CN107169203A - A kind of plumbing system auto-discharing method - Google Patents
A kind of plumbing system auto-discharing method Download PDFInfo
- Publication number
- CN107169203A CN107169203A CN201710348161.3A CN201710348161A CN107169203A CN 107169203 A CN107169203 A CN 107169203A CN 201710348161 A CN201710348161 A CN 201710348161A CN 107169203 A CN107169203 A CN 107169203A
- Authority
- CN
- China
- Prior art keywords
- component
- pipeline
- discharge
- markup information
- discharing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Theoretical Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of plumbing system auto-discharing method, and the discharging method comprises the following steps:S1, opening drawing, are operated to the figure layer and segment in drawing, are easy to be identified and extract pipeline and markup information to the pipeline for needing to carry out discharge operation;In S2, drawing after the activation, pipeline line segment and markup information are obtained;S3, pipeline line segment and markup information according to acquisition, pipeline decomposition is carried out by the algorithm of setting;S4, according to the data message after decomposition, automatically generate multiple with attribute, method and the components for responding particular event, all Component compositions turn into BIM, that is, complete the automatic discharge of pipe-line system.Discharge velocity of the present invention is accelerated, and reduces the quantity of discharge personnel;Discharge accuracy is improved, and reduces the Capability Requirement to discharge personnel;Discharge is more reasonable, can save raw material;Marker map mistake is few, is readily obtained each side's accreditation and difference is less, can accelerate related work progress.
Description
Technical field
The present invention relates to building industrialization production technical field, and in particular to a kind of plumbing system automatic discharge side
Method.
Background technology
Pipe-line system, is the system for conveying and being distributed for flowing material.It is distributed widely in building, according to fluid
The difference of material can be divided into wind system, water system etc..It is equal that pipe-line system belongs to each position in customized product, each building
By designer according to the actual demand of building come design drawing, in drawing, symbol is used as using lines and label character
Number, the information such as type, trend, length, crosspoint to represent pipe-line system interior conduit.
For traditional construction technology, the information of the pipe-line system generally in building-site according to expressed by drawing,
In order while blanking, while process, side install connection.With the development of technology, the advantage of Mechanized Processing gradually shows, main body
Present improved efficiency, steady quality, cost reduction etc..Mechanized Processing, is the equipment using mechanization, automation, streamline
Operation, is completed pipe-line system processing and fabricating, is installed using position field combinations.But design drawing obviously cannot be used directly for
The mechanization production of automation equipment, therefore, it is necessary to drawing by certain rule progress decomposition discharge, turn before pipe-line system is processed
It is changed to the data required for actual machineization processing.
At present, the Mechanized Processing of pipeline is typically decomposed by the way of manual nest to pipe-line system, main point
It is the rule as required by pipeline processing on computer or the drawing printed to solve flow, is decomposed into multistage standardization straight tube
And pipe fitting.
But, the present inventor has found by research, and manual nest is because the experience for fully relying on discharge personnel is entered
OK, for a drawing easily thousands of component, need very carefully, to be otherwise very easy to error in discharging process.
The pipeline of one system, in discharging process, as long as there is one section of error, then needs whole rearrangements, workload greatly, and malfunctions it
Afterwards, discharge people oneself is also difficult to find mistake.After drained material, statistics and calculating to discharge result then need to spend and arrange
Material equal time, and because being manually to check, easily there is Wrong, missing, it is many problem of.If wanting to examine statistical result
Core, then need the time more than spending same to check one by one again, so calculating and being checked repeatedly repeatedly in the presence of an engineering, spends
A large amount of man power and materials are doing this work.In other words, the work of this discharge is carried out, is to the skill set requirements of discharge personnel
It is very high.But in fact, unless the prefabricated processing factory of some specialties, this kind of professional discharge personnel are extremely rare, so just
There is the situation of a large amount of layman's discharges or common laborer's discharge, it is full of mistakes to ultimately result in discharge result, causes the duration
The problems such as delay, economic loss.
In summary, current pipe-line system manual nest method is in the presence of to discharge personnel requirement is high, efficiency is low, mistake
The problems such as many, data can not be reused.
The content of the invention
There is, efficiency low and wrong many technology high to discharge personnel requirement for existing pipe-line system manual nest method
Problem, the present invention provides a kind of plumbing system auto-discharing method.
In order to solve the above-mentioned technical problem, present invention employs following technical scheme:
A kind of plumbing system auto-discharing method, the discharging method comprises the following steps:
S1, open drawing, the figure layer in drawing and segment include it is newly-built, decompose, show, hiding, locking, freezing
Operation inside, is easy to be identified and extract pipeline and markup information to the pipeline for needing to carry out discharge operation;
In S2, drawing after the activation, pipeline line segment and markup information are obtained;
S3, pipeline line segment and markup information according to acquisition, pipeline decomposition is carried out by the algorithm of setting;
S4, according to the data message after decomposition, automatically generate multiple with attribute, the method for executable specific action and can
The component of particular event is responded, all Component compositions turn into BIM, that is, complete the automatic discharge of pipe-line system.
Compared with prior art, the plumbing system auto-discharing method that the present invention is provided, first in the drawing of opening
Pipeline line segment and markup information are obtained, then pipeline decomposition is carried out by the algorithm of setting accordingly, the data finally according to decomposition are believed
The multiple components of breath generation, all Component compositions turn into BIM, so far complete the automatic discharge of pipe-line system.The present invention
In code requirement, the size of raw material and the processing characteristics of algorithm Main Basiss design and construction, technological requirement, make and peace
The convenience of dress is worked out with economy, regular to be implemented in progressive mode, for example, when actually implementing to decompose, preferential basis is set
Meter and job specfication requirement, calculate A kinds isolation in the cards, further according to the size and processing characteristics of raw material, from A
The B kind isolations for being filtered out in isolation and meeting and requiring are planted, further according to economical regulations, are screened from B kind isolations
Go out and meet a kind of desired isolation, regular implementation and the selection of isolation is completed by computer is fast automatic.Therefore,
The auto-discharing method that the present invention is provided, discharge velocity is accelerated, and reduces the quantity of discharge personnel;Discharge accuracy is improved, drop
The low Capability Requirement to discharge personnel;Discharge is more reasonable, can save raw material;Marker map mistake is few, and statistical result is accurate, holds
It is easy to get to each side and approves, production and processing, installation and difference of arranging settlement of accounts is less, can accelerate related work progress.
Further, the step S2 includes:According to the schematic diagram of software interface voluntarily selected member type, after the activation
In drawing pipeline line segment and markup information are obtained using selection and manual input-mode.
Further, the step S2 includes:Figure layer where selecting pipe road pipeline and markup information, pipe is obtained by screening
Road line segment and markup information.
Further, the discharging method is also specifically included including component amendment step S5, the component amendment step S5:
Component and the modification mode of component that S51, selection to be changed;
The selected modification mode of S52, basis, the component for having predicable to component to be changed and with component to be changed enters
Row associated modification, re-starts pipeline by set algorithm and decomposes;
S53, according to again decompose after information data, linkage regenerate component.
Further, the discharging method also includes extracting data and programming count step S6, extraction data and automatic
Statistic procedure S6 is specifically included:
S61, the component selection mode according to setting, obtain the attribute of selected member;
S62, the computation rule according to setting, statistics calculating is carried out by acquired structure attribute;
S63, various statistical report forms and data file are automatically generated according to result of calculation.
Brief description of the drawings
Fig. 1 is the plumbing system auto-discharing method first embodiment schematic flow sheet that the present invention is provided.
Fig. 2 is the plumbing system auto-discharing method second embodiment schematic flow sheet that the present invention is provided.
Fig. 3 is component modification process schematic diagram in the plumbing system auto-discharing method that the present invention is provided.
Fig. 4 is to extract data and automatic in the plumbing system auto-discharing method that the present invention that provides of the present invention is provided
Statistical flowsheet schematic diagram.
Fig. 5 is discharge interface schematic diagram in the plumbing system auto-discharing method that the present invention is provided.
Fig. 6 is to count interface schematic diagram in the plumbing system auto-discharing method that provides of the present invention.
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below
Conjunction is specifically illustrating, and the present invention is expanded on further.
In the present invention, by obtaining drawing (such as CAD planes drawing, based on the BIM models of REVIT platforms) middle conductor
Coordinate position and the corresponding label character information of each line segment, from specialty angle understood, reduction designer intention, structure
Basic engineering information is made, this information includes the specification of pipeline (such as airduct), installation site, the intersection information of pipeline;
Then, the engineering information constructed is decomposed from the professional angle of Mechanized Processing, becomes a series of and can be used for actual add
The component of work, this component has a series of complete attributes available for actual processing, including the pipeline section type of pipeline, specification,
Installation site, material, technique, System Number etc., and regenerate in the form of building block drawing.
Newly-generated component has corresponding ID card information (ID) and attribute, and this also extracts and counted for data calculating and carries
Facility is supplied, statistics computing module of the invention can efficiently extract the association attributes of component on demand, according to national quota calculation
Rule, market general-purpose computations rule, inner accounting computation rule etc. carry out statistics calculating respectively, and professional from building engineering construction
The angle of change, calculates the auxiliary material required for building-site is installed.
In a specific embodiment, user can construct engineering letter according to existing line segment in drawing and markup information
Breath, voluntarily can also input the dimension information of line segment and pipeline to construct engineering information.User is decomposing generation to engineering information
During component available for actual processing, and when extracting data statistics, rule is can customize, can generate and meet various requirement
Data, including generation bar code and two-dimentional code mark, or generation meet the database or main flow of data management software rule
The data that can read of manufacturing and processing equipment.It is understood that this method is equally applicable to the ratio similar with pipe-line system
The automatic discharge work of such as crane span structure, suspension and support.
Specifically it refer to shown in Fig. 1 and Fig. 2, the present invention provides a kind of plumbing system auto-discharing method, the row
Material method comprises the following steps:
S1, open drawing, the figure layer in drawing and segment include decomposing, shown, is hidden, is locked, be frozen in it is interior
Operation, in order to pipe-line system be identified and extraction tube road pipeline and markup information;
In S2, drawing after the activation, pipeline line segment and markup information are obtained;
S3, pipeline line segment and markup information according to acquisition, pipeline decomposition is carried out by the algorithm of setting;
S4, according to the data message after decomposition, automatically generate multiple with attribute, the method for executable specific action and can
The component of particular event is responded, all Component compositions turn into BIM, that is, complete the automatic discharge of pipe-line system.
Compared with prior art, the plumbing system auto-discharing method that the present invention is provided, first in the drawing of opening
Pipeline line segment and markup information are obtained, then pipeline decomposition is carried out by the algorithm of setting accordingly, the data finally according to decomposition are believed
The multiple components of breath generation, all Component compositions turn into BIM, so far complete the automatic discharge of pipe-line system.The present invention
In code requirement, the size of raw material and the processing characteristics of algorithm Main Basiss design and construction, technological requirement, make and peace
The convenience of dress is worked out with economy, regular to be implemented in progressive mode, for example, when actually implementing to decompose, preferential basis is set
Meter and job specfication requirement, calculate A kinds isolation in the cards, further according to the size and processing characteristics of raw material, from A
The B kind isolations for being filtered out in isolation and meeting and requiring are planted, further according to economical regulations, are screened from B kind isolations
Go out and meet a kind of desired isolation, regular implementation and the selection of isolation is completed by computer is fast automatic.Therefore,
The auto-discharing method that the present invention is provided, discharge velocity is accelerated, and reduces the quantity of discharge personnel;Discharge accuracy is improved, drop
The low Capability Requirement to discharge personnel;Discharge is more reasonable, can save raw material;Marker map mistake is few, and statistical result is accurate, holds
It is easy to get to each side and approves, production and processing, installation and difference of arranging settlement of accounts is less, can accelerate related work progress.
As a kind of specific embodiment, it refer to shown in Fig. 1, in the step S2, according to the schematic diagram of software interface
Pipeline line segment is obtained in voluntarily selected member type, drawing after the activation using selection and manual input-mode and mark is believed
Breath.Specifically, the selection, which can be used, clicks with shortcut two ways to carry out, and can be according to selected element type
To provide corresponding prompting, such as straight length, it can point out to click straight line or click the starting point of straight line, elbow then can
Prompting clicks two straight lines, and three general rules can be pointed out to click three straight lines.And in specific selection course, the selection of user may
It might not meet the requirements, such as user has only selected straight line, but require that generation elbow, or user only have selected an arc
Line but requires to generate straight length.In this regard, selection of the present invention using two methods to user is controlled:One is automatic mistake in advance
Filter, if requiring to select straight line, user can not select camber line;Two be to be verified later, if requiring two friendships of selection
Straight line is pitched, but has only selected straight line or two parallel lines, then points out and requires to be conduct a by-election or gravity treatment.Meanwhile, in selection
Element type in, the information such as pipeline line segment in original drawing and mark might not be complete.In this regard, the present invention provide it is defeated
Information i.e. manual input-mode can voluntarily be inputted by user by entering function, and information incomplete in drawing is supplemented.Therefore, manually
Input function and selection function turn into seamless combination, can automatically be judged according to the practical operation of user.
