CN107187817B - Vehicle glass PU squeezes out cure cycle assembly line - Google Patents

Vehicle glass PU squeezes out cure cycle assembly line Download PDF

Info

Publication number
CN107187817B
CN107187817B CN201610144463.4A CN201610144463A CN107187817B CN 107187817 B CN107187817 B CN 107187817B CN 201610144463 A CN201610144463 A CN 201610144463A CN 107187817 B CN107187817 B CN 107187817B
Authority
CN
China
Prior art keywords
room
solidification
track
glass
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610144463.4A
Other languages
Chinese (zh)
Other versions
CN107187817A (en
Inventor
张海波
张爱军
廖启闽
姚超
肖林艳
王选平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUYAO GLASS (HUBEI) Co Ltd
Original Assignee
FUYAO GLASS (HUBEI) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUYAO GLASS (HUBEI) Co Ltd filed Critical FUYAO GLASS (HUBEI) Co Ltd
Priority to CN201610144463.4A priority Critical patent/CN107187817B/en
Publication of CN107187817A publication Critical patent/CN107187817A/en
Application granted granted Critical
Publication of CN107187817B publication Critical patent/CN107187817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/02Articles
    • B65G2201/0214Articles of special size, shape or weigh
    • B65G2201/022Flat

Abstract

Vehicle glass PU squeezes out cure cycle assembly line, including vehicle glass curing room ontology, glass solidification circular pipeline is additionally provided in the vehicle glass curing room ontology, the glass solidification circular pipeline includes one group of glass solidification frame (1) and solidification frame stepping mobile mechanism, the bottom of the glass solidification frame (1) is equipped with caster device (2), the solidification frame stepping mobile mechanism includes section solidification frame moving track (3) of entering the room, first progressive power device, for will solidify frame from section of entering the room be transported to out room section solidification frame transfer, room section solidification frame moving track (4) and the second progressive power device out;Structure of the invention layout designs are reasonable, can complete glass solidification frame and solidify indoor automation disengaging, and can strictly ensure that vehicle glass PU squeezes out curing time, substantially increase solidification quality.

Description

Vehicle glass PU squeezes out cure cycle assembly line
Technical field
The present invention relates to vehicle glass production line technology fields, and in particular to vehicle glass PU squeezes out cure cycle flowing water Line.
Background technique
Currently, the solidification of original vehicle glass PU extruded product be using manually will solidification frame push-in solidification room, and it is right Solidify the mode that frame is indicated and be timed solidification, the arrangement curing room time is long, and curing time uses manual control, Wu Fayan Lattice guarantee curing time, and solidification quality cannot ensure.And cannot achieve and be introduced into the solidification frame of curing room and first go out, automate journey It spends low, wastes a large amount of manpower.
Summary of the invention
The object of the invention is in order to solve the above-mentioned technical problem, and vehicle glass PU is provided and squeezes out cure cycle flowing water Line.
The present invention includes vehicle glass curing room ontology, is additionally provided with glass solidification in the vehicle glass curing room ontology and follows Circulation waterline, the glass solidification circular pipeline include one group of glass solidification frame and solidification frame stepping mobile mechanism, the glass The bottom that glass solidifies frame is equipped with caster device,
The solidification frame stepping mobile mechanism solidifies frame moving track including section of entering the room, the first progressive power device, is used for Solidification frame transfer, room section solidification frame moving track and the second step precession out that frame is transported to out room section from section of entering the room will be solidified Power device, the section of entering the room solidifies frame moving track and room section solidification frame moving track is laid on vehicle glass curing room respectively out On the ground of ontology, and the caster device solidifies frame moving track positioned at section of entering the room and room section solidifies frame moving track out It walks on rail level, the first progressive power device includes decelerating through motor thermomechanical components, driving pulley assembly, rack and pinion assembly, straight Line slide unit and striking gear, the decelerating through motor thermomechanical components are fixedly mounted on by mounting base is located at section solidification frame moving rail of entering the room In foundation pit below road, the rack and pinion assembly passes through the pto shaft drive of driving pulley assembly and decelerating through motor thermomechanical components It is connected, the track of the straight line slide unit is fixedly mounted on the ground of vehicle glass curing room ontology, and the striking gear includes Sliding block lapping plate, pedestal, slide block and tension spring, the sliding block lapping plate is overlapped on the sliding block of straight line slide unit, and and gear teeth The rack gear of bar assembly is fixedly connected, and the pedestal is equipped with slide block mounting groove, and slide block mounting groove is located at vehicle glass solidification At the fixation limited block that the room ontology side of entering is equipped with, the pedestal is mounted on sliding block lapping plate, and the slide block passes through tension spring It is movably arranged on pedestal, in the solidification frame transfer installation vehicle glass curing room ontology, and is located at section solidification of entering the room Between frame moving track and out room section solidification frame moving track, the second progressive power device includes the second decelerating through motor unit Part, the second driving pulley assembly, second gear rack assembly, second straight line slide unit and the second striking gear, second motor subtract Fast thermomechanical components are fixedly mounted on by mounting base to be located in the foundation pit that room section solidifies below frame moving track, the second gear Rack assembly is connected by the second driving pulley assembly with the pto shaft drive of the second decelerating through motor thermomechanical components, and described second is straight The track of line slide unit is fixedly mounted on the ground of vehicle glass curing room ontology, and the striking gear is overlapped including the second sliding block Plate, the second pedestal, the second slide block and tension spring, the second sliding block lapping plate are overlapped on the sliding block of second straight line slide unit, and It is fixedly connected with the rack gear of second gear rack assembly, second pedestal is equipped with slide block mounting groove, and is located at slide block and pacifies Tankage is equipped with the second fixed limited block backwards to the vehicle glass curing room ontology side of going out, and second pedestal is mounted on the second sliding block On lapping plate, second slide block is movably arranged on the second pedestal by tension spring.
The solidification frame transfer is by transhipment decelerating through motor thermomechanical components, stepping synchronous conveyer band, a pair of of block, transhipment rail Road, transfer carriage and transfer carriage docking bearing track composition, the transhipment track laying is on the ground of vehicle glass curing room ontology On, the transhipment decelerating through motor thermomechanical components are mounted in the foundation pit below transhipment track by mounting base, and the stepping is same Step conveyer belt is connected by driving wheel with the pto shaft drive for transporting decelerating through motor thermomechanical components, one end difference of a pair of of block It is fixedly mounted on the synchronous belt zone face of stepping synchronous conveyer band, and forms transfer carriage between a pair of of block and stir position, described turn Fortune is provided with traveling wheel, and the traveling wheel, which is located on the rail level of transhipment track, walks, and is additionally provided with transfer carriage on the top surface of transfer carriage Dock bearing track.
The section solidification frame moving track of entering the room, room section solidification frame moving track, transhipment track and transfer carriage docking are held out Carrier rail road is made of channel steel respectively.
The invention has the advantages that: structure of the invention layout designs are reasonable, and it is indoor automatic in solidification to complete glass solidification frame Change disengaging, and can strictly ensure that vehicle glass PU squeezes out curing time, substantially increases solidification quality.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is schematic cross-sectional view of the present invention.
Fig. 3 is the a-quadrant enlarged structure schematic diagram of Fig. 1.
Fig. 4 is the B area enlarged structure schematic diagram of Fig. 1.
Fig. 5 is the region the C enlarged structure schematic diagram of Fig. 1.
Fig. 6 is the region the D enlarged structure schematic diagram of Fig. 2.
Fig. 7 is the region the E enlarged structure schematic diagram of Fig. 2.
Specific embodiment
As shown in Fig. 1,2,3,4,5,6,7, the present invention includes vehicle glass curing room ontology, the vehicle glass curing room Glass solidification circular pipeline is additionally provided in ontology, the glass solidification circular pipeline is including one group of glass solidification frame 1 and admittedly The bottom of Hua Jia stepping mobile mechanism, the glass solidification frame 1 is equipped with caster device 2, solidification frame stepping mobile mechanism Solidify frame moving track 3, the first progressive power device including section of entering the room, be transported to out room section from section of entering the room for frame will to be solidified Solidify frame transfer, go out room section solidification frame moving track 4 and the second progressive power device, the section solidification frame moving rail of entering the room Road 3 and out room section solidify frame moving track 4 and are laid on the ground of vehicle glass curing room ontology respectively, and the traveling wheel fills It sets 2 and is located at that section of entering the room solidify frame moving track 3 and room section solidifies and to walk on the rail level of frame moving track 4 out, first stepping Power device includes decelerating through motor thermomechanical components 5, driving pulley assembly 6, rack and pinion assembly 7, straight line slide unit 8 and striking gear, institute It states decelerating through motor thermomechanical components 5 and is fixedly mounted on by mounting base and is located in the foundation pit that section of entering the room solidifies below frame moving track 3, institute It states rack and pinion assembly 7 to be connected by driving pulley assembly 6 with the pto shaft drive of decelerating through motor thermomechanical components 5, the straight line The track of slide unit 8 is fixedly mounted on the ground of vehicle glass curing room ontology, the striking gear include sliding block lapping plate 9, Pedestal 10, slide block 11 and tension spring 26, the sliding block lapping plate 9 are overlapped on the sliding block of straight line slide unit 8, and with rack-and-pinion group The rack gear of part 7 is fixedly connected, and the pedestal 10 is equipped with slide block mounting groove, and slide block mounting groove is located at vehicle glass curing room At the fixation limited block 12 that the ontology side of entering is equipped with, the pedestal 10 is mounted on sliding block lapping plate 9, and the slide block 11 passes through Tension spring 26 is movably arranged on pedestal 10, in solidification frame transfer installation vehicle glass curing room ontology, and be located at into Between room section solidification frame moving track 3 and out room section solidification frame moving track 4, the second progressive power device includes the second electricity Machine deceleration thermomechanical components, the second driving pulley assembly, second gear rack assembly 15, second straight line slide unit 16 and the second striking gear, The second decelerating through motor thermomechanical components are fixedly mounted on by mounting base is located at the foundation pit that room section solidifies 4 lower section of frame moving track Interior, the second gear rack assembly 15 is passed by the second driving pulley assembly and the power output shaft of the second decelerating through motor thermomechanical components Dynamic to be connected, the track of the second straight line slide unit 16 is fixedly mounted on the ground of vehicle glass curing room ontology, described to stir Device includes the second sliding block lapping plate 17, the second pedestal 18, the second slide block 19 and tension spring 26, the second sliding block lapping plate 17 It is overlapped on the sliding block of second straight line slide unit 16, and is fixedly connected with the rack gear of second gear rack assembly 15, second base Seat 18 is equipped with slide block mounting groove, and it is solid equipped with second backwards to the vehicle glass curing room ontology side of going out to be located at slide block mounting groove Fixing limit block, second pedestal 18 are mounted on the second sliding block lapping plate 17, and second slide block 19 is living by tension spring 26 It is dynamic to be mounted on the second pedestal 18.
The solidification frame transfer by transhipment decelerating through motor thermomechanical components 20, stepping synchronous conveyer band 21, a pair of of block 22, It transports track 23, transfer carriage 24 and transfer carriage docking bearing track 25 to form, it is solid that the transhipment track 23 is laid on vehicle glass On the ground for changing room ontology, the transhipment decelerating through motor thermomechanical components 20 are mounted on 23 lower section of transhipment track by mounting base In foundation pit, the stepping synchronous conveyer band 21 passes through driving wheel and the pto shaft drive phase for transporting decelerating through motor thermomechanical components 20 Even, one end of a pair of of block 22 is respectively and fixedly installed on the synchronous belt zone face of stepping synchronous conveyer band 21, and a pair of of block 22 Between form transfer carriage and stir position, the transfer carriage 24 is equipped with traveling wheel, and the traveling wheel is located on the rail level of transhipment track 23 It walks, transfer carriage docking bearing track 25 is additionally provided on the top surface of transfer carriage 24.
The section solidification frame moving track 3 of entering the room goes out room section solidification frame moving track 4, transhipment track 23 and transfer carriage pair Bearing track 25 is connect to be made of channel steel respectively.
Working method principle: staff will load on glass solidification frame 1 needs to carry out cured vehicle glass, push-in To section solidification frame moving track 3 of entering the room, the decelerating through motor thermomechanical components 5 of the first progressive power device keep setting time to rotate forward reversion Alternately, decelerating through motor thermomechanical components 5 drive striking gear in the rail of straight line slide unit 8 by driving pulley assembly 6 and rack and pinion assembly 7 It is moved back and forth on road, when striking gear is moved towards inlet, slide block 11 encounters the steelframe of 1 bottom of glass solidification frame When, due to the presence of tension spring 26, slide block 11 is compressed downwardly, and when striking gear is more than steelframe bottom, slide block 11 is sprung back Erect, and be fixed limited block 12 limit, striking gear backwards to inlet move, at this moment slide block 11 by glass solidification frame 1 to Before stir the stroke of a glass solidification frame 1, at this moment staff can be pushed into second glass solidification frame, similarly second glass Glass pushes forward the glass solidification frame of front after solidifying frame push-in, when first glass solidification frame advances to section solidification frame of entering the room It when the end of moving track 3, enters on transfer carriage docking bearing track 25, stepping synchronous conveyer band 21, which reciprocates through, to be turned Glass transfer frame is transported to out room section and solidifies the end of frame moving track 4 by fortune frame 24, at this time ibid the second progressive power of principle Device action stirs glass solidification frame outward one by one, until glass solidification frame is transferred to vehicle glass curing room ontology.
According to the production process, each glass solidification frame residence time in vehicle glass curing room ontology is automobile Glass PU squeezes out the setting time of curing process, whole that a small amount of staff is only needed to be loaded glass, and by glass solidification frame Inwardly conveying, the operating of whole glass solidification frame is all automatic operating, not by human interference, solidifies quality and is protected.

Claims (3)

1. vehicle glass PU squeezes out cure cycle assembly line, including vehicle glass curing room ontology, it is characterised in that the automobile Glass solidification circular pipeline is additionally provided in the ontology of glass solidification room, the glass solidification circular pipeline includes that one group of glass is solid Change frame (1) and solidification frame stepping mobile mechanism, the bottom of the glass solidification frame (1) is equipped with caster device (2), the solidification Frame stepping mobile mechanism include enter the room section solidification frame moving track (3), the first progressive power device, for frame will to be solidified from entering the room Section is transported to out the solidification frame transfer of room section, goes out room section solidification frame moving track (4) and the second progressive power device, described Section of entering the room solidification frame moving track (3) and out room section solidification frame moving track (4) are laid on vehicle glass curing room ontology respectively Ground on, and the caster device (2) be located at enter the room section solidification frame moving track (3) and out room section solidify frame moving track (4) it walks on rail level, the first progressive power device includes decelerating through motor thermomechanical components (5), driving pulley assembly (6), gear Rack assembly (7), straight line slide unit (8) and striking gear, the decelerating through motor thermomechanical components (5) are fixedly mounted in place by mounting base In in the foundation pit that section of entering the room solidifies below frame moving track (3), the rack and pinion assembly (7) by driving pulley assembly (6) with The pto shaft drive of decelerating through motor thermomechanical components (5) is connected, and the track of the straight line slide unit (8) is fixedly mounted on vehicle glass On the ground of curing room ontology, the striking gear includes sliding block lapping plate (9), pedestal (10), slide block (11) and tension spring (26), the sliding block lapping plate (9) is overlapped on the sliding block of straight line slide unit (8), and fixes with the rack gear of rack and pinion assembly (7) Connection, the pedestal (10) is equipped with slide block mounting groove, and slide block mounting groove is located at the vehicle glass curing room ontology side of entering At the fixation limited block (12) being equipped with, the pedestal (10) is mounted on sliding block lapping plate (9), and the slide block (11) passes through drawing Spring (26) is movably arranged on pedestal (10), in the solidification frame transfer installation vehicle glass curing room ontology, and is located at Section of entering the room solidifies between frame moving track (3) and out room section solidification frame moving track (4), and the second progressive power device includes Second decelerating through motor thermomechanical components, the second driving pulley assembly, second gear rack assembly (15), second straight line slide unit (16) and second Striking gear, the second decelerating through motor thermomechanical components are fixedly mounted on by mounting base is located at room section solidification frame moving track (4) in the foundation pit below, the second gear rack assembly (15) passes through the second driving pulley assembly and the second decelerating through motor unit The pto shaft drive of part is connected, and the track of the second straight line slide unit (16) is fixedly mounted on vehicle glass curing room ontology Ground on, the striking gear include the second sliding block lapping plate (17), the second pedestal (18), the second slide block (19) and tension spring (26), the second sliding block lapping plate (17) is overlapped on the sliding block of second straight line slide unit (16), and with second gear rack gear group The rack gear of part (15) is fixedly connected, and second pedestal (18) is equipped with slide block mounting groove, and is located at slide block mounting groove backwards The vehicle glass curing room ontology side of going out is equipped with the second fixed limited block, and second pedestal (18) is mounted on the second sliding block overlap joint On plate (17), second slide block (19) is movably arranged on the second pedestal (18) by tension spring (26).
2. vehicle glass PU according to claim 1 squeezes out cure cycle assembly line, it is characterised in that the solidification frame turns To device by transhipment decelerating through motor thermomechanical components (20), stepping synchronous conveyer band (21), a pair of of block (22), transhipment track (23), Transfer carriage (24) and transfer carriage docking bearing track (25) composition, the transhipment track (23) are laid on vehicle glass curing room sheet On the ground of body, transhipment decelerating through motor thermomechanical components (20) is mounted on the base below transhipment track (23) by mounting base In hole, the stepping synchronous conveyer band (21) passes through driving wheel and the pto shaft drive for transporting decelerating through motor thermomechanical components (20) It is connected, one end of a pair of of block (22) is respectively and fixedly installed on the synchronous belt zone face of stepping synchronous conveyer band (21), and a pair of Transfer carriage is formed between block (22) and stirs position, and the transfer carriage (24) is equipped with traveling wheel, and the traveling wheel is located at transhipment track (23) it walks on rail level, transfer carriage docking bearing track (25) is additionally provided on the top surface of transfer carriage (24).
3. vehicle glass PU according to claim 1 or 2 squeezes out cure cycle assembly line, it is characterised in that the section of entering the room Solidification frame moving track (3) goes out room section solidification frame moving track (4), transhipment track (23) and transfer carriage docking bearing track (25) it is made respectively of channel steel.
CN201610144463.4A 2016-03-15 2016-03-15 Vehicle glass PU squeezes out cure cycle assembly line Active CN107187817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610144463.4A CN107187817B (en) 2016-03-15 2016-03-15 Vehicle glass PU squeezes out cure cycle assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610144463.4A CN107187817B (en) 2016-03-15 2016-03-15 Vehicle glass PU squeezes out cure cycle assembly line

Publications (2)

Publication Number Publication Date
CN107187817A CN107187817A (en) 2017-09-22
CN107187817B true CN107187817B (en) 2018-12-04

Family

ID=59870758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610144463.4A Active CN107187817B (en) 2016-03-15 2016-03-15 Vehicle glass PU squeezes out cure cycle assembly line

Country Status (1)

Country Link
CN (1) CN107187817B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0019107A1 (en) * 1979-05-17 1980-11-26 Sack-Glastechnik GmbH Glass grinding machine
US5143196A (en) * 1989-12-14 1992-09-01 Saint Gobain Vitrage International Production of glazings on a production line comprising several workstations
CN101549718A (en) * 2008-04-03 2009-10-07 株式会社大福 Conveyance apparatus for an assembly line
CN101723170A (en) * 2009-11-12 2010-06-09 浙江大学城市学院 Self-propelled replenish truck system of cargo allocation line of distribution center
CN102849423A (en) * 2012-09-29 2013-01-02 厦门思尔特机器人系统有限公司 Heavy type free shuttling trolley with tracks
CN203544984U (en) * 2013-10-14 2014-04-16 上海通彩自动化设备有限公司 Track transfer moving platform car
CN204777652U (en) * 2015-06-19 2015-11-18 深圳市世纪方舟自动化设备有限公司 Automatic inserted sheet charger of glass piece

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030182969A1 (en) * 2002-03-28 2003-10-02 Dunifon Thomas A. Glass handling and locating system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0019107A1 (en) * 1979-05-17 1980-11-26 Sack-Glastechnik GmbH Glass grinding machine
US5143196A (en) * 1989-12-14 1992-09-01 Saint Gobain Vitrage International Production of glazings on a production line comprising several workstations
CN101549718A (en) * 2008-04-03 2009-10-07 株式会社大福 Conveyance apparatus for an assembly line
CN101723170A (en) * 2009-11-12 2010-06-09 浙江大学城市学院 Self-propelled replenish truck system of cargo allocation line of distribution center
CN102849423A (en) * 2012-09-29 2013-01-02 厦门思尔特机器人系统有限公司 Heavy type free shuttling trolley with tracks
CN203544984U (en) * 2013-10-14 2014-04-16 上海通彩自动化设备有限公司 Track transfer moving platform car
CN204777652U (en) * 2015-06-19 2015-11-18 深圳市世纪方舟自动化设备有限公司 Automatic inserted sheet charger of glass piece

Also Published As

Publication number Publication date
CN107187817A (en) 2017-09-22

Similar Documents

Publication Publication Date Title
CN201235866Y (en) Suspension type steering frame examination and repair production chain
CN102703661B (en) Quenching device of stabilizer bar
CN110239894B (en) Endless vehicle group chain multi-point driving belt conveyor and chain tensioning method
CN108789810A (en) Building concrete wallboard prefabricated components production line
CN102320079B (en) Demoulding hook push ferrying vehicle
CN107187817B (en) Vehicle glass PU squeezes out cure cycle assembly line
CN202626251U (en) Quenching tank for chain type conveying stabilizer bar
CN202440726U (en) Concrete sleeper adjustment system used before automatically turning over sleepers in railway track panel assembling production line
CN204174989U (en) A kind of drive unit of multi-storied garage carrier
CN205274464U (en) On -vehicle bidirectional transport device
CN104249904B (en) For carrying the narrow conveying roller bed of slide plate
CN208039957U (en) The horizontal stereo garage of mobile posture
CN203497526U (en) Telescopic device for transferring cultivation material trays in agaricusbisporus industrialized production
CN201014931Y (en) Plane fast vehicle-moving machine
CN102720102A (en) Construction trolley
CN202245063U (en) Chain type mould transfer vehicle for concrete pipe piles
CN202099751U (en) Self-driven cradle
CN104259848B (en) A kind of motorcycle production line
CN202080362U (en) Front and rear axle adjustable mixed flow trolley for truck chassis assembly line
CN204400116U (en) Dolioform glass bottle transition conveyer
CN2795121Y (en) Down slope mechanism for self walking small vehicle
CN106958372A (en) A kind of chain traction system of parking systems transport apparatus lateral moving device
CN205660354U (en) Conveying mechanism with cut apart a set actuating mechanism
CN208619127U (en) A kind of tunnel lining reinforcing steel bar installation trolley mobile device
CN204606929U (en) A kind of painting dressing automobiles angle drive-type U-shaped oscillating bar conveyer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant