CN107165128A - A kind of double-deck river course structure suitable for mountain stream river course - Google Patents
A kind of double-deck river course structure suitable for mountain stream river course Download PDFInfo
- Publication number
- CN107165128A CN107165128A CN201710428948.0A CN201710428948A CN107165128A CN 107165128 A CN107165128 A CN 107165128A CN 201710428948 A CN201710428948 A CN 201710428948A CN 107165128 A CN107165128 A CN 107165128A
- Authority
- CN
- China
- Prior art keywords
- river
- river course
- lower floor
- upper strata
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 30
- 239000004567 concrete Substances 0.000 claims description 15
- 239000012530 fluid Substances 0.000 claims description 4
- 239000003643 water by type Substances 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 16
- 230000010148 water-pollination Effects 0.000 abstract description 3
- 239000000463 material Substances 0.000 description 11
- 238000013461 design Methods 0.000 description 6
- 239000002689 soil Substances 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 239000004575 stone Substances 0.000 description 5
- 239000011148 porous material Substances 0.000 description 4
- 150000001875 compounds Chemical class 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000029142 excretion Effects 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 241000238557 Decapoda Species 0.000 description 1
- 241001465754 Metazoa Species 0.000 description 1
- 206010068052 Mosaicism Diseases 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 210000003765 sex chromosome Anatomy 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Revetment (AREA)
Abstract
The invention belongs to Hydraulic and Hydro-Power Engineering field, more particularly, to a kind of double-deck river course structure suitable for mountain stream river course.Double-deck river course structure provided by the present invention by set the upper strata Milky Way, lower floor underground river double-deck river course structure, lower floor underground river solves flood period and crosses flow problem, the upper strata Milky Way solves the hydrophilic problem of dry season visitor and river channel ecology problem, solves the not strong shortcoming of the deep narrow river course security in city, hydrophily, landscape.While according to the characteristics of river course land used and structures, foundation pit enclosure pilework can be combined and build lower floor underground river, solve slope in traditional River Construction and excavate and take up an area the problem of excessive and to periphery construction disturbs excessive.
Description
Technical field
The invention belongs to Hydraulic and Hydro-Power Engineering field, more particularly, to a kind of double-deck river course knot suitable for mountain stream river course
Structure.
Background technology
There are rich and varied river regime, section and dynamic variation tendency in natural river.Traditional river regulation reason
By the concept for being the optimal hydraulic radius based on hydraulics, maximum stream flow is conveyed with most economical section.For mankind's flood control, fill
Irrigate, shipping, generating, the need for land use etc., river is fixed between dyke by human use's dyke system, using cutting out curved take
Straight engineering by cranky natural river transformation be in line or broken line type artificical stream or ditch network;For improvement hydrodynamic(al)
Mechanical condition and the purpose such as maintain easily, the compound section regular shape of natural river is melted into trapezoidal, rectangle and arc isotactic
Then geometric cross section;For security consideration, important section carries out lining cutting using hard materials such as concrete, stone-layings, causes riverbed material
The hardening of material.
City river section typically has the patterns such as rectangular cross section, trapezoidal cross-section, combined type section.
(1)Rectangular cross section:Project occupation of land is few, can realize that trade culture is maximized when channel width is restricted.It is applicable work
The area that journey land used is in short supply, construction space is restricted.Two sides are generally vertical type barrier wall structure, higher to fundamental importance.It is conventional
Material have stone masonry or concrete, project durability is good.When channel uses same material river bottom protection, it is commonly called as " three face light ", profit
In the desilting of canal bottom and management, but it is unfavorable for the ecological circulation of landscape and canalization.Rectangular cross section can also use U-shaped reinforced concrete
Soil structure, has the advantages that good integrity, but cost is higher, and construction technical requirement is high, when especially canal cross section is wider, its cost
Index is high, not economical enough.
(2)Trapezoidal cross-section:The appropriate slope in river course two sides of trapezoidal cross-section, project occupation of land is big compared with rectangular cross section.Quaywall(Bank
Slope)During using traditional stone masonry bank protection, concrete revetment, equally with preferable project durability.In recent years, with environment with
Ecological requirement, many channels use ecomaterial bank protection, and with certain landscape and ecological effect, but material roughness is compared with coagulation
Soil material is high, and in the case of both are with section, smooth concrete flood passage is advantageously.Trapezoidal cross-section will stop packway width, and adopt
The mode such as pile up to reach hydrophilic requirement with lawn gentle slope or orderly rubble straggly.Allow small flood inundation on tracks some banks during design
Side facility, makes the ordinary water level in river course try one's best platform, allows people to go to waterside more preferably, certain depth of water is kept for a long time, flood
Allow beach thereon when water comes.
(3)Compound cross-section:Compound cross-section is applied to the open mountain stream river course in river shoal.Water flow in dry season is small, and current return groove
Main stem.Flood period flow is big, it is allowed to flood overbank.Dry season can fully develop the function of river shoal, according to the width of river shoal and
Landform, physical features, with reference to local actual, develop difference in functionality.Such as the wealthyer width of beach, golf course, football pitch can be typically developed
Etc. large-scale or integrated motion;River shoal relative narrower, can build small-sized outdoor sports place, riverside park or relief road etc..
The rational exploitation and utilization of river shoal, can give full play to the function of river shoal, and not raise flood level because enclosing beach, aggravate the anti-of two sides
Big vast pressure.
Urban River Restoration should be combined with water environment treatment, when Section Design is with greening riverbank, should protrude hydrophilic life
State, makes the water environment of " safety, landscape, leisure ", river training works is combined together with two sides landscape, with urban culture,
Style, history, the humane grade mutually coordinated, improve cities and towns, improve the environment that people live.But due to land used limitation and two sides
The factors such as building dense, removal difficulty are limited, and city river typically uses rectangular cross section.Especially mountain stream river course, flood is sudden and violent
Rise and break, to ensure the flood control safety of flood period, river course is generally deep narrow, and revetment, which is lifted off the larger of the river bed discrepancy in elevation, need to set shield
The safeguard measures such as column, the hydrophilic effect in river course is not general good.Meanwhile, such river course water flow in dry season is small, and river course base flow is small, also shadow
Ring river course Ecology.
The design of deep narrow city river at present is summarized, its is ecological typically there are following several ways:(1)Hung down at the top of shore protection
Hang greening;(2)Shore protection surface preventing material uses the rectangular slab of stone, block stone or porous material, prominent landscape or ecological effect;(3)River
Road bottom sets short harmony mill weir, keeps the dry season water surface.The easily realization from engineering technology of three of the above way, wherein,
Greening is hung at top from above and the landscape of shore protection surface is most widely used;Shore protection porous material also have developed many new in conventional practice
Section bar material and technology, such as green concrete, ecology bag, Ecotypic Stone Mesh-box, concrete segment, solidified earth planting matrix.These materials
Material and technology help to solve the problems, such as the slope greening of river alongshore and water and soil conservation, but mould revetment fluidised form is multifarious
Aspect DeGrain, is limited by dry season water small, it is also difficult to meet as aquatic animal(Such as fish, shrimp)Good dwell is provided
Cease the basic demand in environment and procreation space;Harmony mill weir also have developed a variety of patterns, is most commonly combined at present with landscape.
But no matter which kind of processing mode, be limited by the reality of deep narrow river cross-section, its hydrophily is undesirable, river course without
Method meets the hydrophilic needs of citizen, therefore, the hydrophilic sex chromosome mosaicism or industry great difficult problem in city depth narrow river course, it would be highly desirable to solve.
The content of the invention
It is an object of the present invention in order to overcome existing deep narrow river course to solve hydrophilic problem well, carry
For a kind of double-deck river course structure suitable for mountain stream river course, lower floor underground river meets flood period flood discharge, water drainage and required, the upper strata Milky Way
Meet hydrophilic dry season, amusement and recreation and landscape requirement, be it is a kind of can improve river course two sides landscape environment, life taste bilayer
River course structure.
Therefore, the above-mentioned purpose of the present invention is achieved through the following technical solutions:
A kind of double-deck river course structure suitable for mountain stream river course, the double-deck river course includes the upper strata Milky Way and to be arranged on upper strata bright
Lower floor underground river below river, the upper strata Milky Way and lower floor underground river are spaced from one another, the upper strata Milky Way and lower floor underground river
Flow to identical, the upper strata Milky Way, which reduces according to land used size and Transverse to the flow direction or expands hydrophilic waters scope, forms cranky
The upper strata Milky Way, weir diversion is built in the upper strata Milky Way water place appropriate in river course upstream during dry season;The lower floor underground river
Internal rectangular in cross-section, the rectangular in cross-section of the upper strata Milky Way;The upper strata Milky Way be used for meet ecoscape greening and
The hydrophilic requirement played with water of visitor, the inner space on the lower floor underground river is used to be the offer fluid space that drains off floodwater flood period.Under
Layer underground river is used for for the purpose of meeting the flood of design standard, and arrangement is typically more smoothed out, to meet flow-shape requirement.
While using above-mentioned technical proposal, the present invention can also be used or combined using technology further below
Scheme:
The lower floor underground river uses culvert structures, and the upper strata Milky Way is used as bottom plate using at the top of the box culvert on lower floor underground river.Lower floor
Underground river uses cast-in-place concrete box culvert structure, by setting the concrete guard wall formation upper strata Milky Way at the top of box culvert.
The part that the bottom plate of the upper strata Milky Way extends at the top of the box culvert on lower floor underground river sets geomembrane anti-seepage structure, the soil
One end of work film leakage preventing structure is connected at the top of the revetment barricade of the upper strata Milky Way, the box culvert on other end connection lower floor underground river.Upper strata is bright
The revetment in river can be using concrete guard wall or other forms, it is necessary to possess antiseepage requirement.
Box culvert-type lower floor underground river is single hole, diplopore or loose structure.
The lower floor underground river is set the stake barricade of foundation pit enclosure based on foundation pit enclosure stake and kept off with the stake of foundation pit enclosure
Wall uses contignation as side wall, the top plate on the lower floor underground river, and the upper strata Milky Way is made with the top beam slab on lower floor underground river
For bottom plate.Both sides side wall and foundation pit supporting construction are combined by lower floor underground river, land used is narrow or two sides building needs protection
Location, be conducive to constriction construction and excavation face, reduce two sides and take up an area and remove, save construction investment, accelerating construction progress, it is ensured that
Construction time two sides safety.
The part that the bottom plate of the upper strata Milky Way extends the top beam slab on lower floor underground river sets geomembrane anti-seepage structure, the soil
One end of work film leakage preventing structure connects the revetment barricade of the upper strata Milky Way, the top beam slab on other end connection lower floor underground river.
The foundation pit enclosure stake is drilling pouring occlusion pile, and it should ensure that the stability of itself, and interlocking pile surface is cast-in-place thin
Layer concrete side wall improves surface smoothness, improves flow-shape.
Lower floor underground river is single hole, diplopore or loose structure.
The side wall on the lower floor underground river sets rain pipe perforate, for Storm Sewer Network along receiving, it is ensured that water excretion is unobstructed.
The bottom on lower floor underground river sets Concrete bottom plate structure.
A kind of double-deck river course structure suitable for mountain stream river course provided by the present invention, by set the upper strata Milky Way, under
The double-deck river course structure on layer underground river, lower floor underground river solves flood period and crosses flow problem, and the upper strata Milky Way solves dry season visitor parent
Water problems and river channel ecology problem, solve the not strong shortcoming of the deep narrow river course security in city, hydrophily, landscape.Simultaneously
According to the characteristics of river course land used and structures, foundation pit enclosure pilework can be combined and build lower floor underground river, traditional river course is solved
Slope, which is excavated, in construction takes up an area the problem of excessive and to periphery construction disturbs excessive.
Brief description of the drawings
Fig. 1 a are lower floor's single-hole box culvert underground river provided in embodiment 1, the double-deck river course structural representation of the upper strata Milky Way;
Fig. 1 b are that the bottom plate of the upper strata Milky Way provided in embodiment 1 extends the structural representation at the top of the box culvert on lower floor underground river
Figure;
Fig. 2 a are lower floor's diplopore box culvert underground river provided in embodiment 2, the double-deck river course structural representation of the upper strata Milky Way;
Fig. 2 b are that the bottom plate of the upper strata Milky Way provided in embodiment 2 extends the structural representation at the top of the box culvert on lower floor underground river
Figure;
Fig. 3 a are lower floor's single hole stake barricade underground river provided in embodiment 3, the double-deck river course structural representation of the upper strata Milky Way;
Fig. 3 b are the structural representation that the bottom plate of the upper strata Milky Way provided in embodiment 3 extends the top beam slab on lower floor underground river
Figure;
Fig. 4 a are lower floor's diplopore stake barricade underground river provided in embodiment 4, the double-deck river course structural representation of the upper strata Milky Way;
Fig. 4 b are the structural representation that the bottom plate of the upper strata Milky Way provided in embodiment 4 extends the top beam slab on lower floor underground river
Figure.
Embodiment
The present invention is described in further detail with specific embodiment referring to the drawings.
Embodiment 1
Reference picture 1a, a kind of double-deck river course structure suitable for mountain stream river course, including the upper strata Milky Way and it is arranged on the upper strata Milky Way
The lower floor underground river of lower section, the upper strata Milky Way and lower floor underground river are spaced from one another, and the rectangular in cross-section inside lower floor underground river, upper strata is bright
The rectangular in cross-section in river;The upper strata Milky Way sets water plant area, visitor to play with water area for meeting ecoscape greening and visitor parent
The requirement that water is played with water, can also set all kinds of sculpture essays, form diversified elements of landscape, enrich River Landscape intension;Under
The inner space on layer underground river is used to be the offer fluid space that drains off floodwater flood period.The upper strata Milky Way can also according to land used size,
Transverse to the flow direction suitably reduces or expanded hydrophilic waters scope, cranky top river course form is formed, during dry season
Build weir diversion in the Milky Way water place appropriate in river course upstream in upper strata.Lower floor underground river is for the flood for meeting design standard
Purpose, arrangement is typically more smoothed out, to meet flow-shape requirement.In fig 1 a, water plant area is set in the Milky Way of upper strata,
Visitor is set to play with water area in Fig. 2 b, in the Milky Way of upper strata.
Lower floor underground river uses culvert structures, and the upper strata Milky Way is used as bottom plate using at the top of the box culvert on lower floor underground river.Lower floor underground river
Using cast-in-place concrete box culvert structure, by setting the concrete guard wall formation upper strata Milky Way at the top of box culvert.
As shown in Figure 1 b, the part that the bottom plate of the upper strata Milky Way extends at the top of the box culvert on lower floor underground river sets geomembrane anti-seepage
Structure, one end of geomembrane anti-seepage structure is connected at the top of the revetment barricade of the upper strata Milky Way, the box culvert on other end connection lower floor underground river.
The revetment of the upper strata Milky Way can be using concrete guard wall or other forms, it is necessary to possess antiseepage requirement.
In the present embodiment, box culvert-type lower floor underground river is single hole arrangements.
The side wall on lower floor underground river sets rain pipe perforate(It is not shown), for Storm Sewer Network along receiving, it is ensured that water is drained
It is unobstructed.
Embodiment 2
Reference picture 2a and 2b, in the present embodiment, box culvert-type lower floor underground river are double-pore structure.
Miscellaneous part is set with reference to embodiment 1.
Embodiment 3
Reference picture 3a, a kind of double-deck river course structure suitable for mountain stream river course, including the upper strata Milky Way and it is arranged on the upper strata Milky Way
The lower floor underground river of lower section, the upper strata Milky Way and lower floor underground river are spaced from one another, and the rectangular in cross-section inside lower floor underground river, upper strata is bright
The rectangular in cross-section in river;The upper strata Milky Way sets water plant area, visitor to play with water area for meeting ecoscape greening and visitor parent
The requirement that water is played with water, can also set all kinds of sculpture essays, form diversified elements of landscape, enrich River Landscape intension;Under
The inner space on layer underground river is used to be the offer fluid space that drains off floodwater flood period.The upper strata Milky Way can also according to land used size,
Transverse to the flow direction suitably reduces or expanded hydrophilic waters scope, cranky top river course form is formed, during dry season
Build weir diversion in the Milky Way water place appropriate in river course upstream in upper strata.Lower floor underground river is for the flood for meeting design standard
Purpose, arrangement is typically more smoothed out, to meet flow-shape requirement.
Lower floor underground river is set the stake barricade of foundation pit enclosure based on foundation pit enclosure stake and made with the stake barricade of foundation pit enclosure
For side wall, the top plate on lower floor underground river uses contignation, and the upper strata Milky Way is used as bottom plate using the top beam slab on lower floor underground river.Lower floor is dark
Both sides side wall and foundation pit supporting construction are combined by river, land used is narrow or two sides building needs location to be protected, are conducive to
Constriction construction and excavation face, reduces two sides and takes up an area and remove, save construction investment, accelerating construction progress, it is ensured that construction time two sides peace
Entirely.
As shown in Figure 3 b, the bottom plate of the upper strata Milky Way extends the part setting geomembrane anti-seepage of the top beam slab on lower floor underground river
Structure, one end of geomembrane anti-seepage structure connects the revetment barricade of the upper strata Milky Way, the top beam slab on other end connection lower floor underground river.
Foundation pit enclosure stake is drilling pouring occlusion pile, and it should ensure that the stability of itself, and the cast-in-place thin layer in interlocking pile surface is mixed
Solidifying soil side wall improves surface smoothness, improves flow-shape.
In the present embodiment, stake retaining wall type lower floor underground river is single hole arrangements
The side wall on lower floor underground river sets rain pipe perforate(It is not shown), for Storm Sewer Network along receiving, it is ensured that water excretion is unobstructed.
Embodiment 4
Reference picture 4a and 4b, in the present embodiment, stake retaining wall type lower floor underground river are double-pore structure.
Miscellaneous part is set with reference to embodiment 3.
Above-mentioned embodiment is used for illustrating the present invention, only the preferred embodiments of the present invention, rather than to this
Invention is limited, in the protection domain of spirit and claims of the present invention, to any modification of the invention made, is equal
Replace, improve etc., both fall within protection scope of the present invention.
Claims (10)
1. a kind of double-deck river course structure suitable for mountain stream river course, it is characterised in that the double-deck river course includes the upper strata Milky Way
With the lower floor underground river being arranged on below the Milky Way of upper strata, the upper strata Milky Way and lower floor underground river be spaced from one another, and the upper strata is bright
Flowing to for river and lower floor underground river is identical, and the upper strata Milky Way reduces or expanded hydrophilic waters model according to land used size and Transverse to the flow direction
Enclose to form the cranky upper strata Milky Way;Rectangular in cross-section inside the lower floor underground river, the section of the upper strata Milky Way is in square
Shape;The upper strata Milky Way is used to meet ecoscape greening and the hydrophilic requirement played with water of visitor, and the inside on the lower floor underground river is empty
Between be used to drain off floodwater offer fluid space for flood period.
2. a kind of double-deck river course structure suitable for mountain stream river course according to claim 1, it is characterised in that under described
Layer underground river uses culvert structures, and the upper strata Milky Way is used as bottom plate using at the top of the box culvert on lower floor underground river.
3. a kind of double-deck river course structure suitable for mountain stream river course according to claim 2, it is characterised in that upper strata is bright
The part that the bottom plate in river extends at the top of the box culvert on lower floor underground river sets geomembrane anti-seepage structure, the geomembrane anti-seepage structure
One end is connected at the top of the revetment barricade of the upper strata Milky Way, the box culvert on other end connection lower floor underground river.
4. a kind of double-deck river course structure suitable for mountain stream river course according to claim 2, it is characterised in that box culvert-type
Lower floor underground river is single hole, diplopore or loose structure.
5. a kind of double-deck river course structure suitable for mountain stream river course according to claim 1, it is characterised in that under described
Layer underground river sets the stake barricade of foundation pit enclosure and using the stake barricade of foundation pit enclosure as side wall based on foundation pit enclosure stake, described
The top plate on lower floor underground river uses contignation, and the upper strata Milky Way is used as bottom plate using the top beam slab on lower floor underground river.
6. a kind of double-deck river course structure suitable for mountain stream river course according to claim 5, it is characterised in that upper strata is bright
The part that the bottom plate in river extends the top beam slab on lower floor underground river sets geomembrane anti-seepage structure, the geomembrane anti-seepage structure
One end connects the revetment barricade of the upper strata Milky Way, the top beam slab on other end connection lower floor underground river.
7. a kind of double-deck river course structure suitable for mountain stream river course according to claim 5, it is characterised in that the base
Pit enclosure stake is drilling pouring occlusion pile.
8. a kind of double-deck river course structure suitable for mountain stream river course according to claim 5, it is characterised in that lower floor is dark
River is single hole, diplopore or loose structure.
9. a kind of double-deck river course structure suitable for mountain stream river course according to claim 1, it is characterised in that under described
The side wall on layer underground river sets rain pipe perforate.
10. a kind of double-deck river course structure suitable for mountain stream river course according to claim 1, it is characterised in that lower floor
The bottom on underground river sets Concrete bottom plate structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710428948.0A CN107165128A (en) | 2017-06-08 | 2017-06-08 | A kind of double-deck river course structure suitable for mountain stream river course |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710428948.0A CN107165128A (en) | 2017-06-08 | 2017-06-08 | A kind of double-deck river course structure suitable for mountain stream river course |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107165128A true CN107165128A (en) | 2017-09-15 |
Family
ID=59825651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710428948.0A Pending CN107165128A (en) | 2017-06-08 | 2017-06-08 | A kind of double-deck river course structure suitable for mountain stream river course |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107165128A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185061A (en) * | 2019-07-04 | 2019-08-30 | 河南聚誉帆工程技术咨询有限公司 | A kind of assembled integral underground space retaining wall and construction method |
CN110565578A (en) * | 2019-09-12 | 2019-12-13 | 重庆交通大学 | Double-layer ecological river channel structure suitable for mountain sponge city construction |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202450483U (en) * | 2012-01-20 | 2012-09-26 | 贵州省水利水电勘测设计研究院 | Three-dimensional composite box culvert structure for urban rivers |
CN102838208A (en) * | 2011-06-23 | 2012-12-26 | 中国科学院生态环境研究中心 | River channel purifier technology for polluted river water quality improvement |
CN203452038U (en) * | 2013-06-26 | 2014-02-26 | 北京仁创科技集团有限公司 | River purifying system |
CN207775825U (en) * | 2017-06-08 | 2018-08-28 | 中国电建集团华东勘测设计研究院有限公司 | A kind of double-deck river structure suitable for mountain stream river |
-
2017
- 2017-06-08 CN CN201710428948.0A patent/CN107165128A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102838208A (en) * | 2011-06-23 | 2012-12-26 | 中国科学院生态环境研究中心 | River channel purifier technology for polluted river water quality improvement |
CN202450483U (en) * | 2012-01-20 | 2012-09-26 | 贵州省水利水电勘测设计研究院 | Three-dimensional composite box culvert structure for urban rivers |
CN203452038U (en) * | 2013-06-26 | 2014-02-26 | 北京仁创科技集团有限公司 | River purifying system |
CN207775825U (en) * | 2017-06-08 | 2018-08-28 | 中国电建集团华东勘测设计研究院有限公司 | A kind of double-deck river structure suitable for mountain stream river |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185061A (en) * | 2019-07-04 | 2019-08-30 | 河南聚誉帆工程技术咨询有限公司 | A kind of assembled integral underground space retaining wall and construction method |
CN110185061B (en) * | 2019-07-04 | 2024-03-29 | 河南聚誉帆工程技术咨询有限公司 | Assembled integral type underground space retaining wall and construction method |
CN110565578A (en) * | 2019-09-12 | 2019-12-13 | 重庆交通大学 | Double-layer ecological river channel structure suitable for mountain sponge city construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107964917A (en) | A kind of water conservancy system | |
CN203373705U (en) | Ecological slope protection | |
CN212533968U (en) | Drop ecological landscape dam | |
CN207760804U (en) | A kind of Multi-functional economy dike structure | |
CN207619930U (en) | A kind of high stable state ecoscape protective slope structure | |
CN111501664A (en) | Ecological sea wall slope protection structure and construction method thereof | |
CN107165128A (en) | A kind of double-deck river course structure suitable for mountain stream river course | |
CN113818402A (en) | Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof | |
CN207775825U (en) | A kind of double-deck river structure suitable for mountain stream river | |
CN210946670U (en) | River structure suitable for urban river water ecology and water landscape improvement | |
CN207277284U (en) | A kind of Combined drawer type bank protection structure | |
CN215562318U (en) | Ecological bank protection | |
CN210194535U (en) | Revetment structure for forming artificial lake by reserving hydraulic reclamation area | |
CN211621506U (en) | Combined ecological drainage channel structure | |
CN210177445U (en) | Regulation and waterlogging prevention system for increasing water storage capacity of urban river | |
CN105804005B (en) | A kind of wall-hanging eco-concrete dyke and its construction method | |
Cottman et al. | BRIDGES AND CULVERTS REDUCED IN SIZE AND COST BY USE OF CRITICAL FLOW TRANSITIONS. | |
CN106522163A (en) | Ecological brick for riverway | |
CN110565578A (en) | Double-layer ecological river channel structure suitable for mountain sponge city construction | |
De Bruin et al. | A simple start with far‐reaching consequences | |
CN214832355U (en) | Dyke ecological reconstruction structure | |
CN210049128U (en) | Structure located at culvert outlet | |
CN215211162U (en) | Flow-isolating building structure for dry land construction | |
Phienwej et al. | Subsidence and flooding in Bangkok | |
CN205296060U (en) | One set of new structural type's water conservancy building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170915 |
|
RJ01 | Rejection of invention patent application after publication |