CN107134788A - 一种光伏发电集群参与电力系统动态电压控制的方法 - Google Patents

一种光伏发电集群参与电力系统动态电压控制的方法 Download PDF

Info

Publication number
CN107134788A
CN107134788A CN201710453854.9A CN201710453854A CN107134788A CN 107134788 A CN107134788 A CN 107134788A CN 201710453854 A CN201710453854 A CN 201710453854A CN 107134788 A CN107134788 A CN 107134788A
Authority
CN
China
Prior art keywords
mrow
msubsup
msup
msub
photovoltaic generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710453854.9A
Other languages
English (en)
Other versions
CN107134788B (zh
Inventor
吴文传
张伯明
孙宏斌
许桐
王中冠
郭庆来
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201710453854.9A priority Critical patent/CN107134788B/zh
Publication of CN107134788A publication Critical patent/CN107134788A/zh
Application granted granted Critical
Publication of CN107134788B publication Critical patent/CN107134788B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Photovoltaic Devices (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

本发明涉及一种光伏发电集群参与电力系统动态电压控制的方法,属于电力系统运行和控制技术领域。首先建立光伏集群PI控制架构;集群协调层测量并网点电压、有功与无功功率完成对外等值辨识,产生光伏集群输出无功功率参考值;依照潮流线性化方法,建立各光伏发电单元无功出力分配模型,计算各单元无功出力。本方法利用发电单元逆变器的无功补偿能力,通过广域PI控制,实现光伏集群整体的电压动态无差调节,并实现发电单元间无功功率的合理分配。集群协调层通过周期性测量并网点数据完成与更新对外等值辨识,获取外部系统参数。本方法使得光伏集群对系统呈现整体的电压动态无差调节特性,合理安排各发电单元无功出力,改善电压控制的动态特性。

Description

一种光伏发电集群参与电力系统动态电压控制的方法
技术领域
本发明一种光伏发电集群参与电力系统动态电压控制的方法,属于电力系统运行和控制技术领域。
背景技术
随着人类社会的高速发展,对于能源的需求也呈现爆发式增长。但传统能源的过度消耗以及其对于环境的破坏迫使人们寻求例如太阳能这种清洁可再生的新能源作为替代形式。光伏发电近年来发展迅猛,全球光伏发电装机容量增长迅速,我国由于供需资源的地理不平衡,大规模光伏并网并不是实现就地消纳,而是从低负荷地区输送向远方负荷较重的发达地区。光伏集群可以是一个光伏电站,也可以是在配网中电气距离相近的含多个分布式光伏发电的局部配电网络及其分布式光伏发电单元。因为太阳能天然的随机性与波动性,光伏集群并网引起的无功电压问题日益突出,大规模光伏集群必须具备无功调压能力,必要时参与电力系统的无功调节。
目前,光伏集群主要采用无功补偿装置与逆变器共同协作完成集群整体对于系统的无功输出调整。但现有的逆变器控制策略大多为定功率、定功率因素、下垂控制这种较为死板的控制方式,并未充分考虑集群内部各发电单元的协作,实时电压跟踪能力也较差,方法还不够灵活,并不能完全调动每个光伏发电单元的无功调节能力,不适合实际使用中动态调压的快速与稳定要求。因此需要有一种整体协调集群内部各发电单元无功出力并能快速跟踪电压的光伏集群动态调压方法。
发明内容
本发明的目的是提出一种光伏发电集群参与电力系统动态电压控制的方法,以克服已有技术的不足之处,利用分解协调架构与通信技术,基于广域PI调节方法,满足光伏集群整体参与系统动态电压调节的目标,使其实现电压的实时无差调节,且可按照不同光伏发电单元的调节能力在发电单元之间合理分配功率,保证发电单元的安全运行,改善光伏集群动态调压性能。
本发明提出的光伏发电集群参与电力系统动态电压控制的方法,包括以下步骤:
(1)设定光伏发电集群并网点状态采样周期Tu为0.5秒,设定光伏发电集群的对外等值辨识周期Tp为10秒,记采样周期Tu中的任意时刻为的tu,记对外等值辨识周期Tp中的任意时刻为tp,初始化时,分别设tu、tp为零;
(2)采集光伏发电集群并网点的电压Uc、有功功率Pc与无功功率Qc,在每个采样周期中对上述状态变量进行一次采样,记第t个采样周期中采样得到的光伏发电集群并网点的电压为Uc t,有功功率为Pc t,无功功率为Qc t,初始化时,设t=1;
(3)对tp进行判断,若tp≥Tp,则进行步骤(4),若tp<Tp,则进行步骤(6);
(4)采用戴维南等值方法,进行光伏发电集群对外等值辨识,得到光伏发电集群外部等值电路的电阻R、电抗X和外部等值电势E,具体过程如下:
(4-1)建立光伏发电集群并网点电压与光伏发电集群外部等值电势的关系如下:
其中,R为光伏发电集群外部等值电路的电阻,X光伏发电集群外部等值电路的电抗,E为光伏发电集群外部等值电路的外部等值电势;
根据上述光伏发电集群并网点电压与光伏发电集群外部等值电势的关系,得到一个光伏发电集群并网点电压与光伏发电集群并网点有功功率和无功功率的映射关系如下:Uc=Y(Uc,Pc,Qc)
(4-2)采用最小二乘法,得到光伏发电集群进行对外等值辨识的目标函数如下:
其中,T为分析的采样点数,取值范围为6-10。
求解上述目标函数,得到光伏发电集群外部等值电路的电阻R、电抗X和外部等值电势E;
(5)将tp重新设置为零;
(6)对tu进行判断,若tu<Tu,则重复进行本步骤,直到tu≥Tu,进行步骤(7);
(7)按照如下步骤,实现光伏发电集群参与电力系统的动态电压控制:
(7-1)设定一个光伏发电集群并网点的参考电压Ur,将采集到的光伏发电集群并网点的电压Uc t与设定的参考电压Ur进行比较,得到差值ΔU=Ur-Uc t
(7-2)根据上述差值ΔU,利用下式进行比例积分计算,得到光伏发电集群并网点无功功率增量的参考值ΔQr
ΔQr=KP·ΔU+KI·∫ΔUdt
其中,Kp为比例系数,取值为10,KI为积分系数,取值为0.5;
(7-3)建立一个动态电压控制的优化模型,求解得到光伏发电集群中各光伏发电单元的无功功率改变量,过程如下:
(7-3-1)建立各光伏发电单元电压控制的目标函数如下:
其中,Uri是光伏发电集群中的第i个光伏发电单元端电压的预设值,取值为
其中,分别为第i个光伏发电单元端电压的下限和上限,Ui为经参与电力系统动态电压控制后第i个光伏发电单元的端电压,N为光伏发电集群中光伏发电单元的个数;
(7-3-2)建立光伏发电集群光伏发电单元的约束条件:
a、光伏发电集群无功功率的平衡约束:
其中,ΔQi为第i个光伏发电单元的无功功率改变量,为待求解的第i个光伏发电单元的无功功率,Qri为第i个光伏发电单元当前的无功出力;
b、光伏发电集群潮流约束:
光伏发电集群内部的潮流约束:
其中,rij为第i个光伏发电单元与第j个光伏发电单元之间的支路ij的电阻,xij为第i个光伏发电单元与第j个光伏发电单元之间的支路ij的电抗,为第i个光伏发电单元当前的端电压,为第i个光伏发电单元与第j个光伏发电单元之间的支路ij当前的有功和无功潮流,Pij和Qij为优化后第i个光伏发电单元与第j个光伏发电单元之间的支路ij的有功和无功潮流,PiG为第i个光伏发电单元的有功功率;
光伏发电集群外部的潮流约束:
c、光伏发电集群中各支路的容量约束和各发电单元的电压约束:
其中,分别为第i个光伏发电单元与第j个光伏发电单元之间的支路ij无功潮流的下限和上限;
(7-3-3)采用内点法,求解上述步骤(7-3-1)和(7-3-2)中的优化模型,得到各光伏发电单元的无功功率光伏发电集群将得到的无功功率以广播形式发送至各光伏发电单元;
(8)将tu重新设置为零,返回步骤(2),实现光伏发电集群参与电力系统的动态电压控制。
本发明提出的光伏发电集群参与电力系统动态电压控制的方法,通过广域PI控制,设计了光伏发电单元光伏集群整体参与动态调压的分解协调控制方法,通过PI控制,光伏集群能够实现电压的无差实时跟踪,动态性能优越。一方面,引入线性化技术来松弛潮流约束使得光伏集群协调层只需要进行简单的量测和计算,大大降低了其数据处理的负担,且充分考虑光伏发电单元运行约束,能够合理分配各个光伏发电单元无功出力,保证光伏集群安全稳定运行。另一方面,本方法充分利用光伏发电单元逆变器解耦控制特性,光伏发电单元通过与协调层通信获取参考无功出力参考值实现自动调节,从而使得整个光伏集群实现广域PI反馈控制。另外,光伏集群协调层还能充分利用采集数据实现对外等值辨识并定时更新,掌握外系统变化情况。
本发明方法的优点是:
1、本发明方法建立了光伏集群整体参与动态调压的广域PI控制框架,光伏集群能够实现对系统参考电压的快速跟踪与无差调节。
2、本发明方法通过线性化技术极大降低了优化问题求解难度,使得无功功率分配过程简单迅速高效。相比传统的潮流计算方法,该方法在尽量保证准确性的基础上松弛了潮流约束,使得问题求解变得非常容易。
3、本发明方法能够完成光伏集群对外等值辨识并定时更新,以保证光伏集群能及时掌握外系统状况,实现方法简单高效。
附图说明
图1是本发明提出的光伏发电集群参与电力系统动态电压控制的方法的流程框图。
图2是本发明方法中光伏发电集群与光伏发电单元的控制关系图。
具体实施方式
本发明提出的光伏发电集群参与电力系统动态电压控制的方法,其流程框图如图1所示,包括对外等值辨识流程以及基于广域PI控制的动态调压流程,两个流程均按照一定周期循环执行,由光伏集群协调控制器完成。其中动态调压流程还将通过广播通信的方式将集群协调层的信息定时发送给光伏发电单元控制器同时也接收光伏发电单元的节点测量信息,该方法具体包括以下步骤:
(1)设定光伏发电集群并网点状态采样周期Tu为0.5秒,设定光伏发电集群的对外等值辨识周期Tp为10秒,记采样周期Tu中的任意时刻为的tu,记对外等值辨识周期Tp中的任意时刻为tp,初始化时,分别设tu、tp为零;
(2)采集光伏发电集群并网点的电压Uc、有功功率Pc与无功功率Qc,在每个采样周期中对上述状态变量进行一次采样,记第t个采样周期中采样得到的光伏发电集群并网点的电压为有功功率为无功功率为初始化时,设t=1;
(3)对tp进行判断,若tp≥Tp,则进行步骤(4),若tp<Tp,则进行步骤(6);
(4)采用戴维南等值方法,进行光伏发电集群对外等值辨识,得到光伏发电集群外部等值电路的电阻R、电抗X和外部等值电势E,具体过程如下:
(4-1)建立光伏发电集群并网点电压与光伏发电集群外部等值电势的关系如下:
其中,R为光伏发电集群外部等值电路的电阻,X光伏发电集群外部等值电路的电抗,E为光伏发电集群外部等值电路的外部等值电势;
根据上述光伏发电集群并网点电压与光伏发电集群外部等值电势的关系,得到一个光伏发电集群并网点电压与光伏发电集群并网点有功功率和无功功率的映射关系如下:Uc=Y(Uc,Pc,Qc)
(4-2)采用最小二乘法,得到光伏发电集群进行对外等值辨识的目标函数如下:
其中,T为分析的采样点数,取值范围为6-10。
求解上述目标函数,得到光伏发电集群外部等值电路的电阻R、电抗X和外部等值电势E;
(5)将tp重新设置为零;
(6)对tu进行判断,若tu<Tu,则重复进行本步骤,直到tu≥Tu,进行步骤(7);
(7)按照如下步骤,实现光伏发电集群参与电力系统的动态电压控制:
(7-1)设定一个光伏发电集群并网点的参考电压Ur,将采集到的光伏发电集群并网点的电压与设定的参考电压Ur进行比较,得到差值
(7-2)根据上述差值ΔU,利用下式进行比例积分计算,得到光伏发电集群并网点无功功率增量的参考值ΔQr
ΔQr=KP·ΔU+KI·∫ΔUdt
其中,Kp为比例系数,取值为10,KI为积分系数,取值为0.5,可视实际光伏集群情况进行调节;
(7-3)建立一个动态电压控制的优化模型,求解得到光伏发电集群中各光伏发电单元的无功功率改变量,过程如下:
(7-3-1)为保证较为均匀分配各光伏发电单元承担无功出力,同时使得各光伏发电单元端电压变化较为平均,建立各光伏发电单元电压控制的目标函数如下:
其中,Uri是光伏发电集群中的第i个光伏发电单元端电压的预设值,取值为
其中,分别为第i个光伏发电单元端电压的下限和上限,Ui为经参与电力系统动态电压控制后第i个光伏发电单元的端电压,N为光伏发电集群中光伏发电单元的个数;
(7-3-2)建立光伏发电集群光伏发电单元的约束条件:
a、光伏发电集群无功功率的平衡约束:
其中,ΔQi为第i个光伏发电单元的无功功率改变量,为待求解的第i个光伏发电单元的无功功率,Qri为第i个光伏发电单元当前的无功出力;
b、光伏发电集群潮流约束:
光伏发电集群内部的潮流约束:
其中,rij为第i个光伏发电单元与第j个光伏发电单元之间的支路ij的电阻,xij为第i个光伏发电单元与第j个光伏发电单元之间的支路ij的电抗,为第i个光伏发电单元当前的端电压,为第i个光伏发电单元与第j个光伏发电单元之间的支路ij当前的有功和无功潮流,Pij和Qij为优化后第i个光伏发电单元与第j个光伏发电单元之间的支路ij的有功和无功潮流,Pi G为第i个光伏发电单元的有功功率;
光伏发电集群外部的潮流约束:
c、光伏发电集群中各支路的容量约束和各发电单元的电压约束:
其中,分别为第i个光伏发电单元与第j个光伏发电单元之间的支路ij无功潮流的下限和上限;
(7-3-3)采用内点法,求解上述步骤(7-3-1)和(7-3-2)中的优化模型,得到各光伏发电单元的无功功率光伏发电集群将得到的无功功率以广播形式发送至各光伏发电单元,光伏发电集群与光伏发电单元间的控制关系如附图2所示;
(8)将tu重新设置为零,返回步骤(2),实现光伏发电集群参与电力系统的动态电压控制。

Claims (1)

1.一种光伏发电集群参与电力系统动态电压控制的方法,其特征在于该方法包括以下步骤:
(1)设定光伏发电集群并网点状态采样周期Tu为0.5秒,设定光伏发电集群的对外等值辨识周期Tp为10秒,记采样周期Tu中的任意时刻为的tu,记对外等值辨识周期Tp中的任意时刻为tp,初始化时,分别设tu、tp为零;
(2)采集光伏发电集群并网点的电压Uc、有功功率Pc与无功功率Qc,在每个采样周期中对上述状态变量进行一次采样,记第t个采样周期中采样得到的光伏发电集群并网点的电压为Uc t,有功功率为Pc t,无功功率为Qc t,初始化时,设t=1;
(3)对tp进行判断,若tp≥Tp,则进行步骤(4),若tp<Tp,则进行步骤(6);
(4)采用戴维南等值方法,进行光伏发电集群对外等值辨识,得到光伏发电集群外部等值电路的电阻R、电抗X和外部等值电势E,具体过程如下:
(4-1)建立光伏发电集群并网点电压与光伏发电集群外部等值电势的关系如下:
<mrow> <msubsup> <mi>U</mi> <mi>c</mi> <mn>2</mn> </msubsup> <mo>=</mo> <msup> <mi>E</mi> <mn>2</mn> </msup> <mo>+</mo> <mn>2</mn> <mrow> <mo>(</mo> <msub> <mi>RP</mi> <mi>c</mi> </msub> <mo>+</mo> <msub> <mi>XQ</mi> <mi>c</mi> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mrow> <mo>(</mo> <msup> <mi>R</mi> <mn>2</mn> </msup> <mo>+</mo> <msup> <mi>X</mi> <mn>2</mn> </msup> <mo>)</mo> </mrow> <mfrac> <mrow> <msup> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mi>c</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mrow> <mo>(</mo> <msub> <mi>Q</mi> <mi>c</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> <msup> <mrow> <mo>(</mo> <msub> <mi>U</mi> <mi>c</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> </mrow>
其中,R为光伏发电集群外部等值电路的电阻,X光伏发电集群外部等值电路的电抗,E为光伏发电集群外部等值电路的外部等值电势;
根据上述光伏发电集群并网点电压与光伏发电集群外部等值电势的关系,得到一个光伏发电集群并网点电压与光伏发电集群并网点有功功率和无功功率的映射关系如下:Uc=Y(Uc,Pc,Qc)
(4-2)采用最小二乘法,得到光伏发电集群进行对外等值辨识的目标函数如下:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </mtd> <mtd> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>-</mo> <mi>T</mi> </mrow> <mi>t</mi> </munderover> <msup> <mrow> <mo>(</mo> <msup> <msub> <mi>U</mi> <mi>c</mi> </msub> <mi>t</mi> </msup> <mo>-</mo> <mi>Y</mi> <mo>(</mo> <msup> <msub> <mi>U</mi> <mi>c</mi> </msub> <mi>t</mi> </msup> <mo>,</mo> <msup> <msub> <mi>P</mi> <mi>c</mi> </msub> <mi>t</mi> </msup> <mo>,</mo> <msup> <msub> <mi>Q</mi> <mi>c</mi> </msub> <mi>t</mi> </msup> <mo>)</mo> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </mtd> </mtr> </mtable> </mfenced>
其中,T为分析的采样点数,取值范围为6-10。
求解上述目标函数,得到光伏发电集群外部等值电路的电阻R、电抗X和外部等值电势E;
(5)将tp重新设置为零;
(6)对tu进行判断,若tu<Tu,则重复进行本步骤,直到tu≥Tu,进行步骤(7);
(7)按照如下步骤,实现光伏发电集群参与电力系统的动态电压控制:
(7-1)设定一个光伏发电集群并网点的参考电压Ur,将采集到的光伏发电集群并网点的电压Uc t与设定的参考电压Ur进行比较,得到差值ΔU=Ur-Uc t
(7-2)根据上述差值ΔU,利用下式进行比例积分计算,得到光伏发电集群并网点无功功率增量的参考值ΔQr
ΔQr=KP·ΔU+KI·∫ΔUdt
其中,Kp为比例系数,取值为10,KI为积分系数,取值为0.5;
(7-3)建立一个动态电压控制的优化模型,求解得到光伏发电集群中各光伏发电单元的无功功率改变量,过程如下:
(7-3-1)建立各光伏发电单元电压控制的目标函数如下:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </mtd> <mtd> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msup> <mrow> <mo>(</mo> <msub> <mi>U</mi> <mrow> <mi>r</mi> <mi>i</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>U</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </mtd> </mtr> </mtable> </mfenced> 1
其中,Uri是光伏发电集群中的第i个光伏发电单元端电压的预设值,取值为
<mrow> <msub> <mi>U</mi> <mrow> <mi>r</mi> <mi>i</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <msubsup> <mi>U</mi> <mi>i</mi> <mi>min</mi> </msubsup> <mo>+</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mi>max</mi> </msubsup> </mrow> <mn>2</mn> </mfrac> </mrow>
其中,分别为第i个光伏发电单元端电压的下限和上限,Ui为经参与电力系统动态电压控制后第i个光伏发电单元的端电压,N为光伏发电集群中光伏发电单元的个数;
(7-3-2)建立光伏发电集群光伏发电单元的约束条件:
a、光伏发电集群无功功率的平衡约束:
<mrow> <msub> <mi>&amp;Delta;Q</mi> <mi>r</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msub> <mi>&amp;Delta;Q</mi> <mi>i</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <mrow> <mo>(</mo> <msubsup> <mi>Q</mi> <mi>i</mi> <mi>G</mi> </msubsup> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>r</mi> <mi>i</mi> </mrow> </msub> <mo>)</mo> </mrow> </mrow>
其中,ΔQi为第i个光伏发电单元的无功功率改变量,为待求解的第i个光伏发电单元的无功功率,Qri为第i个光伏发电单元当前的无功出力;
b、光伏发电集群潮流约束:
光伏发电集群内部的潮流约束:
<mrow> <msubsup> <mi>U</mi> <mi>i</mi> <mn>2</mn> </msubsup> <mo>-</mo> <msubsup> <mi>U</mi> <mi>j</mi> <mn>2</mn> </msubsup> <mo>=</mo> <mn>2</mn> <mo>&amp;lsqb;</mo> <msub> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <mfrac> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mrow> <mo>(</mo> <msubsup> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>x</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>2</mn> </msubsup> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mn>2</mn> <mo>&amp;lsqb;</mo> <msub> <mi>x</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <mfrac> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mrow> <mo>(</mo> <msubsup> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>x</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>2</mn> </msubsup> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mfrac> <mrow> <mo>(</mo> <msubsup> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>x</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>2</mn> </msubsup> <mo>)</mo> <mo>&amp;lsqb;</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;rsqb;</mo> </mrow> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> </mrow>
<mrow> <mo>&amp;lsqb;</mo> <mn>1</mn> <mo>-</mo> <mn>2</mn> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mo>&amp;lsqb;</mo> <mn>1</mn> <mo>-</mo> <mn>2</mn> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mo>&amp;lsqb;</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>=</mo> <munder> <mi>&amp;Sigma;</mi> <mrow> <mi>k</mi> <mo>&amp;Element;</mo> <mi>j</mi> </mrow> </munder> <msub> <mi>P</mi> <mrow> <mi>j</mi> <mi>k</mi> </mrow> </msub> <mo>-</mo> <msubsup> <mi>P</mi> <mi>j</mi> <mi>G</mi> </msubsup> </mrow>
<mrow> <mo>&amp;lsqb;</mo> <mn>1</mn> <mo>-</mo> <mn>2</mn> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>x</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mo>&amp;lsqb;</mo> <mn>1</mn> <mo>-</mo> <mn>2</mn> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>x</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <mo>&amp;lsqb;</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>P</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>r</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mn>0</mn> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mo>=</mo> <munder> <mi>&amp;Sigma;</mi> <mrow> <mi>k</mi> <mo>&amp;Element;</mo> <mi>j</mi> </mrow> </munder> <msub> <mi>Q</mi> <mrow> <mi>j</mi> <mi>k</mi> </mrow> </msub> <mo>-</mo> <msubsup> <mi>Q</mi> <mi>j</mi> <mi>G</mi> </msubsup> </mrow>
其中,rij为第i个光伏发电单元与第j个光伏发电单元之间的支路ij的电阻,xij为第i个光伏发电单元与第j个光伏发电单元之间的支路ij的电抗,为第i个光伏发电单元当前的端电压,为第i个光伏发电单元与第j个光伏发电单元之间的支路ij当前的有功和无功潮流,Pij和Qij为优化后第i个光伏发电单元与第j个光伏发电单元之间的支路ij的有功和无功潮流,Pi G为第i个光伏发电单元的有功功率;
光伏发电集群外部的潮流约束:
<mrow> <msup> <msub> <mi>U</mi> <mi>c</mi> </msub> <mn>2</mn> </msup> <mo>-</mo> <msup> <mi>E</mi> <mn>2</mn> </msup> <mo>=</mo> <mn>2</mn> <mo>&amp;lsqb;</mo> <mi>R</mi> <mo>-</mo> <mfrac> <msubsup> <mi>P</mi> <mi>c</mi> <mi>t</mi> </msubsup> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>c</mi> <mi>t</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mrow> <mo>(</mo> <msup> <mi>R</mi> <mn>2</mn> </msup> <mo>+</mo> <msup> <mi>X</mi> <mn>2</mn> </msup> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mi>c</mi> </msub> <mo>+</mo> <mn>2</mn> <mo>&amp;lsqb;</mo> <mi>X</mi> <mo>-</mo> <mfrac> <msubsup> <mi>Q</mi> <mi>c</mi> <mi>t</mi> </msubsup> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>c</mi> <mi>t</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> <mrow> <mo>(</mo> <msup> <mi>R</mi> <mn>2</mn> </msup> <mo>+</mo> <msup> <mi>X</mi> <mn>2</mn> </msup> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msub> <mi>Q</mi> <mi>c</mi> </msub> <mo>+</mo> <mfrac> <mrow> <mo>(</mo> <msup> <mi>R</mi> <mn>2</mn> </msup> <mo>+</mo> <msup> <mi>X</mi> <mn>2</mn> </msup> <mo>)</mo> <mo>&amp;lsqb;</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>P</mi> <mi>c</mi> <mi>t</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>Q</mi> <mi>c</mi> <mi>t</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;rsqb;</mo> </mrow> <msup> <mrow> <mo>(</mo> <msubsup> <mi>U</mi> <mi>c</mi> <mi>t</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mfrac> </mrow>
c、光伏发电集群中各支路的容量约束和各发电单元的电压约束:
<mrow> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msubsup> <mo>&amp;le;</mo> <msub> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mi>max</mi> </msubsup> </mrow>
<mrow> <msubsup> <mi>U</mi> <mi>i</mi> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>U</mi> <mi>i</mi> </msub> <mo>&amp;le;</mo> <msubsup> <mi>U</mi> <mi>i</mi> <mi>max</mi> </msubsup> </mrow>
其中,分别为第i个光伏发电单元与第j个光伏发电单元之间的支路ij无功潮流的下限和上限;
(7-3-3)采用内点法,求解上述步骤(7-3-1)和(7-3-2)中的优化模型,得到各光伏发电单元的无功功率光伏发电集群将得到的无功功率以广播形式发送至各光伏发电单元;
(8)将tu重新设置为零,返回步骤(2),实现光伏发电集群参与电力系统的动态电压控制。
CN201710453854.9A 2017-06-15 2017-06-15 一种光伏发电集群参与电力系统动态电压控制的方法 Active CN107134788B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710453854.9A CN107134788B (zh) 2017-06-15 2017-06-15 一种光伏发电集群参与电力系统动态电压控制的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710453854.9A CN107134788B (zh) 2017-06-15 2017-06-15 一种光伏发电集群参与电力系统动态电压控制的方法

Publications (2)

Publication Number Publication Date
CN107134788A true CN107134788A (zh) 2017-09-05
CN107134788B CN107134788B (zh) 2019-09-27

Family

ID=59734734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710453854.9A Active CN107134788B (zh) 2017-06-15 2017-06-15 一种光伏发电集群参与电力系统动态电压控制的方法

Country Status (1)

Country Link
CN (1) CN107134788B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111463798A (zh) * 2020-04-08 2020-07-28 长园深瑞继保自动化有限公司 用于储能协调控制装置的电网电压模糊控制方法
CN112965060A (zh) * 2021-02-19 2021-06-15 加特兰微电子科技(上海)有限公司 生命特征参数的检测方法、装置和检测体征点的方法
CN115173485A (zh) * 2022-07-07 2022-10-11 中国三峡新能源(集团)股份有限公司 一种光伏电站内部多源无功最优分配方法及装置
CN116826788A (zh) * 2023-08-30 2023-09-29 东方电气集团科学技术研究院有限公司 一种光伏发电主动支撑集群构建及控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3460446B2 (ja) * 1996-05-10 2003-10-27 株式会社明電舎 系統連系用インバータの単独運転検出方式
CN102280892A (zh) * 2011-08-01 2011-12-14 湖南师范大学 分布式电力无功优化的实时控制设备和方法
CN102868167A (zh) * 2012-09-11 2013-01-09 南京中德保护控制系统有限公司 光伏电站无功电压控制方法
CN104767221A (zh) * 2015-04-21 2015-07-08 国家电网公司 一种基于逆变器功率协调控制的电压调节方法
CN106058887A (zh) * 2016-07-08 2016-10-26 燕山大学 提高含分布式光伏电源配电网电压合格率的无功优化方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3460446B2 (ja) * 1996-05-10 2003-10-27 株式会社明電舎 系統連系用インバータの単独運転検出方式
CN102280892A (zh) * 2011-08-01 2011-12-14 湖南师范大学 分布式电力无功优化的实时控制设备和方法
CN102868167A (zh) * 2012-09-11 2013-01-09 南京中德保护控制系统有限公司 光伏电站无功电压控制方法
CN104767221A (zh) * 2015-04-21 2015-07-08 国家电网公司 一种基于逆变器功率协调控制的电压调节方法
CN106058887A (zh) * 2016-07-08 2016-10-26 燕山大学 提高含分布式光伏电源配电网电压合格率的无功优化方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方景辉 等: "分布式光伏就地自适应电压控制策略研究", 《电力系统保护与控制》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111463798A (zh) * 2020-04-08 2020-07-28 长园深瑞继保自动化有限公司 用于储能协调控制装置的电网电压模糊控制方法
CN111463798B (zh) * 2020-04-08 2024-02-13 长园深瑞继保自动化有限公司 用于储能协调控制装置的电网电压模糊控制方法
CN112965060A (zh) * 2021-02-19 2021-06-15 加特兰微电子科技(上海)有限公司 生命特征参数的检测方法、装置和检测体征点的方法
CN115173485A (zh) * 2022-07-07 2022-10-11 中国三峡新能源(集团)股份有限公司 一种光伏电站内部多源无功最优分配方法及装置
CN115173485B (zh) * 2022-07-07 2023-02-28 中国三峡新能源(集团)股份有限公司 一种光伏电站内部多源无功最优分配方法及装置
CN116826788A (zh) * 2023-08-30 2023-09-29 东方电气集团科学技术研究院有限公司 一种光伏发电主动支撑集群构建及控制方法
CN116826788B (zh) * 2023-08-30 2024-01-05 东方电气集团科学技术研究院有限公司 一种光伏发电主动支撑集群构建及控制方法

Also Published As

Publication number Publication date
CN107134788B (zh) 2019-09-27

Similar Documents

Publication Publication Date Title
CN105140936B (zh) 一种最小化发电成本的微电网调频控制方法
CN103199542B (zh) 一种风电场无功电压优化控制方法
CN107134788A (zh) 一种光伏发电集群参与电力系统动态电压控制的方法
CN105811407B (zh) 一种基于分布式牛顿法的微电网一次调频控制方法
CN103715719B (zh) 一种适用于电力系统全过程动态仿真的光伏模型建模方法
CN103715700B (zh) 适用于风电场并网点电压控制的无功控制系统及控制方法
CN102570471B (zh) 多无功源分层协调的风电场电压控制方法
CN106921164B (zh) 配网电压无功协同优化的混合整数二阶锥规划方法与系统
CN106549392B (zh) 一种配电网协调控制方法
CN105322535B (zh) 含统一潮流控制器的电力系统两阶段最优潮流计算方法
CN103944172B (zh) 一种光伏电站无功电压控制方法
CN106877338A (zh) 含高密度间歇性能源的交直流微电网不确定优化运行方法
CN106992526A (zh) 一种分层分布式的光伏接入配电网电压控制系统及方法
CN104037805B (zh) 一种计及电网安全约束的光伏电站可发电裕度分配方法
CN105262098B (zh) 基于风电场发电功率波动评估的敏捷自动电压控制方法
CN107947192A (zh) 一种下垂控制型孤岛微电网的无功优化配置方法
CN104638643A (zh) 一种对电力系统微电网的全分布式二次调频方法
CN102684201A (zh) 一种基于电压越限概率的含风电场电网无功优化方法
CN106712058A (zh) 双馈风机风电场参与电力系统一次调频的协调控制方法
CN102902298B (zh) 基于分段模型的光伏阵列 mppt 控制器及控制方法
CN104362650B (zh) 一种考虑成本因素的电力系统无功优化方法
CN105162129B (zh) 计及分布式电源最优配置的配网无功电压控制方法
CN104269855B (zh) 一种适应多种能源接入的站点无功电压快速调节方法
CN103227508A (zh) 风光储综合控制系统和方法
CN107196343A (zh) 一种多端柔性直流孤岛电网送端的日前电压计划生成方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170905

Assignee: Nanjing ruiqinglian Technology Co.,Ltd.

Assignor: TSINGHUA University

Contract record no.: X2023990000385

Denomination of invention: A Method for Participating in Dynamic Voltage Control of Power Systems in Photovoltaic Power Generation Clusters

Granted publication date: 20190927

License type: Common License

Record date: 20230412

EE01 Entry into force of recordation of patent licensing contract