CN107130518A - A kind of temporary support and its construction method for being used to support steel box-girder - Google Patents

A kind of temporary support and its construction method for being used to support steel box-girder Download PDF

Info

Publication number
CN107130518A
CN107130518A CN201710366165.4A CN201710366165A CN107130518A CN 107130518 A CN107130518 A CN 107130518A CN 201710366165 A CN201710366165 A CN 201710366165A CN 107130518 A CN107130518 A CN 107130518A
Authority
CN
China
Prior art keywords
girder
steel box
crossbeam
temporary support
tubing string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710366165.4A
Other languages
Chinese (zh)
Inventor
戴立先
朱邵辉
杜金鑫
廖选茂
蔡玉龙
郑伟盛
袁晓民
李龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201710366165.4A priority Critical patent/CN107130518A/en
Publication of CN107130518A publication Critical patent/CN107130518A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The embodiment of the present invention is applied to construction steel structure technical field, and there is provided a kind of temporary support and its construction method for being used to support steel box-girder.The temporary support includes four tubing strings on the basis of being fixed on, four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, in four tubing strings, some first crossbeams being mutually detachably connected are erected between two adjacent tubing string upper ends, some first crossbeams enclose jointly is set as a main frame, and the upper end of main frame is fixed with some backbars for being used to support steel box-girder.The present invention has cost low, sets up the good advantage of easy, time saving and stability.

Description

A kind of temporary support and its construction method for being used to support steel box-girder
Technical field
The invention belongs to construction steel structure technical field, more particularly to a kind of temporary support for being used to support steel box-girder and Its construction method.
Background technology
The final purpose of Traffic Development is the outside environment that sequence is provided with for the mankind, with it is people-oriented, green go out The proposition of the Modern City Traffic theories such as row, the city slow-vehicle system by representative of bicycle expressway is progressively taken seriously.
Bicycle expressway refers to the urban transportation infrastructure for being exclusively used in cycling, has the characteristics that:1) row Sail speed fast, traffic efficiency is high.Due to Computer method in current city, the travel speed of bicycle is less than 10km/h, and voluntarily Scooter 30km/h during the design of car highway, the efficiency that greatly improves that cyclists only alleviates the congestion of large size city indirectly Effect.2) it is people-oriented, embody fair.Bicycle highway carries out the non-separation of machine so that bicycle enjoys independent right of way, fills Code insurance protects injury of the cycling person from motor vehicle, and reduces influencing each other for two kinds of vehicles.3) environmental protection, it is low Carbon health.Green Travel is advocated in bicycle expressway, life idea, protection urban ecology to improving modern city low-carbon environment-friendly Environment has positive meaning.
The bicycle traffic system of current domestic city is still in the starting stage, its planning and designing, manufacture install it is theoretical and Technology far falls behind countries in Europe.This problem puts forth effort on the planning of large size city bicycle expressway and builds key issue and grinds Study carefully, by reasonably planning, perfect design and overall process construction, propose city bicycles expressway system integration solution party Case, it is significant to the green in promotion city, low-carbon and sustainable development.
The supporting construction for being currently used for steel box-girder of the supporting as expressway generally uses Bailey bracket, and a section is needed when using One section is set up, and sets up cumbersome, and requires also higher for workman, causes cost of labor high and to set up the time long.In addition, for The higher situation of supporting construction, in order to ensure the stability of Bailey bracket support, it is necessary to be supported using multiple rows of Bailey bracket, Bailey bracket consumption Amount is big, and cost is high.
The content of the invention
Technical problem to be solved of the embodiment of the present invention is to provide a kind of temporary support for being used to support steel box-girder And its construction method, it is intended to solve prior art supporting construction exist set up it is cumbersome, set up time length and cost is high asks Topic.
The embodiment of the present invention is achieved in that a kind of temporary support for being used to support steel box-girder, the temporary support Frame includes four tubing strings on the basis of being fixed on, and four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, In four tubing strings, some first crossbeams being mutually detachably connected, institute are erected between two adjacent tubing string upper ends Some first crossbeams stated enclose jointly is set as a main frame, and the upper end of the main frame, which is fixed with, some to be used to support steel box-girder Backbar.
Further, the main frame is rectangular, is interfixed between the first crossbeam and the tubing string by welding, It is bolted to connection between the first crossbeam and first crossbeam.
Further, the bottom of four described tubing strings is connected by expansion bolt with basis.
Further, in four described tubing strings, it is erected with and some mutually detachably connects between adjacent tubing string lower end The second cross beam connect.
Further, interfixed between the second cross beam and the tubing string by welding, the second cross beam and the It is bolted to connection between two crossbeams.
Further, ride upon solid by reinforcement welding between the first crossbeam of the tubing string upper end and the tubing string tube wall It is fixed.
Further, described some backbars are evenly distributed in the surrounding of the main frame.
The embodiment of the present invention additionally provides a kind of construction method of temporary support as described above, and the construction method includes Following steps:
S1, according to site operation situation and the steel box-girder width situation to be supported, by the installation site of four tubing strings Structure is set as a rectangle, and the bottom of four tubing strings is fixed on into basis by expansion bolt;
S2, in four described tubing string upper ends the first crossbeam is welded and fixed, it is horizontal in the first crossbeam and first It is bolted to connection between beam, to meet the width demand of steel box-girder width.
S3, in described some backbars of first crossbeam upper end vertical welding.
Further, the falsework also includes some second cross beams, between the step S1 and step S2, including Following steps:
S11, two tubing string lower ends adjacent in four described tubing strings are welded and fixed the second cross beam, described It is bolted between two crossbeams and second cross beam.
Further, the falsework also includes four reinforcements, between the step S2 and step S3, including such as Lower step:
S21, between the first crossbeam and the root tubing string tube wall of the every tubing string upper end weld the reinforcement.
Compared with prior art, beneficial effect is the embodiment of the present invention:The temporary support of the present invention includes four pipes Post, basis is fixed on by the bottom of four tubing strings, and four tubing strings enclose the space for being set as being easy to accommodating pier stud, and pier stud is to steel Box beam carries out being permanently fixed support;First crossbeam, some first are set up between adjacent two tubing strings in four tubing strings Crossbeam encloses composition main frame, and some backbars are fixed in the upper end of main frame, for carrying out temporary support to steel box-girder, in steel case After the completion of being set up between beam, reused after above-mentioned temporary support is dismantled, it has cost low, set up easy, province When and the good advantage of stability.
Brief description of the drawings
Fig. 1 is temporary support main structure diagram provided in an embodiment of the present invention;
Fig. 2 is the view of the temporary support support steel box-girder shown in Fig. 1;
Fig. 3 is Fig. 1 side structure schematic view;
Fig. 4 is Fig. 1 overlooking the structure diagram.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figures 1 to 4, be provided by the present invention for support steel box-girder the preferred embodiment of temporary support one, The temporary support includes four tubing strings 1 on the basis of being fixed on, and four tubing strings 1 enclose jointly to be set as one and be easy to accommodating pier stud A Space, pier stud A be used for steel box-girder B is permanently fixed.In the present embodiment, four tubing strings 1 are tubular pillar, and its bottom is equal It is connected by expansion bolt (not shown) with basis, is easy to carry out dismounting recycling to tubular pillar.In four tubing strings 1 In, it is erected with some first crossbeams 2 being mutually detachably connected, some first crossbeams 2 between two adjacent upper ends of tubing string 1 It is H profile steel, H profile steel is enclosed jointly is set as a rectangular main frame 20, the upper end of main frame 20, which is fixed with, some is used for branch Support steel box-girder B backbar 3.Specifically, interfixed between first crossbeam 2 and tubing string 1 by welding, it is ensured that first crossbeam 2 The stability being connected with tubing string 1, is fixedly connected between first crossbeam 2 and first crossbeam 2 by bolt 4, be easy to first crossbeam 2 with It is detachably connected between first crossbeam 2, is easy to first crossbeam 2 to reuse and connect by adding the progress bolt 4 of first crossbeam 2 Connect, so as to increase the length of main frame 20, some backbars 3 are evenly distributed in the surrounding of main frame 20, with according to steel box-girder B Width demand, steel box-girder B is supported, it is low with cost, set up the good advantage of easy, time saving and stability.
In above-described embodiment, in order to further increase the stability of four tubing strings 1, in four tubing strings 1, adjacent tubing string Some second cross beams 5 being mutually detachably connected are erected between 1 lower end.Specifically, second cross beam 5 is H profile steel, second cross beam Interfixed, be fixedly connected between second cross beam 5 and second cross beam 5 by bolt 4, so as to right by welding between 5 and tubing string 1 Second cross beam 5 is reused.In addition, it is welded between the first crossbeam 2 of the upper end of tubing string 1 and the tube wall of tubing string 1 and leads to Cross reinforcement 6 to be welded and fixed, first crossbeam 2, reinforcement 6 and tubing string 1 constitute a triangular structure, meet above-mentioned interim branch Support support steel box-girder B intensity requirement.
The embodiment of the present invention additionally provides a kind of construction method of temporary support as described above, and the construction method includes Following steps:
S1, according to site operation situation and the steel box-girder B width situations to be supported, by the installation position of four tubing strings 1 Put structure and be set as a rectangle, and basis is fixed in the bottom of four tubing strings 1 by expansion bolt;And in four tubing strings 1 In adjacent two lower ends of tubing string 1 be welded and fixed second cross beam 5, connected between second cross beam 5 and second cross beam 5 by bolt 4 Connect, to strengthen the stability of the temporary support.
S2, four upper ends of tubing string 1 first crossbeam 2 is welded and fixed, passed through between first crossbeam 2 and first crossbeam 2 Bolt 4 is fixedly connected, to meet the width demand of steel box-girder B width.And in the first crossbeam 2 of the every upper end of tubing string 1 and this Reinforcement of weld beam 6 between the tube wall of root tubing string 1, further enhances the stability of the temporary support.
S3, in some backbars 3 of the upper end vertical welding of first crossbeam 1, for temporary support steel box-girder.
Above-mentioned temporary support has the following advantages that:
(1) H profile steel and tubular pillar of wide material sources can be made full use of, can live processing and fabricating, saving construction duration.
(2) pass through welding and bolt connecting mode, you can be rapidly completed installation and dismounting, on the one hand can increase connection steady Solidity, on the other hand the temporary support can be dismounted, facilitate entrucking to be reused.
(3) bolt connection is carried out, between two second cross beams by adding first crossbeam between two first crossbeams Bolt connection is carried out by adding second cross beam, it is adaptable to which the steel box-girder in different wide faces is supported.
(4) for supporting higher steel box-girder, tubular pillar can save traditional institute according to required random length is taken With the waste of multiple rows of Bailey bracket material, cost is reduced.
(5) Secondary Control that the backbar being fixed on main frame can coordinate jack to carry out height is corrected.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of temporary support for being used to support steel box-girder, it is characterised in that the temporary support includes being fixed on basis On four tubing strings, four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, in four tubing strings, phase Some first crossbeams being mutually detachably connected are erected between two adjacent tubing string upper ends, described some first crossbeams are total to A main frame is set as with enclosing, the upper end of the main frame is fixed with some backbars for being used to support steel box-girder.
2. the temporary support as claimed in claim 1 for being used to support steel box-girder, it is characterised in that the main frame is in square Shape, is interfixed by welding between the first crossbeam and the tubing string, passed through between the first crossbeam and first crossbeam Bolt is fixedly connected.
3. the temporary support as claimed in claim 1 or 2 for being used to support steel box-girder, it is characterised in that four described pipes The bottom of post is connected by expansion bolt with basis.
4. the temporary support as claimed in claim 1 or 2 for being used to support steel box-girder, it is characterised in that at described four In tubing string, some second cross beams being mutually detachably connected are erected between adjacent tubing string lower end.
5. the temporary support as claimed in claim 4 for being used to support steel box-girder, it is characterised in that the second cross beam and institute State between tubing string and to be interfixed by welding, is bolted to connection between the second cross beam and second cross beam.
6. being used for as described in claim 1 or 5 supports the temporary support of steel box-girder, it is characterised in that ride upon the pipe It is welded and fixed between the first crossbeam of post upper end and the tubing string tube wall by reinforcement.
7. the temporary support as claimed in claim 2 for being used to support steel box-girder, it is characterised in that described some backbars It is evenly distributed in the surrounding of the main frame.
8. a kind of construction method of temporary support as claimed in any of claims 1 to 7 in one of claims, it is characterised in that including Following steps:
S1, according to site operation situation and the steel box-girder width situation to be supported, the installation site structure of four tubing strings is set Basis is fixed on by expansion bolt into a rectangle, and by the bottom of four tubing strings;
S2, in four described tubing string upper ends be welded and fixed the first crossbeam, the first crossbeam and first crossbeam it Between be bolted to connection, to meet the width demand of steel box-girder width.
S3, in described some backbars of first crossbeam upper end vertical welding.
9. the construction method of temporary support as claimed in claim 8, it is characterised in that the falsework also includes some Second cross beam, between the step S1 and step S2, comprises the following steps:
S11, two tubing string lower ends adjacent in four described tubing strings are welded and fixed the second cross beam, and described second is horizontal It is bolted between beam and second cross beam.
10. the construction method of temporary support as claimed in claim 8, it is characterised in that the falsework also includes four Root reinforcement, between the step S2 and step S3, comprises the following steps:
S21, between the first crossbeam and the root tubing string tube wall of the every tubing string upper end weld the reinforcement.
CN201710366165.4A 2017-05-23 2017-05-23 A kind of temporary support and its construction method for being used to support steel box-girder Pending CN107130518A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710366165.4A CN107130518A (en) 2017-05-23 2017-05-23 A kind of temporary support and its construction method for being used to support steel box-girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710366165.4A CN107130518A (en) 2017-05-23 2017-05-23 A kind of temporary support and its construction method for being used to support steel box-girder

Publications (1)

Publication Number Publication Date
CN107130518A true CN107130518A (en) 2017-09-05

Family

ID=59732510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710366165.4A Pending CN107130518A (en) 2017-05-23 2017-05-23 A kind of temporary support and its construction method for being used to support steel box-girder

Country Status (1)

Country Link
CN (1) CN107130518A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144828A (en) * 2019-06-03 2019-08-20 中建钢构有限公司 The linear control method of the location structure of steel box girder assembling, support construction and bridge
CN113123244A (en) * 2021-04-19 2021-07-16 中铁十九局集团第三工程有限公司 Temporary steel box girder consolidation structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032533A (en) * 1999-07-21 2001-02-06 Kajima Corp Temporary support work method and temporary support device
CA2451695A1 (en) * 2003-02-03 2004-08-03 Steel King Industries, Inc. Pallet rack with camber beams
CN201665819U (en) * 2010-03-16 2010-12-08 中国第一冶金建设有限责任公司 Detachable modularization temporary support used for installing steel box girder road surface
CN102031756A (en) * 2010-12-01 2011-04-27 中建五局土木工程有限公司 Support assembly and construction method of cast-in-place box girder
CN103669226A (en) * 2013-12-25 2014-03-26 中建六局土木工程有限公司 River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN104831635A (en) * 2015-05-26 2015-08-12 中铁二十二局集团第三工程有限公司 Combined H-shaped steel cast-in-situ box beam support adjoining to and overpassing existing lines
CN207017165U (en) * 2017-05-23 2018-02-16 中建钢构有限公司 A kind of temporary support for being used to support steel box-girder

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032533A (en) * 1999-07-21 2001-02-06 Kajima Corp Temporary support work method and temporary support device
CA2451695A1 (en) * 2003-02-03 2004-08-03 Steel King Industries, Inc. Pallet rack with camber beams
CN201665819U (en) * 2010-03-16 2010-12-08 中国第一冶金建设有限责任公司 Detachable modularization temporary support used for installing steel box girder road surface
CN102031756A (en) * 2010-12-01 2011-04-27 中建五局土木工程有限公司 Support assembly and construction method of cast-in-place box girder
CN103669226A (en) * 2013-12-25 2014-03-26 中建六局土木工程有限公司 River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN104831635A (en) * 2015-05-26 2015-08-12 中铁二十二局集团第三工程有限公司 Combined H-shaped steel cast-in-situ box beam support adjoining to and overpassing existing lines
CN207017165U (en) * 2017-05-23 2018-02-16 中建钢构有限公司 A kind of temporary support for being used to support steel box-girder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144828A (en) * 2019-06-03 2019-08-20 中建钢构有限公司 The linear control method of the location structure of steel box girder assembling, support construction and bridge
CN113123244A (en) * 2021-04-19 2021-07-16 中铁十九局集团第三工程有限公司 Temporary steel box girder consolidation structure

Similar Documents

Publication Publication Date Title
CN107142831A (en) Bicycle high speed steel box girder and preparation method thereof
CN203201562U (en) Shield tunneling machine initial counter-force frame convenient to detach, install and transport
CN203430063U (en) Slipping splicing scaffold used for installing large-span steel structure roof primary truss
CN207017165U (en) A kind of temporary support for being used to support steel box-girder
CN107130518A (en) A kind of temporary support and its construction method for being used to support steel box-girder
CN105946977A (en) Automobile body framework
CN201835518U (en) Seamless combination formwork
CN206903347U (en) A kind of Multifunctional communication tower of communication base station
CN207259937U (en) Bicycle high speed steel box girder
CN207775719U (en) A kind of Bridge Erector for setting up full precast beam
CN207017167U (en) A kind of interim door frame for being used to support bike lane's bridge
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis
CN206376180U (en) High-speed railway steel concrete assembled pier
CN205349372U (en) For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only
CN107119549A (en) Bicycle expressway and the construction method that bicycle expressway is set up under BRT
CN209816676U (en) Ox leg type hoop
CN207017132U (en) A kind of bicycle expressway
CN203920973U (en) A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel
CN203247703U (en) Steel structural plant frame
CN101532336A (en) Beam-column type support and method for constructing multi-section adjacent bridges using same
CN202577110U (en) Tire road roller rack
CN206667056U (en) A kind of new V supports support
CN204668721U (en) Mobile substation steel structure base
CN205977232U (en) Bamboo joint formula structure of tunnel secondary lining platform turning mold board stand and template crossbeam
CN203430064U (en) Base of sliding assembling jig frame for mounting large-span steel structure roof primary truss

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905