CN107130618B - 护坡支挡结构施工方法 - Google Patents

护坡支挡结构施工方法 Download PDF

Info

Publication number
CN107130618B
CN107130618B CN201710536683.6A CN201710536683A CN107130618B CN 107130618 B CN107130618 B CN 107130618B CN 201710536683 A CN201710536683 A CN 201710536683A CN 107130618 B CN107130618 B CN 107130618B
Authority
CN
China
Prior art keywords
bank protection
breast boards
soil body
soil
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710536683.6A
Other languages
English (en)
Other versions
CN107130618A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sheyang Tonghai Village Construction Development Co., Ltd
Original Assignee
叶长青
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶长青 filed Critical 叶长青
Priority to CN201710536683.6A priority Critical patent/CN107130618B/zh
Publication of CN107130618A publication Critical patent/CN107130618A/zh
Application granted granted Critical
Publication of CN107130618B publication Critical patent/CN107130618B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明公开了一种护坡支挡结构施工方法,其特征是施工步骤包括:(1)施工护坡柱,护坡柱插入土体;(2)将钢板插入土体作为临时施工支撑;(3)浇筑挡土板、肋梁和护坡板混凝土;浇筑压顶梁混凝土,使挡土板、肋梁和护坡板以及护坡柱形成整体;(4)对1/3护坡高度以上土体进行卸除,卸土后铺设土工布,然后安装土锚板;(5)撑杆穿过挡土板和护坡板的预埋孔顶住土锚板;(6)拆除钢板临时施工支撑,钢板与挡土板之间空隙采用砂填塞;(7)采用千斤顶对撑杆进行预应力顶推;(8)在挡土板和右侧土体之间填充填料。

Description

护坡支挡结构施工方法
技术领域
本发明涉及一种支挡施工方法,特别涉及一种护坡支挡施工方法。
背景技术
护坡支挡结构是防止土体塌方或变形失稳的一种构造物,是岩土工程重要的研究课题之一。重力式支挡结构是最古老的挡墙结构,具有就地取材,施工简便等显著的优点,但是随着工程建设规模越来越大,重力式挡墙己不能适应工程条件复杂地区对支挡结构的需要,主要是由于重力式挡墙成本比较高,而且在施工过程中由于开挖较多会引起地基失稳,如何节约工程造价、保证工程安全是工程人员面临的课题。
发明内容
本发明是提供一种护坡支挡施工方法,解决护坡支挡结构不安全和成本高的问题。
本发明在1/3护坡高度处进行卸土,通过预应力顶推右侧护坡土体使右侧护坡土体处于平衡状态,采用格构式结构整体形成挡土结构,格构式结构中护坡柱将主动土压力有效地传递到深层土体。下部朝向土体部位的护坡板采用折线形式,使该区域土体在受荷移动过程中形成土拱,上部土体采用撑杆顶推土锚板使土体维持稳定。
护坡柱伸入基底标高以下2-2.5米,护坡柱设置间距为4-6m,护坡柱截面为正方形,正方形长度为200-250mm,护坡柱外侧设置护坡板,护坡板厚度为60-80mm,护坡板为平板,朝土面设置挡土板,挡土板为折板,折板角度为150-160度,折板右侧形成不同单元的三角形土,三角土体在外推力作用下会出现一定变形,形成水平方向的卸荷拱,卸荷拱内土体产生的水平推力由折线板承受。挡土板留设泄水孔,泄水孔布置间距为每平方1个,泄水孔直径为6-8mm,挡土板与护坡柱之间设置肋梁,肋梁高度为150-250mm,最下排肋梁离基底标高高度为400-500mm,相邻排肋梁竖向间距为600-800mm。护坡柱、护坡板、肋梁、挡土板形成格构式结构,格构式结构顶部设置压顶梁,压顶梁高度为400-600mm,护坡上部1/3总高度位置将土方挖空,土方挖空宽度为0.6-0.8m,右侧土体开挖成斜坡,斜坡与水平线的夹角为70-80度,斜坡表面铺设土工布,土工布上面设置土锚板,土锚板形状为三角形,土锚板为厚度12-18mm的钢筋混凝土板,土锚板带有三根锚筋,锚筋直径为14-16mm,锚筋长度为400-600mm,锚筋伸入右侧土体。撑杆右端顶住土锚板,撑杆左端施加预应力后用锚栓固定在护坡板上,撑杆采用直径为28mm或32mm的钢筋,相邻撑杆距离为0.7-0.9m。土方挖空部位填充填料,填料采用砂碎石,砂碎石粒径不大于80mm,砂碎石通过0.07mm筛孔的土粒应小于15%,或者虽然多于15%但通过0.015mm筛孔的土粒应小于10%。
施工步骤包括:
(1)施工护坡柱,护坡柱插入土体;
(2)将钢板插入土体作为临时施工支撑,钢板右侧用角钢进行支顶,开挖土方留出工作面;
(3)安装挡土板、肋梁和护坡板模板,将挡土板、肋梁和护坡板钢筋架放入模板内,浇筑挡土板、肋梁和护坡板混凝土;然后安装压顶梁模板,将压顶梁钢筋架放入模板内,浇筑压顶梁混凝土,使挡土板、肋梁和护坡板以及护坡柱形成整体;
(4)对1/3护坡高度以上土体进行卸除,卸土后铺设土工布,然后安装土锚板;
(5)撑杆穿过挡土板和护坡板的预埋孔顶住土锚板;
(6)拆除钢板临时施工支撑,钢板与挡土板之间空隙采用砂填塞;
(7)采用千斤顶对撑杆进行预应力顶推;根据千斤顶的压缩值来控制预应力顶推压力,如果撑杆采用直径为28mm的钢筋,千斤顶的压缩值确定为5mm,如果撑杆采用直径为32mm的钢筋,千斤顶的压缩值确定为4mm,撑杆进行预应力顶推后可以有效地应对右侧土体的主动土压力;
为了避免撑杆受腐蚀,在撑杆预应力顶推后刷一层防腐沥青油膏,刷完后用工业纱布包裹,包裹后再刷一层沥青油膏。
(8)在挡土板和右侧土体之间填充填料,填料采用分层回填夯实,每层铺设厚度500mm,铺摊后随之耙平。
本发明安全性能好,工程造价低。
附图说明
图1为护坡支挡结构立面示意图,图2为支挡结构平面示意图,图3为土锚板平面示意图,图4为土锚板立面示意图。
各附图中:1、护坡柱,2、护坡板,3、肋梁,4、挡土板,5、撑杆,6、锚栓,7、土锚板,8、土工布,9、压顶梁,10、填料。
具体实施方式
实施例中护坡柱1伸入基底标高以下2米,护坡柱1设置间距为5m,护坡柱1截面为正方形,正方形长度为250mm,护坡柱1外侧设置护坡板2,护坡板2厚度为80mm,护坡板2为平板,朝土面设置挡土板4,挡土板4为折板,折板角度为160度。挡土板4留设泄水孔,泄水孔布置间距为每平方1个,泄水孔直径为7mm,挡土板4与护坡柱1之间设置肋梁3,肋梁3高度为200mm,最下排肋梁3离基底标高高度为450mm,相邻排肋梁3竖向间距为700mm。护坡柱1、护坡板2、肋梁3、挡土板4形成格构式结构,格构式结构顶部设置压顶梁9,压顶梁9高度为400mm,护坡上部1/3总高度位置将土方挖空,土方挖空宽度为0.7m,右侧土体开挖成斜坡,斜坡与水平线的夹角为75度,斜坡表面铺设土工布8,土工布8上面设置土锚板7,土锚板7形状为三角形,土锚板7为厚度16mm的钢筋混凝土板,土锚板7带有三根锚筋,锚筋直径为14mm,锚筋长度为500mm,锚筋伸入右侧土体。撑杆5右端顶住土锚板7,撑杆5左端施加预应力后用锚栓6固定在护坡板2上,撑杆5采用直径为28mm或32mm的钢筋,相邻撑杆5距离为0.8m。土方挖空部位填充填料10,填料10采用砂碎石,砂碎石粒径不大于80mm,砂碎石通过0.07mm筛孔的土粒应小于15%。
施工步骤包括:
(1)施工护坡柱1,护坡柱1插入土体;
(2)将钢板插入土体作为临时施工支撑,钢板右侧用角钢进行支顶,开挖土方留出工作面;
(3)安装挡土板4、肋梁3和护坡板2模板,将挡土板4、肋梁3和护坡板2钢筋架放入模板内,浇筑挡土板4、肋梁3和护坡板2混凝土;然后安装压顶梁9模板,将压顶梁9钢筋架放入模板内,浇筑压顶梁9混凝土,使挡土板4、肋梁3和护坡板2以及护坡柱1形成整体;
(4)对1/3护坡高度以上土体进行卸除,卸土后铺设土工布8,然后安装土锚板7;
(5)撑杆5穿过挡土板4和护坡板2的预埋孔顶住土锚板7;
(6)拆除钢板临时施工支撑,钢板与挡土板4之间空隙采用砂填塞;
(7)采用千斤顶对撑杆5进行预应力顶推;根据千斤顶的压缩值来控制预应力顶推压力,撑杆5采用直径为28mm的钢筋,千斤顶的压缩值确定为5mm;
为了避免撑杆5受腐蚀,在撑杆5预应力顶推后刷一层防腐沥青油膏,刷完后用工业纱布包裹,包裹后再刷一层沥青油膏。
(8)在挡土板4和右侧土体之间填充填料10,填料10采用分层回填夯实,每层铺设厚度500mm,铺摊后随之耙平。

Claims (4)

1.一种护坡支挡结构施工方法,其特征是在设定高度处进行卸土,通过预应力顶推右侧护坡土体使右侧护坡土体处于平衡状态,采用格构式结构整体形成挡土结构,格构式结构中护坡柱将主动土压力有效地传递到深层土体;下部朝向土体部位的护坡板采用折线形式,使该区域土体在受荷移动过程中形成土拱,上部土体采用撑杆顶推土锚板使土体维持稳定;
护坡柱伸入基底标高以下2-2.5米,护坡柱设置间距为4-6m,护坡柱截面为正方形,正方形长度为200-250mm,护坡柱外侧设置护坡板,护坡板厚度为60-80mm,护坡板为平板,朝土面设置挡土板,挡土板为折板,折板角度为150-160度;挡土板留设泄水孔,泄水孔布置间距为每平方1个,泄水孔直径为6-8mm,挡土板与护坡柱之间设置肋梁,肋梁高度为150-250mm,最下排肋梁离基底标高高度为400-500mm,相邻排肋梁竖向间距为600-800mm;护坡柱、护坡板、肋梁、挡土板形成格构式结构,格构式结构顶部设置压顶梁,压顶梁高度为400-600mm,土方从护坡顶部往下开挖,开挖深度为1/3护坡总高度,土方挖空宽度为0.6-0.8m,右侧土体开挖成斜坡,斜坡与水平线的夹角为70-80度,斜坡表面铺设土工布,土工布上面设置土锚板,土锚板形状为三角形,土锚板为厚度12-18mm的钢筋混凝土板,土锚板带有三根锚筋,锚筋直径为14-16mm,锚筋长度为400-600mm,锚筋伸入右侧土体;撑杆右端顶住土锚板,撑杆左端施加预应力后用锚栓固定在护坡板上,撑杆采用直径为28mm或32mm的钢筋,相邻撑杆距离为0.7-0.9m;土方挖空部位填充填料,填料采用砂碎石;
施工步骤包括:
(1)施工护坡柱,护坡柱插入土体;
(2)将钢板插入土体作为临时施工支撑,钢板右侧用角钢进行支顶,开挖土方留出工作面;
(3)安装挡土板、肋梁和护坡板模板,将挡土板、肋梁和护坡板钢筋架放入模板内,浇筑挡土板、肋梁和护坡板混凝土;然后安装压顶梁模板,将压顶梁钢筋架放入模板内,浇筑压顶梁混凝土,使挡土板、肋梁和护坡板以及护坡柱形成整体;
(4)对1/3护坡高度以上土体进行卸除,卸土后铺设土工布,然后安装土锚板;
(5)撑杆穿过挡土板和护坡板的预埋孔顶住土锚板;
(6)拆除钢板临时施工支撑,钢板与挡土板之间空隙采用砂填塞;
(7)采用千斤顶对撑杆进行预应力顶推;
(8)在挡土板和右侧土体之间填充填料,填料采用分层回填夯实,每层铺设厚度500mm,铺摊后随之耙平。
2.根据权利要求1所述的护坡支挡结构施工方法,其特征是砂碎石粒径不大于80mm,砂碎石通过0.07mm筛孔的土粒小于15%,或者虽然多于15%但通过0.015mm筛孔的土粒小于10%。
3.根据权利要求1所述的护坡支挡结构施工方法,其特征是根据千斤顶的压缩值来控制预应力顶推压力,如果撑杆采用直径为28mm的钢筋,千斤顶的压缩值确定为5mm,如果撑杆采用直径为32mm的钢筋,千斤顶的压缩值确定为4mm。
4.根据权利要求1所述的护坡支挡结构施工方法,其特征是在撑杆预应力顶推后刷一层防腐沥青油膏,刷完后用工业纱布包裹,包裹后再刷一层沥青油膏。
CN201710536683.6A 2016-04-12 2016-04-12 护坡支挡结构施工方法 Active CN107130618B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710536683.6A CN107130618B (zh) 2016-04-12 2016-04-12 护坡支挡结构施工方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610288325.3A CN105839650B (zh) 2016-04-12 2016-04-12 护坡支挡结构
CN201710536683.6A CN107130618B (zh) 2016-04-12 2016-04-12 护坡支挡结构施工方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610288325.3A Division CN105839650B (zh) 2016-04-12 2016-04-12 护坡支挡结构

Publications (2)

Publication Number Publication Date
CN107130618A CN107130618A (zh) 2017-09-05
CN107130618B true CN107130618B (zh) 2018-11-09

Family

ID=56590728

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710536683.6A Active CN107130618B (zh) 2016-04-12 2016-04-12 护坡支挡结构施工方法
CN201610288325.3A Active CN105839650B (zh) 2016-04-12 2016-04-12 护坡支挡结构

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610288325.3A Active CN105839650B (zh) 2016-04-12 2016-04-12 护坡支挡结构

Country Status (1)

Country Link
CN (2) CN107130618B (zh)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0868054A (ja) * 1994-08-30 1996-03-12 Kensetsu Kiso Eng Co Ltd 発泡樹脂ブロックによる水平地盤構築方法
JP2001317054A (ja) * 2000-05-09 2001-11-16 Tokyu Constr Co Ltd 盛土のり面補強用のl型かごの変形防止水平部材およびそれによる補強盛土工法
CN201232188Y (zh) * 2008-05-29 2009-05-06 安徽省建设工程勘察设计院 扶壁式土钉墙
CN201671108U (zh) * 2010-04-27 2010-12-15 中国科学院武汉岩土力学研究所 一种沿河路肩预应力锚索桩板墙
CN102330431A (zh) * 2011-06-16 2012-01-25 兰州理工大学 格构式框架预应力锚杆柔性支护结构及其施工方法
KR101181619B1 (ko) * 2011-10-06 2012-09-13 쌍용건설 주식회사 어스앵커의 재인장을 통한 대규모 지하구조물 높은 옹벽의 축조 공법
CN103726495B (zh) * 2014-01-10 2016-01-13 上海建工五建集团有限公司 近海深基坑支护结构及其施工方法
CN204456180U (zh) * 2015-02-27 2015-07-08 重庆大学 折板桩挡土墙
CN204919573U (zh) * 2015-08-27 2015-12-30 山东科技大学 一种复合式边坡支护结构

Also Published As

Publication number Publication date
CN107130618A (zh) 2017-09-05
CN105839650B (zh) 2017-11-28
CN105839650A (zh) 2016-08-10

Similar Documents

Publication Publication Date Title
CN106499413B (zh) 一种浅埋偏压段隧道地层加固施工方法
CN109826667B (zh) 煤矿地下水库工字型挡水坝
CN111485901B (zh) 侧跨无充填型狭长浅底溶洞段的隧道修建方法
CN105672240B (zh) 倾倒破坏型危岩体治理方法
CN105089680B (zh) 一种沿空留巷轻质高强混凝土砌块墙体及其施工工艺
CN109797769B (zh) 一种湿陷性黄土地区地下综合管廊地基结构及其施工方法
CN109183809B (zh) 一种淤泥质黏土深基坑工程复合支护换撑的施工方法
CN107447778A (zh) 一种在役钢筋混凝土挡土墙的加高加固结构及方法
CN106758561A (zh) 跨越坎儿井高速铁路路基加固结构
CN205475197U (zh) 松软土岩溶地基加固结构
CN202323960U (zh) 一种确保边坡稳定的浅基坑成型施工结构
CN108487234B (zh) 现浇桩板式站台墙施工的方法
CN111622234B (zh) 一种斜竖向组合钢管桩承托的卸荷式薄壁箱型挡墙及施工工艺
CN107130618B (zh) 护坡支挡结构施工方法
CN205742290U (zh) 一种底板后浇带传力结构
CN104196036A (zh) 基于老旧地下室外墙结构的基坑支护结构及支护方法
CN103669976A (zh) 古塔纠偏
CN102912800B (zh) 一种用于处理后筑式高陡填方边坡的立体组合加固方法
CN204097889U (zh) 一种补桩与增大台帽组合加固已建桥台结构
CN216275591U (zh) 一种采用预应力混凝土管桩复合地基防沉降结构
CN105113350A (zh) 桥墩台路基结构及施工方法
CN205977233U (zh) 一种隧道锁脚旋喷桩结构
CN205776258U (zh) 一种深基坑桩锚支护体系
CN105672350B (zh) 一种挡土墙侧向位移修复施工方法
CN205529734U (zh) 一种用于填方路基的u形支挡结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201126

Address after: 224000 Dajian neighborhood committee, Haitong Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: Sheyang Tonghai Village Construction Development Co., Ltd

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Wenzhou City, Zhejiang Province, No. 4

Patentee before: Ye Changqing

TR01 Transfer of patent right