CN107152092A - The installation method of buried water stop and its fixed mount used at a kind of construction joint - Google Patents

The installation method of buried water stop and its fixed mount used at a kind of construction joint Download PDF

Info

Publication number
CN107152092A
CN107152092A CN201710453105.6A CN201710453105A CN107152092A CN 107152092 A CN107152092 A CN 107152092A CN 201710453105 A CN201710453105 A CN 201710453105A CN 107152092 A CN107152092 A CN 107152092A
Authority
CN
China
Prior art keywords
intermediate plate
support bar
fixed mount
bar
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710453105.6A
Other languages
Chinese (zh)
Other versions
CN107152092B (en
Inventor
王海军
赵栓富
王春晓
程敬克
李春明
马辉杰
张庆峰
徐双利
吴鸿胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION, China Railway 15th Bureau Group Co Ltd filed Critical 5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
Priority to CN201710453105.6A priority Critical patent/CN107152092B/en
Publication of CN107152092A publication Critical patent/CN107152092A/en
Application granted granted Critical
Publication of CN107152092B publication Critical patent/CN107152092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Abstract

The invention discloses a kind of installation method of buried water stop at construction joint and its fixed mount used.Its drip irrigation device is to include support bar, suspension rod, intermediate plate and split bolt, the support bar is at least two, every support bar two ends are connected with wall steel bar stress, the suspension rod includes the reinforcing bar two side by side, and be overlapped in above support bar, the intermediate plate is steel plate arranged in pairs, at least two pairs, the two panels steel plate of each pair intermediate plate respectively with corresponding reinforcement welding, bolt hole is equipped with each pair intermediate plate, passed through for split bolt, waterstop is held between each pair intermediate plate, each pair intermediate plate is locked by split bolt.The fixed mount only needs to be fixed in support bar into the steel bar stress of construction wall both sides when mounted, simple to operate, easy to disassemble, and the fixed mount uses reinforcing bar as structural master part of frog type, and whole fixed mount deadweight is lighter, it is easy to carry.

