CN107130518A - A kind of temporary support and its construction method for being used to support steel box-girder - Google Patents
A kind of temporary support and its construction method for being used to support steel box-girder Download PDFInfo
- Publication number
- CN107130518A CN107130518A CN201710366165.4A CN201710366165A CN107130518A CN 107130518 A CN107130518 A CN 107130518A CN 201710366165 A CN201710366165 A CN 201710366165A CN 107130518 A CN107130518 A CN 107130518A
- Authority
- CN
- China
- Prior art keywords
- girder
- steel box
- crossbeam
- temporary support
- tubing string
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 42
- 239000010959 steel Substances 0.000 title claims abstract description 42
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 238000003466 welding Methods 0.000 claims description 11
- 230000002787 reinforcement Effects 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 4
- 230000008901 benefit Effects 0.000 abstract description 5
- 229910052799 carbon Inorganic materials 0.000 description 3
- 230000001351 cycling effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The embodiment of the present invention is applied to construction steel structure technical field, and there is provided a kind of temporary support and its construction method for being used to support steel box-girder.The temporary support includes four tubing strings on the basis of being fixed on, four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, in four tubing strings, some first crossbeams being mutually detachably connected are erected between two adjacent tubing string upper ends, some first crossbeams enclose jointly is set as a main frame, and the upper end of main frame is fixed with some backbars for being used to support steel box-girder.The present invention has cost low, sets up the good advantage of easy, time saving and stability.
Description
Technical field
The invention belongs to construction steel structure technical field, more particularly to a kind of temporary support for being used to support steel box-girder and
Its construction method.
Background technology
The final purpose of Traffic Development is the outside environment that sequence is provided with for the mankind, with it is people-oriented, green go out
The proposition of the Modern City Traffic theories such as row, the city slow-vehicle system by representative of bicycle expressway is progressively taken seriously.
Bicycle expressway refers to the urban transportation infrastructure for being exclusively used in cycling, has the characteristics that:1) row
Sail speed fast, traffic efficiency is high.Due to Computer method in current city, the travel speed of bicycle is less than 10km/h, and voluntarily
Scooter 30km/h during the design of car highway, the efficiency that greatly improves that cyclists only alleviates the congestion of large size city indirectly
Effect.2) it is people-oriented, embody fair.Bicycle highway carries out the non-separation of machine so that bicycle enjoys independent right of way, fills
Code insurance protects injury of the cycling person from motor vehicle, and reduces influencing each other for two kinds of vehicles.3) environmental protection, it is low
Carbon health.Green Travel is advocated in bicycle expressway, life idea, protection urban ecology to improving modern city low-carbon environment-friendly
Environment has positive meaning.
The bicycle traffic system of current domestic city is still in the starting stage, its planning and designing, manufacture install it is theoretical and
Technology far falls behind countries in Europe.This problem puts forth effort on the planning of large size city bicycle expressway and builds key issue and grinds
Study carefully, by reasonably planning, perfect design and overall process construction, propose city bicycles expressway system integration solution party
Case, it is significant to the green in promotion city, low-carbon and sustainable development.
The supporting construction for being currently used for steel box-girder of the supporting as expressway generally uses Bailey bracket, and a section is needed when using
One section is set up, and sets up cumbersome, and requires also higher for workman, causes cost of labor high and to set up the time long.In addition, for
The higher situation of supporting construction, in order to ensure the stability of Bailey bracket support, it is necessary to be supported using multiple rows of Bailey bracket, Bailey bracket consumption
Amount is big, and cost is high.
The content of the invention
Technical problem to be solved of the embodiment of the present invention is to provide a kind of temporary support for being used to support steel box-girder
And its construction method, it is intended to solve prior art supporting construction exist set up it is cumbersome, set up time length and cost is high asks
Topic.
The embodiment of the present invention is achieved in that a kind of temporary support for being used to support steel box-girder, the temporary support
Frame includes four tubing strings on the basis of being fixed on, and four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud,
In four tubing strings, some first crossbeams being mutually detachably connected, institute are erected between two adjacent tubing string upper ends
Some first crossbeams stated enclose jointly is set as a main frame, and the upper end of the main frame, which is fixed with, some to be used to support steel box-girder
Backbar.
Further, the main frame is rectangular, is interfixed between the first crossbeam and the tubing string by welding,
It is bolted to connection between the first crossbeam and first crossbeam.
Further, the bottom of four described tubing strings is connected by expansion bolt with basis.
Further, in four described tubing strings, it is erected with and some mutually detachably connects between adjacent tubing string lower end
The second cross beam connect.
Further, interfixed between the second cross beam and the tubing string by welding, the second cross beam and the
It is bolted to connection between two crossbeams.
Further, ride upon solid by reinforcement welding between the first crossbeam of the tubing string upper end and the tubing string tube wall
It is fixed.
Further, described some backbars are evenly distributed in the surrounding of the main frame.
The embodiment of the present invention additionally provides a kind of construction method of temporary support as described above, and the construction method includes
Following steps:
S1, according to site operation situation and the steel box-girder width situation to be supported, by the installation site of four tubing strings
Structure is set as a rectangle, and the bottom of four tubing strings is fixed on into basis by expansion bolt;
S2, in four described tubing string upper ends the first crossbeam is welded and fixed, it is horizontal in the first crossbeam and first
It is bolted to connection between beam, to meet the width demand of steel box-girder width.
S3, in described some backbars of first crossbeam upper end vertical welding.
Further, the falsework also includes some second cross beams, between the step S1 and step S2, including
Following steps:
S11, two tubing string lower ends adjacent in four described tubing strings are welded and fixed the second cross beam, described
It is bolted between two crossbeams and second cross beam.
Further, the falsework also includes four reinforcements, between the step S2 and step S3, including such as
Lower step:
S21, between the first crossbeam and the root tubing string tube wall of the every tubing string upper end weld the reinforcement.
Compared with prior art, beneficial effect is the embodiment of the present invention:The temporary support of the present invention includes four pipes
Post, basis is fixed on by the bottom of four tubing strings, and four tubing strings enclose the space for being set as being easy to accommodating pier stud, and pier stud is to steel
Box beam carries out being permanently fixed support;First crossbeam, some first are set up between adjacent two tubing strings in four tubing strings
Crossbeam encloses composition main frame, and some backbars are fixed in the upper end of main frame, for carrying out temporary support to steel box-girder, in steel case
After the completion of being set up between beam, reused after above-mentioned temporary support is dismantled, it has cost low, set up easy, province
When and the good advantage of stability.
Brief description of the drawings
Fig. 1 is temporary support main structure diagram provided in an embodiment of the present invention;
Fig. 2 is the view of the temporary support support steel box-girder shown in Fig. 1;
Fig. 3 is Fig. 1 side structure schematic view;
Fig. 4 is Fig. 1 overlooking the structure diagram.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
As shown in Figures 1 to 4, be provided by the present invention for support steel box-girder the preferred embodiment of temporary support one,
The temporary support includes four tubing strings 1 on the basis of being fixed on, and four tubing strings 1 enclose jointly to be set as one and be easy to accommodating pier stud A
Space, pier stud A be used for steel box-girder B is permanently fixed.In the present embodiment, four tubing strings 1 are tubular pillar, and its bottom is equal
It is connected by expansion bolt (not shown) with basis, is easy to carry out dismounting recycling to tubular pillar.In four tubing strings 1
In, it is erected with some first crossbeams 2 being mutually detachably connected, some first crossbeams 2 between two adjacent upper ends of tubing string 1
It is H profile steel, H profile steel is enclosed jointly is set as a rectangular main frame 20, the upper end of main frame 20, which is fixed with, some is used for branch
Support steel box-girder B backbar 3.Specifically, interfixed between first crossbeam 2 and tubing string 1 by welding, it is ensured that first crossbeam 2
The stability being connected with tubing string 1, is fixedly connected between first crossbeam 2 and first crossbeam 2 by bolt 4, be easy to first crossbeam 2 with
It is detachably connected between first crossbeam 2, is easy to first crossbeam 2 to reuse and connect by adding the progress bolt 4 of first crossbeam 2
Connect, so as to increase the length of main frame 20, some backbars 3 are evenly distributed in the surrounding of main frame 20, with according to steel box-girder B
Width demand, steel box-girder B is supported, it is low with cost, set up the good advantage of easy, time saving and stability.
In above-described embodiment, in order to further increase the stability of four tubing strings 1, in four tubing strings 1, adjacent tubing string
Some second cross beams 5 being mutually detachably connected are erected between 1 lower end.Specifically, second cross beam 5 is H profile steel, second cross beam
Interfixed, be fixedly connected between second cross beam 5 and second cross beam 5 by bolt 4, so as to right by welding between 5 and tubing string 1
Second cross beam 5 is reused.In addition, it is welded between the first crossbeam 2 of the upper end of tubing string 1 and the tube wall of tubing string 1 and leads to
Cross reinforcement 6 to be welded and fixed, first crossbeam 2, reinforcement 6 and tubing string 1 constitute a triangular structure, meet above-mentioned interim branch
Support support steel box-girder B intensity requirement.
The embodiment of the present invention additionally provides a kind of construction method of temporary support as described above, and the construction method includes
Following steps:
S1, according to site operation situation and the steel box-girder B width situations to be supported, by the installation position of four tubing strings 1
Put structure and be set as a rectangle, and basis is fixed in the bottom of four tubing strings 1 by expansion bolt;And in four tubing strings 1
In adjacent two lower ends of tubing string 1 be welded and fixed second cross beam 5, connected between second cross beam 5 and second cross beam 5 by bolt 4
Connect, to strengthen the stability of the temporary support.
S2, four upper ends of tubing string 1 first crossbeam 2 is welded and fixed, passed through between first crossbeam 2 and first crossbeam 2
Bolt 4 is fixedly connected, to meet the width demand of steel box-girder B width.And in the first crossbeam 2 of the every upper end of tubing string 1 and this
Reinforcement of weld beam 6 between the tube wall of root tubing string 1, further enhances the stability of the temporary support.
S3, in some backbars 3 of the upper end vertical welding of first crossbeam 1, for temporary support steel box-girder.
Above-mentioned temporary support has the following advantages that:
(1) H profile steel and tubular pillar of wide material sources can be made full use of, can live processing and fabricating, saving construction duration.
(2) pass through welding and bolt connecting mode, you can be rapidly completed installation and dismounting, on the one hand can increase connection steady
Solidity, on the other hand the temporary support can be dismounted, facilitate entrucking to be reused.
(3) bolt connection is carried out, between two second cross beams by adding first crossbeam between two first crossbeams
Bolt connection is carried out by adding second cross beam, it is adaptable to which the steel box-girder in different wide faces is supported.
(4) for supporting higher steel box-girder, tubular pillar can save traditional institute according to required random length is taken
With the waste of multiple rows of Bailey bracket material, cost is reduced.
(5) Secondary Control that the backbar being fixed on main frame can coordinate jack to carry out height is corrected.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.
Claims (10)
1. a kind of temporary support for being used to support steel box-girder, it is characterised in that the temporary support includes being fixed on basis
On four tubing strings, four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, in four tubing strings, phase
Some first crossbeams being mutually detachably connected are erected between two adjacent tubing string upper ends, described some first crossbeams are total to
A main frame is set as with enclosing, the upper end of the main frame is fixed with some backbars for being used to support steel box-girder.
2. the temporary support as claimed in claim 1 for being used to support steel box-girder, it is characterised in that the main frame is in square
Shape, is interfixed by welding between the first crossbeam and the tubing string, passed through between the first crossbeam and first crossbeam
Bolt is fixedly connected.
3. the temporary support as claimed in claim 1 or 2 for being used to support steel box-girder, it is characterised in that four described pipes
The bottom of post is connected by expansion bolt with basis.
4. the temporary support as claimed in claim 1 or 2 for being used to support steel box-girder, it is characterised in that at described four
In tubing string, some second cross beams being mutually detachably connected are erected between adjacent tubing string lower end.
5. the temporary support as claimed in claim 4 for being used to support steel box-girder, it is characterised in that the second cross beam and institute
State between tubing string and to be interfixed by welding, is bolted to connection between the second cross beam and second cross beam.
6. being used for as described in claim 1 or 5 supports the temporary support of steel box-girder, it is characterised in that ride upon the pipe
It is welded and fixed between the first crossbeam of post upper end and the tubing string tube wall by reinforcement.
7. the temporary support as claimed in claim 2 for being used to support steel box-girder, it is characterised in that described some backbars
It is evenly distributed in the surrounding of the main frame.
8. a kind of construction method of temporary support as claimed in any of claims 1 to 7 in one of claims, it is characterised in that including
Following steps:
S1, according to site operation situation and the steel box-girder width situation to be supported, the installation site structure of four tubing strings is set
Basis is fixed on by expansion bolt into a rectangle, and by the bottom of four tubing strings;
S2, in four described tubing string upper ends be welded and fixed the first crossbeam, the first crossbeam and first crossbeam it
Between be bolted to connection, to meet the width demand of steel box-girder width.
S3, in described some backbars of first crossbeam upper end vertical welding.
9. the construction method of temporary support as claimed in claim 8, it is characterised in that the falsework also includes some
Second cross beam, between the step S1 and step S2, comprises the following steps:
S11, two tubing string lower ends adjacent in four described tubing strings are welded and fixed the second cross beam, and described second is horizontal
It is bolted between beam and second cross beam.
10. the construction method of temporary support as claimed in claim 8, it is characterised in that the falsework also includes four
Root reinforcement, between the step S2 and step S3, comprises the following steps:
S21, between the first crossbeam and the root tubing string tube wall of the every tubing string upper end weld the reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710366165.4A CN107130518A (en) | 2017-05-23 | 2017-05-23 | A kind of temporary support and its construction method for being used to support steel box-girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710366165.4A CN107130518A (en) | 2017-05-23 | 2017-05-23 | A kind of temporary support and its construction method for being used to support steel box-girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107130518A true CN107130518A (en) | 2017-09-05 |
Family
ID=59732510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710366165.4A Pending CN107130518A (en) | 2017-05-23 | 2017-05-23 | A kind of temporary support and its construction method for being used to support steel box-girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107130518A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110144828A (en) * | 2019-06-03 | 2019-08-20 | 中建钢构有限公司 | The linear control method of the location structure of steel box girder assembling, support construction and bridge |
CN113123244A (en) * | 2021-04-19 | 2021-07-16 | 中铁十九局集团第三工程有限公司 | Temporary steel box girder consolidation structure |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001032533A (en) * | 1999-07-21 | 2001-02-06 | Kajima Corp | Temporary support work method and temporary support device |
CA2451695A1 (en) * | 2003-02-03 | 2004-08-03 | Steel King Industries, Inc. | Pallet rack with camber beams |
CN201665819U (en) * | 2010-03-16 | 2010-12-08 | 中国第一冶金建设有限责任公司 | Detachable modularization temporary support used for installing steel box girder road surface |
CN102031756A (en) * | 2010-12-01 | 2011-04-27 | 中建五局土木工程有限公司 | Support assembly and construction method of cast-in-place box girder |
CN103669226A (en) * | 2013-12-25 | 2014-03-26 | 中建六局土木工程有限公司 | River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method |
CN104831635A (en) * | 2015-05-26 | 2015-08-12 | 中铁二十二局集团第三工程有限公司 | Combined H-shaped steel cast-in-situ box beam support adjoining to and overpassing existing lines |
CN207017165U (en) * | 2017-05-23 | 2018-02-16 | 中建钢构有限公司 | A kind of temporary support for being used to support steel box-girder |
-
2017
- 2017-05-23 CN CN201710366165.4A patent/CN107130518A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001032533A (en) * | 1999-07-21 | 2001-02-06 | Kajima Corp | Temporary support work method and temporary support device |
CA2451695A1 (en) * | 2003-02-03 | 2004-08-03 | Steel King Industries, Inc. | Pallet rack with camber beams |
CN201665819U (en) * | 2010-03-16 | 2010-12-08 | 中国第一冶金建设有限责任公司 | Detachable modularization temporary support used for installing steel box girder road surface |
CN102031756A (en) * | 2010-12-01 | 2011-04-27 | 中建五局土木工程有限公司 | Support assembly and construction method of cast-in-place box girder |
CN103669226A (en) * | 2013-12-25 | 2014-03-26 | 中建六局土木工程有限公司 | River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method |
CN104831635A (en) * | 2015-05-26 | 2015-08-12 | 中铁二十二局集团第三工程有限公司 | Combined H-shaped steel cast-in-situ box beam support adjoining to and overpassing existing lines |
CN207017165U (en) * | 2017-05-23 | 2018-02-16 | 中建钢构有限公司 | A kind of temporary support for being used to support steel box-girder |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110144828A (en) * | 2019-06-03 | 2019-08-20 | 中建钢构有限公司 | The linear control method of the location structure of steel box girder assembling, support construction and bridge |
CN113123244A (en) * | 2021-04-19 | 2021-07-16 | 中铁十九局集团第三工程有限公司 | Temporary steel box girder consolidation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107142831A (en) | Bicycle high speed steel box girder and preparation method thereof | |
CN203201562U (en) | Shield tunneling machine initial counter-force frame convenient to detach, install and transport | |
CN203430063U (en) | Slipping splicing scaffold used for installing large-span steel structure roof primary truss | |
CN207017165U (en) | A kind of temporary support for being used to support steel box-girder | |
CN107130518A (en) | A kind of temporary support and its construction method for being used to support steel box-girder | |
CN105946977A (en) | Automobile body framework | |
CN201835518U (en) | Seamless combination formwork | |
CN206903347U (en) | A kind of Multifunctional communication tower of communication base station | |
CN207259937U (en) | Bicycle high speed steel box girder | |
CN207775719U (en) | A kind of Bridge Erector for setting up full precast beam | |
CN207017167U (en) | A kind of interim door frame for being used to support bike lane's bridge | |
CN206636581U (en) | A kind of shield tunnel Second Lining Construction chassis | |
CN206376180U (en) | High-speed railway steel concrete assembled pier | |
CN205349372U (en) | For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only | |
CN107119549A (en) | Bicycle expressway and the construction method that bicycle expressway is set up under BRT | |
CN209816676U (en) | Ox leg type hoop | |
CN207017132U (en) | A kind of bicycle expressway | |
CN203920973U (en) | A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel | |
CN203247703U (en) | Steel structural plant frame | |
CN101532336A (en) | Beam-column type support and method for constructing multi-section adjacent bridges using same | |
CN202577110U (en) | Tire road roller rack | |
CN206667056U (en) | A kind of new V supports support | |
CN204668721U (en) | Mobile substation steel structure base | |
CN205977232U (en) | Bamboo joint formula structure of tunnel secondary lining platform turning mold board stand and template crossbeam | |
CN203430064U (en) | Base of sliding assembling jig frame for mounting large-span steel structure roof primary truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170905 |