In addition, in specific implementation, the information such as mark in original drawing might not specification.In this regard, the present invention is provided
Such as logic judgment code can carry out intelligence supplement and intelligent specification, during continuous pulp discharge, only have selected pipeline pipeline section, non-selected
Markup information, then it is automatic that the preceding markup information once selected is added into this selection, and carry out inquiry prompting;Or, selection
Markup information do not meet the design specification of general pipeline, then reminder alerting is carried out to user, and point out design specification to illustrate, it is right
Cause according to that can not produce in difference is excessive, then user is carried out forbidding warning, and require that user reselects or inputted.
It refer to shown in Fig. 1, Fig. 2 and Fig. 5, specifically in the step S3, default algorithm can be used in user, also can be to calculating
Method is adjusted, and the code requirement of this algorithm Main Basiss design and construction, the size of raw material and processing characteristics, technique will
Convenience and the economy asked, make and installed are worked out, regular implemented in progressive mode.For example, for point of ventilation shaft
Solution, first needs the radius of curvature requirement to ventilation shaft elbow according to specification, calculates the minimum length of elbow, deduct this length
Afterwards, the length of the airduct of straight tube, the minimum 500mm of length that elbow is such as gone out according to proper calculation can be as arranged, and pipeline section is total
A length of 3000mm, the then length decomposed available for straight tube is 2500mm to the maximum;On this basis, according to used raw material and
Technological requirement carries out straight tube decomposition, if use the wide galvanized steel plain sheets of 1250mm, and processing technology is that plate flange connects altogether
Connect, deduct the shared material length of plate flange altogether, then can calculate can the length of straight pipe that goes out of actual processing can for 1160mm, i.e. 2500mm
It is decomposed into the long straight tubes of long+1 section of 180mm of standard straight tube of 2 sections of 1160mm;But consider from economy, the straight tube of 1 section of 180mm length,
The waste material of 980mm length can be produced, it is uneconomical, consider, then can meet the elbow length minimum 500mm's of code requirement
On the basis of, lengthen as 680mm, i.e., the elbow that final discharge result is the long standard straight tubes of 2 sections of 1160mm+long 680mm meets
Specification, also complies with the size requirement of raw material, meanwhile, because reducing 1 section of 180mm straight tube, while reducing corresponding a collection of
Accessory is connected, makes and is also greatly improved with economy with the convenience installed, discharge is completed.
, it is necessary to handle pipeline pipeline and markup information in specific implementation, specifically include and obtain each pipeline respectively
End points, and crosspoint is calculated according to the end points of each pipeline, intersection sets shaped piece, according to the overlapping number of times in crosspoint, sentenced
Whether disconnected intersection shaped piece type is reasonable, and decomposes markup information, according to markup information and shaped piece type, calculates abnormity
Part size, and the pipeline after shaped piece size will be deducted, decomposition computation is carried out by standard knot or non-standard section length, in conjunction with machine
Requirement of the toolization processing to data is decomposed, and the data message after decomposition is stored in data file.And the result decomposed is
Various irregular straight lines and mark become to meet the component of ad hoc rules, and these components are the elementary cells of production and processing, can
Production line processing is directly used in, these components are assembled at the construction field (site) eventually through auxiliary materials such as connecting bolts.
It refer to shown in Fig. 1 and Fig. 2, specifically in the step S4, according to the data message after decomposition, generate new figure
Block, the face shapings of these segments, insertion position, carries attribute etc. and makes respective change, and this according to the difference of data message
A little newly-generated segments are referred to as component.Component is the base unit of machining production product, and each component has one
Unique ID card information ID, all thousands of components are divided into different individuals by this unique No. ID, these structures
End result after part combination is referred to as BIM.Meanwhile, in this embodiment, all components all have attribute, this
A little attributes can be different, can also be identical, and wherein these attributes of identical, and partial component organically combined, shape
Into an entirety.Such as all components have the attribute of a System Number, and a System Number is divided into system number and numbering two again
Part, then system number identical part component, if one of component changes, the component of other same systems number
Linkage can be then produced, and the component of other different systems number is without any influence of generation.In this embodiment, it is all simultaneously
Component also has the method for executable specific action, including upgrades, repaints, inverts, shows, hides, the size of such as component
Attribute is changed, and this can cause the display outward appearance of component to change, then need to use corresponding upgrade method to be risen
Level.In addition in this embodiment, all components can also be responded to external event, and all components are provided with " folder point ",
By the operation to folder point, it can directly change component.For example, straight length two end points respectively has a stretching folder point, click on
This folder point, can elongate straight length, at this moment the length attribute of component can be modified simultaneously, the mark shown by component,
If provided as display length, it can also be modified simultaneously, the display outward appearance of component also can accordingly be upgraded.
From previous embodiment as can be seen that the discharge work of pipe-line system, it is only necessary to which user is on drawing according to prompting
Some line segments and mark are selected or are inputted, the present invention will be calculated and discharge automatically.Relatively existing pipeline decompose and
Generation component, which needs professional to carry out very complicated calculating, to be completed, but in the present embodiment, user need not do substantially
Any operation fast automatic can be completed.
As another specific embodiment, user can need not according to the schematic diagram of software interface voluntarily selected member,
And by the present invention automatically selects required component according to the pipeline pipeline and markup information of acquisition, specifically refer to Fig. 2 institutes
Show, the step S2 includes:Figure layer where selecting pipe road pipeline and markup information, pipeline line segment and mark are obtained by screening
Information.In the present embodiment, very high to the standardisation requirements of drawing, drawing must strictly distinguish figure layer, accurate mark, such as pipeline
Pipeline must be individually in a drawing, and pipeline mark must be marked individually with pipeline pipeline same in a figure layer, or pipeline
One figure layer, and be both needed to individually be labeled in suitable distance per segment pipe.In specific implementation process, the present invention is strictly held
Row screening is acted, and the pipeline line segment and markup information that may cause erroneous judgement are screened out outside.Mark from pipeline section too far or mistake
Closely, pipeline section is nearby without mark, and pipeline section is too short, long etc., and pipeline section turns, crossing many etc., as may cause the bar of erroneous judgement
Part and be excluded.In practical operation, because the standardization level of drawing is difficult to ensure that, in the situation of full automation discharge
Under because having lacked user's participation, there is a possibility that it is wrong arrange, omit in printing, plurality of rows of situation has and is not found, thus discharge
As a result it is typically only capable to get the raw materials ready etc. as construction budget and buying and uses, it is impossible to is used as production and processing data.In this regard, user can be first
Revisions on drawings carries out acquisition of information again;Or, user can be checked amendment one by one again after first overall screen gather material.
From the present embodiment as can be seen that user, which only needs to perform, opens drawing and the two actions of selection figure layer, you can one
Key is automatically performed the discharge work of pipe-line system.It should be noted that, the participation process of user is also that drawing is checked
Process, in the case where cannot ensure the complete standard of drawing, the participation of user is also necessary.
As specific embodiment, the present inventor also found by practice, for the automatic discharge work completed
Make, situation about modifying is needed also exist for sometimes.And pipe-line system discharge has a feature, be exactly some technique or material it
The change of class, will cause whole pipe-line system discharge all to change.In this regard, refer to shown in Fig. 3, what the present invention was provided
The discharging method is also specifically included including component amendment step S5, the component amendment step S5:
Component and the modification mode of component that S51, selection to be changed.Specifically, component modification include single member modification with
Batch component is changed, and the single member modification of most of situation, can all cause associated other components to be also required to make adaptability
Modification, although so modification when obtain be solid memder attribute, the other components associated with the attribute of this component,
Scope is changed herein.It is a kind of the invention provides the mode that two kinds enter modification pattern simultaneously in order to easily realize modification
It is to double-click some component for needing to change, and the completion modification in the modification dialog box of ejection;Another is directly to click some
The folder point of the component of modification is needed to modify, generally folder point modification can cause other components of same system number to be arranged automatically again
Material, but the present invention has been also provided to the option whether user causes system interlink.
The selected modification mode of S52, basis, the component for having predicable to component to be changed and with component to be changed enters
Row associated modification, re-starts pipeline by set algorithm and decomposes.Specifically, the modification content produced by modification dialog box, generally
The change of algorithm caused by change including technique, material etc., this associated modification can delete all existing with predicable
Component, completely newly recalculate decomposition.And the modification content that point is produced is pressed from both sides, length of pipe section change etc. is generally included, and these are simultaneously
The change of algorithm will not be caused, this associated modification is directed to the component of same system number being connected with this pipeline section, herein
When system pipeline section recalculates decomposition, produce the amended component of folder point and keep immobilizing, other components are using this component as base
Being associated property of plinth is adjusted.
S53, according to again decompose after information data, linkage regenerate component.Specifically, for completing after discharge
Batch modification is acted, and still can re-start automatic discharge in the way of linkage, it is to avoid the problem of repeating discharge.
As specific embodiment, the present inventor also found by practice, for the automatic discharge work completed
Make, in addition it is also necessary to which the data in discharge result are used.In this regard, refer to shown in Fig. 4 and Fig. 6, it is described that the present invention is provided
Discharging method also includes extracting data and programming count step S6, and extraction data and programming count the step S6 is specifically included:
S61, the component selection mode according to setting, obtain the attribute of selected member.Specifically in instances, set or provide
A variety of component selection modes, including whole components, the free component of user, by Systematic selection component, according to condition screen component, this
Four kinds of component selection modes, can meet the various statistical demands of user.During extraction, the underlying attribute information of component is arranged with component
Each component that the form of table is presented in statistical window, build list table counter in drawing can be looked into and check.Wherein, in drawing
Component entity is corresponded with statistics list by No. ID of component, thus user can be as needed to any in list
Component entity carries out that position is counter to be looked into drawing, to facilitate user to be quickly found out component entity, or is changed accordingly.
Acquired component information data are carried out statistics calculating by S62, the computation rule according to setting.Specifically, user
Self-defined setting can be carried out to computation rule, also more complicated because computation rule is more, the present invention provides the meter of three kinds of standards
Rule, including national quota calculation rule, market general-purpose computations rule, inner accounting computation rule are calculated, specific statistics is calculated
It is automatically performed according to foregoing three kinds of criterion calculation rules.
S63, various statistical report forms and data file are automatically generated according to result of calculation, can specifically generate the text of multiple format
Part, but general EXCEL file is typically exported as, derived form generally comprises detailed component, production list, buying order, auxiliary material
Single etc., derived file format acquiescence forbids modification.
In the present embodiment, all data are all from can be to be extracted immediately in optional component, to discharge result
Data extract and statistics evaluation work can one-key operation, will in manual nest take the plenty of time professional work moment
Complete, improve operating efficiency, reduce error probability, realize the reusable of data.
The plumbing system auto-discharing method that the present invention is provided, it is only necessary to the starting point and specification information of pipeline, i.e.,
The component with attribute that can be actually produced and processed by rule generation automatically, and manual nest then needs to rely on discharge people
Personal understand to carry out discharge mark, it is impossible to make the component with attribute.When some component is modified, the present invention can be with
Automatic change associated component and its attribute, discharge again automatically, and manual nest is the simple mark of work, and mark nothing
Relevance, thus can not automatic re-arrangement.Meanwhile, the present invention can be automatically performed data on the basis of discharge modeling work is carried out
Extract and statistics calculated, as long as and marker map and the discharging method that provides of the present invention are provided, it is all to carry out accurate statistics per capita,
And the statistics of manual nest and calculating manually clear number, artificial calculating, not only process exception is cumbersome, and different people is each
The result of calculating there is likely to be deviation.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with
The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to skill of the invention
Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this
Among the right of invention.
Claims (5)
1. a kind of plumbing system auto-discharing method, it is characterised in that the discharging method comprises the following steps:
S1, open drawing, the figure layer in drawing and segment include it is newly-built, decompose, show, hiding, locking, be frozen in it is interior
Operation, be easy to need carry out discharge operation pipeline be identified and extract pipeline and markup information;
In S2, drawing after the activation, pipeline line segment and markup information are obtained;
S3, pipeline line segment and markup information according to acquisition, pipeline decomposition is carried out by the algorithm of setting;
S4, according to the data message after decomposition, automatically generating multiple with attribute, the method for executable specific action and can respond
The component of particular event, all Component compositions turn into BIM, that is, complete the automatic discharge of pipe-line system.
2. plumbing system auto-discharing method according to claim 1, it is characterised in that the step S2 includes:
According to the schematic diagram of software interface voluntarily selected member type, selection and manual input-mode is used to come in drawing after the activation
Obtain pipeline line segment and markup information.
3. plumbing system auto-discharing method according to claim 1, it is characterised in that the step S2 includes:
Figure layer where selecting pipe road pipeline and markup information, pipeline line segment and markup information are obtained by screening.
4. plumbing system auto-discharing method according to claim 1, it is characterised in that the discharging method is also wrapped
Component amendment step S5 is included, the component amendment step S5 is specifically included:
Component and the modification mode of component that S51, selection to be changed;
The selected modification mode of S52, basis, the component for having predicable to component to be changed and with component to be changed joins
Dynamic modification, re-starts pipeline by set algorithm and decomposes;
S53, according to again decompose after information data, linkage regenerate component.
5. the plumbing system auto-discharing method according to any one of claim 1-4, it is characterised in that the row
Material method also includes extracting data and programming count step S6, and extraction data and programming count the step S6 is specifically included:
S61, the component selection mode according to setting, obtain the attribute of selected member;
S62, the computation rule according to setting, statistics calculating is carried out by acquired structure attribute;
S63, various statistical report forms and data file are automatically generated according to result of calculation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710348161.3A CN107169203B (en) | 2017-05-17 | 2017-05-17 | Automatic discharging method for building pipeline system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710348161.3A CN107169203B (en) | 2017-05-17 | 2017-05-17 | Automatic discharging method for building pipeline system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107169203A true CN107169203A (en) | 2017-09-15 |
CN107169203B CN107169203B (en) | 2020-11-20 |
Family
ID=59815406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710348161.3A Active CN107169203B (en) | 2017-05-17 | 2017-05-17 | Automatic discharging method for building pipeline system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107169203B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110717207A (en) * | 2019-09-06 | 2020-01-21 | 景森设计股份有限公司 | Labeling method, system and storage medium for pipeline design |
CN111652970A (en) * | 2020-05-29 | 2020-09-11 | 深圳市大富网络技术有限公司 | Three-dimensional CAD model generation method and device, computer equipment and storage medium |
CN111753347A (en) * | 2020-06-30 | 2020-10-09 | 广东天元建筑设计有限公司 | Component screening method based on Revit primitive, Revit platform and storage medium |
CN111798649A (en) * | 2020-06-23 | 2020-10-20 | 深圳市富思源智慧消防股份有限公司 | Fire-fighting component numbering method and system for automatic fire alarm plan, intelligent terminal and storage medium |
CN112613138A (en) * | 2020-12-14 | 2021-04-06 | 成都飞机工业(集团)有限责任公司 | Management and control system and method for physical and chemical samples |
CN114332361A (en) * | 2021-12-15 | 2022-04-12 | 南京奥特自动化有限公司 | SPOOL automatic splitting method for process pipeline prefabricating link |
CN114429639A (en) * | 2022-01-27 | 2022-05-03 | 广联达科技股份有限公司 | Pipeline marking identification method and device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102446236A (en) * | 2010-10-13 | 2012-05-09 | 中国石油大学(华东) | Automatically optimized piping arrangement method based on improved genetic algorithm |
CN102609687A (en) * | 2012-01-31 | 2012-07-25 | 华中科技大学 | Subway construction drawing and engineering parameter automatic identification method |
CN102622484A (en) * | 2012-03-13 | 2012-08-01 | 河北省电力勘测设计研究院 | Method for automatically and designing pipeline of power plant |
CN102799714A (en) * | 2012-06-27 | 2012-11-28 | 西安理工大学 | Method for extracting data of integrated pipeline of metro based on Auto computer-aided design (CAD) drawing |
CN103927419A (en) * | 2014-04-18 | 2014-07-16 | 山东泰华电讯有限责任公司 | Data processing method and system for CAD urban pipeline as-built drawing based on ArcGIS platform |
CN105260541A (en) * | 2015-10-13 | 2016-01-20 | 中国十七冶集团有限公司 | Pipeline deepening method based on BIM model |
CN105302931A (en) * | 2014-06-30 | 2016-02-03 | 上海神机软件有限公司 | Recognition system and method for construction engineering drawing, and template arrangement system and method |
-
2017
- 2017-05-17 CN CN201710348161.3A patent/CN107169203B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102446236A (en) * | 2010-10-13 | 2012-05-09 | 中国石油大学(华东) | Automatically optimized piping arrangement method based on improved genetic algorithm |
CN102609687A (en) * | 2012-01-31 | 2012-07-25 | 华中科技大学 | Subway construction drawing and engineering parameter automatic identification method |
CN102622484A (en) * | 2012-03-13 | 2012-08-01 | 河北省电力勘测设计研究院 | Method for automatically and designing pipeline of power plant |
CN102799714A (en) * | 2012-06-27 | 2012-11-28 | 西安理工大学 | Method for extracting data of integrated pipeline of metro based on Auto computer-aided design (CAD) drawing |
CN103927419A (en) * | 2014-04-18 | 2014-07-16 | 山东泰华电讯有限责任公司 | Data processing method and system for CAD urban pipeline as-built drawing based on ArcGIS platform |
CN105302931A (en) * | 2014-06-30 | 2016-02-03 | 上海神机软件有限公司 | Recognition system and method for construction engineering drawing, and template arrangement system and method |
CN105260541A (en) * | 2015-10-13 | 2016-01-20 | 中国十七冶集团有限公司 | Pipeline deepening method based on BIM model |
Non-Patent Citations (1)
Title |
---|
陈祥祥: ""面向建筑管道工厂化施工的深化设计与辅助施工系统"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110717207A (en) * | 2019-09-06 | 2020-01-21 | 景森设计股份有限公司 | Labeling method, system and storage medium for pipeline design |
CN110717207B (en) * | 2019-09-06 | 2024-01-02 | 景森设计股份有限公司 | Labeling method, system and storage medium for pipeline design |
CN111652970A (en) * | 2020-05-29 | 2020-09-11 | 深圳市大富网络技术有限公司 | Three-dimensional CAD model generation method and device, computer equipment and storage medium |
CN111652970B (en) * | 2020-05-29 | 2023-07-07 | 深圳市集慧技术有限公司 | Three-dimensional CAD model generation method, device, computer equipment and storage medium |
CN111798649A (en) * | 2020-06-23 | 2020-10-20 | 深圳市富思源智慧消防股份有限公司 | Fire-fighting component numbering method and system for automatic fire alarm plan, intelligent terminal and storage medium |
CN111753347A (en) * | 2020-06-30 | 2020-10-09 | 广东天元建筑设计有限公司 | Component screening method based on Revit primitive, Revit platform and storage medium |
CN111753347B (en) * | 2020-06-30 | 2024-05-03 | 广东天元建筑设计有限公司 | Component screening method based on Revit primitives, revit platform and storage medium |
CN112613138A (en) * | 2020-12-14 | 2021-04-06 | 成都飞机工业(集团)有限责任公司 | Management and control system and method for physical and chemical samples |
CN114332361A (en) * | 2021-12-15 | 2022-04-12 | 南京奥特自动化有限公司 | SPOOL automatic splitting method for process pipeline prefabricating link |
CN114429639A (en) * | 2022-01-27 | 2022-05-03 | 广联达科技股份有限公司 | Pipeline marking identification method and device |
CN114429639B (en) * | 2022-01-27 | 2024-05-03 | 广联达科技股份有限公司 | Pipeline annotation recognition method and device |
Also Published As
Publication number | Publication date |
---|---|
CN107169203B (en) | 2020-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107169203A (en) | A kind of plumbing system auto-discharing method | |
CN105117573B (en) | Auto hydraulic model building method based on CAD drainage pipeline networks drawing informations | |
US10496046B2 (en) | Systems and methods for optimizing control systems for a process environment | |
US8620708B2 (en) | Progress status management method, program, and progress status management device | |
CN106095989A (en) | A kind of architectural engineering information switching method based on BIM | |
CN108491491B (en) | Method and system for constructing intelligent customer service knowledge graph | |
CN107545120A (en) | The method and computing device that a kind of prefabricated components based on BIM are split automatically | |
CN104200026A (en) | Method and system for formwork matching of three-dimension space software | |
CN106295078A (en) | A kind of reinforcement detailing computing module system of processing based on BIM technology and method | |
CN106383956B (en) | The converting system and method for thermal power plant civil engineering model data | |
CN107808042A (en) | The LOD500 model implementation methods of BIM technology | |
CN107220798A (en) | A kind of construction monitoring and managing method based on BIM | |
CN113742873B (en) | Intelligent urban drainage management system | |
WO2015150163A1 (en) | Method for automatically processing a number of log files of an automation system | |
WO2008046367A1 (en) | Method and system for controlling an electrical installation | |
CN109002520A (en) | A kind of intelligent analysis method of Regional agriculture planning industrial selection | |
CN110321590A (en) | Automatic generation method, device and the storage device of refrigerant system design drawing | |
CN105931139A (en) | Water data standardization management system | |
CN116029262A (en) | Legal and legal code generation method, database construction method and device | |
CN103778509A (en) | Digital hand-over system based on engineering construction | |
CN103678784A (en) | Device and method for generating three-dimensional images of embedded parts for irrigation structures | |
JP2021068010A (en) | Plan generation system construction support device, and plan generation system construction support method | |
CN114548930B (en) | Information intelligent processing method and system of comprehensive energy management platform | |
JP2000205500A (en) | Facility apparatus classification data base device and facility apparatus control device | |
CN109492209A (en) | A kind of table signature automatic generation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |