CN107130686B - Prefabrication and assembly construction column foundation anchor bar accurate positioning method - Google Patents

Prefabrication and assembly construction column foundation anchor bar accurate positioning method Download PDF

Info

Publication number
CN107130686B
CN107130686B CN201710461994.0A CN201710461994A CN107130686B CN 107130686 B CN107130686 B CN 107130686B CN 201710461994 A CN201710461994 A CN 201710461994A CN 107130686 B CN107130686 B CN 107130686B
Authority
CN
China
Prior art keywords
column
bracket
bar
steel
anchor bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710461994.0A
Other languages
Chinese (zh)
Other versions
CN107130686A (en
Inventor
顾彦杰
刘松涛
唐士飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201710461994.0A priority Critical patent/CN107130686B/en
Publication of CN107130686A publication Critical patent/CN107130686A/en
Application granted granted Critical
Publication of CN107130686B publication Critical patent/CN107130686B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of prefabrication and assembly construction column foundation anchor bar accurate positioning methods, and including forming a pit for bed course 300 ~ 350mm of sinking of pre- buried column anchor bar corresponding position, hole bottom side length is 500mm bigger than pillar side length;Pour after bed course the pop-up column reinforcing bar sideline on blinding concrete;Bracket is fixed temporarily using pre- buried column anchor bar, is located in reinforcing bar within the scope of corresponding column muscle sideline by adjusting backing positions;Bracket will be fixed temporarily and pit side bed course is shored securely, and the verticality of stake muscle can be adjusted by hound;Pit inner concrete is poured in advance, is allowed to design bed course either flush with former, after waiting the part concrete to have some strength, dismounting is fixed temporarily bracket;Sole plate reinforcing bar is completed in binding, installs steel bar positioning plate again, and install sole plate groove template;Base concrete pours completion and removes groove template after reaching some strength.The present invention is easy for construction, it is ensured that registration.

Description

Prefabrication and assembly construction column foundation anchor bar accurate positioning method
Technical field
The present invention relates to a kind of prefabrication and assembly construction column foundation anchor bar accurate positioning methods.
Background technique
In prefabricated assembled concrete structure, large scale prefabricated concrete column connect with basis and is typically employed in base concrete In pre-buried anchor bar, specification, quantity, relative position and precast concrete column bottom preset reinforcing bar slurry anchor connection sleeve phase Match, and only anchor bar diameter more reserved than basis is 14 ~ 17mm big in the aperture of the reserved slurry anchor sleeve in prefabricated post, reserves anchoring steel It is 8d+20mm(d bar diameter that muscle, which stretches out basic end face length), about 16 ~ 32 reinforcing bar slurry anchor connections in a prefabricated post The pre-buried anchor bar of sleeve and basis corresponds, when the deviation for wherein having 1 pile foundation anchor bar is more than 7mm, then entire column It will be unable to install, this is very high to the position accuracy of the pre-buried anchor bar in basis, significantly larger than normal concrete structural steel The pre-buried required precision of muscle.
The current country is greatly developing building industry modernization, wherein the design of prefabricated assembled concrete structure with apply Work technology is gradually popularized.Statistics indicate that, pre-buried dowel is inclined in basis according to the engineering sounding for having completion Rate is about 0.5% ~ 0.8% by the deviation ratio that the reinforcing bar radical in column calculates, but is about 20% ~ 25% based on the number of pillar, by This causes a large amount of prefabricated posts that can not be mounted directly, and needs to take other corrections or reinforcement measure, cause huge economic loss and Construction delay, and construction quality is also by a degree of damage.
It can be seen that in prefabricated assembled concrete structure construction, to pre-buried anchor of the precast concrete column in basis Gu the accuracy of reinforcement location will influence construction quality, construction speed, the key factor of construction cost.How to improve pre-buried The accuracy of anchor bar position is the key link of this technology research.
Summary of the invention
The purpose of the present invention is to provide a kind of easy for construction, the prefabrication and assembly construction column foundation anchor bar of registration is accurate Localization method.
The technical solution of the invention is as follows:
A kind of prefabrication and assembly construction column foundation anchor bar accurate positioning method, it is characterized in that: including the following steps:
1) by bed course 300 ~ 350mm of sinking of pre- buried column anchor bar corresponding position, a pit is formed, bottom side length ratio is cheated The big 500mm of pillar side length;Pour after bed course the pop-up column reinforcing bar sideline on blinding concrete;
2) bracket is fixed temporarily using pre- buried column anchor bar, first installation is fixed temporarily bracket, by adjusting backing positions It is located in reinforcing bar within the scope of corresponding column muscle sideline;
3) it is fixed temporarily branch and sets up two pieces of positioning plates up and down, positioning plate is by the periphery 65*4 steel plate and 4 thick core steel plate bolts Connect integral, periphery steel plate opens up semi-circular recesses mouth according to bar diameter, quantity, position, groove port diameter and column reinforcing bar Diameter is consistent, and groove port relative position and prefabricated column bottom reserved steel bar slurry are anchored head bore position consistency;It is positioned at upper and lower two pieces It is allowed to be linked to be entirety using 4 Ф 48*3 steel-pipe weldings between plate core steel plate;It is bolted and faces in the middle part of 2 crossbeam channel steels When fixed bracket, both ends are supported on pit upper brim concrete cushion by adjustable bolt;Crossbeam channel steel and pit slope It is supported between surface concrete bed course using adjustable bolt, for adjusting fixed cross beam left-right position and levelness;Locating support Front and rear sides respectively set one with the hound for adjusting bolt, adjust stationary positioned bracket front-rear position and verticality;Pre- buried column anchor Gu setting U-shaped card between reinforcing bar and upper and lower two pieces of positioning plates fixes or directlys adopt iron wire binding;
4) bracket will be fixed temporarily and pit side bed course is shored securely, and the verticality of stake muscle can be adjusted by hound;
5) pit inner concrete is poured in advance, is allowed to design bed course either flush with former, waits the part concrete that there is C10 After the above intensity, dismounting is fixed temporarily bracket;
6) sole plate reinforcing bar is completed in binding, installs steel bar positioning plate again, and install sole plate groove template, simultaneously The positioning precision of the pre-buried anchor bar of column is checked with shaper;
7) base concrete pours completion and removes groove template after reaching some strength.
The reserved anchor in basis is checked using shaper in advance after step (7) remove groove template, before hoisting prefabricated column The accuracy of muscle joint location carries out prefabricated post lifting after meeting the requirements.
The shaper includes bottom plate, setting and slurry anchor sleeve diameter reserved in prefabricated post and spread pattern phase on bottom plate Same steel pipe.
It is fixed temporarily bracket first to form in level land over-assemble, lifting is in place, adjusts and fixes bracket by adjusting bolt, make It positions correct and secured.
The present invention is easy for construction, it is ensured that registration.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is to be fixed temporarily bracket to install status diagram.
Fig. 2 is the A-A view of Fig. 1.
Fig. 3 is the B-B view of Fig. 1.
Fig. 4 is shaper structural schematic diagram.
Specific embodiment
A kind of prefabrication and assembly construction column foundation anchor bar accurate positioning method, including the following steps:
1) by the 300 ~ 350mm of sinking of bed course 8 of pre- buried column anchor bar corresponding position, a pit is formed, bottom side length is cheated It is 500mm bigger than pillar side length;Pour after bed course the pop-up column reinforcing bar sideline on blinding concrete;
2) bracket is fixed temporarily using pre- buried column anchor bar, first installation is fixed temporarily bracket, by adjusting backing positions It is located in reinforcing bar within the scope of corresponding column muscle sideline;
3) it is fixed temporarily branch and sets up two pieces of positioning plates 1,2 up and down, positioning plate is by the periphery 65*4 steel plate and 4 thick core steel plate spiral shells It tethers and is connected into entirety, periphery steel plate opens up semi-circular recesses mouth, groove port diameter and column steel according to bar diameter, quantity, position Muscle diameter is consistent, and groove port relative position and prefabricated column bottom reserved steel bar slurry are anchored head bore position consistency;It is fixed at upper and lower two pieces It is allowed to be linked to be entirety using 4 Ф 48*3 steel-pipe weldings between the plate core steel plate of position;It is bolted in the middle part of 2 crossbeam channel steels It is fixed temporarily bracket, both ends are supported on pit upper brim concrete cushion by adjustable bolt 3;Crossbeam channel steel and pit are oblique Using adjustable bolt support 4 between slope concrete bed course, for adjusting fixed cross beam left-right position and levelness;Positioning branch Frame front and rear sides respectively set one with the hound 5 for adjusting bolt, adjust stationary positioned bracket front-rear position and verticality;Pre- buried column U-shaped card is set between anchor bar and upper and lower two pieces of positioning plates fixes or directly adopt iron wire binding;
4) bracket will be fixed temporarily and pit side bed course is shored securely, and the verticality of stake muscle can be adjusted by hound;
5) pit inner concrete is poured in advance, is allowed to design bed course either flush with former, waits the part concrete that there is C10 After the above intensity, dismounting is fixed temporarily bracket;
6) sole plate reinforcing bar is completed in binding, installs steel bar positioning plate again, and install sole plate groove template, simultaneously The positioning precision of the pre-buried anchor bar of column is checked with shaper;
7) base concrete pours completion and removes groove template after reaching some strength.
The reserved anchor in basis is checked using shaper in advance after step (7) remove groove template, before hoisting prefabricated column The accuracy of muscle joint location carries out prefabricated post lifting after meeting the requirements.
The shaper includes bottom plate 6, setting and slurry anchor sleeve diameter reserved in prefabricated post and spread pattern on bottom plate Identical steel pipe 7.
It is fixed temporarily bracket first to form in level land over-assemble, lifting is in place, adjusts and fixes bracket by adjusting bolt, make It positions correct and secured.

Claims (4)

1. a kind of prefabrication and assembly construction column foundation anchor bar accurate positioning method, it is characterized in that: including the following steps:
1) by bed course 300 ~ 350mm of sinking of pre- buried column anchor bar corresponding position, a pit is formed, hole bottom side length compares pillar The big 500mm of side length;Pour after bed course the pop-up column reinforcing bar sideline on blinding concrete;
2) bracket is fixed temporarily using pre- buried column anchor bar, first installation is fixed temporarily bracket, makes steel by adjusting backing positions Muscle is located within the scope of corresponding column muscle sideline;
3) it is fixed temporarily branch and sets up two pieces of positioning plates up and down, positioning plate is bolted by the periphery 65*4 steel plate and 4 thick core steel plates Integral, periphery steel plate opens up semi-circular recesses mouth, groove port diameter and column bar diameter according to bar diameter, quantity, position Unanimously, groove port relative position and prefabricated column bottom reserved steel bar slurry are anchored head bore position consistency;In upper and lower two pieces of positioning plate core It is allowed to be linked to be entirety using 4 Ф 48*3 steel-pipe weldings between core steel plate;It is bolted in the middle part of 2 crossbeam channel steels interim solid Fixed rack, both ends are supported on pit upper brim concrete cushion by adjustable bolt;Crossbeam channel steel and pit slope are mixed It is supported between solidifying soil padding using adjustable bolt, for adjusting fixed cross beam left-right position and levelness;Before and after locating support Two sides respectively set one with the hound for adjusting bolt, adjust stationary positioned bracket front-rear position and verticality;Pre- buried column anchors steel U-shaped card is set between muscle and upper and lower two pieces of positioning plates fixes or directly adopt iron wire binding;
4) bracket will be fixed temporarily and pit side bed course is shored securely, and the verticality of stake muscle can be adjusted by hound;
5) pit inner concrete is poured in advance, is allowed to design bed course either flush with former, waits the part concrete that there is C10 or more After intensity, dismounting is fixed temporarily bracket;
6) sole plate reinforcing bar is completed in binding, installs steel bar positioning plate again, and install sole plate groove template, while with calmly Pattern tool checks the positioning precision of the pre-buried anchor bar of column;
7) base concrete pours completion and removes groove template after reaching some strength.
2. prefabrication and assembly construction column foundation anchor bar accurate positioning method according to claim 1, it is characterized in that: in step (7) essence of basic reserved dowel joint location is checked after dismounting groove template, before hoisting prefabricated column using shaper in advance Exactness carries out prefabricated post lifting after meeting the requirements.
3. prefabrication and assembly construction column foundation anchor bar accurate positioning method according to claim 2, it is characterized in that: the sizing Mold includes bottom plate, setting steel pipe identical with slurry anchor sleeve diameter reserved in prefabricated post and spread pattern on bottom plate.
4. prefabrication and assembly construction column foundation anchor bar accurate positioning method according to claim 1,2 or 3, it is characterized in that: facing When fixed bracket first formed in level land over-assemble, lifting is in place, adjust and fix bracket by adjusting bolt, position it correctly And securely.
CN201710461994.0A 2017-06-19 2017-06-19 Prefabrication and assembly construction column foundation anchor bar accurate positioning method Active CN107130686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710461994.0A CN107130686B (en) 2017-06-19 2017-06-19 Prefabrication and assembly construction column foundation anchor bar accurate positioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710461994.0A CN107130686B (en) 2017-06-19 2017-06-19 Prefabrication and assembly construction column foundation anchor bar accurate positioning method

Publications (2)

Publication Number Publication Date
CN107130686A CN107130686A (en) 2017-09-05
CN107130686B true CN107130686B (en) 2019-03-05

Family

ID=59735301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710461994.0A Active CN107130686B (en) 2017-06-19 2017-06-19 Prefabrication and assembly construction column foundation anchor bar accurate positioning method

Country Status (1)

Country Link
CN (1) CN107130686B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779320A (en) * 2020-07-27 2020-10-16 邓得文 Prefabricated installation anchoring system and method for highway toll island

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978713B (en) * 2018-08-27 2023-12-15 江苏船谷重工有限公司 Factory prefabricated elevator shaft pit and installation method thereof
CN109403552B (en) * 2018-12-21 2023-05-26 北京城建北方集团有限公司 Tool type wall steel bar positioning frame
CN109853610A (en) * 2019-01-30 2019-06-07 山西三建集团有限公司 Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN111809653A (en) * 2020-07-06 2020-10-23 中建八局第三建设有限公司 High-precision regularization installation method for foundation embedded part of special amusement equipment
CN112695798A (en) * 2020-12-26 2021-04-23 山东齐星建筑有限公司 Large-scale equipment anchor plate and protective pipe mounting structure and method
CN113700028A (en) * 2021-08-27 2021-11-26 上海市基础工程集团有限公司 Movable reusable support foundation structure for mounting prefabricated parts of viaduct bridge
CN114635446B (en) * 2022-03-23 2023-12-19 中国华电科工集团有限公司 Installation method of large steel cylinder annular foundation
CN114809672A (en) * 2022-05-06 2022-07-29 山西三建集团有限公司 Accurate positioning method for steel beam connection embedded bottom plate of frame structure factory building
CN114718077B (en) * 2022-06-07 2022-08-09 中国二十二冶集团有限公司 Cushion layer construction method for foundation pit slope
CN117005621B (en) * 2023-09-19 2024-02-06 中铁四局集团有限公司 Prefabricated wallboard reinforcing steel bar auxiliary positioning device and application method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7823348B1 (en) * 2007-09-20 2010-11-02 Manuel Leiva Device and method for the support of both steel and precast concrete wall posts for installation
JP2011149181A (en) * 2010-01-20 2011-08-04 Kumagai Gumi Co Ltd Method for constructing monopile foundation
CN202577336U (en) * 2011-12-20 2012-12-05 北京建工四建工程建设有限公司 Positioner for square column foundation bolts
CN104032894A (en) * 2014-06-18 2014-09-10 中国建筑第八工程局有限公司 Framework post root structure and generating method of framework post root structure
CN206052765U (en) * 2016-09-14 2017-03-29 中建七局安装工程有限公司 A kind of streetlamp foundation positions instrument

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7823348B1 (en) * 2007-09-20 2010-11-02 Manuel Leiva Device and method for the support of both steel and precast concrete wall posts for installation
JP2011149181A (en) * 2010-01-20 2011-08-04 Kumagai Gumi Co Ltd Method for constructing monopile foundation
CN202577336U (en) * 2011-12-20 2012-12-05 北京建工四建工程建设有限公司 Positioner for square column foundation bolts
CN104032894A (en) * 2014-06-18 2014-09-10 中国建筑第八工程局有限公司 Framework post root structure and generating method of framework post root structure
CN206052765U (en) * 2016-09-14 2017-03-29 中建七局安装工程有限公司 A kind of streetlamp foundation positions instrument

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779320A (en) * 2020-07-27 2020-10-16 邓得文 Prefabricated installation anchoring system and method for highway toll island

Also Published As

Publication number Publication date
CN107130686A (en) 2017-09-05

Similar Documents

Publication Publication Date Title
CN107130686B (en) Prefabrication and assembly construction column foundation anchor bar accurate positioning method
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
JP6061154B2 (en) Foundation systems for bridges and other structures
CN106012851B (en) Steel box-girder and performance of concrete column confined method for synchronously constructing
JP5045214B2 (en) Column head construction method
CN108222046A (en) A kind of method of construction of prefabricated isolated footing
CN103866982B (en) A kind of petal art framework construction method
CN209652963U (en) Mold for assembly concrete hypogee sole plate
CN216787957U (en) Column type inspection pit cast-in-place concrete track stand column
CN110409320A (en) A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope
CN114439291B (en) Column type inspection pit cast-in-place concrete track column and construction method
CN214245823U (en) Advance through structure of new and old structure girder on two sides of mid-partition wall
CN206903062U (en) A kind of open tubular column with fore-set
CN110004939A (en) A kind of device and construction method applied to foundation pit support replacement
CN112096096B (en) Positioning device for embedded steel plate and construction method thereof
CN114809673A (en) Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN107476336A (en) A kind of steel pipe column positioning construction method
CN210684479U (en) Concrete cast-in-place support of adjustable slope
CN210238447U (en) Steel dam supporting hinged support
CN106930297B (en) Foundation pit steel support bracket pre-embedding device and construction method
CN106930406A (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
CN109183623B (en) Precast beam bottom longitudinal slope construction method and device thereof
CN209162874U (en) A kind of basis prefabricated post and foundation structure
CN210420851U (en) Bridge bearing pad stone anchor bolt hole positioning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant