CN107191204A CN201710215775.4A CN201710215775A CN107191204A CN 107191204 A CN107191204 A CN 107191204A CN 201710215775 A CN201710215775 A CN 201710215775A CN 107191204 A CN107191204 A CN 107191204A
Authority
CN
China
Prior art keywords
anchor tube
shelf
channel
steel arch
lock pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710215775.4A
Other languages
English (en)
Inventor
徐松
刘雪冬
范春宇
邵志远
李德武
马学宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
China Railway 22nd Bureau Group Co Ltd
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Original Assignee
Lanzhou Jiaotong University
China Railway 22nd Bureau Group Co Ltd
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University, China Railway 22nd Bureau Group Co Ltd, Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd filed Critical Lanzhou Jiaotong University
Priority to CN201710215775.4A priority Critical patent/CN107191204A/zh
Publication of CN107191204A publication Critical patent/CN107191204A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting

Abstract

一种隧道钢拱架锁脚锚管的支撑锁定方法,包括钢拱架(1)、槽钢(2)、锁脚锚管(3)和L型钢筋连接件(4),其特征在于:在钢拱架(1)靠近围岩一侧焊接沿着纵向的短槽钢(2);锁脚锚管(3)在钢架两侧通过槽钢(2)上预制孔洞打入围岩,并将锁脚锚管与槽钢焊接牢固;在锁脚锚管(3)端部通过L型钢筋连接件(4)将锁脚锚管(3)焊接于钢拱架(1),L型钢筋连接件(4)由钢筋弯制而成;通过槽钢(2)上的锁脚锚管(3),将钢拱架(1)锚固于围岩深部。

Description

一种隧道钢拱架锁脚锚管的支撑锁定方法
技术领域
本发明涉及一种隧道钢拱架锁脚锚管的支撑锁定方法,适用于隧道初期支护中的钢拱架与锁脚锚管之间的锁定连接方法。
背景技术
隧道开挖后,使原有围岩的应力重新分布,进而使围岩产生了塑性变形和松弛,为了阻止被扰动后围岩的过度位移和变形,必须采用合理的支护结构来承受围岩的压力。钢拱架是隧道初期支护结构中重要的组成部分,同时又是永久支护的一部分,钢拱架本身具有较大刚度和较强的承载能力,能够在喷射混凝土未达到要求强度之前,有效的控制围岩的变形和位移,承担地层压力和约束围岩变形。
若要使钢拱架对开挖后周边围岩提供支撑作用,需要对钢拱架进行锁定。通过施做锁脚锚管,并与钢拱架进行牢固的连接,使锁脚锚管与钢拱架形成一个整体,将钢拱架锚固于围岩深部,在一定程度上限制钢拱架的刚体位移,充分发挥钢拱架的刚度和强度,以便对坑道周边围岩提供较大的支护抗力,防止围岩产生有害的过度变形。
现有的锁脚锚管与钢拱架之间的连接,一般采用将锁脚锚管与钢拱架贴紧点焊、增加L型短钢筋焊接在一起或采用U型钢筋将锁脚锚管卡套并焊接在型钢翼缘上,这些连接方式在受力较大时比较容易脱开,点焊方式最弱,增加L型短钢筋焊接方式次之, U型钢筋卡套焊连方式最好,但是受钢筋直径、焊接强度、锁脚锚管端头效应的影响大,不能保证对钢拱架的牢固锁定。
发明内容
为了解决上述背景技术中的不足之处,提供一种隧道钢拱架锁脚锚管的支撑锁定方法,可以有效保证钢拱架与锁脚锚管的连接强度和刚度,提高施工的安全性和结构的稳定性。
实现本发明而采用的技术方案为:
一种隧道钢拱架锁脚锚管的支撑锁定方法,包括钢拱架(1)、槽钢(2)、锁脚锚管(3)和L型钢筋连接件(4),其特征在于:在钢拱架(1)靠近围岩一侧焊接沿着纵向的短槽钢(2);锁脚锚管(3)在钢架两侧通过槽钢(2)上预制孔洞打入围岩,并将锁脚锚管与槽钢焊接牢固;在锁脚锚管(3)端部通过L型钢筋连接件(4)将锁脚锚管(3)焊接于钢拱架(1),L型钢筋连接件(4)由钢筋弯制而成;通过槽钢(2)上的锁脚锚管(3),将钢拱架(1)锚固于围岩深部。
与现有隧道钢拱架锁脚锚管的支撑锁定方法相比,本隧道钢拱架锁脚锚管的支撑锁定方法具有的优点和效果如下:
1.本发明在传力方面比较明确,锁脚锚管与围岩产生的作用通过锚管与槽钢的连接传至槽钢,槽钢再通过焊缝将作用传至钢拱架,从而有效的对钢拱架进行了锁定。
2.本发明具有良好的整体性,钢拱架背后焊接槽钢,可以增大焊接受力面积,槽钢与锁脚锚管通过槽钢预制孔周边焊接,由于槽钢的强度和刚度大保证了对锁脚锚管的支撑约束作用,同时通过L型钢筋连接件将锁脚锚管焊接于钢拱架,保证了锁脚锚管与钢拱架的连接强度和刚度。
附图说明
图1 本发明的结构示意图(实体图);
图2 本发明的结构示意图(侧面图)。
具体实施方式
一种隧道钢拱架锁脚锚管的支撑锁定方法,包括钢拱架(1)、槽钢(2)、锁脚锚管(3)和L型钢筋连接件(4),其特征在于:在钢拱架(1)靠近围岩一侧焊接沿着纵向的短槽钢(2);锁脚锚管(3)在钢架两侧通过槽钢(2)上预制孔洞打入围岩,并将锁脚锚管与槽钢焊接牢固;在锁脚锚管(3)端部通过L型钢筋连接件(4)将锁脚锚管(3)焊接于钢拱架(1),L型钢筋连接件(4)由钢筋弯制而成;通过槽钢(2)上的锁脚锚管(3),将钢拱架(1)锚固于围岩深部。
工作原理:在钢拱架背后焊接沿着纵向的短槽钢,将灌浆锁脚锚管通过槽钢两侧预制孔打入围岩,并将锁脚锚管与槽钢焊接牢固,在锁脚锚管端部通过L型钢筋连接件将锁脚锚管焊接于钢拱架,钢拱架与槽钢、灌浆锁脚锚管共同受力,连接体现整体性,传力明确,极限承载能力得到提高。

Claims (1)

1.一种隧道钢拱架锁脚锚管的支撑锁定方法,包括钢拱架(1)、槽钢(2)、锁脚锚管(3)和L型钢筋连接件(4),其特征在于:在钢拱架(1)靠近围岩一侧焊接沿着纵向的短槽钢(2);锁脚锚管(3)在钢架两侧通过槽钢(2)上预制孔洞打入围岩,并将锁脚锚管与槽钢焊接牢固;在锁脚锚管(3)端部通过L型钢筋连接件(4)将锁脚锚管(3)焊接于钢拱架(1),L型钢筋连接件(4)由钢筋弯制而成;通过槽钢(2)上的锁脚锚管(3),将钢拱架(1)锚固于围岩深部。
CN201710215775.4A 2017-04-04 2017-04-04 一种隧道钢拱架锁脚锚管的支撑锁定方法 Pending CN107191204A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710215775.4A CN107191204A (zh) 2017-04-04 2017-04-04 一种隧道钢拱架锁脚锚管的支撑锁定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710215775.4A CN107191204A (zh) 2017-04-04 2017-04-04 一种隧道钢拱架锁脚锚管的支撑锁定方法

Publications (1)

Publication Number Publication Date
CN107191204A true CN107191204A (zh) 2017-09-22

Family

ID=59871099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710215775.4A Pending CN107191204A (zh) 2017-04-04 2017-04-04 一种隧道钢拱架锁脚锚管的支撑锁定方法

Country Status (1)

Country Link
CN (1) CN107191204A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975382A (zh) * 2017-11-23 2018-05-01 中铁九局集团有限公司 一种用于控制锁脚锚管精度的安装方法
CN108060935A (zh) * 2017-11-16 2018-05-22 长安大学 一种隧道光纤光栅测力锁脚锚管的埋设方法
CN111335924A (zh) * 2020-03-30 2020-06-26 中铁隧道集团二处有限公司 一种锁脚锚管与钢架之间的连接结构及其安装方法
CN111706367A (zh) * 2020-06-30 2020-09-25 中铁二院工程集团有限责任公司 一种隧道内初期支护钢架复合锁脚构造及施工方法
CN112211653A (zh) * 2020-10-20 2021-01-12 中国铁建重工集团股份有限公司 一种钢拱架支撑结构及其安装方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202055842U (zh) * 2011-05-25 2011-11-30 兰州交通大学 一种隧道钢拱架与锁脚锚管连接方式
CN202659251U (zh) * 2012-05-18 2013-01-09 中铁十二局集团有限公司 隧道软弱、黄土围岩钢拱架锁脚锚管加固连接装置
CN204552783U (zh) * 2015-03-24 2015-08-12 兰州交通大学 一种黄土隧道竖向变形控制结构
CN204646269U (zh) * 2015-05-29 2015-09-16 湖南科技大学 一种用于加固软弱地层隧道的钢拱架锁脚锚管装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202055842U (zh) * 2011-05-25 2011-11-30 兰州交通大学 一种隧道钢拱架与锁脚锚管连接方式
CN202659251U (zh) * 2012-05-18 2013-01-09 中铁十二局集团有限公司 隧道软弱、黄土围岩钢拱架锁脚锚管加固连接装置
CN204552783U (zh) * 2015-03-24 2015-08-12 兰州交通大学 一种黄土隧道竖向变形控制结构
CN204646269U (zh) * 2015-05-29 2015-09-16 湖南科技大学 一种用于加固软弱地层隧道的钢拱架锁脚锚管装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060935A (zh) * 2017-11-16 2018-05-22 长安大学 一种隧道光纤光栅测力锁脚锚管的埋设方法
CN108060935B (zh) * 2017-11-16 2020-05-26 长安大学 一种隧道光纤光栅测力锁脚锚管的埋设方法
CN107975382A (zh) * 2017-11-23 2018-05-01 中铁九局集团有限公司 一种用于控制锁脚锚管精度的安装方法
CN111335924A (zh) * 2020-03-30 2020-06-26 中铁隧道集团二处有限公司 一种锁脚锚管与钢架之间的连接结构及其安装方法
CN111706367A (zh) * 2020-06-30 2020-09-25 中铁二院工程集团有限责任公司 一种隧道内初期支护钢架复合锁脚构造及施工方法
CN112211653A (zh) * 2020-10-20 2021-01-12 中国铁建重工集团股份有限公司 一种钢拱架支撑结构及其安装方法

Similar Documents

Publication Publication Date Title
CN107191204A (zh) 一种隧道钢拱架锁脚锚管的支撑锁定方法
CN204552783U (zh) 一种黄土隧道竖向变形控制结构
CN204646269U (zh) 一种用于加固软弱地层隧道的钢拱架锁脚锚管装置
CN208966352U (zh) 一种软弱岩质区域隧道的支护结构
JP2009249885A (ja) 既設の鋼矢板の補強方法及び構造、既設の鋼矢板の補強用部材
CN107338866A (zh) 一种钢结构柱梁刚性节点的连接方法及连接结构
CN102797478A (zh) 分布式抗剪阻滑钢筋混凝土桩防治软岩巷道底鼓方法
CN106640147A (zh) 隧道初期支护钢拱架锁脚固定方式
CN202055842U (zh) 一种隧道钢拱架与锁脚锚管连接方式
CN110005444A (zh) 高烈度区隧道施工方法及隧道支护结构
CN203855954U (zh) 一种齿状型接头的方桩
CN105064512A (zh) 圆钢管混凝土柱与钢梁的连接结构
CN109578018A (zh) 一种抗底鼓的隧道仰拱结构
CN110486068A (zh) 一种隧道超前支护式锁脚锚杆结构及其施工方法
CN108868820A (zh) 一种软土地基盾构隧道沉降控制结构及使用方法
CN108086471A (zh) 可拆卸预制装配式方钢管混凝土柱和钢梁组合节点
CN203947596U (zh) 一种组装式铸钢外套筒-t型件梁与柱连接装置
CN208073515U (zh) 一种隧道钢拱架锁脚锚管的支撑锁定装置
CN104060700A (zh) 一种组装式铸钢外套筒-t型件梁与柱连接装置
CN206396914U (zh) 一种连接梁柱的整体式节点
KR101083762B1 (ko) Cft기둥과 플랫플레이트 바닥구조물간의 접합구조
CN210797873U (zh) 一种装配式钢筋混凝土柱连接系统
CN106677340A (zh) 法兰盘型预制装配式混凝土暗牛腿干式连接系统
CN209099350U (zh) 先张法预应力管桩连接接头
CN207829932U (zh) 一种用于隧道初期支护结构的支承装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 113 West Street, Nangang District, Harbin City, Heilongjiang Province, 150001

Applicant after: CHINA RAILWAY 22ND CONSTRUCTION BUREAU 1ST ENGINEERING Co.,Ltd.

Applicant after: China Railway 22nd Bureau Group Co.,ltd.

Applicant after: Lanzhou Jiaotong University

Address before: No. 113 West Street, Nangang District, Harbin City, Heilongjiang Province, 150001

Applicant before: HARBIN RAILWAY CONSTRUCTION GROUP CO.,LTD. OF CHINA RAILWAY 22ND CONSTRUCTION BUREAU CO.,LTD.

Applicant before: China Railway 22nd Bureau Group Co.,ltd.

Applicant before: Lanzhou Jiaotong University