CN107150110A - 一种扇形段拔出导轨安装方法 - Google Patents
一种扇形段拔出导轨安装方法 Download PDFInfo
- Publication number
- CN107150110A CN107150110A CN201710166613.6A CN201710166613A CN107150110A CN 107150110 A CN107150110 A CN 107150110A CN 201710166613 A CN201710166613 A CN 201710166613A CN 107150110 A CN107150110 A CN 107150110A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- embedded board
- welded
- fan
- extracted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
- B22D11/057—Manufacturing or calibrating the moulds
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明涉及一种扇形段拔出导轨安装方法,其中包括以下步骤:首先将拔出导轨(1)吊装至安装位置,使拔出导轨平面平行于铸流中心平面;将拔出导轨(1)紧贴在预埋板(2)上,然后将拔出导轨(1)与预埋板(2)接触部分满焊焊接;在拔出导轨(1)的两侧利用若干固定挡块(3)同时焊接在预埋板(2)和拔出导轨(1)上,用以将拔出导轨(1)固定;在拔出导轨(1)的预留孔加焊钢板(4),通过满焊将拔出导轨(1)、预埋板(2)、加焊钢板(4)连在一起。本发明的优点为使用材料简单,价格低廉,方便施工,因此可以在省时、省力、节约成本的基础之上有效避免因为扇形段导轨基础预埋板偏差对导轨安装精度及稳定性的影响。
Description
技术领域
本发明属冶金行业板坯连铸技术领域,特别是涉及一种扇形段拔出导轨安装方法。
背景技术
因为扇形段拔出导轨的安装精度直接影响着扇形段能否顺利沿着导轨就位,按照图纸要求安装精度高,安装调整难度大,所以拔出导轨的基础预埋板位置的偏差对设备安装影响大。如果基础预埋板到连铸中心线的距离有所偏差或者由于混凝土胀模造成预埋板偏离设计位置,拔出导轨的安装精度和稳定性都会受到严重影响。针对这些问题,现有的解决办法为去除预埋板多余部分以增大预埋板和连铸中心线之间的距离,在预埋板上加焊钢板以减小预埋板和连铸中心线之间的距离,偏差严重的需要爆破拆除重新浇筑。但是通过对预埋板的加工改变了预埋板的构造不能保证导轨的稳定性,重新浇筑成本大,耗时长。
发明内容
本发明所要解决的技术问题是提供一种扇形段拔出导轨安装方法,通过将拔出导轨安装在预埋板上,解决土建施工中造成的拔出导轨预埋板偏差较大的问题,同时确保拔出导轨的定位精度和稳定性。
本发明解决其技术问题所采用的技术方案是:提供一种扇形段拔出导轨安装方法,其中包括以下步骤:
(a)首先将拔出导轨吊装至安装位置,使拔出导轨平面平行于铸流中心平面;
(b)将拔出导轨紧贴在预埋板上,然后将拔出导轨与预埋板接触部分满焊焊接;
(c)在拔出导轨的两侧利用若干固定挡块同时焊接在预埋板和拔出导轨上,用以将拔出导轨固定;
(d)在拔出导轨的预留孔加焊钢板,通过满焊将拔出导轨、预埋板、加焊钢板连在一起。
本发明的进一步技术特征是,所述步骤(b)中,所述预埋板(2)设置在混凝土基墙(7)上。
本发明的又进一步技术特征是,所述步骤(b)中,所述拔出导轨与预埋板缝隙过大无法完全贴合时,通过固定挡块将拔出导轨与预埋板焊接在一起。
本发明的再进一步技术特征是,所述拔出导轨与预埋板焊接时使用满焊焊接,且在固定挡块的周边焊接加强筋板。
本发明的再进一步技术特征是,所述步骤(b)中,所述预埋板位置偏离拔出导轨安装位置时,用钢板将预埋板连接起来,然后将拔出导轨焊接在钢板上。
本发明的再进一步技术特征是,所述钢板与预埋板通过满焊焊接连接。
本发明的再进一步技术特征是,所述钢板厚度为20mm。
本发明的更进一步技术特征是,所述步骤(d)中,所述拔出导轨的预留孔加焊钢板厚度为20mm。
有益效果
本发明的优点为使用材料简单,价格低廉,方便施工,因此可以在省时、省力、节约成本的基础之上有效避免因为扇形段导轨基础预埋板偏差对导轨安装精度及稳定性的影响,降低了施工难度,提高了工程的质量。
附图说明
图1为拔出导轨固定安装示意图。
图2拔出导轨安装截面图。
图3预埋板水平位置发生偏差解决方式示意图。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
实施例1
如图1-2所示,一种扇形段拔出导轨安装方法,其中包括以下步骤:
1、首先将拔出导轨1吊装至安装位置,使拔出导轨平面平行于铸流中心平面;
2、预埋板2设置在混凝土基墙7上,将拔出导轨1紧贴在预埋板2上,然后将拔出导轨1与预埋板2接触部分满焊焊接;
3、在拔出导轨1的两侧利用若干固定挡块3同时焊接在预埋板2和拔出导轨1上,用以将拔出导轨1固定;
4、在拔出导轨1的预留孔加焊厚度为20mm的钢板4,通过满焊将拔出导轨1、预埋板2、加焊钢板4连在一起。
所述步骤2中,拔出导轨1与预埋板缝隙过大无法完全贴合时,通过固定挡块3将拔出导轨1与预埋板焊接在一起,所述拔出导轨1与预埋板2焊接时使用满焊焊接,且在固定挡块3的周边焊接加强筋板5,如图2所示。
如图3所示,预埋板2位置偏离拔出导轨1安装位置时,用钢板6将预埋板2连接起来,然后将拔出导轨1焊接在钢板6上,所述钢板6与预埋板2通过满焊焊接连接,所述钢板6厚度为20mm。
Claims (8)
1.一种扇形段拔出导轨安装方法,其特征在于:包括以下步骤:
(a)首先将拔出导轨(1)吊装至安装位置,使拔出导轨平面平行于铸流中心平面;
(b)将拔出导轨(1)紧贴在预埋板(2)上,然后将拔出导轨(1)与预埋板(2)接触部分满焊焊接;
(c)在拔出导轨(1)的两侧利用若干固定挡块(3)同时焊接在预埋板(2)和拔出导轨(1)上,用以将拔出导轨(1)固定;
(d)在拔出导轨(1)的预留孔加焊钢板(4),通过满焊将拔出导轨(1)、预埋板(2)、加焊钢板(4)连在一起。
2.根据权利要求1所述一种扇形段拔出导轨安装方法,其特征在于:所述步骤(b)中,所述预埋板(2)设置在混凝土基墙(7)上。
3.根据权利要求1所述一种扇形段拔出导轨安装方法,其特征在于:所述步骤(b)中,所述拔出导轨(1)与预埋板缝隙过大无法完全贴合时,通过固定挡块(3)将拔出导轨(1)与预埋板焊接在一起。
4.根据权利要求3所述一种扇形段拔出导轨安装方法,其特征在于:所述拔出导轨(1)与预埋板(2)焊接时使用满焊焊接,且在固定挡块(3)的周边焊接加强筋板(5)。
5.根据权利要求1所述的一种扇形段拔出导轨安装方法,其特征在于:所述步骤(b)中,所述预埋板(2)位置偏离拔出导轨(1)安装位置时,用钢板(6)将预埋板(2)连接起来,然后将拔出导轨(1)焊接在钢板(6)上。
6.根据权利要求5所述的一种扇形段拔出导轨安装方法,其特征在于:所述钢板(6)与预埋板(2)通过满焊焊接连接。
7.根据权利要求5所述的一种扇形段拔出导轨安装方法,其特征在于:所述钢板(6)厚度为20mm。
8.根据权利要求1所述的一种扇形段拔出导轨安装方法,其特征在于:所述步骤(d)中,所述拔出导轨(1)的预留孔加焊钢板(4)厚度为20mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710166613.6A CN107150110A (zh) | 2017-03-20 | 2017-03-20 | 一种扇形段拔出导轨安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710166613.6A CN107150110A (zh) | 2017-03-20 | 2017-03-20 | 一种扇形段拔出导轨安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107150110A true CN107150110A (zh) | 2017-09-12 |
Family
ID=59791563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710166613.6A Pending CN107150110A (zh) | 2017-03-20 | 2017-03-20 | 一种扇形段拔出导轨安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107150110A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108772540A (zh) * | 2018-06-29 | 2018-11-09 | 中国十七冶集团有限公司 | 一种连铸结晶器的安装方法 |
CN110523933A (zh) * | 2019-07-24 | 2019-12-03 | 中国一冶集团有限公司 | 一种连铸机更换导轨流水化安装方法 |
CN110523938A (zh) * | 2019-07-24 | 2019-12-03 | 中国一冶集团有限公司 | 一种连铸机更换导轨墙面固定装置及更换导轨固定的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003048673A (ja) * | 2001-08-02 | 2003-02-21 | Mitsubishi Electric Corp | エレベーターのガイドレール固定装置及び固定方法 |
CN102101159A (zh) * | 2009-12-17 | 2011-06-22 | 中冶天工建设有限公司 | 连铸机扇形段更换导轨的安装法 |
CN203265554U (zh) * | 2012-11-26 | 2013-11-06 | 唐山渤海冶金设备有限责任公司 | 方圆矩坯连铸机扇形段外弧侧安装导轨 |
CN203621429U (zh) * | 2013-11-15 | 2014-06-04 | 苏州新长光热能科技有限公司 | 液压半连续铸造机导轨 |
CN105586855A (zh) * | 2015-09-28 | 2016-05-18 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种取水口拦污栅耙斗轨道安装方法及结构 |
-
2017
- 2017-03-20 CN CN201710166613.6A patent/CN107150110A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003048673A (ja) * | 2001-08-02 | 2003-02-21 | Mitsubishi Electric Corp | エレベーターのガイドレール固定装置及び固定方法 |
CN102101159A (zh) * | 2009-12-17 | 2011-06-22 | 中冶天工建设有限公司 | 连铸机扇形段更换导轨的安装法 |
CN203265554U (zh) * | 2012-11-26 | 2013-11-06 | 唐山渤海冶金设备有限责任公司 | 方圆矩坯连铸机扇形段外弧侧安装导轨 |
CN203621429U (zh) * | 2013-11-15 | 2014-06-04 | 苏州新长光热能科技有限公司 | 液压半连续铸造机导轨 |
CN105586855A (zh) * | 2015-09-28 | 2016-05-18 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种取水口拦污栅耙斗轨道安装方法及结构 |
Non-Patent Citations (1)
Title |
---|
陈占: "《电梯工程》", 31 August 2010, 中国电力出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108772540A (zh) * | 2018-06-29 | 2018-11-09 | 中国十七冶集团有限公司 | 一种连铸结晶器的安装方法 |
CN110523933A (zh) * | 2019-07-24 | 2019-12-03 | 中国一冶集团有限公司 | 一种连铸机更换导轨流水化安装方法 |
CN110523938A (zh) * | 2019-07-24 | 2019-12-03 | 中国一冶集团有限公司 | 一种连铸机更换导轨墙面固定装置及更换导轨固定的方法 |
CN110523938B (zh) * | 2019-07-24 | 2021-10-01 | 中国一冶集团有限公司 | 一种连铸机更换导轨墙面固定装置及更换导轨固定的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107150110A (zh) | 一种扇形段拔出导轨安装方法 | |
CN204266193U (zh) | 桩基钢筋笼定位器 | |
CN102926504B (zh) | 一种钢混叠合梁结合部施工方法 | |
CN202658532U (zh) | 桥梁湿接缝施工模板 | |
CN104389268A (zh) | 一种带有定位结构的钢塔柱及其吊装施工方法 | |
CN103967284B (zh) | 预留柱头对接的钢柱安装方法 | |
CN105926672A (zh) | 一种地铁暗挖车站钢管柱施工方法 | |
CN103790377B (zh) | 重型预埋件安装精度控制方法 | |
CN109500992A (zh) | 一种预制构件预埋组件及其安装方法 | |
CN102535849A (zh) | 构造柱柱顶混凝土浇筑方法 | |
CN104452825B (zh) | 一种用于围护结构支撑拆除时的后浇带换撑结构 | |
CN105040992B (zh) | 逆作法结构型钢柱倒插式施工方法 | |
CN208717918U (zh) | 一种下穿高压线或高架桥的地铁车站基坑围护结构 | |
CN104653222B (zh) | 一种盾构区间隧道预制疏散平台 | |
CN207144456U (zh) | 悬挑脚手架工字钢预埋件 | |
CN109468420A (zh) | 一种高炉炉壳推移分段液压同步提升组装方法 | |
CN108843043A (zh) | 一种人防门框换撑加固装置及其施工方法 | |
CN105480842B (zh) | 一种后浇设备支撑梁及其施工方法 | |
CN210387491U (zh) | 板坯连铸机扇形段底座安装用测量装置 | |
CN205476528U (zh) | 预制桩快速就位装置 | |
CN209478542U (zh) | 一种预制构件预埋组件 | |
CN202726407U (zh) | 大直径管道的空中组对装置 | |
CN106948841A (zh) | 高铁隧道预埋槽道安装模具自动升降系统和安装方法 | |
CN207295754U (zh) | 一种高精度设备基础预埋螺栓套筒装置 | |
CN206503377U (zh) | 一种钢栈桥的活动栏杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170912 |
|
RJ01 | Rejection of invention patent application after publication |