Description

The installation method of buried water stop and its fixed mount used at a kind of construction joint
Technical field
The present invention relates to the installation method of waterstop, at more particularly to a kind of construction joint in buried water stop installation method And its fixed mount used.
Background technology
Construction joint referred in concreting process, because design requirement or construction need segmentation to pour, and one after another The seam formed between the concrete poured.Because the concrete of after-pouring can not be mixed with the first pouring concrete solidified Close, so concrete can form lamination, the faying face of concrete delamination is just referred to as construction joint twice.Due to construction joint meeting Infiltration, so in order to prevent the phenomenon that seeps water, waterstop can be set at construction joint.Waterstop is typically closed with natural rubber with various It is made into rubber, width is 250 ~ 500mm, thickness is 6 ~ 10mm.
Waterstop is divided into back-adhering waterstop and middle buried water stop.Middle buried water stop is to be embedded in the sealing in the middle of wall Band, need to be arranged on thickness of wall body position of center line.When middle buried water stop is used in construction joint position, below half be embedded in and first pour mixed In solidifying soil, above half be embedded in rear pouring concrete.In order to ensure to forbid on anti-seepage effect, waterstop punching, and will be by setting Meter requires strict positioning, it is desirable to linear straight, it is necessary to which in the middle part of casting concrete, buried depth is accurate.When therefore constructing, It is general that it is fixed using waterstop fixed mount.
China Patent Publication No. CN103670451A, which discloses mounting tool of embedded longitudinal rubber waterstop in a kind of tunnel, to be had And application method.The invention includes cleat assembly, channel-section steel and channel-section steel support, and it mainly passes through the cleat assembly every 1 meter of setting Channel-section steel is fixed on construction part by the face with channel-section steel by after waterstop firm grip.The fixation of channel-section steel is mutually tied using two kinds of measures The method of conjunction.The first measure is two welding groove steel bracket in channel-section steel, and one described, channel-section steel support is fixed on a ring The connection of M16 ground anchor bolts, another is connected with temporarily fixed M16 ground anchor bolts.Second of measure is channel-section steel bottom, with Every the pre-buried round steel of φ 16 welding of 1 m.
Foregoing invention, solves the influences such as uneven, the not straight buried depth easily occurred when waterstop is installed, tipping, kink The problem of engineering guarded drainage quality, but two kinds of fixations of channel-section steel are too complicated in the program, fixed mount needs welding, operation Inconvenience, and pre-buried M16 ground anchor bolts and the round steel of φ 16 can not reuse.
The content of the invention
It is an object of the invention to provide a kind of fixed mount of buried water stop in be used at construction joint, the light warp of the fixed mount Ji, and be easily installed and dismantle.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of fixed mount for buried water stop at construction joint, including support bar, suspension rod, intermediate plate and split bolt, it is described Support bar is at least two, and every support bar two ends are connected with wall steel bar stress, and the suspension rod includes the reinforcing bar two side by side, And be overlapped in above support bar, the intermediate plate is steel plate arranged in pairs, at least two pairs, the two panels steel plate of each pair intermediate plate respectively with Bolt hole is equipped with corresponding reinforcement welding, each pair intermediate plate, is passed through for split bolt, waterstop is held in each pair intermediate plate Between, each pair intermediate plate is locked by split bolt.
By using above-mentioned technical proposal, in use, a line of waterstop first is embedded in into intermediate plate space;Tighten to drawing spiral shell Bolt, makes intermediate plate clamp waterstop;Waterstop is sling with suspension rod, construction part is placed in;Support bar is overlapped under suspension rod by root Face;Adjustment support bar makes waterstop be located at design requirement position;Support bar is fixed on wall steel bar stress.Remove fixed mount When unscrew split bolt, release the connection of support bar and wall steel bar stress, you can take out fixed mount.The present invention is when mounted only Support bar need to be fixed in the steel bar stress of construction wall both sides, it is simple to operate, it is easy to disassemble, and also the fixed mount uses steel Muscle is as structural master part of frog type, and whole fixed mount deadweight is lighter, it is easy to carry.
Preferably, it is described a kind of at construction joint affixed two in the middle part of the support bar of the fixed mount of buried water stop Individual realizing middle limiting part, two realizing middle limiting parts are located at suspension rod both sides respectively, to limit its transverse shifting.
By using above-mentioned technical proposal, the transverse shifting of suspension rod is limited, and is reduced because suspension rod is horizontal by construction interference The phenomenon that waterstop position caused by movement is offset, improves the precision of waterstop installation site.
Preferably, a kind of two reinforcing bars side by side for the fixed mount of buried water stop at construction joint are used It is articulated and connected.
By using above-mentioned technical proposal, two bar connectings for making suspension rod together, are conveniently carried, and press from both sides each pair Bolt hole relative position on piece is fixed, more convenient to penetrate bolt.
Preferably, it is described a kind of for being set between two reinforcing bars of the fixed mount of buried water stop at construction joint Leaf of hinge, two fan leafs of leaf of hinge respectively with two reinforcement weldings.
By using above-mentioned technical proposal, leaf of hinge is the product that in the market is easily bought and cheap, is realized using it Being hinged for two reinforcing bars, it is easy to operate.
Preferably, it is described a kind of for the split bolt head of the fixed mount of buried water stop and folder at construction joint Piece is welded.
By using above-mentioned technical proposal, in elastic split bolt, a spanner tightening nut only need to be used.Avoid During tightening nut, whole screw rod follows rotation, and the bolt after being welded and fixed is not easy to lose.
Preferably, a kind of support bar and wall stress for the fixed mount of buried water stop at construction joint Fixation kit is provided between reinforcing bar, the fixation kit includes U bolt, fastener, claw and nut, and the fastener is provided with Two bolts hole corresponding with U bolt, four angles of the one side of the fastener are symmetrically connected with four claws, during connection, wall Body steel bar stress is connected between the ring of U bolt and fastener composition, and support bar is overlapped on the screw rod of the U bolt of fixation kit On.
By using above-mentioned technical proposal, fixed mount is connected pure manual operations, installing/dismounting with wall steel bar stress More facilitate, it is to avoid the problem of welding method need to connect inconvenience and 8# iron wires colligations the connection easy absent-mindedness of power supply.
Preferably, a kind of fixation kit for the fixed mount of buried water stop at construction joint also includes connecing Stock, extension bar is at least one, is welded on both the above claw, and extension bar tail end is upwarped so that claw and extension bar Obtuse angle is formed, during connection, support bar is connected in the groove formed by wall steel bar stress and extension bar.
By using above-mentioned technical proposal, wall steel bar stress limits the horizontal shifting of support bar with extension bar formation groove It is dynamic, add the stability of whole fixed mount.
Preferably, a kind of support bar for the fixed mount of buried water stop at construction joint is close to end Termination locating part is connected with, the termination locating part is located at support bar and fixation kit intersection, is contradicted with extension bar formation, institute State termination locating part at least two.
By using above-mentioned technical proposal, limitation support bar is in work progress because external force is acted on along the longitudinal direction of itself body of rod It is mobile, waterstop is preferably fixed on wall center, improve the embedded quality of waterstop.
Preferably, a kind of suspension rod for the fixed mount of buried water stop at construction joint is provided with U-shaped card Tool, the U-shaped fixture is hung on suspension rod, in the range of intermediate plate, and the length of U-shaped fixture is not less than the width of waterstop.
By using above-mentioned technical proposal, U-shaped fixture blocks whole piece waterstop, limits waterstop the latter half and inclines Oblique or turnup phenomenon, improves the embedded quality of waterstop.
The installation method of buried water stop at a kind of construction joint, it is characterised in that:
Step one:Suspension rod with intermediate plate is put on the ground, and make intermediate plate with nut one upwardly, unscrew to drawing spiral shell Bolt;
Step 2:Intermediate plate is opened, is put into a line of waterstop is straight in the gap of each pair intermediate plate;
Step 3:Split bolt is tightened, intermediate plate is clamped waterstop;
Step 4:Waterstop is sling with suspension rod, is placed at wall construction seam;
Step 5:Support bar is overlapped on below suspension rod by root, and realizing middle limiting part is blocked suspension rod;
Step 6:Support bar is moved up and down, the center line of waterstop is overlapped with construction joint, moving left and right support bar makes waterstop Positioned at wall center;
Step 7:Claw blocks wall steel bar stress, and U bolt just passes through bolt hole to face of the fastener with claw, makes U-shaped spiral shell Bolt and the ring set of fastener formation live steel bar stress, move up and down fixation kit, two piece-root grafting stocks is held support bar, finally tighten Nut;
Step 8:U-shaped fixture is stuck on suspension rod one by one, makes it while blocking suspension rod, intermediate plate and waterstop;
Step 9:Pour lower wall body concrete;
Step 10:U-shaped fixture is taken out, vibration compacting is carried out to concrete at this with vibrating head;
Step 11:Unscrew split bolt, intermediate plate is separated with waterstop;
Step 12:Support bar is extracted out by root, removes suspension rod;
Step 13:Unscrew nut, pull down fixation kit;
Step 14:Top abutment wall reinforcing bar and template are installed, top side wall concrete is poured.
By using above-mentioned technical proposal, the fixed installation more convenience and high-efficiency of waterstop, workman need to only use spanner one The fixed mount that the instrument of kind can mount and dismount after fixed mount, and dismounting is member structure, is easy to deposit and carries.
In summary, the invention has the advantages that:
1st, the fixed mount can be directly anchored on wall steel bar stress, it is not necessary to which built-in fitting can be fixed;
2nd, the equipment such as input electric welding oxyacetylene metal-cutting are not required to during installing/dismounting, only need to manually be operated, convenient disassembly, efficiency high;
3rd, it is member structure after fixed mount dismounting, is easy to carry, repeats and utilize.
Brief description of the drawings
Fig. 1 is a kind of fixed mount overall structure figure of buried water stop in be used at construction joint;
Fig. 2 is the fixed mount overall structure figure of embodiment two;
Fig. 3 is the enlarged drawing of A in Fig. 2;
Fig. 4 is fixation kit structure chart;
Fig. 5 is the fixed mount overall structure figure of embodiment three;
Fig. 6 is the enlarged drawing of B in Fig. 5;
Fig. 7 is the fixed mount overall structure figure of example IV;
Fig. 8 is the enlarged drawing of C in Fig. 7;
Fig. 9 is the enlarged drawing of D in Fig. 7.
In figure, 1, support bar;2nd, suspension rod;3rd, intermediate plate;4th, split bolt;5th, waterstop;6th, wall steel bar stress;7th, it is middle Locating part;8th, leaf of hinge;9th, fixation kit;91st, U bolt;92nd, fastener;93rd, claw;94th, nut;95th, extension bar;10th, hold Head locating part;11st, U-shaped fixture.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical reference Represent.It should be noted that below in description the word "front", "rear", "left", "right", the "up" and "down" that use refer to it is attached Direction in figure, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometric center Direction.
Embodiment one:
As shown in figure 1, a kind of fixed mount for buried water stop at construction joint, it includes support bar 1, suspension rod 2, intermediate plate 3 With bolt 4.The support bar 1 is at least two, can be four, every two ends of support bar 1 welded with wall steel bar stress 6 or Connected with the colligation of 8# iron wires.The suspension rod 2 includes the reinforcing bar two side by side, is overlapped in above support bar 1.The intermediate plate 3 is into To the size identical steel plate of arrangement, at least two pairs, the two panels steel plate of each pair intermediate plate 3 respectively with corresponding reinforcement welding, each pair Intermediate plate 3 is identical with the thickness of waterstop 5 close to the gap of the one end of suspension rod 2, and bolt hole is equipped with each pair intermediate plate 3, for drawing Bolt 4 is passed through, and head and the intermediate plate 3 of split bolt 4 are welded.It is big by elastic achievable a pair of the intermediate plate intermediate spaces of regulating bolt Small adjustment, is clamped or release waterstop 5 with facilitating.
During mounting and fixing support, split bolt 4 is unclamped, is put into a line of waterstop is straight in the gap of each pair intermediate plate 3; Split bolt 4 is tightened, intermediate plate 3 is clamped waterstop;Waterstop is sling with suspension rod 2, is placed at wall construction seam;By support bar 1 is overlapped on below suspension rod 2 by root;The mobile position of support bar 1 makes waterstop be located at wall center and its center line and construction joint Overlap;Support bar 1 is fixed on wall steel bar stress 6 with 8# iron wires or welding procedure.
When removing fixed mount, unscrew split bolt 4, intermediate plate 3 is separated with waterstop 5;Release support bar 1 and wall stress The connection of reinforcing bar 6, separates it;Take out fixed mount.
Embodiment two:
It is with the difference of embodiment one, as shown in Figure 2 and Figure 3, the fixed mount also includes realizing middle limiting part 7 and leaf of hinge 8, And fixed mount is connected with wall steel bar stress 6 by fixation kit 9.The realizing middle limiting part 7 is two, is fixed in support bar 1 Middle part, two realizing middle limiting parts 7 respectively be located at suspension rod 2 both sides, to limit its transverse shifting.The leaf of hinge 8 at least two Individual, two fan leafs of each leaf of hinge 8 are respectively welded on two reinforcing bars of suspension rod 2, two reinforcing bars is turned into articulated structure.
As shown in figure 4, fixation kit 9 includes U bolt 91, fastener 92, claw 93 and nut 94.The fastener 92 is one Block steel plate, steel plate is provided with and 91 corresponding two bolts hole of U bolt.Four angles of the one side of fastener 92 are symmetrically connected with four Individual claw 93.
As shown in figure 3, the fixation kit 9 is in use, claw 93 blocks wall steel bar stress 6;U bolt 91 is just right Face of the fastener 92 with claw 93 passes through bolt hole, wall steel bar stress 6 is located at the ring that fastener 92 and U bolt 91 are constituted In;The height and angle of fixation kit 9 are adjusted, support bar 1 is overlapped on the screw rod of U bolt 91;Finally tighten nut 94.
Embodiment three:
It is with the difference of embodiment two, as shown in figs. 5 and 6, fixation kit 9 also includes extension bar 95, and extension bar 95 can To be one or two, it is welded on two claws 93 above steel wire dop, and the tail end of extension bar 95 is upwarped so that claw 93 form obtuse angle with extension bar 95.In use, support bar 1 is connected to the groove formed by wall steel bar stress 6 and extension bar 95 In.
Example IV:
It is with the difference of embodiment three, as shown in Fig. 7, Fig. 8 and Fig. 9, support bar 1 is provided with the joint of fixation kit 9 U-shaped fixture 11 is hung on termination locating part 10, suspension rod 2.The termination locating part 10 is fixed in support bar 1, at least two, with The formation of extension bar 95 is contradicted, to limit the vertically moving along itself body of rod of support bar 1.The U-shaped fixture 11 is hung on suspension rod 2, In the range of intermediate plate 3, its length is not less than the width of waterstop 5, occurs tilting or turns over to limit waterstop the latter half Volume.
The application method of U-shaped fixture 11:After the position of bar 1 to be supported is fixed, pour before lower wall body concrete, by U-shaped card Tool 11 is hung on suspension rod 2 one by one, makes it while blocking suspension rod 2, intermediate plate 3 and waterstop 5;After the completion of lower wall body concreting U-shaped fixture 11 is taken out immediately, and vibration compacting is carried out to concrete at this with vibrating head.
Embodiment five:
The installation method of buried water stop is as follows at a kind of construction joint:
Step one:Suspension rod 2 with intermediate plate 3 is put on the ground, and make intermediate plate 3 with nut one upwardly, unscrew to drawing Bolt 4;
Step 2:Intermediate plate 3 is opened, is put into a line of waterstop 5 is straight in the gap of each pair intermediate plate 3, and make waterstop 5 Side is contradicted with split bolt 4;
Step 3:Split bolt 4 is tightened, intermediate plate 3 is clamped waterstop;
Step 4:Sling waterstop with suspension rod 2, be placed at wall construction seam, and make intermediate plate 3 with nut one facing to tunnel In road hole;
Step 5:Support bar 1 is overlapped on below suspension rod 2 by root, and realizing middle limiting part 7 is blocked suspension rod 2;
Step 6:Support bar 1 is moved up and down, the center line of waterstop 5 is overlapped with construction joint, moving left and right support bar 1 makes to stop Water band 5 is located at wall center;
Step 7:Claw 93 blocks wall steel bar stress 6, and U bolt 91 just passes through bolt to face of the fastener 92 with claw 93 Hole, makes the ring set of U bolt 91 and fastener 92 formation live steel bar stress 6, moves up and down fixation kit 9, at the same around wall by Power reinforcing bar 6 rotates the angle of fixation kit 9, two piece-root grafting stocks 95 is held support bar 1, finally tightens nut 94;
Step 8:U-shaped fixture is stuck on suspension rod one by one, makes it while blocking suspension rod, intermediate plate and waterstop;
Step 9:Pour lower wall body concrete;
Step 10:U-shaped fixture 11 is taken out, vibration compacting is carried out to concrete at this with vibrating head;
Step 11:Unscrew split bolt 4, intermediate plate 3 is separated with waterstop 5;
Step 12:Support bar 1 is extracted out by root, removes suspension rod 2;
Step 13:Unscrew nut 94, pull down fixation kit 9;
Step 14:Top abutment wall reinforcing bar and template are installed, top side wall concrete is poured.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification without creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (10)

1. a kind of fixed mount for buried water stop at construction joint, it is characterised in that:Including support bar(1), suspension rod(2)、 Intermediate plate(3)And split bolt(4), the support bar(1)At least two, every support bar(1)Two ends and wall steel bar stress (6)Connection, the suspension rod(2)Including the reinforcing bar two side by side, and it is overlapped in support bar(1)Above, the intermediate plate(3)To be paired The steel plate of arrangement, at least two pairs, each pair intermediate plate(3)Two panels steel plate respectively with corresponding reinforcement welding, each pair intermediate plate(3)It is upper equal Provided with bolt hole, for split bolt(4)Pass through, waterstop(5)It is held in each pair intermediate plate(3)Between, each pair intermediate plate(3)It is logical Cross split bolt(4)Locking.
2. the fixed mount according to claim 1 for buried water stop at construction joint, it is characterised in that:Support bar (1)The affixed two realizing middle limiting parts in middle part(7), two realizing middle limiting parts(7)It is located at suspension rod respectively(2)Both sides, it is horizontal to limit it To movement.
3. the fixed mount according to claim 1 for buried water stop at construction joint, it is characterised in that:Two side by side Reinforcing bar be hinged.
4. the fixed mount according to claim 3 for buried water stop at construction joint, it is characterised in that:Two side by side Reinforcing bar between leaf of hinge is set(8), leaf of hinge(8)Two fan leafs respectively with two reinforcement weldings.
5. the fixed mount according to claim 1 for buried water stop at construction joint, it is characterised in that:Described pair of drawing Bolt(4)Head and intermediate plate(3)Welding.
6. the fixed mount according to claim 1 for buried water stop at construction joint, it is characterised in that:Support bar (1)With wall steel bar stress(6)Between be provided with fixation kit(9), the fixation kit(9)Including U bolt(91), fastener (92), claw(93)And nut(94), the fastener(92)It is provided with and U bolt(91)Corresponding two bolts hole, it is described Fastener(92)Four angles of one side be symmetrically connected with four claws(93), during connection, wall steel bar stress(6)It is connected to U-shaped Bolt(91)With fastener(92)Between the ring of composition, support bar(1)It is overlapped on fixation kit(9)U bolt(91)Screw rod On.
7. the fixed mount according to claim 6 for buried water stop at construction joint, it is characterised in that:The fixation Component(9)Also include extension bar(95), extension bar(95)At least one, it is welded on both the above claw(93)On, and spreading Bar(95)Tail end is upwarped so that claw(93)With extension bar(95)Form obtuse angle, during connection, support bar(1)It is connected to by wall Steel bar stress(6)With extension bar(95)In the groove of formation.
8. the fixed mount according to claim 7 for buried water stop at construction joint, it is characterised in that:Support bar (1)Termination locating part is connected with close to end(10), the termination locating part(10)Positioned at support bar(1)With fixation kit (9)Intersection, with extension bar(95)Formed and contradicted, the termination locating part(10)At least two.
9. the fixed mount as claimed in any of claims 1 to 8 for buried water stop at construction joint, its feature It is:Suspension rod(2)It is provided with U-shaped fixture(11), the U-shaped fixture(11)It is hung on suspension rod(2)On, positioned at intermediate plate(3)Scope It is interior, U-shaped fixture(11)Length be not less than waterstop(5)Width.
10. the installation method of buried water stop at a kind of construction joint, it is characterised in that:
Step one:Intermediate plate will be carried(3)Suspension rod(2)Put on the ground, and make intermediate plate(3)With nut one upwardly, twist Loose split bolt 4;
Step 2:Open intermediate plate(3), each pair intermediate plate is put into by a line of waterstop is straight(3)Gap in;
Step 3:Tighten split bolt(4), make intermediate plate(3)Clamp waterstop;
Step 4:Use suspension rod(2)Waterstop is sling, is placed at wall construction seam;
Step 5:By support bar(1)Suspension rod is overlapped on by root(2)Below, and realizing middle limiting part is made(6)Block suspension rod(2);
Step 6:Move up and down support bar(1), make waterstop(5)Center line overlapped with construction joint, move left and right support bar (1)Make waterstop(5)Positioned at wall center;
Step 7:Claw(93)Block wall steel bar stress(6), U bolt is just to fastener(92)With claw(93)Face wear Bolt hole is crossed, makes U bolt and the ring set of fastener formation firmly steel bar stress, moves up and down fixation kit(9), make two piece-root grafting stocks (95)Hold support bar(1), finally tighten nut(94);
Step 8:By U-shaped fixture(11)Suspension rod is stuck in one by one(2)On, make it while blocking suspension rod(2), intermediate plate(3)And waterstop (5);
Step 9:Pour lower wall body concrete;
Step 10:Take out U-shaped fixture(11), and vibration compacting is carried out to concrete at this with vibrating head;
Step 11:Unscrew split bolt(4), make intermediate plate(3)With waterstop(5)Separation;
Step 12:Support bar is extracted out by root(1), remove suspension rod(2);
Step 13:Unscrew nut(94), pull down fixation kit(9);
Step 14:Top abutment wall reinforcing bar and template are installed, top side wall concrete is poured.
CN201710453105.6A 2017-06-15 2017-06-15 The installation method of buried water stop and its fixed frame used at a kind of construction joint Active CN107152092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710453105.6A CN107152092B (en) 2017-06-15 2017-06-15 The installation method of buried water stop and its fixed frame used at a kind of construction joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710453105.6A CN107152092B (en) 2017-06-15 2017-06-15 The installation method of buried water stop and its fixed frame used at a kind of construction joint

Publications (2)

Publication Number Publication Date
CN107152092A true CN107152092A (en) 2017-09-12
CN107152092B CN107152092B (en) 2019-03-29

Family

ID=59796572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710453105.6A Active CN107152092B (en) 2017-06-15 2017-06-15 The installation method of buried water stop and its fixed frame used at a kind of construction joint

Country Status (1)

Country Link
CN (1) CN107152092B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387135A (en) * 2017-09-13 2017-11-24 中交公局桥隧工程有限公司 A kind of tunnel longitudinal direction waterstop holding clamp and application method
CN109256736A (en) * 2018-09-14 2019-01-22 中国冶集团有限公司 A kind of wire box built-in process and positioning device
CN109594662A (en) * 2019-01-16 2019-04-09 中建八局第建设有限公司 A kind of middle buried water stop fixing means and its grip device
TWI758166B (en) * 2021-04-19 2022-03-11 方建弘 Building, standing board assembly and holder thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139726A (en) * 2003-11-06 2005-06-02 Kurosaki:Kk Panel unit
CN202787957U (en) * 2012-09-23 2013-03-13 中国十七冶集团有限公司 Construction template device of parapet wall
CN103089009A (en) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 Middle-buried type rubber waterstop fixing split bolt and use method thereof
CN203393854U (en) * 2013-08-15 2014-01-15 黄河勘测规划设计有限公司 Connecting structure between poured concrete waterstop and new poured concrete waterstop
CN203452103U (en) * 2013-09-03 2014-02-26 衡水鑫盛达工程橡胶有限公司 Waterstop
CN204326117U (en) * 2014-11-28 2015-05-13 中国建筑第六工程局有限公司 Middle buried water stop locating rack
CN205577133U (en) * 2016-03-18 2016-09-14 北京建工集团有限责任公司 A U type bolt fastening presss from both sides and fixation clamp structure for fixing outer wall rubber waterstop
CN206220277U (en) * 2016-10-11 2017-06-06 中建一局集团第五建筑有限公司 The simple type deformation joint structure of site operation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139726A (en) * 2003-11-06 2005-06-02 Kurosaki:Kk Panel unit
CN202787957U (en) * 2012-09-23 2013-03-13 中国十七冶集团有限公司 Construction template device of parapet wall
CN103089009A (en) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 Middle-buried type rubber waterstop fixing split bolt and use method thereof
CN203393854U (en) * 2013-08-15 2014-01-15 黄河勘测规划设计有限公司 Connecting structure between poured concrete waterstop and new poured concrete waterstop
CN203452103U (en) * 2013-09-03 2014-02-26 衡水鑫盛达工程橡胶有限公司 Waterstop
CN204326117U (en) * 2014-11-28 2015-05-13 中国建筑第六工程局有限公司 Middle buried water stop locating rack
CN205577133U (en) * 2016-03-18 2016-09-14 北京建工集团有限责任公司 A U type bolt fastening presss from both sides and fixation clamp structure for fixing outer wall rubber waterstop
CN206220277U (en) * 2016-10-11 2017-06-06 中建一局集团第五建筑有限公司 The simple type deformation joint structure of site operation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387135A (en) * 2017-09-13 2017-11-24 中交公局桥隧工程有限公司 A kind of tunnel longitudinal direction waterstop holding clamp and application method
CN109256736A (en) * 2018-09-14 2019-01-22 中国冶集团有限公司 A kind of wire box built-in process and positioning device
CN109594662A (en) * 2019-01-16 2019-04-09 中建八局第建设有限公司 A kind of middle buried water stop fixing means and its grip device
CN109594662B (en) * 2019-01-16 2024-01-30 中建八局第一建设有限公司 Method for fixing embedded water stop and clamp device thereof
TWI758166B (en) * 2021-04-19 2022-03-11 方建弘 Building, standing board assembly and holder thereof

Also Published As

Publication number Publication date
CN107152092B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN107152092A (en) The installation method of buried water stop and its fixed mount used at a kind of construction joint
CN205531315U (en) Can dismantle steel bar truss building carrier plate support system
CN206091299U (en) A floor buried sleeve fixing device for aluminum alloy template
CN103194972A (en) Construction method for cable-stayed bridge cable guiding pipe with pipe opening extending out of tower wall
CN207393216U (en) A kind of fixed structure of tunnel double-lining back-grouting pipe
CN210002889U (en) Pipeline opening mould hanging device
CN105888243B (en) The anti-flare device of building template
CN207727770U (en) A kind of C-shaped channel stripe shape embedded part installation combination unit
CN213539400U (en) Prefabricated coincide wallboard
CN103469736B (en) Template supporting device of diaphragm plate of T-shaped bridge surface and template supporting and removing method
CN207435906U (en) For the bracket of bridge construction
CN110344553A (en) A kind of formwork erecting structure and formwork support process of stair lifting construction piece post-cast strip
CN201169923Y (en) Grouting and joint pointing dual-purpose tools
CN214658822U (en) Can have enough to meet need building templates anchor clamps of use
CN104929367B (en) The control device of flat concrete pouring quality and its using method
CN211421839U (en) Hoop type concrete pouring template system for plugging through floor slab pipeline hole gap
CN208763063U (en) Fixture for pipe gallery rubber watertight strip connection operation
CN105442829B (en) A kind of anti-skidding universal wall-connecting piece of the hoop formula with non-slipping block
CN209011852U (en) A kind of lining plug of hinge-type two for fixing tunnel steel plate water stopper
CN209539376U (en) A kind of positioning device for tunnel-liner steel side sealing belt construction
CN207794600U (en) A kind of oblique bracing means of building form
CN205206368U (en) Instrument formula floor protector
CN219364242U (en) Inspection shaft compaction device that fills in
CN109610506A (en) A kind of bracing means and construction method for steel form pre-buried channel flow
CN104594619B (en) A kind of construction and implementation of tool-type anchored end of Overhanging Outside Scaffold section steel beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant