CN107143171A - Garbage incinerating power plant main building arrangement structure - Google Patents
Garbage incinerating power plant main building arrangement structure Download PDFInfo
- Publication number
- CN107143171A CN107143171A CN201710364644.2A CN201710364644A CN107143171A CN 107143171 A CN107143171 A CN 107143171A CN 201710364644 A CN201710364644 A CN 201710364644A CN 107143171 A CN107143171 A CN 107143171A
- Authority
- CN
- China
- Prior art keywords
- main building
- power plant
- burning
- steam turbine
- arrangement structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
The invention discloses a kind of garbage incinerating power plant main building arrangement structure, including main building body, between the inside of the main building body is provided with burning, the lower section between the burning is provided with the vacant area of factory building;Turbo-generator Set, the Turbo-generator Set is arranged in the vacant area of the factory building;And steam turbine subsidiary engine equipment, the side that the steam turbine subsidiary engine equipment is arranged in the vacant area of the factory building and deviated from positioned at the Turbo-generator Set between the burning.It can so avoid making the vacant area of factory building formed below between burning from causing vacant waste or utilization rate not high, by optimizing arrangement to each equipment, it is greatly improved the utilization rate of factory building inner space, it is to avoid there is excessive space waste, improves its usage economy of main building.
Description
Technical field
The present invention relates to garbage incinerating power plant technical field, more particularly to a kind of garbage incinerating power plant main building cloth
Put structure.
Background technology
The incinerator in country's garbage incinerating power plant typically uses stoker fired grate, and main power house of power plant arrangement knot at present
Structure is typically by between burning between (containing incinerator, waste heat boiler, pit etc.), steam turbine and the several modules of deaerator bay are arranged;Wherein
Generally individually be arranged in a factory building between burning, and between steam turbine and deaerator bay be then individually arranged in it is another between in factory building, two
Factory building is disposed adjacent.In view of the work characteristics of stoker fired grate formula incinerator, rubbish heap on its slag tap height and stoker fired grate
The space requirement put is larger, thus needs the waste heat boiler for absorbing the heat that incineration firing is produced being arranged in higher position.Press
The situation of current country's garbage incinerating power plant, waste heat boiler generally arranges natural recirculating type water-tube boiler using horizontal, such
Type waste heat boiler is normally supported on 15 meters of platforms, below platform it is vacant go out larger space, and the space is generally only arranged
Remove the gred the less equipment such as workshop and pipe sandwich, still has most of space to be underutilized, there is larger space waste,
Influence the utilization rate and economy of main building.
The content of the invention
Based on this, the present invention is necessary to provide a kind of garbage incinerating power plant main building arrangement structure, by each equipment
Arrangement is optimized, the utilization rate of factory building inner space is greatly improved, it is to avoid there is excessive space waste, main building is improved
Its usage economy.
Its technical scheme is as follows:
A kind of garbage incinerating power plant main building arrangement structure, including:
Main building body, between the inside of the main building body is provided with burning, the lower section between the burning is provided with factory building
Vacant area;
Turbo-generator Set, the Turbo-generator Set is arranged in the vacant area of the factory building;And
Steam turbine subsidiary engine equipment, the steam turbine subsidiary engine equipment is arranged in the vacant area of the factory building and positioned at steamer hair
The side that group of motors deviates between the burning.
During above-mentioned garbage incinerating power plant main building arrangement structure building, set in the inside of main building body between burning,
Lower section between burning reserves the vacant area of factory building, and Turbo-generator Set is arranged in the vacant area of factory building afterwards, while by steam turbine
Subsidiary engine equipment is arranged in the side in the vacant area of factory building and positioned at Turbo-generator Set between burning.It can so avoid making burning
Between the vacant area of factory building formed below cause vacant waste or utilization rate not high, can be big by optimizing arrangement to each equipment
The big utilization rate for improving factory building inner space, it is to avoid there is excessive space waste, improves its usage economy of main building.
Technical scheme is further described below:
In one of the embodiments, the main building body is additionally provided between gas cleaning, is provided with the burning
Waste heat boiler, between the steam turbine subsidiary engine equipment is arranged between the waste heat boiler and the gas cleaning.
In one of the embodiments, the vacant area of the factory building includes the first mounting layer, and the steam turbine subsidiary engine equipment includes
Oxygen-eliminating device and boiler blow down flash device, the oxygen-eliminating device and the boiler blow down flash device are arranged in first mounting layer.
The vacant area of factory building can be so made full use of to be located at the space in the first mounting layer region, it is to avoid to cause space waste, can also reduce
Connecting pipe length between oxygen-eliminating device and continuous sewage-discharge volum expander for boiler.
In one of the embodiments, the steam turbine subsidiary engine equipment also includes feedwater pump group, and the feedwater pump group includes giving
Water pump, industrial water pump and hydrophobic development unit, the vacant area of factory building also include being located at the second peace below first mounting layer
Layer is filled, the feed pump, the industrial water pump and the hydrophobic development unit are arranged in second mounting layer and positioned at described
At zero meter of the lower section of oxygen-eliminating device.So ensuring fully to be located at the same of the space in the second mounting layer region using the vacant area of factory building
When, the connecting pipe length between oxygen-eliminating device and feed pump can also be reduced, the resistance of ducting is reduced, feed pump energy consumption, drop is reduced
Low cost expenditure, improves the economy in power plant.
In one of the embodiments, the vacant area of the factory building also includes pipe sandwich, and the steam turbine subsidiary engine equipment is also wrapped
Heater is included, the heater is arranged at the pipe sandwich and positioned between the oxygen-eliminating device and the feedwater pump group.Thus
By at pipe sandwich that heater is arranged between oxygen-eliminating device and water pump group, ensureing that heater condensate is smooth, energy can
While by recycling, the space availability ratio in the vacant area of factory building can also be further lifted, reduction main building is because of space waste
And the economic attrition caused.
In one of the embodiments, be additionally provided with least one incinerator in the burning, the incinerator it is upper
Portion's flue gas horizontally enters into the waste heat boiler.Not only the inner space between burning can be made further to be made full use of, improved
The space efficiency utilization of main building body, while the garbage disposal efficiency in power plant can also be greatly promoted.
In one of the embodiments, the steam turbine subsidiary engine equipment also include low-pressure heater, the low-pressure heater with
The Turbo-generator Set is in layer absolute altitude.The steam turbine subsidiary engine equipment such as low-pressure heater can so be entered with Turbo-generator Set
One-step optimization is configured, it is ensured that power plant is stablized while improving space availability ratio, Effec-tive Function, lifts each unit operation
Economy.
In one of the embodiments, slag treatment equipment, the slag treatment equipment are additionally provided with the burning
Positioned at the lower section of the incinerator.The region being located between burning below incinerator can be so made full use of, makes the rubbish after burning
Waste residue is able to reliable treatments, it is ensured that power plant has preferably slag treatment performance, it is ensured that surrounding enviroment health.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the garbage incinerating power plant main building arrangement structure described in the embodiment of the present invention;
Fig. 2 is the side structure schematic view of the garbage incinerating power plant main building arrangement structure described in the embodiment of the present invention.
Description of reference numerals:
100th, main building body, 110, burn between, 120, the vacant area of factory building, the 121, first mounting layer, 122, second installs
Layer, 123, pipe sandwich, 200, Turbo-generator Set, 300, steam turbine subsidiary engine equipment, 310, oxygen-eliminating device, 330, feedwater pump group,
340th, heater, 400, waste heat boiler, 500, incinerator, 600, slag treatment equipment.
Embodiment
For the objects, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with accompanying drawing and specific embodiment party
Formula, the present invention is described in further detail.It should be appreciated that embodiment described herein is only to solve
The present invention is released, protection scope of the present invention is not limited.
It should be noted that when element is referred to as " being fixedly arranged on ", " being arranged at " or " install in " another element, it can be with
Directly on another element or there can also be an element placed in the middle.When an element is considered as " connection " another yuan
Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element
The concrete mode being fixedly connected can be achieved by the prior art, and will not be repeated here, it is preferred to use the fixation side of threaded connection
Formula.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " including one or more
The arbitrary and all combination of related Listed Items.
Heretofore described " first ", " second " do not represent specific quantity and order, are only used for the differentiation of title.
It is a kind of garbage incinerating power plant main building arrangement structure of displaying of the embodiment of the present invention, bag shown in Fig. 2 such as Fig. 1
Include:Main building body 100, the inside of the main building body 100 is provided between burning 110, and 110 lower section is set between the burning
There is the vacant area 120 of factory building;Turbo-generator Set 200, the Turbo-generator Set 200 is arranged in the vacant area 120 of the factory building;
And steam turbine subsidiary engine equipment 300, the steam turbine subsidiary engine equipment 300 is arranged in the vacant area 120 of the factory building and positioned at the steamer
Generating set 200 deviates between the burning 110 side.
During above-mentioned garbage incinerating power plant main building arrangement structure building, set and burn in the inside of main building body 100
Between 110,110 lower section reserves the vacant area 120 of factory building between burning, and it is vacant that Turbo-generator Set 200 is arranged in into factory building afterwards
In area 120, burnt while steam turbine subsidiary engine equipment 300 to be arranged in the vacant area 120 of factory building and deviate from positioned at Turbo-generator Set 200
110 side between burning.The 110 vacant areas 120 of factory building formed below between making burning can be so avoided to cause vacant waste or use
Rate is not high, by optimizing arrangement to each equipment, is greatly improved the utilization rate of factory building inner space, it is to avoid exist excessive
Space waste, improves its usage economy of main building.
Specifically, above-mentioned main building body 100 can be manufactured using armored concrete cast, metal framework and steel plate are spelled
Be connected into type etc., preferably using the manufacture of metal framework and steel plate splicing, with difficulty of construction is low, the manufacturing cycle is short and into
This is low, while the advantage recycled can be repeated.
In one embodiment, the main building body 100 is additionally provided with (not shown) between gas cleaning, the burning
Between be provided with waste heat boiler 400 in 110, the steam turbine subsidiary engine equipment 300 is arranged in the waste heat boiler 400 and the flue gas is net
Between between change.Thus by arrangement steam turbine subsidiary engine equipment 300 between waste heat boiler 400 and gas cleaning, it can carry significantly
Space availability ratio inside high main building body 100.Wherein, the flue gas for removing the discharge of waste heat boiler 400 is used between gas cleaning
In pernicious gas, impurity etc.;Waste heat boiler 400 is used for the heat that the high-temperature flue gas that incinerator 500 is discharged is reclaimed by heat exchange
Amount, improves the ability utilization ratio of power plant system, lifts economy.
Fig. 2 is refer to, in addition, the vacant area 120 of the factory building includes the first mounting layer 121, the steam turbine subsidiary engine equipment 300
Including oxygen-eliminating device 310 and boiler blow down flash device (not shown), the oxygen-eliminating device 310 and the boiler blow down flash device are equal
It is arranged in first mounting layer 121.The vacant area 120 of factory building can be so made full use of to be located at the sky in the region of the first mounting layer 121
Between, it is to avoid cause space waste.
Further, the steam turbine subsidiary engine equipment 300 also includes feedwater pump group 330, and the feedwater pump group 330 includes feedwater
Pump, industrial water pump and hydrophobic development unit, the vacant area 120 of factory building also include being located at the of the lower section of first mounting layer 121
Two mounting layers 122, the feed pump, the industrial water pump and the hydrophobic development unit are arranged in second mounting layer 122
And at zero meter of the lower section of the oxygen-eliminating device 310.So ensuring fully to use the vacant area 120 of factory building to be located at the second mounting layer
While the space in 122 regions, the connecting pipe length between oxygen-eliminating device 310 and feed pump can also be reduced, pipeline is reduced and damages
Consumption, reduces cost payout, improves the economy in power plant.
Further, the vacant area 120 of the factory building also includes pipe sandwich 123, and the steam turbine subsidiary engine equipment 300 is also wrapped
Heater 340 is included, the heater 340 is arranged at the pipe sandwich 123 and positioned at the oxygen-eliminating device 310 and the feed pump
Between group 330., can be with thus by arranging heater 340 at the pipe sandwich 123 between oxygen-eliminating device 310 and water pump group
The further space availability ratio in lifting factory building vacant area 120, reduction main building because space waste and caused by economic attrition.
As depicted in figs. 1 and 2, it is described to burn in addition, being additionally provided with least one incinerator 500 in 110 between the burning
The upper smoke gas of stove 500 horizontally enters into the waste heat boiler 400.The incinerator of two or more quantity is arranged while optional
500, between burning 110 inner space can not only further made full use of, the space profit of main building body 100 is improved
With efficiency, while the garbage disposal efficiency in power plant can also be greatly promoted.
On the basis of above-described embodiment, the steam turbine subsidiary engine equipment 300 also includes low-pressure heater, the low-pressure heating
Device is in layer absolute altitude with the Turbo-generator Set 200.So can be by the steam turbine subsidiary engine such as low-pressure heater equipment 300 and steamer
Generating set 200 is further distributed rationally, it is ensured that improve space availability ratio while enable power plant stablize, Effec-tive Function,
Lift each unit operation economy.
Further, 110 between the burning in be additionally provided with slag treatment equipment 600, the slag treatment equipment 600
In the lower section of the incinerator 500.110 region below incinerator 500 between burning can be so made full use of, is made after burning
Rubbish waste residue be able to reliable treatments, it is ensured that power plant has preferably slag treatment performance, it is ensured that surrounding enviroment health.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of garbage incinerating power plant main building arrangement structure, it is characterised in that including:
Main building body, between the inside of the main building body is provided with burning, it is vacant that the lower section between the burning is provided with factory building
Area;
Turbo-generator Set, the Turbo-generator Set is arranged in the vacant area of the factory building;And
Steam turbine subsidiary engine equipment, the steam turbine subsidiary engine equipment is arranged in the vacant area of the factory building and positioned at the steam turbine generator
The side that group deviates between the burning.
2. garbage incinerating power plant main building arrangement structure according to claim 1, it is characterised in that the main building sheet
Body is additionally provided between gas cleaning, is provided with waste heat boiler in the burning, the steam turbine subsidiary engine equipment is arranged in the waste heat
Between between boiler and the gas cleaning.
3. garbage incinerating power plant main building arrangement structure according to claim 1, it is characterised in that the factory building is vacant
Area includes the first mounting layer, and the steam turbine subsidiary engine equipment includes oxygen-eliminating device and boiler blow down flash device, the oxygen-eliminating device and described
Boiler blow down flash device is arranged in first mounting layer.
4. the garbage incinerating power plant main building arrangement structure according to claim 1 or 3, it is characterised in that the steam turbine
Subsidiary engine equipment also includes feedwater pump group, and the feedwater pump group includes feed pump, industrial water pump and hydrophobic development unit, and the factory building is empty
Put area also include be located at first mounting layer below the second mounting layer, the feed pump, the industrial water pump and it is described dredge
Water flash vessel is arranged in second mounting layer and at zero meter of the lower section of the oxygen-eliminating device.
5. the garbage incinerating power plant main building arrangement structure according to claim 1 or 4, it is characterised in that the factory building
Vacant area also includes pipe sandwich, and the steam turbine subsidiary engine equipment also includes heater, and the heater is arranged at the pipeline folder
Layer is simultaneously located between the oxygen-eliminating device and the feedwater pump group.
6. garbage incinerating power plant main building arrangement structure according to claim 2, it is characterised in that in the burning
At least one incinerator is additionally provided with, the upper smoke gas of the incinerator horizontally enters into the waste heat boiler.
7. garbage incinerating power plant main building arrangement structure according to claim 1, it is characterised in that the steam turbine subsidiary engine
Equipment also includes low-pressure heater, and the low-pressure heater is in layer absolute altitude with the Turbo-generator Set.
8. garbage incinerating power plant main building arrangement structure according to claim 6, it is characterised in that in the burning
Slag treatment equipment is additionally provided with, the slag treatment equipment is located at the lower section of the incinerator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710364644.2A CN107143171B (en) | 2017-05-22 | 2017-05-22 | Garbage incinerating power plant main building arrangement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710364644.2A CN107143171B (en) | 2017-05-22 | 2017-05-22 | Garbage incinerating power plant main building arrangement structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107143171A true CN107143171A (en) | 2017-09-08 |
CN107143171B CN107143171B (en) | 2019-06-28 |
Family
ID=59778529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710364644.2A Active CN107143171B (en) | 2017-05-22 | 2017-05-22 | Garbage incinerating power plant main building arrangement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143171B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086727A (en) * | 2017-12-25 | 2018-05-29 | 中国能源建设集团广东省电力设计研究院有限公司 | Waste incineration and generating electricity integrates plant layout structure |
CN110130685A (en) * | 2019-05-09 | 2019-08-16 | 山西省工业设备安装集团有限公司 | A kind of domestic garbage burning electricity generation construction techniques |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201198663Y (en) * | 2008-04-17 | 2009-02-25 | 上海电气工程设计有限公司 | Main power drive type arrangement of thermal power generation plant |
CN102677924A (en) * | 2011-03-18 | 2012-09-19 | 中国电力工程顾问集团华东电力设计院 | Main workshop provided with high-position steam turbine room and low-position steam turbine room and having deaerator and high-pressure heater in improved arrangement |
CN203487818U (en) * | 2013-08-09 | 2014-03-19 | 华能国际电力股份有限公司 | Main plant of thermal power plant |
JP2016041939A (en) * | 2015-10-20 | 2016-03-31 | 株式会社タクマ | Waste power generation system |
-
2017
- 2017-05-22 CN CN201710364644.2A patent/CN107143171B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201198663Y (en) * | 2008-04-17 | 2009-02-25 | 上海电气工程设计有限公司 | Main power drive type arrangement of thermal power generation plant |
CN102677924A (en) * | 2011-03-18 | 2012-09-19 | 中国电力工程顾问集团华东电力设计院 | Main workshop provided with high-position steam turbine room and low-position steam turbine room and having deaerator and high-pressure heater in improved arrangement |
CN203487818U (en) * | 2013-08-09 | 2014-03-19 | 华能国际电力股份有限公司 | Main plant of thermal power plant |
JP2016041939A (en) * | 2015-10-20 | 2016-03-31 | 株式会社タクマ | Waste power generation system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086727A (en) * | 2017-12-25 | 2018-05-29 | 中国能源建设集团广东省电力设计研究院有限公司 | Waste incineration and generating electricity integrates plant layout structure |
CN110130685A (en) * | 2019-05-09 | 2019-08-16 | 山西省工业设备安装集团有限公司 | A kind of domestic garbage burning electricity generation construction techniques |
Also Published As
Publication number | Publication date |
---|---|
CN107143171B (en) | 2019-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101481958B (en) | Main power zone island type arrangement of thermal power generation plant | |
CN201198663Y (en) | Main power drive type arrangement of thermal power generation plant | |
CN107143171A (en) | Garbage incinerating power plant main building arrangement structure | |
CN106089341A (en) | Strengthen the method that in many gas turbines combined cycle power plant, cold steamturbine starts | |
AU2006220355B2 (en) | Installation construction method for boiler facilities | |
CN201715490U (en) | Waste heat comprehensive recovery system of fuel gas boiler | |
CN113790456B (en) | Method and system for calculating maximum sludge blending combustion amount of coal-fired boiler | |
JP5060313B2 (en) | Operation method of waste treatment facility with power generation equipment | |
CN205172657U (en) | Double reheat ultra supercritical unit by transformation of subcritical coal -fired generating set | |
CN103712216B (en) | Mud and rubbish combine incineration thermoelectric treatment system and processing method | |
CN103790659A (en) | Gas-steam combined cycle cogeneration unit | |
CN110409878A (en) | A kind of arragement construction of nuclear power station oil or gas boiler room | |
CN211647500U (en) | Compact three-row steam turbine room structure of 660MW coal-fired generator set | |
CN210317419U (en) | Waste incineration power generation system | |
CN210035461U (en) | Garbage reheating boiler | |
CN108086727A (en) | Waste incineration and generating electricity integrates plant layout structure | |
CN210134979U (en) | Garbage power generation system with external independent reheater | |
CN215107728U (en) | Land-saving type thermal power plant | |
CN110630056A (en) | Compact three-row steam turbine room structure of 660MW coal-fired generator set | |
CN207499926U (en) | Waste incineration and generating electricity system | |
CN205878180U (en) | City domestic waste innocent treatment complete sets | |
CN205860468U (en) | A kind of stack boiler | |
Kirkman et al. | Sheffield energy recovery facility and district energy network | |
CN110513164A (en) | A kind of waste incineration and generating electricity system | |
CN212657875U (en) | Efficient pulverized coal industrial boiler adopting clean combustion of coal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |