Municipal concrete steel structure road and bridge and its installation method Download PDFInfo
- Publication number
- CN107152024A CN107152024A CN201710558692.5A CN201710558692A CN107152024A CN 107152024 A CN107152024 A CN 107152024A CN 201710558692 A CN201710558692 A CN 201710558692A CN 107152024 A CN107152024 A CN 107152024A
- Authority
- CN
- China
- Prior art keywords
- scroll
- thin end
- grabbing
- bridge pier
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
Abstract
The present invention relates to bridge technology field, more particularly to municipal concrete steel structure road and bridge, including bridge pier, bridge pier and abutment, bridge pier is fixed on bridge pier and is supported in below abutment, the bridge pier includes pile and support stake, and the pile includes many and grabs the thin end of the scroll in what packing shape was distributed and be fixedly installed in the pressure plot that the thin end of the scroll upper end is grabbed described in many;The thin end of the scroll of grabbing is curved hollow pipe, and the head for grabbing the thin end of the scroll has angle, and the diameter for grabbing the thin end of the scroll is tapered into from afterbody to head, and head of blocking up is placed with the angle for grabbing the thin end of the scroll;The convex surface upper lateral part for grabbing the thin end of the scroll is provided with vertical fixing hole, the vertical fixing hole at upper end open and is plugged with fix bar, and the upper end of the fix bar for grabbing the thin end of the scroll is connected by steel wire;Groove is provided with the pressure plot, the groove floor in pressure plot is provided with grabbing ground club head to the hole being adapted to, and the upper end in the pressure plot is provided with screwed hole, and the bridge pier is connected by screw with bridge pier, the abutment and bridge pier mode connects for screw.
Description
Technical field
The present invention relates to a kind of town road bridge technology field, more particularly to a kind of municipal concrete steel structure road bridge
Beam.
Background technology
At present, national rapid economic development, big small city possesses that number of vehicles is more and more per capita, the road in city
It is increasingly congestion, although urban road is in a large amount of newly-increased and rectification, but present situation is still more to carry out also congestion.
Intersection in city, for pedestrian, the safety of vehicle and the consideration maintained order, generally sets at the parting of the ways
There are traffic lights automatically control traffic order, vehicle is required for stopping when traveling encounters red light to crossroad and waited,
And the simply pedestrian for the vehicle parking waiting simply kept straight on for that need not turn.When distance farther out when, it is necessary to pass through crossing
Inherently more, if each crossing is required for waiting once, even repeatedly red light could pass through, and also will result in whole piece road
On rest on road and wait the car for mouth of passing by one's way more, and then generate congestion in road problem.As can be seen here, it is ensured that straight in road
The unobstructed vehicle that is not detained of runway is the basic method for solving traffic congestion.And make road forever unobstructed, it is necessary to be built at crossing
Vertical viaduct.And in many mature cities such as Changsha, a large amount of populations are poured in, the increase of a large amount of vehicles is driven, but city is in itself
Design and the reserved of road lead to not build viaduct on existing road, even and if there is space to build, concreting it is vertical
Hand over bridge cost high, construction period is longer, and president's time effects road traffic in construction, build row on many roads at present
People's metal bridge, but the bridge pier of metal bridge is larger, the traffic also having had influence on ground.
The content of the invention
The applicant provides a kind of municipal concrete steel structure road and bridge, and it has, and bridge pier floor space is small, when building
Between it is short, can anti-down resistance to movement the characteristics of.
In order to solve the above problems, the present invention uses following scheme:
A kind of municipal concrete steel structure road and bridge, including bridge pier, bridge pier and abutment, bridge pier are fixed on bridge pier and propped up
Support below the abutment, the bridge pier includes pile and support stake, the pile include many in packing shape be distributed grab the thin end of the scroll and
It is fixedly installed in the pressure plot that the thin end of the scroll upper end is grabbed described in many, the pressure plot and cavity structure of the support stake in one;It is described
The thin end of the scroll is grabbed for curved hollow pipe, the head for grabbing the thin end of the scroll has angle, and the diameter for grabbing the thin end of the scroll is from afterbody to head
Taper into, head of blocking up is placed with the angle for grabbing the thin end of the scroll, the head of blocking up is snapped in the neck on the outside of angle;It is described
Grab the convex surface upper lateral part of the thin end of the scroll and be provided with upper end open in vertical fixing hole, the vertical fixing hole and be plugged with fix bar,
The upper end of the fix bar for grabbing the thin end of the scroll is connected by steel wire;Groove is provided with the pressure plot, the groove floor in pressure plot is set
Have with grabbing ground club head to the hole being adapted to, the upper end in the pressure plot is provided with screwed hole, and the bridge pier is connected with bridge pier by screw
Connect, the abutment and bridge pier mode connects for screw.
It is used as the further improvement of above-mentioned technical proposal:
The end of the steel wire is twisted one in pressure plot.
The ground bar side wall of grabbing is provided with multiple reinforced holes.
The reinforced hole tilts upward setting from the Inside To Outside for grabbing the thin end of the scroll.
Pressure plot inner bottom surface is concave surface.
The present invention provides a kind of installation method of the municipal concrete steel structure road and bridge, including:
Grab the installation process of the thin end of the scroll:The hole in pressure plot can be put down by digging on the ground, will be grabbed the thin end of the scroll and utilized hydraulic test pressure
Enter underground, many are grabbed the thin end of the scroll into tree root disc distribution, are grabbed the thin end of the scroll and are pressed into after correct position, by fix bar from the upper end for grabbing the thin end of the scroll
Opening insertion, and inserted from fixing hole;Pour into cement from the upper end for grabbing the thin end of the scroll, during cement is poured into, will grab the thin end of the scroll to
Upper lifting a small distance, using the squeezing action of cement, head of blocking up is separated with angle, and cement extrudes infiltration soil from angle
In;
Press the installation process in plot:After grabbing the cement in the thin end of the scroll and filling but when not spilling over, then pressure plot is placed in grabs ground
In the upper end of bar, the base apertures for grabbing the thin end of the scroll insertion pressure plot;After the completion of pressure plot is combined with grabbing the thin end of the scroll, steel wire is connected bar
Upper end, and all steel wires are twisted one;Cement is poured into from the upper end of support stake, inner chamber and the drowning in whole pressure plot is filled up
Grab the thin end of the scroll and steel wire;The hole dug is filled and led up using cement, and covers pressure plot;
The installation process of bridge pier:By the lower end of bridge pier by screw with pressing the upper end in plot to be connected, finally by abutment and bridge
The upper end of pier is connected by screw.
The technical effects of the invention are that:
The present invention grabs ground structure using lower embedding type, the reasonable in design, ingenious;Tree root disc distribution grabs the thin end of the scroll,
Strong connection is formed with ground, it is hollow to grab in the thin end of the scroll after cementing, improve selve support intensity and raising and the combination of soil
Power;Combined using pressure plot with grabbing the thin end of the scroll, the pressure exposed part floor space outside ground in plot is small, will not take excessive road
Road, does not interfere with traffic above-ground.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is installed on the structure chart of underground for bridge pier in the present invention.
Fig. 3 is grabs the local structural graph of the thin end of the scroll in the present invention.
In figure:1st, bridge pier;11st, pile;111st, the thin end of the scroll is grabbed;1111st, angle;1112nd, block up head;1113rd, vertical fixing hole;
1114th, reinforced hole;112nd, plot is pressed;1121st, groove;113rd, fix bar;114th, steel wire;12nd, stake is supported;2nd, bridge pier;3rd, bridge
Platform.
Embodiment
The embodiment to the present invention is described further below in conjunction with the accompanying drawings, how to apply skill to the present invention whereby
Art means solve technical problem, and reach the implementation process of technique effect and can fully understand and implement according to this.Need explanation
It is that, as long as not constituting conflict, each embodiment in the present invention and each feature in each embodiment can be combined with each other, institute
The technical scheme of formation is within protection scope of the present invention.
Embodiment 1:As shown in Figure 1 to Figure 3, the municipal concrete steel structure road and bridge of the present embodiment, including bridge pier 1,
Bridge pier 2 and abutment 3, bridge pier 2 are fixed on bridge pier 1 and are supported in the lower section of abutment 3, and bridge pier 1 includes pile 11 and support stake 12, ground
Stake 11 includes many and grabs the thin end of the scroll 111 in what packing shape was distributed and be fixedly installed in many pressure plot 112 for grabbing the upper end of the thin end of the scroll 111,
Press plot 112 and cavity structure of the support stake 12 in one;The thin end of the scroll 111 is grabbed for curved hollow pipe, the head of the thin end of the scroll 111 is grabbed
With angle 1111, the diameter for grabbing the thin end of the scroll 111 tapers into from afterbody to head, grabs and be placed with the angle 1111 of the thin end of the scroll 111
Block up first 1112, blocking up first 1112 is snapped in the necks in the outside of angle 1111;The convex surface upper lateral part of the thin end of the scroll 111 is grabbed close to upper end
It is provided with opening in vertical fixing hole 1113, vertical fixing hole 1113 and is plugged with fix bar 113, grabs the fix bar 113 of the thin end of the scroll 111
Upper end by steel wire 114 be connected;Press and groove 1121 is provided with plot 112, the groove floor in pressure plot 112 is provided with grabbing the thin end of the scroll
111 heads are to the hole of adaptation, and the upper end in pressure plot 112 is provided with screwed hole, and bridge pier 2 is connected by screw with bridge pier 1, abutment 3 and
Bridge pier 2 uses mode connects for screw.Screw between bridge pier 2 and bridge pier 1 can be arranged to above and below multi-turn, between abutment 3 and bridge pier 2
Screw, can also equally be arranged to multi-turn.
The installation method of the municipal concrete steel structure road and bridge of the present invention, including:
Grab the installation process of the thin end of the scroll 111:The hole in pressure plot 112 can be put down by digging on the ground, will be grabbed the thin end of the scroll 111 and utilized liquid
Equipment press-in underground is pressed, many are grabbed the thin end of the scroll 111 into tree root disc distribution, are grabbed the thin end of the scroll 111 and are pressed into after correct position, by fix bar
113 insert from the upper end open for grabbing the thin end of the scroll 111, and are inserted from vertical fixing hole 1113;Water is poured into from the upper end for grabbing the thin end of the scroll 111
Mud, during cement is poured into, will grab the lifting a small distance (50-200mm) upwards of the thin end of the scroll 111, is in due to grabbing the thin end of the scroll 111
Arc and due to the squeezing action of cement, using the squeezing action of cement, block up first 1112 separates with angle 1111, and cement is from oblique
Extrusion is penetrated into soil in mouth 1111;
Press the installation process in plot 112:After grabbing the cement in the thin end of the scroll 111 and filling but when not spilling over, then plot 112 will be pressed
The upper end for grabbing the thin end of the scroll 111 is placed in, in the base apertures for grabbing the insertion pressure of the thin end of the scroll 111 plot 112;Pressure plot 112 is combined with grabbing the thin end of the scroll 111
After the completion of, the upper end for bar 113 that steel wire 114 is connected, and all steel wires 114 are twisted one;From the upper end of support stake 12
Cement is poured into, the inner chamber in whole pressure plot 112 is filled up and drowning grabs the thin end of the scroll 111 and steel wire 114;The hole dug is filled out using cement
It is flat, and cover pressure plot 112;
The installation process of bridge pier 2:By the lower end of bridge pier 2 by screw with pressing the upper end in plot 112 to be connected, finally by abutment
3 are connected with the upper end of bridge pier 2 by screw.
Embodiment 2:The present embodiment is further improved on the basis of embodiment 1, wherein, grab the upper end of the thin end of the scroll 111
Steel wire 114 pressure plot 112 in be twisted one.During construction, after the insertion underground of the thin end of the scroll 111 is grabbed, after insertion fix bar 113,
Steel wire 114 is twisted after one, then pours into cement.The thin end of the scroll 111 will be grabbed and pass through the fix bar 113 and steel wire 114 that are embedded in cement
Fix together, improve the adjacent overall earth-grasping force and stability grabbed between the thin end of the scroll 111.
Embodiment 3:The present embodiment further improves on the basis of above-described embodiment 1 and embodiment 2, grabs the side of the thin end of the scroll 111
Wall is provided with multiple reinforced holes 1114.When reinforced hole 1114 is used for cementing, beneficial to oozing out for cement, the thin end of the scroll is grabbed so as to reinforce
Grasp force between 111 and soil.Wherein, reinforced hole 1114 is obliquely installed, and is tilted upward from the Inside To Outside for grabbing the thin end of the scroll 111
Extension, can be avoided when grabbing in the insertion soil of the thin end of the scroll 111, and soil enters from the reinforced hole 1114 grabs the inner chamber of the thin end of the scroll 111 and block up
Extremely.
In the present invention, pour into and grabbed in the thin end of the scroll 111 for ease of cement, the pressure inner bottom surface of plot 112 is concave surface, and concave surface can facilitate water
Mud water conservancy diversion.
Embodiment provided above is the better embodiment of the present invention, only illustrates the present invention for convenient, not to this hair
It is bright to make any formal limitation, any those of ordinary skill in the art, if putting forward skill not departing from the present invention
In the range of art feature, using the equivalent embodiment locally changed or modified made by disclosed technology contents, and
Without departing from the technical characteristic content of the present invention, in the range of still falling within the technology of the present invention feature.
Claims (6)
1. a kind of municipal concrete steel structure road and bridge, it is characterised in that:Including bridge pier (1), bridge pier (2) and abutment (3), bridge
Pier (2) is fixed on bridge pier (1) and is supported in below abutment (3), and the bridge pier (1) includes pile (11) and support stake (12),
The pile (11) includes many and grabs the thin end of the scroll (111) in what packing shape was distributed and be fixedly installed in described in many and grab the thin end of the scroll (111)
The pressure plot (112) of upper end, the pressure plot (112) and cavity structure of the support stake (12) in one;It is described to grab the thin end of the scroll (111)
For curved hollow pipe, the head for grabbing the thin end of the scroll (111) has an angle (1111), the diameter for grabbing the thin end of the scroll (111) from
Afterbody to head is tapered into, and head of blocking up (1112), the head of blocking up are placed with the angle (1111) for grabbing the thin end of the scroll (111)
(1112) it is snapped in the neck on the outside of angle (1111);The convex surface upper lateral part for grabbing the thin end of the scroll (111) is at upper end open
Provided with vertical fixing hole (1113), fix bar (113) is plugged with the vertical fixing hole (1113), it is described to grab the thin end of the scroll (111)
Fix bar (113) upper end by steel wire (114) be connected;Groove (1121) is provided with the pressure plot (112), plot is pressed
(112) groove floor is provided with grabbing the thin end of the scroll (111) head to the hole being adapted to, and the upper end of the pressure plot (112) is provided with screw thread
Hole, the bridge pier (2) is connected by screw with bridge pier (1), and the abutment (3) uses mode connects for screw with bridge pier (2).
2. municipal concrete steel structure road and bridge according to claim 1, it is characterised in that:The steel wire (114)
End is twisted one in pressure plot (112).
3. municipal concrete steel structure road and bridge according to claim 1, it is characterised in that:It is described to grab the thin end of the scroll (111)
Side wall is provided with multiple reinforced holes (1114).
4. municipal concrete steel structure road and bridge according to claim 4, it is characterised in that:The reinforced hole (1114)
Setting is tilted upward from the Inside To Outside for grabbing the thin end of the scroll (111).
5. municipal concrete steel structure road and bridge according to claim 1, it is characterised in that:The pressure plot (112)
Inner bottom surface is concave surface.
6. a kind of installation method of municipal concrete steel structure road and bridge as claimed in claim 1, it is characterised in that including:
Grab the installation process of the thin end of the scroll (111):The hole of pressure plot (112) can be put down by digging on the ground, will grab the thin end of the scroll (111) utilization
Hydraulic test is pressed into underground, and many are grabbed the thin end of the scroll (111) into tree root disc distribution, are grabbed the thin end of the scroll (111) and are pressed into after correct position, will
Fix bar (113) is inserted from the upper end open for grabbing the thin end of the scroll (111), and is inserted from fixing hole (1113);From grabbing the thin end of the scroll (111)
Upper end pours into cement, during cement is poured into, and will grab the thin end of the scroll (111) and lifts a small distance upwards, utilizes the extruding of cement
Effect, head of blocking up (1112) is separated with angle (1111), and cement extrusion from angle (1111) is penetrated into soil;
Press the installation process of plot (112):After grabbing the cement in the thin end of the scroll (111) and filling but when not spilling over, then plot will be pressed
(112) upper end for grabbing the thin end of the scroll (111) is placed in, in the base apertures for grabbing the thin end of the scroll (111) insertion pressure plot (112);Press plot (112) with
Grab after the completion of the thin end of the scroll (111) combines, the upper end for bar (113) that steel wire (114) is connected, and all steel wires (114) are twisted
One;Pour into cement from the upper end of support stake (12), the inner chamber for filling up whole pressure plot (112) and drowning grab the thin end of the scroll (111) and
Steel wire (114);The hole dug is filled and led up using cement, and covers pressure plot (112);
The installation process of bridge pier (2):The lower end of bridge pier (2) is connected by screw and the upper end of pressure plot (112), finally by bridge
The upper end of platform (3) and bridge pier (2) is connected by screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558692.5A CN107152024A (en) | 2017-07-11 | 2017-07-11 | Municipal concrete steel structure road and bridge and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558692.5A CN107152024A (en) | 2017-07-11 | 2017-07-11 | Municipal concrete steel structure road and bridge and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107152024A true CN107152024A (en) | 2017-09-12 |
Family
ID=59796839
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710558692.5A Pending CN107152024A (en) | 2017-07-11 | 2017-07-11 | Municipal concrete steel structure road and bridge and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107152024A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US779880A (en) * | 1904-04-12 | 1905-01-10 | Frank Shuman | Forming concrete piles and preparatory piles therefor. |
FR844126A (en) * | 1937-10-02 | 1939-07-19 | Method and material for the formation in soil of cement concrete piles for foundations | |
US2576507A (en) * | 1949-02-14 | 1951-11-27 | Ben C Gerwick Inc | Hollow mandrel for placement of discrete material |
US5039256A (en) * | 1990-03-15 | 1991-08-13 | Richard Gagliano | Pinned foundation system |
JPH10299005A (en) * | 1997-04-24 | 1998-11-10 | Tone Chika Gijutsu Kk | Footing equipped with sloped pile bundled and method of construction work |
JP2001032296A (en) * | 1999-07-22 | 2001-02-06 | Shimizu Corp | Vibration control foundation structure |
JP2006207124A (en) * | 2005-01-25 | 2006-08-10 | Nippon Sharyo Seizo Kaisha Ltd | Steel-made pier structural body and its construction method |
CN101139834A (en) * | 2007-08-02 | 2008-03-12 | 夏良站 | Concrete pile structure |
JP2011006944A (en) * | 2009-06-26 | 2011-01-13 | Tis&Partners Co Ltd | Bridge structure |
JP2012092532A (en) * | 2010-10-26 | 2012-05-17 | Takaaki Yoshimura | Pile for soft ground reinforcement and construction method therefor |
CN104685132A (en) * | 2012-07-20 | 2015-06-03 | 伊藤组土建株式会社 | Pile foundation and pile foundation installation method |
-
2017
- 2017-07-11 CN CN201710558692.5A patent/CN107152024A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US779880A (en) * | 1904-04-12 | 1905-01-10 | Frank Shuman | Forming concrete piles and preparatory piles therefor. |
FR844126A (en) * | 1937-10-02 | 1939-07-19 | Method and material for the formation in soil of cement concrete piles for foundations | |
US2576507A (en) * | 1949-02-14 | 1951-11-27 | Ben C Gerwick Inc | Hollow mandrel for placement of discrete material |
US5039256A (en) * | 1990-03-15 | 1991-08-13 | Richard Gagliano | Pinned foundation system |
JPH10299005A (en) * | 1997-04-24 | 1998-11-10 | Tone Chika Gijutsu Kk | Footing equipped with sloped pile bundled and method of construction work |
JP2001032296A (en) * | 1999-07-22 | 2001-02-06 | Shimizu Corp | Vibration control foundation structure |
JP2006207124A (en) * | 2005-01-25 | 2006-08-10 | Nippon Sharyo Seizo Kaisha Ltd | Steel-made pier structural body and its construction method |
CN101139834A (en) * | 2007-08-02 | 2008-03-12 | 夏良站 | Concrete pile structure |
JP2011006944A (en) * | 2009-06-26 | 2011-01-13 | Tis&Partners Co Ltd | Bridge structure |
JP2012092532A (en) * | 2010-10-26 | 2012-05-17 | Takaaki Yoshimura | Pile for soft ground reinforcement and construction method therefor |
CN104685132A (en) * | 2012-07-20 | 2015-06-03 | 伊藤组土建株式会社 | Pile foundation and pile foundation installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207919363U (en) | A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system | |
CN103938533B (en) | The construction method of Simply supported non-uniform structure | |
CN107386127A (en) | A kind of bridge pier assembly device | |
CN208701729U (en) | A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap | |
CN207227975U (en) | Precast concrete Anti-collision railing unit member | |
CN103334371A (en) | Roadbed subsidence grouting treatment structure and construction method thereof | |
CN104278635B (en) | The forward method of earth anchored suspension bridge cat road track cable | |
CN107130626A (en) | The ground pilework of municipal concrete steel structure viaduct | |
CN107152023A (en) | Municipal concrete steel structure viaduct | |
CN107152024A (en) | Municipal concrete steel structure road and bridge and its installation method | |
CN210596882U (en) | Pedestrian road | |
CN109594467A (en) | Precast pier and cushion cap connection structure, construction method, precast pier, cushion cap | |
CN207193777U (en) | A kind of U-shaped beam hole for hoist fast plugging device | |
CN107130599A (en) | The pile and its installation method of municipal concrete steel structure viaduct | |
CN107246009A (en) | Municipal concrete steel structure viaduct and its installation method | |
CN204151675U (en) | The bogie of earth anchored suspension bridge cat road track cable | |
CN209194564U (en) | It is a kind of to excavate the strong empty iron column basis of structure less | |
CN106320184A (en) | Novel fabricated bridge construction method | |
CN110158475A (en) | A kind of prefabricated assembled bridge substructure and its construction method | |
CN202831384U (en) | Double-prefabricated superposed frame beam | |
CN206512585U (en) | A kind of adjustable box-structure viaduct of the gradient | |
CN110130934A (en) | The construction method of city tunnel bifurcation mouth with box top board structure | |
CN109706842A (en) | A kind of urban viaduct Single column pier capping beam construction device | |
CN108978705A (en) | Precast concrete retaining wall system | |
CN108867664A (en) | A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |