from space Glue-injection base on position at the breather pipe at height second from the bottom injects epoxy grouting resin into crack;With such Push away, until filling epoxy grouting resin by the glue-injection base at last breather pipe.
Step 9, after epoxy grouting resin solidification and after reaching the intensity of design requirement, by the glue on the surface of prestressed pore passage 7 Glue-injection base at liquid etc. and each breather line is polished off.
The part do not addressed in the present invention uses or used for reference prior art and can be achieved.
Specific embodiment described herein is only the spiritual example explanation to the present invention.Belonging to of the invention Those skilled in the art can make various modifications or supplement or using similar to described specific embodiment Mode is substituted, but without departing from the spiritual of the present invention or surmounts scope defined in appended claims.

Claims (8)

1. a kind of uncompacted restorative procedure of prestress hole path pressure grouting, it is characterised in that this method comprises the following steps:
Step 1, several drillings are opened up along fracture length direction at the crack of prestress hole pipeline outer wall, each drilling is with advance should The endoporus in power duct is connected;
Step 2, it is the inner wall cleaning of each drilling is clean, it is ensured that without dust, chip;
Step 3, from the breather pipe being adapted with drilling and quantity is equal, a ventilation is set respectively in each drilling Pipe, and each breather pipe be installed to drilling in after, each breather pipe need to retain certain exposed size;
Step 4, surface-closed is carried out to the non-drilled region of prestressed pore passage fracture faces using adhesive;
Step 5, the breather pipe exposed parts that lowest part is on locus are connected with vavuum pump, the gas outlet of vavuum pump It is connected with the first container for filling drier self-indicating, when vavuum pump is opened, hole portion in the prestressed pore passage being connected with vavuum pump Point Free water gasify under suction function discharge, and be discharged into air after the first container;Breather pipe in remaining each drilling leads to Cross flexible pipe and be connected with filling the second container of discoloration drier;
Step 6, when the drier self-indicating in the first container no longer changes colour because making moist, by vavuum pump with being on locus Breather pipe at height second from the bottom is connected, and repeat the above steps 5, the moisture emptying in prestressed pore passage;
Step 7, the exposed parts of each breather pipe are cut away, afterwards at each breather pipe install glue-injection base, by glue-injecting pump from Glue-injection base on locus at the breather pipe in lowest part injects epoxy grouting resin into prestressed pore passage;
Step 8, stay in the glue-injection base on locus at the breather pipe at height third from the bottom to start after plastic emitting, stop To the glue-injection base injecting glue on locus at the breather pipe in lowest part, then by glue-injecting pump from locus Glue-injection base at the breather pipe at height second from the bottom injects epoxy grouting resin into crack;By that analogy, until Epoxy grouting resin is filled by the glue-injection base at last breather pipe;
Step 9, after epoxy grouting resin solidification and after reaching the intensity of design requirement, by the glue on prestressed pore passage surface and Glue-injection base at each breather line is polished off.
2. the uncompacted restorative procedure of a kind of prestress hole path pressure grouting according to claim 1, it is characterised in that each described The internal diameter of drilling is 10~15mm.
3. the uncompacted restorative procedure of a kind of prestress hole path pressure grouting according to claim 1, it is characterised in that adjacent two The distance between described drilling is 20~40cm.
4. a kind of uncompacted restorative procedure of prestress hole path pressure grouting according to claim 1, it is characterised in that the step In rapid 2, the method cleaning drill hole inner wall of pressure-air is passed through using to each drill.
5. a kind of uncompacted restorative procedure of prestress hole path pressure grouting according to claim 1, it is characterised in that the step In rapid 3, breather pipe is bonded on drill hole inner wall by using adhesive.
6. a kind of uncompacted restorative procedure of prestress hole path pressure grouting according to claim 5, it is characterised in that the glue Glutinous agent is epoxy resin.
7. the uncompacted restorative procedure of a kind of prestress hole path pressure grouting according to claim 1, it is characterised in that each described Breather pipe is stainless steel tube.
8. the uncompacted restorative procedure of a kind of prestress hole path pressure grouting according to claim 1, it is characterised in that each described The bottom of breather pipe need to be flush with prestressed pore passage inwall.
CN201710472293.7A 2017-06-21 2017-06-21 A kind of uncompacted restorative procedure of prestress hole path pressure grouting Active CN107201828B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710472293.7A CN107201828B (en) 2017-06-21 2017-06-21 A kind of uncompacted restorative procedure of prestress hole path pressure grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710472293.7A CN107201828B (en) 2017-06-21 2017-06-21 A kind of uncompacted restorative procedure of prestress hole path pressure grouting

Publications (2)

Publication Number Publication Date
CN107201828A true CN107201828A (en) 2017-09-26
CN107201828B CN107201828B (en) 2019-07-19

Family

ID=59907075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710472293.7A Active CN107201828B (en) 2017-06-21 2017-06-21 A kind of uncompacted restorative procedure of prestress hole path pressure grouting

Country Status (1)

Country Link
CN (1) CN107201828B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795072A (en) * 2017-11-28 2018-03-13 北京市地铁运营有限公司地铁运营技术研发中心 Reinforcement type subway prestressing force beam body and manufacture method
CN108344799A (en) * 2017-12-09 2018-07-31 菏泽城建工程发展集团有限公司 A kind of detection method for bridge prestress pore channel slip casting plumpness
CN109928013A (en) * 2017-12-15 2019-06-25 楚天科技股份有限公司 A kind of sample bottle production method of leak tester

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0206707A1 (en) * 1985-06-21 1986-12-30 Rene Jiminez Sealant composition
US20080058445A1 (en) * 1990-06-19 2008-03-06 Dry Carolyn M Self-Repairing, Reinforced Matrix Materials
CN103195468A (en) * 2013-04-02 2013-07-10 重庆市能源投资集团科技有限责任公司 System process for conducting efficient strengthened extraction in surrounding rock
CN104481560A (en) * 2014-12-09 2015-04-01 中煤第一建设有限公司 Roadway roof aquifer treatment method
CN204570685U (en) * 2015-02-26 2015-08-19 北京公联信达智能交通技术有限责任公司 Repair the mud jacking formula anchor pole of U-shaped abutment longitudinal cracking

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0206707A1 (en) * 1985-06-21 1986-12-30 Rene Jiminez Sealant composition
US20080058445A1 (en) * 1990-06-19 2008-03-06 Dry Carolyn M Self-Repairing, Reinforced Matrix Materials
CN103195468A (en) * 2013-04-02 2013-07-10 重庆市能源投资集团科技有限责任公司 System process for conducting efficient strengthened extraction in surrounding rock
CN104481560A (en) * 2014-12-09 2015-04-01 中煤第一建设有限公司 Roadway roof aquifer treatment method
CN204570685U (en) * 2015-02-26 2015-08-19 北京公联信达智能交通技术有限责任公司 Repair the mud jacking formula anchor pole of U-shaped abutment longitudinal cracking

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795072A (en) * 2017-11-28 2018-03-13 北京市地铁运营有限公司地铁运营技术研发中心 Reinforcement type subway prestressing force beam body and manufacture method
CN108344799A (en) * 2017-12-09 2018-07-31 菏泽城建工程发展集团有限公司 A kind of detection method for bridge prestress pore channel slip casting plumpness
CN109928013A (en) * 2017-12-15 2019-06-25 楚天科技股份有限公司 A kind of sample bottle production method of leak tester
CN109928013B (en) * 2017-12-15 2023-11-28 楚天科技股份有限公司 Sample bottle manufacturing method of leak detector

Also Published As

Publication number Publication date
CN107201828B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN107201828B (en) A kind of uncompacted restorative procedure of prestress hole path pressure grouting
CN111485922B (en) Method for treating water leakage, block falling and slurry turning of ELF railway tunnel
CN207739264U (en) A kind of Grouting Pipe
CN106544961A (en) A kind of distress in concrete blocking method
CN105625149A (en) Equipment and method used for repairing road base damages
WO2018184254A1 (en) Carbonization mixing pile-ventilating pipe pile composite foundation and construction method thereof
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN104895581A (en) Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof
CN104912574A (en) A tunnel lining leakage water treatment method
CN104498000A (en) Organic synthesized alloy fiber plugging agent for drilling as well as preparation method and application thereof
CN102433878A (en) Post-grouting device and construction method for pipe pile foundation
CN105970980A (en) Weak surrounding rock four-wire super large section railway tunnel construction method
CN105220680A (en) A kind of draining deal pile reinforces Soft Clay Foundation and construction method thereof
CN214885801U (en) A slip casting leaking stoppage system for floor infiltration point
CN106759277A (en) Grouting device, bottom-enlarging prefabricated pile tube, bottom-enlarging filling pile and its construction method
CN106761841B (en) Working face tailgate fractured coal grouting reinforcement method
CN109723490A (en) A kind of filling counterfort and its construction method for underground metal mine
CN109898880A (en) A kind of steel counter-force pressing plate reinforcement means with crack cob wall
CN105297771B (en) A kind of reinforcement means of highway masonry retaining wall
CN107514150A (en) A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant
CN106939700A (en) The vacuum aided sealing off and covering anchorage construction method of back-off anchor recess
CN206581254U (en) Grouting device and bottom-enlarging prefabricated pile tube
CN100398782C (en) Vertical pipe vacuum pre pressing bidirectional slip casting method and sealed slip casting system thereof
CN109736152B (en) Gap repairing structure and repairing method between ballastless track sleeper and track slab
CN110565958A (en) Vacuum pumping, draining and clearing internal bleeding of mass concrete and structure anti-cracking method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190626

Address after: 100012 No. 18 Laiguangying West Road, Chaoyang District, Beijing

Applicant after: Engineering Co., Ltd of middle friendship three public office first

Applicant after: Qingdao Linchuan Engineering Technology Consulting Co., Ltd.

Applicant after: Gansu Changda Highway Co., Ltd.

Address before: 266500 Jinshatan Road, Qingdao economic and Technological Development Zone, Shandong 182

Applicant before: Qingdao Linchuan Engineering Technology Consulting Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200601

Address after: 100012 Beijing City, Chaoyang District, No. 18 West Road

Co-patentee after: QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co.,Ltd.

Patentee after: THE FRIST ENGINEERING CO., LTD. OF THE CCCC THIRD HIGHWAY ENGINEERING Co.,Ltd.

Co-patentee after: GANSU CHANGDA HIGHWAY Co.,Ltd.

Co-patentee after: SHANDONG HIGHWAY & BRIDGE CONSTRUCTION Co.,Ltd.

Address before: 100012 Beijing City, Chaoyang District, No. 18 West Road

Co-patentee before: QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co.,Ltd.

Patentee before: THE FRIST ENGINEERING CO., LTD. OF THE CCCC THIRD HIGHWAY ENGINEERING Co.,Ltd.

Co-patentee before: GANSU CHANGDA HIGHWAY Co.,Ltd.

TR01 Transfer of patent right