CN103778509A - Digital hand-over system based on engineering construction - Google Patents

Digital hand-over system based on engineering construction Download PDF

Info

Publication number
CN103778509A
CN103778509A CN201410028995.2A CN201410028995A CN103778509A CN 103778509 A CN103778509 A CN 103778509A CN 201410028995 A CN201410028995 A CN 201410028995A CN 103778509 A CN103778509 A CN 103778509A
Authority
CN
China
Prior art keywords
digitizing
platform
data
transferred
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410028995.2A
Other languages
Chinese (zh)
Inventor
何珊
文本颖
陈寿标
叶文辉
周晓庆
潘颖
林生文
杨丽
李翌
曾凌捷
郭聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Electric Power Survey and Design Institute
Original Assignee
Fujian Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Electric Power Survey and Design Institute filed Critical Fujian Electric Power Survey and Design Institute
Priority to CN201410028995.2A priority Critical patent/CN103778509A/en
Publication of CN103778509A publication Critical patent/CN103778509A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an automatic hand-over technique used for designing files and data in engineering construction, in particular to a digital hand-over system based on engineering construction. Firstly, procedure control and file identification are carried out on a digital integrated design platform and a production management platform, then a 3Dgateway technique is used in a digital hand-over auxiliary system to automatic dig data which need to be handed over and are identified in data pools of platforms of a project, and ultimately, the data are submitted to a digital information platform to form a digital hand-over product of the project. The system effectively controls procedures of project design and construction, uniqueness and reliability of data hand-over are guaranteed, and accuracy and true effectiveness of the handed-over data are guaranteed.

Description

System is transferred in the digitizing of building based on engineering construction
Technical field
The present invention relates to one for engineering construction, technology is transferred in the robotization of design document, data, and particularly system is transferred in a kind of digitizing of building based on engineering construction.
Background technology
In engineering design, in construction, it is all based on digital integration design platform, the engineering design system of the data platform composition of production management platform and unit of taking part in building completes, described digital integration design platform provides PDMS design platform, relevant interface between all kinds of professional softwares and professional software and PDMS etc., production management platform provides production management infosystem and archive management system, generally need to be through design in design and document management process, audit, approval, publish, five flow processs such as filing, each flow process can produce the engineering finished product inventory of all kinds of Engineering Documents compositions.
But, in engineering finished product inventory, which need to be transferred and not do clear and definite mark, in Practical Project, often carry out the artificial data information needing of progressively collecting in process according to historical experience or industrial practice in project, therefore management and the level of control of the personnel that experience level is different to data just has difference, and these data informations are scattered in different engineering participant hands, in the time that owner requires to submit to certain data, need to notify relevant unit, this unit passes through mail after by artificial selection data, the traditional approachs such as express delivery are transferred owner to, the correctness of data, standardization is substantially by artificially judging, the carrier of data has electronic edition, also there is papery version, unification lack of standardization, in addition, because data exists different versions in forming process, if same document obtains from various flows journey (file processing node), what obtain may be inconsistent data, same information repeats in different pieces of information source simultaneously, conflicting situation also happens occasionally, therefore this mode of manually asking for submission lacks effective version monitoring means, also not to submitting to channel effectively to retrain, cause data display confusion, the problems such as the data distortion of submitting to.
Summary of the invention
The object of the invention is to according to the deficiencies in the prior art part provide a kind of can effective monitoring file, guarantee data uniqueness, submit to the authentic and valid digitizing of building based on engineering construction of data to transfer system.
The object of the invention is to realize by following approach:
System is transferred in the digitizing of building based on engineering construction, and its main points are, include digital integration design platform, production management platform, digitizing transfer backup system and digital information platform;
Digital integration design platform comprises the connection data interface between PDMS design platform, professional software application and professional software application and PDMS design platform; Production management platform includes production management infosystem and archive management system;
In PDMS design platform and production management infosystem, include multiple file processing nodes, each file processing node all sequentially connects, and final file processing node connects archive management system;
Digitizing is transferred in backup system and is provided with data mining unit and reference cell, and digital integration design platform and production management platform are connected respectively to digitizing and transfer backup system, and transfers backup system by digitizing and be connected to digital information platform; The collection terminal of data mining unit is connected with final file processing node simultaneously;
In production management infosystem, model newly built construction task, and newly built construction task is carried out to WBS decomposition, thereby obtain engineering finished product inventory, secondly in the engineering finished product inventory obtaining, select to need the task items of transfer, the task items of finally by system, needs being transferred is carried out digitizing and is transferred mark, and the file of this task items is all transferred mark with digitizing in digitizing transport process thus;
The data of digitizing corresponding newly built construction being transferred to mark send the reference cell in digitizing transfer backup system to, and store; Mark is transferred according to digitizing in reference cell in data mining unit, gathers the file that has digitizing and transfer mark from final file processing node, and according to the design code storage of file self to corresponding unit in digital information platform.
File processing node of the present invention generally sequentially comprises that for volume design node, school examine node, approval node, publication (issues) node and filing node, generally using publisher node or file node as final file processing node.For device data, generally sequentially comprise system, equipment list, data checking, specific design, facility installation drawing and three-dimensional model, described facility installation drawing and three-dimensional model are final file processing node.
Each file processing node can produce a file product, take design node as initiated process node, when designing a product, as volume drawing, three-dimensional model, equipment installation guide file, equipment debugging log file etc., all corresponding meeting is carried out school and is examined, approval, finally publish and file, if directly extract data on original digital integration design platform and production management platform, because all data are not all carried out flow process control, therefore the data extracted can be the file datas that any one file processing node produces, thereby cause distortion and the mistake of data.The deisgn product that the file data that the present invention extracts only produces for last file processing node, is generally the file data of filing node.
Digitizing of the present invention is transferred backup system and is intended to the stereo channel of creating a file and transferring, adopt 3Dgateway technology by the data automatic mining that needs in each platform data pond of engineering to transfer, be submitted to digital information platform, product is transferred in the digitizing that forms engineering.A complete digital information platform of synchronous formation in the time that engineering finishes, from last file processing Node extraction file data, guarantee to transfer synchronism and the correctness of data due to targetedly, avoided collecting due to the later stage distortion of data generation information, entanglement, mistake etc. situation.
In addition, a new engineering construction completes and has a lot of achievements, which achievement to carry out digitizing transfer for, and which does not carry out digitizing transfer, while planning, determines at the engineering construction initial stage.The content of transferring for needs in the time that a newly built construction carries out WBS Task-decomposing is carried out digitizing and is transferred mark, in the time that engineering WBS completes, the finished product inventory that participates in transfer is also just automatically definite, and the structure of digital information platform and content inventory be corresponding formation also, waits for supplementary relevant finished product.Digitizing is transferred the mark that backup system transfers with digitizing by this just the file in system is excavated and gathered, and finally can obtain unique, file data accurately.
In digital information platform, for the file object of each class, according to its recognition coding, corresponding storage unit is set, like this, in the time that the information of carrying out is issued, just can from correct position, extract corresponding file data and issue.
Digitizing transfer system of the present invention also includes the management platform of unit of taking part in building, and it comprises construction management platform, data publishing platform of unit of taking part in building etc.; Wherein: a, construction management platform can carry out the management of equipment arrival, to the tracking and managing that carries out of preparation of construction; B, construction project time management embeds Fujian institute and builds according to national project the engineering construction woprk standardization flow process that relevant regulations customizes, to working procedure, flow process, progress is carried out standardization, and templating management, also can carry out construction speed, engineering extension inquiry etc.In the management platform of described unit of taking part in building, be provided with equally multiple file processing nodes, its last file processing node is connected with the data mining unit that digitizing is transferred in backup system.Like this, digitizing is transferred backup system and just can from the management platform of unit of taking part in building, be excavated equally the file data that needs transfer.
In sum, the invention provides a kind of digitizing of building based on engineering construction and transfer system, first on digital integration design platform and production management platform, carry out flow process control and file identification, then transfer in backup system and apply 3Dgateway technology by the data automatic mining of the needs transfer identifying in each platform data pond of engineering in digitizing, finally be submitted to digital information platform, product is transferred in the digitizing that forms engineering.The present invention effectively controls the flow process in engineering construction construction, has guaranteed uniqueness and the reliability of data handover, has guaranteed to transfer accuracy and the real effectiveness of data.
Accompanying drawing explanation
Figure 1 shows that the system architecture schematic diagram of digitizing transfer system of building based on engineering construction of the present invention.
Figure 2 shows that the schematic flow sheet that in the embodiment of the present invention, volume is transferred.
Figure 3 shows that the schematic flow sheet that in the embodiment of the present invention, device data is transferred.
Embodiment
Most preferred embodiment:
With reference to accompanying drawing 1, system is transferred in the digitizing of building based on engineering construction, and backup system and digital information platform are transferred in the management platform, the digitizing that include digital integration design platform, production management platform, the unit of taking part in building;
Digital integration design platform: comprise PDMS design platform, all kinds of professional softwares and professional software and PDMS relevant interface etc.;
Production management platform: comprise production management infosystem, archive management system etc.;
Digital information platform: the final object that engineering digitizing is transferred, the drawing that comprises engineering, data, three-dimensional model, document etc., these finished products rely on object identity code interrelated, connect whole engineering information.A new engineering construction completes and has a lot of achievements, which achievement to carry out digitizing transfer for, and which does not carry out digitizing transfer, while planning, determines at the engineering construction initial stage.The content of transferring for needs in the time that a newly built construction carries out WBS Task-decomposing is carried out digitizing and is transferred mark, in the time that engineering WBS completes, the finished product inventory that participates in transfer is also just automatically definite, and the structure of digital information platform and content inventory be corresponding formation also, waits for supplementary relevant finished product.
The management platform of unit of taking part in building: comprise construction management platform, data publishing platform of unit of taking part in building etc.;
3Dgateway: aided management system is transferred in digitizing, and it will 1., 2., 4. needs in data pool that the object transferred is automatic, synchronous acquisition is published to digital information platform;
In PDMS design platform and production management infosystem, include multiple file processing nodes, each file processing node all sequentially connects, and final file processing node connects archive management system;
Digitizing is transferred in backup system and is provided with data mining unit and reference cell, and digital integration design platform and production management platform are connected respectively to digitizing and transfer backup system, and transfers backup system by digitizing and be connected to digital information platform; The collection terminal of data mining unit is connected with final file processing node simultaneously;
In production management infosystem, model newly built construction task, and newly built construction task is carried out to WBS decomposition, thereby obtain engineering finished product inventory, secondly in the engineering finished product inventory obtaining, select to need the task items of transfer, the task items of finally by system, needs being transferred is carried out digitizing and is transferred mark, and the file of this task items is all transferred mark with digitizing in digitizing transport process thus;
Send the data with digitizing transfer mark corresponding newly built construction to digitizing and transfer the reference cell in backup system, and store; Mark is transferred according to digitizing in reference cell in data mining unit, gathers the file that has digitizing and transfer mark from final file processing node, and according to the design code storage of file self to corresponding unit in digital information platform.
For example: a newly built construction, engineering duty decomposes, and first determines that engineering finished product comprises A, B, C, D
The relevant finished product of simultaneously needs being transferred makes marks, and obtains the list of engineering of transferring when engineering duty decomposes WBS.Above-mentioned A, C item participates in transferring, and identifies A, C item, B, D item does not make marks, and obtains the list of engineering A of transfer, C when engineering duty decomposes WBS simultaneously .....For objects different in inventory, define corresponding identification code, in Process of Engineering Construction, data in the management platform of digital integration design platform, production management platform and unit of taking part in building constantly produce, 3Dgateway is automatic by data mining in above-mentioned each platform by identification code, extract, be distributed in digital information platform.
Be issued as example with the data of a volume below and introduce lower digitizing transfer flow process:
With reference to accompanying drawing 2, process description: take volume task A as example, A is become will be by corresponding design cycle before final finished, be formed with a lot of intermediate releases, 3Dgateway by volume number if D0001 is as unique identification, only have in the time that 5. volume A D0001 arrival filing node is filed, automatically 5. volume AD0001 is distributed on to digital information platform from node, guarantee that by production process management digital information platform obtains correctly, suitable data, this is one of core of digitizing transfer technology in the present invention.Common digital information platform does not have flow process control, and the A issuing may be from 1., 2., and 3., 4., the data in the arbitrary stage in 5..Can produce like this distortion of data, entanglement, mistake.
Be issued as example with the data of equipment below and introduce lower digitizing transfer flow process:
With reference to accompanying drawing 3, process description: take equipment C as example, first carry out system diagram design forming equipment list, according to equipment list checking producer data, meet designing requirement producer's file transfer carry out detailed design to designer and finally form installation drawing, if engineering also needs the three-dimensional model of equipment C, after the checking of producer's data, circulation simultaneously, to three-dimensional center, completes modelling by three-dimensional center.
For the finished product of equipment C, as system diagram, three-dimensional model etc., 3Dgateway is extracted and is distributed on digital information platform as unique identification by the equipment KKS for example XXX001 that encodes from data pool.
It is same as the prior art that the present invention does not state part.

Claims (2)

1. system is transferred in the digitizing of building based on engineering construction, it is characterized in that, includes digital integration design platform, production management platform, digitizing transfer backup system and digital information platform;
Digital integration design platform comprises the connection data interface between PDMS design platform, professional software application and professional software application and PDMS design platform; Production management platform includes production management infosystem and archive management system;
In PDMS design platform and production management infosystem, include multiple file processing nodes, each file processing node all sequentially connects, and final file processing node connects archive management system;
Digitizing is transferred in backup system and is provided with data mining unit and reference cell, and digital integration design platform and production management platform are connected respectively to digitizing and transfer backup system, and transfers backup system by digitizing and be connected to digital information platform; The collection terminal of data mining unit is connected with final file processing node simultaneously;
In production management infosystem, model newly built construction task, and newly built construction task is carried out to WBS decomposition, thereby obtain engineering finished product inventory, secondly in the engineering finished product inventory obtaining, select to need the task items of transfer, the task items of finally by system, needs being transferred is carried out digitizing and is transferred mark, and the file of this task items is all transferred mark with digitizing in digitizing transport process thus;
The data of digitizing corresponding newly built construction being transferred to mark send the reference cell in digitizing transfer backup system to, and store; Mark is transferred according to digitizing in reference cell in data mining unit, gathers the file that has digitizing and transfer mark from final file processing node, and according to the design code storage of file self to corresponding unit in digital information platform.
2. system is transferred in digitizing of building based on engineering construction according to claim 1, it is characterized in that, also include the management platform of unit of taking part in building, it comprises the data publishing platform of construction management platform and unit of taking part in building; Construction management platform carries out the management of equipment arrival, to the tracking and managing that carries out of preparation of construction; In the management platform of described unit of taking part in building, be provided with equally multiple file processing nodes, its last file processing node is connected with the data mining unit that digitizing is transferred in backup system.
CN201410028995.2A 2014-01-22 2014-01-22 Digital hand-over system based on engineering construction Pending CN103778509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410028995.2A CN103778509A (en) 2014-01-22 2014-01-22 Digital hand-over system based on engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410028995.2A CN103778509A (en) 2014-01-22 2014-01-22 Digital hand-over system based on engineering construction

Publications (1)

Publication Number Publication Date
CN103778509A true CN103778509A (en) 2014-05-07

Family

ID=50570715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410028995.2A Pending CN103778509A (en) 2014-01-22 2014-01-22 Digital hand-over system based on engineering construction

Country Status (1)

Country Link
CN (1) CN103778509A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184505A (en) * 2015-09-24 2015-12-23 武汉英思工程科技股份有限公司 Digital management method and system used for water conservancy and hydropower engineering construction process
CN109241581A (en) * 2018-08-16 2019-01-18 中国电建集团河北省电力勘测设计研究院有限公司 It is encoded based on KKS and realizes two, the associated method of three-dimension interaction
CN109255109A (en) * 2018-08-16 2019-01-22 中国电建集团河北省电力勘测设计研究院有限公司 The method filled automatically based on KKS coding implementation model attribute

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020198755A1 (en) * 2001-06-22 2002-12-26 Birkner Charles Christian Integrated quality assurance control system to manage construction projects
JP2003242204A (en) * 2002-02-21 2003-08-29 Mitsubishi Electric Corp Construction design management system
CN101013482A (en) * 2006-06-13 2007-08-08 蒋丽萍 Online integrated management platform for archive and data of constructing project item
CN102254251A (en) * 2011-07-18 2011-11-23 广东省电力设计研究院 Power grid three-dimensional design result data management system and digital management method thereof
CN103093393A (en) * 2012-12-14 2013-05-08 深圳供电局有限公司 Customer business information and integrating application method of digitized information thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020198755A1 (en) * 2001-06-22 2002-12-26 Birkner Charles Christian Integrated quality assurance control system to manage construction projects
JP2003242204A (en) * 2002-02-21 2003-08-29 Mitsubishi Electric Corp Construction design management system
CN101013482A (en) * 2006-06-13 2007-08-08 蒋丽萍 Online integrated management platform for archive and data of constructing project item
CN102254251A (en) * 2011-07-18 2011-11-23 广东省电力设计研究院 Power grid three-dimensional design result data management system and digital management method thereof
CN103093393A (en) * 2012-12-14 2013-05-08 深圳供电局有限公司 Customer business information and integrating application method of digitized information thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁永福等: "宁东_山东_660kV直流输电示范工程三维数字化移交", 《电力建设》 *
叶文辉: "电力企业数字化移交平台建设", 《福建电脑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184505A (en) * 2015-09-24 2015-12-23 武汉英思工程科技股份有限公司 Digital management method and system used for water conservancy and hydropower engineering construction process
CN109241581A (en) * 2018-08-16 2019-01-18 中国电建集团河北省电力勘测设计研究院有限公司 It is encoded based on KKS and realizes two, the associated method of three-dimension interaction
CN109255109A (en) * 2018-08-16 2019-01-22 中国电建集团河北省电力勘测设计研究院有限公司 The method filled automatically based on KKS coding implementation model attribute
CN109241581B (en) * 2018-08-16 2022-12-06 中国电建集团河北省电力勘测设计研究院有限公司 Method for realizing two-dimensional and three-dimensional interactive correlation based on KKS coding
CN109255109B (en) * 2018-08-16 2022-12-06 中国电建集团河北省电力勘测设计研究院有限公司 Method for realizing automatic filling of model attributes based on KKS coding

Similar Documents

Publication Publication Date Title
CN109559069B (en) Production management method and device based on assembly type building platform and terminal equipment
CN109344900B (en) Component identification method, device, equipment and computer readable storage medium
CN107665122B (en) Automatic updating method of civil engineering BIM (building information modeling)
CN105117573B (en) Auto hydraulic model building method based on CAD drainage pipeline networks drawing informations
CN104484494B (en) Structure zooming based on building BIM models leads load method automatically
CN103914564B (en) Method and system for updating and warehousing urban pipelines on basis of ArcGIS (geographic information system)
CN101689122A (en) Digital design ecosystem
CN109146711A (en) A method of comprehensive utilization BIM technology and 3D laser scanning system Optimizing construction
CN103246603B (en) A kind of software deficiency report automatic distributing method of defect tracking system
CN106650142B (en) Method for batch view copying based on Revit
CN112257160B (en) BIM-based standardized forward design method for garbage incineration power plant
CN106777644A (en) Power plant identifies the automatic generation method and device of system coding
CN104135521A (en) Method and system of identifying data abnormal values of environment automatic monitoring network
CN105302978A (en) Quantity calculation method and device
CN108647450A (en) A kind of pre-buried big foundation bolt construction method based on BIM technology
CN106203812A (en) The industrialized data processing method of building decoration, Apparatus and system
CN109360123B (en) Multi-professional construction management method and system based on room
CN103778509A (en) Digital hand-over system based on engineering construction
CN108073747A (en) Aircraft structure Three Dimensional Design Model quality detecting system and method
CN115310182A (en) BIM parameter-based fabricated building design and real construction matching evaluation method
CN109472044A (en) A kind of cable calculation amount method, system and medium based on BIM
CN115168971A (en) Component parameter library-based integrated collaborative method for design and construction of fabricated building
DE102019202304B4 (en) Method and arrangement for creating a digital building model
CN106779620A (en) Digitized Design Platform building method based on IPD systems
CN109271701B (en) Water supply and drainage BIM forward design method based on reach system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140507

RJ01 Rejection of invention patent application after publication