CN107142832A - A kind of construction method of arc steel box-girder - Google Patents

A kind of construction method of arc steel box-girder Download PDF

Info

Publication number
CN107142832A
CN107142832A CN201710367005.1A CN201710367005A CN107142832A CN 107142832 A CN107142832 A CN 107142832A CN 201710367005 A CN201710367005 A CN 201710367005A CN 107142832 A CN107142832 A CN 107142832A
Authority
CN
China
Prior art keywords
girder
steel box
segment
cross beam
connecting cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710367005.1A
Other languages
Chinese (zh)
Other versions
CN107142832B (en
Inventor
李任戈
廖选茂
蔡玉龙
郑伟盛
袁晓民
金荣秋
李龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201710367005.1A priority Critical patent/CN107142832B/en
Publication of CN107142832A publication Critical patent/CN107142832A/en
Application granted granted Critical
Publication of CN107142832B publication Critical patent/CN107142832B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention is applied to the realm of building construction, there is provided a kind of construction method of arc steel box-girder, it sets the first connecting cross beam and the second connecting cross beam by elder generation at the place for needing to construct, then whole arc steel box-girder is divided into three sections, and the construction method being welded and fixed respectively with first connecting cross beam and the second connecting cross beam completes the installation of arc steel box-girder.Because arc steel box-girder is segmented welding and all in accordance with demand processing is fabricated separately in each steel box girder segment, therefore, assembly welding is more convenient, and hoisting process can reduce the input of man power and material's cost without too many crane co-operation.Simultaneously as the steel box girder segment volume after the segmentation of arc steel box-girder is relatively small, then in work progress, the site area of occupancy is relatively small, therefore does not result in traffic congestion.

Description

A kind of construction method of arc steel box-girder
Technical field
The invention belongs to the realm of building construction, more particularly to a kind of construction method of arc steel box-girder.
Background technology
In modern bridge or the work progress of expressway, the larger arc steel box-girder of build is often used, for changing Become the trend of road.
However, when the volume and weight of the arc steel box-girder used in construction is larger, then lifting construction process can be very numb It is tired., it is necessary to which many loop wheel machines coordinate many people's cooperations in hoisting process, could complete overall lifting, man power and material into This is higher.Meanwhile, in the more location of flow of the people, easily cause traffic congestion.
The content of the invention
The technical problems to be solved by the invention are a kind of construction method of arc steel box-girder of offer, it is intended to solve existing skill The problem of being unfavorable for constructing because arc steel box-girder volume weight is larger in art, and easily cause traffic congestion.
In order to solve the above technical problems, the present invention is achieved in that a kind of construction method of arc steel box-girder, including with Lower step:
Required to set the first connecting cross beam and the second connecting cross beam according to construction site;
Whole arc steel box-girder is split according to the position that first connecting cross beam and the second connecting cross beam match Into first paragraph, second segment and the 3rd section, the first paragraph, second segment and the 3rd section are divided into two segments, and each segment Individually produce making;
Two segments of the first paragraph are respectively welded to be fixed on first connecting cross beam and connected away from described second Connect the side of crossbeam;
Two segments of the second segment are respectively welded be fixed on first connecting cross beam and the second connecting cross beam it Between, and ensure that the second segment matches with the linear of first paragraph;
Described 3rd section of two segments are respectively welded to be fixed on second connecting cross beam and connected away from described first The side of crossbeam is connect, and ensures that described 3rd section matches with the linear of the second segment.
Further, it is further comprising the steps of:Some I-shapeds are welded between two segments of the first paragraph steel box-girder Steel.
Further, it is further comprising the steps of:Some I-shapeds are welded between two segments of the second segment steel box-girder Steel.
Further, it is further comprising the steps of:Some I-shapeds are welded between two segments of the 3rd section of steel box-girder Steel.
Further, it is further comprising the steps of:
Need to set eight hangers, each four hangers in two ends on the segment lifted for the first time in each section of steel box-girder;
Four hangers, each two hangers in two ends are set on the segment that second of needs of each section of steel box-girder are lifted.
Compared with prior art, beneficial effect is the present invention:A kind of construction method of arc steel box-girder of the present invention, its First connecting cross beam and the second connecting cross beam are set at the place for needing to construct by elder generation, then by whole arc steel box-girder point Into three sections, and the construction method that is welded and fixed respectively with first connecting cross beam and the second connecting cross beam completes arc-shaped steel case The installation of beam.Because arc steel box-girder is segmented welding and all in accordance with demand processing is fabricated separately in each steel box girder segment, therefore, spelling Welding equipment connects more convenient, and hoisting process is co-operated without too many crane, can reduce the input of man power and material's cost.Together When, the steel box girder segment volume after being split due to arc steel box-girder is relatively small, then in work progress, the site area phase of occupancy To smaller, therefore traffic congestion is not resulted in.
Brief description of the drawings
Fig. 1 to Fig. 8 is a kind of construction process figure of the construction method of arc steel box-girder provided in an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figures 1 to 7, it is a kind of construction method of arc steel box-girder provided in an embodiment of the present invention, Specific construction When, comprise the following steps:
S1, requires to set the first connecting cross beam 10 and the second connecting cross beam 20 according to construction site.Reference picture 1, first in institute The lower section for stating the first connecting cross beam 10 and the second connecting cross beam 20 sets support post (not shown), is then connected described first The connecting cross beam 20 of crossbeam 10 and second is separately fixed on corresponding support post.
S2, by whole arc steel box-girder according to the position matched with the connecting cross beam 20 of the first connecting cross beam 10 and second Put and be divided into first paragraph 1, second segment 2 and the 3rd section 3.Reference picture 2, the first paragraph 1, second segment 2 and the 3rd section 3 are divided into two Individual segment, and each segment individually produces making, so that it is excessive to avoid steel box girder segment volume and weight, is easy to the later stage Splicing assembling.
S3, the segment 11 and segment 12 of the first paragraph 1 are respectively welded and are fixed on first connecting cross beam 10 far From the side of second connecting cross beam 20.In reference picture 3, Specific construction engineering, 160T truck cranes are first passed through by the segment Then 11 liftings are weldingly fixed on first connecting cross beam 10 to specified station.Subsequently, by the truck crane by institute It is welded and fixed after stating the lifting of segment 12 to the position matched with the segment 11.
S4, reference picture 4 welds some I-steel 13 between the segment 11 and segment 12 of the first paragraph steel box-girder 1.It is logical Cross the relative position that some I-steel 13 fix the segment 11 and segment 12, it is ensured that the first paragraph steel box-girder 1 will not Topple.
S5, the segment 21 and segment 22 of the second segment 2 are respectively welded and are fixed on first connecting cross beam 10 and Between two connecting cross beams 20, reference picture 5, by the way of 160T truck cranes and 80T truck crane double-machine lifting cranes, by the segment 21 Lift to specified station, and solder joint so that the segment 21 matches with the linear of segment 12.Then will be described small then, Section 22 is lifted to specified station, and solder joint, the segment 22 is matched with the linear of segment 11.
S6, reference picture 6 welds some I-steel 23 between the segment 21 and segment 22 of the second segment steel box-girder 2.It is logical Cross the relative position that some I-steel 23 fix the segment 21 and segment 22, it is ensured that the second segment steel box-girder 2 will not Topple.
S7, described 3rd section 3 of segment 31 and segment 32 are respectively welded and are fixed on second connecting cross beam 20 far From the side of first connecting cross beam 20, reference picture 7, will by the way of 160T truck cranes and 80T truck crane double-machine lifting cranes The segment 31 is lifted to specified station, and solder joint so that the segment 31 matches with the linear of segment 22.Then, The segment 32 is lifted to specified station, and solder joint again, the segment 32 is matched with the linear of segment 21.
S8, reference picture 8 welds some I-steel 33 between the segment 31 and segment 32 of the 3rd section of steel box-girder 3.It is logical Cross the relative position that some I-steel 33 fix the segment 31 and segment 32, it is ensured that the second segment steel box-girder 3 will not Topple.
In embodiments of the present invention, it is necessary to be completed in the assembly of each segment when lifting the segment 11, segment 21 and segment 31 Dividing plate afterwards sets totally eight hangers, each four of two ends with web junction;Lift the segment 12, segment 22 and segment 32 When, it is necessary to which dividing plate and web junction after the completion of the splicing of each segment set totally four hangers, each two of two ends.Before lifting, Need the welding quality of inspection hanger, it is ensured that full penetration., during construction due to the danger that may be present of toppling of curved arc section A upper lifting components for curved arc section are asked to be lifted again after completing the welding of abutment joint with installation component.Meanwhile, it is tight before construction Lattice set enclosing, water code and men working warning banner board according to traffic dispersion.
In summary, the construction method of a kind of arc steel box-girder provided in an embodiment of the present invention, it is needing to apply by elder generation First connecting cross beam 10 and the second connecting cross beam 20 are set at the place of work, whole arc steel box-girder is then divided into three sections, and The construction method that is welded and fixed respectively with the connecting cross beam 20 of the first connecting cross beam 10 and second completes arc steel box-girder Install.It is therefore, assembled to weld because arc steel box-girder is segmented welding and all in accordance with demand processing is fabricated separately in each steel box girder segment Connect more convenient, hoisting process is co-operated without too many crane, can reduce the input of man power and material's cost.Meanwhile, Steel box girder segment volume after being split due to arc steel box-girder is relatively small, then in work progress, the site area of occupancy is relative It is smaller, therefore do not result in traffic congestion.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (5)

1. a kind of construction method of arc steel box-girder, it is characterised in that comprise the following steps:
Required to set the first connecting cross beam and the second connecting cross beam according to construction site;
Whole arc steel box-girder is divided into according to the position matched with first connecting cross beam and the second connecting cross beam One section, second segment and the 3rd section, the first paragraph, second segment and the 3rd section are divided into two segments, and each segment is single Solely manufacture;
Two segments of the first paragraph are respectively welded and are fixed on first connecting cross beam away from the described second connection horizontal stroke The side of beam;
Two segments of the second segment are respectively welded and are fixed between first connecting cross beam and the second connecting cross beam, and Ensure that the second segment matches with the linear of first paragraph;
Described 3rd section of two segments are respectively welded and are fixed on second connecting cross beam away from the described first connection horizontal stroke The side of beam, and ensure that described 3rd section matches with the linear of the second segment.
2. the construction method of arc steel box-girder as claimed in claim 1, it is characterised in that further comprising the steps of:Described Some I-steel are welded between two segments of first paragraph steel box-girder.
3. the construction method of arc steel box-girder as claimed in claim 2, it is characterised in that further comprising the steps of:Described Some I-steel are welded between two segments of second segment steel box-girder.
4. the construction method of arc steel box-girder as claimed in claim 3, it is characterised in that further comprising the steps of:Described Some I-steel are welded between two segments of the 3rd section of steel box-girder.
5. the construction method of the arc steel box-girder as described in any one in Claims 1-4, it is characterised in that also including with Lower step:
Need to set eight hangers, each four hangers in two ends on the segment lifted for the first time in each section of steel box-girder;
Four hangers, each two hangers in two ends are set on the segment that second of needs of each section of steel box-girder are lifted.
CN201710367005.1A 2017-05-23 2017-05-23 A kind of construction method of arc steel box-girder Active CN107142832B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710367005.1A CN107142832B (en) 2017-05-23 2017-05-23 A kind of construction method of arc steel box-girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710367005.1A CN107142832B (en) 2017-05-23 2017-05-23 A kind of construction method of arc steel box-girder

Publications (2)

Publication Number Publication Date
CN107142832A true CN107142832A (en) 2017-09-08
CN107142832B CN107142832B (en) 2019-08-13

Family

ID=59778260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710367005.1A Active CN107142832B (en) 2017-05-23 2017-05-23 A kind of construction method of arc steel box-girder

Country Status (1)

Country Link
CN (1) CN107142832B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130831A (en) * 2017-12-26 2018-06-08 中车长江车辆有限公司 A kind of assembling device and method of curve box beam
CN110315174A (en) * 2019-07-23 2019-10-11 安徽伟宏钢结构集团股份有限公司 A kind of welding method of steel plate box beam
CN111535191A (en) * 2020-05-08 2020-08-14 安徽伟宏钢结构集团股份有限公司 Construction method of arc-shaped steel box girder convenient to construct
CN112411381A (en) * 2020-10-26 2021-02-26 中交路桥建设有限公司 Construction method for erecting precast box girder of overbridge in deep cutting area

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061064A (en) * 2003-08-12 2005-03-10 Oriental Construction Co Ltd Curved road surface corresponding type box girder, and form device and manufacturing method for the same
CN101368373A (en) * 2008-09-19 2009-02-18 中铁大桥局股份有限公司 Long continuous structural steel box beam or combination box beam construction method
CN101487232A (en) * 2009-01-05 2009-07-22 广州市市政集团有限公司 Steel box girder assembling construction method
CN102182139A (en) * 2011-05-11 2011-09-14 江苏沪宁钢机股份有限公司 Three-crankcase steel connecting bridge and manufacturing method thereof
CN105970811A (en) * 2015-06-12 2016-09-28 上海绿地建设(集团)有限公司 Construction technology for elevated bridge with large-span spatial 3D-surface fish-bellied box steel structure
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061064A (en) * 2003-08-12 2005-03-10 Oriental Construction Co Ltd Curved road surface corresponding type box girder, and form device and manufacturing method for the same
CN101368373A (en) * 2008-09-19 2009-02-18 中铁大桥局股份有限公司 Long continuous structural steel box beam or combination box beam construction method
CN101487232A (en) * 2009-01-05 2009-07-22 广州市市政集团有限公司 Steel box girder assembling construction method
CN102182139A (en) * 2011-05-11 2011-09-14 江苏沪宁钢机股份有限公司 Three-crankcase steel connecting bridge and manufacturing method thereof
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN105970811A (en) * 2015-06-12 2016-09-28 上海绿地建设(集团)有限公司 Construction technology for elevated bridge with large-span spatial 3D-surface fish-bellied box steel structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵培松: "岳集互通区钢箱梁施工关键技术探讨", 《公路与汽运》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130831A (en) * 2017-12-26 2018-06-08 中车长江车辆有限公司 A kind of assembling device and method of curve box beam
CN108130831B (en) * 2017-12-26 2020-04-24 中车长江车辆有限公司 Assembling device and method for curved box-shaped beam
CN110315174A (en) * 2019-07-23 2019-10-11 安徽伟宏钢结构集团股份有限公司 A kind of welding method of steel plate box beam
CN111535191A (en) * 2020-05-08 2020-08-14 安徽伟宏钢结构集团股份有限公司 Construction method of arc-shaped steel box girder convenient to construct
CN112411381A (en) * 2020-10-26 2021-02-26 中交路桥建设有限公司 Construction method for erecting precast box girder of overbridge in deep cutting area

Also Published As

Publication number Publication date
CN107142832B (en) 2019-08-13

Similar Documents

Publication Publication Date Title
CN107142832B (en) A kind of construction method of arc steel box-girder
CN102220811B (en) Truss arching-erecting splicing method of extra-large-pan steel pipe
CN102182147B (en) Steel box girder erection method
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN109680568A (en) The linear adjustment equipment of track girder and method
CN114215170B (en) Lifting method for ultrahigh-altitude giant-suspension multilayer conjoined structure
CN105298139A (en) Modular mounting method of large space division cooling box steel structure
CN105568860B (en) A kind of Temporary Piers construction method using assembled heavy steel tube support meanss
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN108149577A (en) A kind of steel bracket system and its installation method
CN202658590U (en) Integral assembled drilling platform
CN205152802U (en) Improve structure of arched bridge strength nature skeleton building -site preparation precision
CN102635070A (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
KR101458088B1 (en) Construction method for rahmen bridge using transverse prestressed girder
CN208328662U (en) A kind of combinable folding steel truss
CN204126297U (en) A kind of temporary support of steel truss roof
CN105822066A (en) Construction method for underground large-span large-space ultrahigh non-column steel structural tube truss
CN102587287B (en) Construction method for integral lifting of single channel girders of single-span channel girder bridge
CN105442456B (en) A kind of assembled heavy steel tube support meanss
CN105350698A (en) Large-span dome installation construction method
CN205840289U (en) A kind of suspension type vertical operating platform
CN105817883B (en) Hydraulic press frame group is carried out to method using mold
JP2019056230A (en) Member replacement method for truss structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220915

Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Science And Industry Co.,Ltd.