CN206052765U - A kind of streetlamp foundation positions instrument - Google Patents

A kind of streetlamp foundation positions instrument Download PDF

Info

Publication number
CN206052765U
CN206052765U CN201621054801.7U CN201621054801U CN206052765U CN 206052765 U CN206052765 U CN 206052765U CN 201621054801 U CN201621054801 U CN 201621054801U CN 206052765 U CN206052765 U CN 206052765U
Authority
CN
China
Prior art keywords
scale
connector
angle steel
bolt
streetlamp foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621054801.7U
Other languages
Chinese (zh)
Inventor
穆庄庄
陈培真
马东旭
韩魁
蔡朝阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority to CN201621054801.7U priority Critical patent/CN206052765U/en
Application granted granted Critical
Publication of CN206052765U publication Critical patent/CN206052765U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model proposes a kind of streetlamp foundation positions instrument, in solving the problems, such as prior art, streetlamp foundation is accurately positioned.This utility model includes least one set Position Scale, and every group of described Position Scale includes angle steel scale, and angle steel scale is provided with scale, some connectors are provided with angle steel scale, and connector is connected with platform, and platform has steel reinforcement cage.This utility model has the advantages that:Instrument is positioned by streetlamp foundation, on the basis of the kerbstone of greenbelt both sides, street lamp steel reinforcement cage is accurately positioned, be can be good at ensureing the installation site of street lamp, reach installation effect attractive in appearance, neat.

Description

A kind of streetlamp foundation positions instrument
Technical field
This utility model is related to the installation of street lamp, particularly relates to a kind of streetlamp foundation positioning instrument.
Background technology
Light pole is determined by streetlamp foundation reinforcing bar cage location by pre-buried bolt connection, i.e. street lamp position with streetlamp foundation It is fixed.It is located at town road street lamp in the greenbelt of side point more, comes true frequently with distance of the tape measure steel reinforcement cage away from greenbelt kerbstone Determine the lateral attitude of steel reinforcement cage, but cannot fix after steel reinforcement cage is put in foundation ditch, steel reinforcement cage holds during casting concrete, when vibrating Easily deviate original position, cause street lamp to install rear whole structure unsightly.
Utility model content
The utility model proposes a kind of streetlamp foundation positions instrument, solve what streetlamp foundation in prior art was accurately positioned Problem.
What the technical solution of the utility model was realized in:A kind of streetlamp foundation positions instrument, including least one set is determined Position scale, every group of described Position Scale include angle steel scale, and angle steel scale is provided with scale, is provided with some on angle steel scale Connector, connector are connected with platform, and platform has steel reinforcement cage.
Described streetlamp foundation positioning instrument includes that two groups use cooperatively and horizontally disposed Position Scale.
Two groups of described Position Scales are parallel to each other.
End face and the end face being disposed vertically that described angle steel scale includes horizontal positioned, are provided with the end face of horizontal positioned Bolt groove, angle steel scale are coordinated by bolt groove, bolt and greenbelt both sides kerbstone, the end face being disposed vertically On be provided with connector groove, angle steel scale is by the connection of connector groove, bolt and connector.
Described connector is L-type connector, is provided with and is connected what is be engaged with angle steel scale on an end face of connector Bolt hole, is provided with another end face of connector and is connected the bolt hole being engaged with steel reinforcement cage, and connector passes through bolt and puts down Platform connects.
Two connectors are installed on described angle steel scale.
Described angle steel scale is coordinated by bolt groove, two bolts and greenbelt both sides kerbstone.
Described plateau levels are arranged, and are provided with and are connected the bolt hole being engaged with connector, if steel reinforcement cage includes on platform Dry vertically disposed reinforcing bar, horizontally disposed ring muscle, platform are fixedly connected with vertically disposed reinforcing bar, horizontally disposed ring muscle enclose It is fastenedly connected around vertically disposed reinforcing bar.
This utility model has the advantages that:Instrument is positioned by streetlamp foundation, with greenbelt both sides kerbstone as base Standard, is accurately positioned to street lamp steel reinforcement cage, can be good at ensureing the installation site of street lamp, reaches installation attractive in appearance, neat Effect.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is that streetlamp foundation positions instrument schematic diagram.
Fig. 2 is that streetlamp foundation positioning instrument uses exemplary plot.
Wherein:1. angle steel scale, 11. connector grooves, 12. bolt grooves, 2. connector, 3. bolt, 4. reinforcing bar Cage, 41. platforms.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is paid The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Embodiment 1:A kind of streetlamp foundation positions instrument, including least one set Position Scale, every group of described Position Scale Including angle steel scale 1, angle steel scale 1 is provided with scale, and some connectors 2, connector 2 and platform are provided with angle steel scale 1 41 connections, platform 41 have steel reinforcement cage 4.
Described streetlamp foundation positioning instrument includes that two groups use cooperatively and horizontally disposed Position Scale.
Two groups of described Position Scales are parallel to each other.
Embodiment 2:A kind of streetlamp foundation positions instrument, and described angle steel scale 1 includes the end face of horizontal positioned and vertical The end face of placement, is provided with bolt groove 12 on the end face of horizontal positioned, angle steel scale 1 is by bolt groove 12, positioning spiral shell Bolt 3 is coordinated with greenbelt both sides kerbstone, and connector groove 11 is provided with the end face being disposed vertically, and angle steel scale 1 passes through connector groove 11st, bolt and connector 2 connect.
Described connector 2 is L-type connector, is provided with to be connected with angle steel scale 1 is engaged on an end face of connector 2 Bolt hole, be provided with another end face of connector 2 and be connected the bolt hole being engaged with steel reinforcement cage 4, connector 2 pass through bolt It is connected with platform 41.
Other structures are with embodiment 1.
Embodiment 3:A kind of streetlamp foundation positions instrument, including least one set Position Scale, every group of described Position Scale Including angle steel scale 1, angle steel scale 1 is provided with scale, and some connectors 2 are provided with angle steel scale 1, and angle steel scale 1 is divided into There is steel reinforcement cage 4, steel reinforcement cage is provided with platform 41, and angle steel scale 1 is connected by connector 2 with platform 41.
Described streetlamp foundation positioning instrument includes that two groups use cooperatively and horizontally disposed Position Scale.
Two groups of described Position Scales are parallel to each other.
End face and the end face being disposed vertically that described angle steel scale 1 includes horizontal positioned, open on the end face of horizontal positioned There is bolt groove 12, angle steel scale 1 is coordinated by bolt groove 12, bolt 3 and greenbelt both sides kerbstone, vertically put Connector groove 11 is provided with the end face put, angle steel scale 1 passes through connector groove 11, bolt and connector 2 connects.
Described connector 2 is L-type connector, is provided with to be connected with angle steel scale 1 is engaged on an end face of connector 2 Bolt hole, be provided with another end face of connector 2 and be connected the bolt hole being engaged with steel reinforcement cage 4, connector 2 pass through bolt It is connected with platform 41.
Two connectors 2 are installed on described angle steel scale 1.
Described angle steel scale 1 is coordinated with greenbelt both sides kerbstone by 12, two bolts of bolt groove 3.
Described platform 41 is horizontally disposed with, and is provided with and is connected the bolt hole being engaged, steel reinforcement cage 4 with connector 2 on platform 41 Including some vertically disposed reinforcing bars, horizontally disposed ring muscle, platform 41 is fixedly connected with vertically disposed reinforcing bar, is horizontally disposed with Ring muscle enclose be fastenedly connected around vertically disposed reinforcing bar.
Embodiment 4:A kind of streetlamp foundation positions instrument, is used cooperatively by two Position Scales in pairs, and each includes angle steel Scale 1 and two connectors 2, angle steel scale 1 and connector 2 are bolted, and connector 2 is by pre-embedded bolt and street lamp base The steel reinforcement cage 4 of plinth is interim to be connected, and bolt 3 is connected temporarily with angle steel scale 1.
Angle steel scale 1 using 40mm*40mm*4mm angle steel, in the middle of scale be 0 scale, scale from centre to two ends gradually Increase and two ends scale is symmetrical, in the middle of two wing plates of angle steel, have 1cm to slot.
Connector 2 adopts a length of 24cm, a width of 3cm, thickness for the steel plate of 0.3cm, apart from 90 ° at bolt nose end 10cm Bending is formed.Diameter screw hole is provided with the 5cm of one end for connecting steel reinforcement cage 4, at other end 2cm being provided with bolt hole is used for Interim angle cleat scale 1.Connector 2 can slide along 1 wing plate of angle steel scale fluting, the distance between two connectors 2 of adjustment, Suitable for various sizes of steel reinforcement cage 4.
Bolt 3 be diameter 0.6cm, the bolt of long 10cm, by 1 wing plate of angle steel scale fluting be temporarily fixed on component Angle steel scale 1.Bolt 3 can slide along 1 wing plate of angle steel scale fluting, and the distance between two bolts of adjustment are suitable for In the greenbelt of different in width.
Other structures are with embodiment 3.
Preferred embodiment of the present utility model is the foregoing is only, it is not to limit this utility model, all at this Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in this utility model Protection domain within.

Claims (8)

1. a kind of streetlamp foundation positions instrument, including least one set Position Scale, it is characterised in that:Every group of described Position Scale Including angle steel scale(1), angle steel scale(1)It is provided with scale, angle steel scale(1)On some connectors are installed(2), connector (2)With platform(41)Connection, platform(41)Have steel reinforcement cage(4).
2. streetlamp foundation according to claim 1 positions instrument, it is characterised in that:Described streetlamp foundation positioning tool kit Include two groups to use cooperatively and horizontally disposed Position Scale.
3. streetlamp foundation according to claim 2 positions instrument, it is characterised in that:Two groups of described Position Scales are mutually put down OK.
4. the streetlamp foundation according to claim 1 or 2 or 3 positions instrument, it is characterised in that:Described angle steel scale(1) End face and the end face being disposed vertically including horizontal positioned, is provided with bolt groove on the end face of horizontal positioned(12), angle steel mark Chi(1)By bolt groove(12), bolt(3)Coordinate with greenbelt both sides kerbstone, be provided with the end face being disposed vertically Connector groove(11), angle steel scale(1)By connector groove(11), bolt and connector(2)Connection.
5. streetlamp foundation according to claim 4 positions instrument, it is characterised in that:Described connector(2)Connect for L-type Part, connector(2)An end face on be provided with and angle steel scale(1)The bolt hole that connection is engaged, connector(2)Another It is provided with end face and steel reinforcement cage(4)The bolt hole that connection is engaged, connector(2)By bolt and platform(41)Connection.
6. streetlamp foundation according to claim 5 positions instrument, it is characterised in that:Described angle steel scale(1)Upper installation There are two connectors(2).
7. streetlamp foundation according to claim 6 positions instrument, it is characterised in that:Described angle steel scale(1)By fixed Position bolt slot(12), two bolts(3)Coordinate with greenbelt both sides kerbstone.
8. streetlamp foundation according to claim 7 positions instrument, it is characterised in that:Described platform(41)It is horizontally disposed, Platform(41)On be provided with and connector(2)The bolt hole that connection is engaged, steel reinforcement cage(4)Including some vertically disposed reinforcing bars, Horizontally disposed ring muscle, platform(41)It is fixedly connected with vertically disposed reinforcing bar, horizontally disposed ring muscle enclose is around vertically disposed Reinforcing bar is fastenedly connected.
CN201621054801.7U 2016-09-14 2016-09-14 A kind of streetlamp foundation positions instrument Active CN206052765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621054801.7U CN206052765U (en) 2016-09-14 2016-09-14 A kind of streetlamp foundation positions instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621054801.7U CN206052765U (en) 2016-09-14 2016-09-14 A kind of streetlamp foundation positions instrument

Publications (1)

Publication Number Publication Date
CN206052765U true CN206052765U (en) 2017-03-29

Family

ID=58369821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621054801.7U Active CN206052765U (en) 2016-09-14 2016-09-14 A kind of streetlamp foundation positions instrument

Country Status (1)

Country Link
CN (1) CN206052765U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130686A (en) * 2017-06-19 2017-09-05 南通建工集团股份有限公司 Prefabrication and assembly construction column foundation anchor bar accurate positioning method
CN107489172A (en) * 2017-08-31 2017-12-19 中交第四航务工程局有限公司 A kind of water tank installation of embedded parts positioner and application method
CN109244961A (en) * 2018-11-20 2019-01-18 济南城建集团有限公司 A kind of technique reducing the wasting of resources about comprehensive pipeline

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130686A (en) * 2017-06-19 2017-09-05 南通建工集团股份有限公司 Prefabrication and assembly construction column foundation anchor bar accurate positioning method
CN107130686B (en) * 2017-06-19 2019-03-05 南通建工集团股份有限公司 Prefabrication and assembly construction column foundation anchor bar accurate positioning method
CN107489172A (en) * 2017-08-31 2017-12-19 中交第四航务工程局有限公司 A kind of water tank installation of embedded parts positioner and application method
CN109244961A (en) * 2018-11-20 2019-01-18 济南城建集团有限公司 A kind of technique reducing the wasting of resources about comprehensive pipeline

Similar Documents

Publication Publication Date Title
CN206052765U (en) A kind of streetlamp foundation positions instrument
CN103107219B (en) The method of photovoltaic board system, photovoltaic panel fixing device and installing photovoltaic board system
CN205156916U (en) Detection apparatus for be used for constructional steel form setting straightness that hangs down
CN203284785U (en) Verticality-adjusting fixing system of reverse steel pipe column
CN204793864U (en) Stride provisional overhead line facility of small region muddy ground
CN104092173B (en) Assemble type buried cable ditch based on city integrated wiring
CN204801846U (en) Civil engineering pipe fitting rack
CN205314666U (en) Novel protection guardrail with adjustable width
CN204703186U (en) A kind of pre-embedded bolt positioning installation apparatus
CN203367936U (en) Cable trench
CN205061177U (en) Wire winding pile of installation ladder frame
CN207705732U (en) A kind of Combined cable support for cable duct
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN207277691U (en) A kind of concrete column position apparatus for form
CN202914109U (en) Integral type lining system of light-section cable tunnel
CN202612861U (en) General leftward-rotation elevation bent joint for ocean platform
CN204826220U (en) Location built -in fitting with U type groove
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN204390625U (en) A kind of phase look board
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN204753374U (en) Equipment bridge railing
CN204243547U (en) A kind of based on square and power distribution cabinet assembly that is triangle splice plate
CN204040452U (en) A kind of Corner Link for tools type section steel builder's jack
CN106368234A (en) Novel cup foundation box-shaped steel column installation constructing technology
CN207381897U (en) Cable support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant