CN107387135A - A kind of tunnel longitudinal direction waterstop holding clamp and application method - Google Patents
A kind of tunnel longitudinal direction waterstop holding clamp and application method Download PDFInfo
- Publication number
- CN107387135A CN107387135A CN201710823619.6A CN201710823619A CN107387135A CN 107387135 A CN107387135 A CN 107387135A CN 201710823619 A CN201710823619 A CN 201710823619A CN 107387135 A CN107387135 A CN 107387135A
- Authority
- CN
- China
- Prior art keywords
- waterstop
- neck
- positioner
- longitudinal direction
- hinge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 26
- 239000010959 steel Substances 0.000 claims abstract description 26
- 238000003466 welding Methods 0.000 claims abstract description 18
- 238000010276 construction Methods 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 10
- 238000007789 sealing Methods 0.000 description 4
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/381—Setting apparatus or devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/385—Sealing means positioned between adjacent lining members
Abstract
Description
Claims (7)
- A kind of 1. tunnel longitudinal direction waterstop holding clamp, it is characterised in that:Including waterstop positioning fixture (13), the waterstop Positioning fixture (13) is made up of waterstop neck (3), neck positioner (6), waterstop tightening device (9), the waterstop The first sidewall template (5) side welding channel-section steel (1) of neck (3);The second sidewall template (12) welding of the waterstop neck (3) Positive angle steel (2) forms bayonet socket, and the top of bayonet socket is be hinged;One end of the waterstop neck (3) sets neck bolt (4);Institute The one end for stating neck positioner (6) is connected with the first sidewall template (5) welding hinge (7);Three are reserved on the hinge (7) Bolt hole (8);The other end of the neck positioner (6) reserves locating notch, places and fix the waterstop neck (4);The waterstop tightening device (9) is made up of bar clamp (11) and turnbuckle (10), and the bar clamp (11) clamps institute State turnbuckle (10);Neck positioner (6) nut connects the bar clamp (11).
- A kind of 2. tunnel longitudinal direction waterstop holding clamp according to claim 1, it is characterised in that:The waterstop positioning Fixture (13) long 3000mm, wide 120mm, high 300mm.
- A kind of 3. tunnel longitudinal direction waterstop holding clamp according to claim 1, it is characterised in that:The first abutment wall mould The side welding 50mm channel-section steels (1) of plate (5).
- A kind of 4. tunnel longitudinal direction waterstop holding clamp according to claim 1, it is characterised in that:The second abutment wall mould The side welding positive angle steel of 50mm (2) of plate (12) forms bayonet socket.
- A kind of 5. tunnel longitudinal direction waterstop holding clamp according to claim 1, it is characterised in that:On the hinge (7) The pitch of holes for reserving three bolts hole (8) is 25mm.
- A kind of 6. tunnel longitudinal direction waterstop holding clamp according to claim 1, it is characterised in that:The neck positioning dress Put the longitudinal pitch 1500mm of (6).
- 7. a kind of usage right requires the application method of any one of 1-6 tunnel longitudinal direction waterstop holding clamp, it is characterised in that:Comprise the following steps:Step 1:Neck positioner (6) link bolt hole (8) is determined according to inverted arch lining thickness and connects into hinge (7), is turned over Turning hinge (7) makes neck positioner (6) lie on the first sidewall template (5);Step 2:The waterstop reserved at abutment wall is clamped with bar clamp (11), turnbuckle (10) is connected and passes through the anchor points such as reinforcing bar Waterstop is tightened, stretched, is evened up, draw it is suitable;Step 3:Waterstop neck bolt (4) is loosened, bayonet socket is placed in waterstop both sides, and card will be caught on the outside of channel-section steel (1) In the reserved locating notch of groove positioner (6), accurate adjustment waterstop, it is highly 175mm to ensure that waterstop exposes longitudinal construction joint, Make to be fastened and fixed neck bolt (4) after the linear straight, position of waterstop is placed in the middle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710823619.6A CN107387135A (en) | 2017-09-13 | 2017-09-13 | A kind of tunnel longitudinal direction waterstop holding clamp and application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710823619.6A CN107387135A (en) | 2017-09-13 | 2017-09-13 | A kind of tunnel longitudinal direction waterstop holding clamp and application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107387135A true CN107387135A (en) | 2017-11-24 |
Family
ID=60349638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710823619.6A Pending CN107387135A (en) | 2017-09-13 | 2017-09-13 | A kind of tunnel longitudinal direction waterstop holding clamp and application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107387135A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533292A (en) * | 2018-06-21 | 2018-09-14 | 中铁第四勘察设计院集团有限公司 | A kind of tunnel double-lining armored concrete location end mode structure and installation method |
CN108716412A (en) * | 2018-06-21 | 2018-10-30 | 中铁第四勘察设计院集团有限公司 | A kind of tunnel double-lining plain concrete location end mode structure and installation method |
CN110056372A (en) * | 2019-03-12 | 2019-07-26 | 中交一公局桥隧工程有限公司 | Concreting method in a kind of lining construction |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012246746A (en) * | 2011-05-30 | 2012-12-13 | Shoji Matsuzawa | Position correction structure for anchor bolt and position correction method of anchor bolt |
CN203756197U (en) * | 2014-02-20 | 2014-08-06 | 中铁十局集团第三建设有限公司 | Fixation device of water-stop belt |
CN204344142U (en) * | 2014-12-15 | 2015-05-20 | 中铁四局集团第三建设有限公司 | A kind of fixed structure of constructing tunnel waterstop |
CN204960950U (en) * | 2015-09-23 | 2016-01-13 | 中交第二航务工程局有限公司 | Two grommets in tunnel bury fixed combination steel mould of open and flat butt clamp of formula waterstop in to |
CN107152092A (en) * | 2017-06-15 | 2017-09-12 | 中铁十五局集团有限公司 | The installation method of buried water stop and its fixed mount used at a kind of construction joint |
CN207131426U (en) * | 2017-09-13 | 2018-03-23 | 中交一公局桥隧工程有限公司 | A kind of tunnel longitudinal direction waterstop holding clamp |
-
2017
- 2017-09-13 CN CN201710823619.6A patent/CN107387135A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012246746A (en) * | 2011-05-30 | 2012-12-13 | Shoji Matsuzawa | Position correction structure for anchor bolt and position correction method of anchor bolt |
CN203756197U (en) * | 2014-02-20 | 2014-08-06 | 中铁十局集团第三建设有限公司 | Fixation device of water-stop belt |
CN204344142U (en) * | 2014-12-15 | 2015-05-20 | 中铁四局集团第三建设有限公司 | A kind of fixed structure of constructing tunnel waterstop |
CN204960950U (en) * | 2015-09-23 | 2016-01-13 | 中交第二航务工程局有限公司 | Two grommets in tunnel bury fixed combination steel mould of open and flat butt clamp of formula waterstop in to |
CN107152092A (en) * | 2017-06-15 | 2017-09-12 | 中铁十五局集团有限公司 | The installation method of buried water stop and its fixed mount used at a kind of construction joint |
CN207131426U (en) * | 2017-09-13 | 2018-03-23 | 中交一公局桥隧工程有限公司 | A kind of tunnel longitudinal direction waterstop holding clamp |
Non-Patent Citations (1)
Title |
---|
中铁十一局集团: "《隧道衬砌成套施工技术》", 14 January 2017, 腾讯视频 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533292A (en) * | 2018-06-21 | 2018-09-14 | 中铁第四勘察设计院集团有限公司 | A kind of tunnel double-lining armored concrete location end mode structure and installation method |
CN108716412A (en) * | 2018-06-21 | 2018-10-30 | 中铁第四勘察设计院集团有限公司 | A kind of tunnel double-lining plain concrete location end mode structure and installation method |
CN108716412B (en) * | 2018-06-21 | 2024-03-15 | 中铁第四勘察设计院集团有限公司 | Tunnel secondary lining concrete section end mold structure and installation method |
CN108533292B (en) * | 2018-06-21 | 2024-03-15 | 中铁第四勘察设计院集团有限公司 | Tunnel secondary lining reinforced concrete section end mould structure and installation method |
CN110056372A (en) * | 2019-03-12 | 2019-07-26 | 中交一公局桥隧工程有限公司 | Concreting method in a kind of lining construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107387135A (en) | A kind of tunnel longitudinal direction waterstop holding clamp and application method | |
CN107022947B (en) | A kind of pre-buried fashioned iron carvel joint bolt type connection locator of the prefabricated arch rib of concrete segment and its construction method | |
CN206923398U (en) | One kind afforestation supports erection device with seedling | |
CN204546759U (en) | Prestressed concrete mortar leakage prevention device | |
CN207131426U (en) | A kind of tunnel longitudinal direction waterstop holding clamp | |
CN207749517U (en) | A kind of pile extension device for concrete pipe pile | |
CN205475725U (en) | Post -construction concrete floor beam board steel bar connection device stagnates | |
CN109695473A (en) | A kind of railway tunnel built-in groove channel fixing device and fixing means | |
CN107100088B (en) | Ultrashort closure section of swivel construction bridge and construction method thereof | |
CN206052759U (en) | A kind of steel-pipe pile attachment means under water | |
CN204960953U (en) | Vertical waterstop of formula of burying device of flare -outing in tunnel | |
CN207080239U (en) | A kind of fixing device of longitudinal waterstop | |
CN107152092A (en) | The installation method of buried water stop and its fixed mount used at a kind of construction joint | |
CN207435906U (en) | For the bracket of bridge construction | |
CN207525611U (en) | A kind of Ballast track railroad bridge telescopic device | |
CN107401414A (en) | A kind of scalable waterstop fixing mould of tunnel ring and application method | |
CN211735424U (en) | Subway construction template reinforcing apparatus | |
CN205637648U (en) | Device for connecting concrete roof truss and steel member | |
CN103089009B (en) | Middle-buried type rubber waterstop fixing split bolt and use method thereof | |
CN208763063U (en) | Fixture for pipe gallery rubber watertight strip connection operation | |
CN207035963U (en) | A kind of directional blasting device of adjustable-angle for explosion | |
CN208685382U (en) | A kind of water permeable concrete elastic telescopic crack structure | |
CN106088472A (en) | A kind of aspect is than the stirrup attachment structure of combined steel and concrete column and installation method thereof | |
CN110344496A (en) | A kind of assembled is partially filled with group frame-support construction and its construction method | |
CN110258650A (en) | A kind of basement shear wall late poured band structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Lixin Inventor after: Wang Heqi Inventor after: Lv Zhiqiang Inventor after: Huang Mingli Inventor after: Zhang Zhien Inventor after: Chen Penggao Inventor after: Wang Guojing Inventor before: Wang Heqi Inventor before: Lv Zhiqiang Inventor before: Huang Mingli Inventor before: Zhang Zhien Inventor before: Chen Penggao Inventor before: Wang Guojing |
|
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Room B901 and 916, No.10 Xinghuo Road, Science City, Fengtai District, Beijing Applicant after: CCCC Central South Engineering Bureau Co.,Ltd. Address before: Room B901 and 916, No.10 Xinghuo Road, Science City, Fengtai District, Beijing (Park) Applicant before: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |