CN207017165U - A kind of temporary support for being used to support steel box-girder - Google Patents

A kind of temporary support for being used to support steel box-girder Download PDF

Info

Publication number
CN207017165U
CN207017165U CN201720583444.1U CN201720583444U CN207017165U CN 207017165 U CN207017165 U CN 207017165U CN 201720583444 U CN201720583444 U CN 201720583444U CN 207017165 U CN207017165 U CN 207017165U
Authority
CN
China
Prior art keywords
girder
steel box
support
temporary support
tubing string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720583444.1U
Other languages
Chinese (zh)
Inventor
戴立先
蔡玉龙
郑伟盛
袁晓民
廖彪
魏莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201720583444.1U priority Critical patent/CN207017165U/en
Application granted granted Critical
Publication of CN207017165U publication Critical patent/CN207017165U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model embodiment is applied to construction steel structure technical field, there is provided a kind of temporary support for being used to support steel box-girder.The temporary support includes four tubing strings on the basis of being fixed on, four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, in four tubing strings, some first crossbeams being mutually detachably connected are erected between two adjacent tubing string upper ends, some first crossbeams enclose jointly is set as a main frame, and the upper end of main frame is fixed with some backbars for being used to support steel box-girder.The utility model has cost low, sets up the advantages of easy, time saving and stability is good.

Description

A kind of temporary support for being used to support steel box-girder
Technical field
The utility model belongs to construction steel structure technical field, more particularly to a kind of temporary support for being used to support steel box-girder Frame.
Background technology
The final purpose of Traffic Development is that the outside environment of sequence is provided with for the mankind, with it is people-oriented, green go out The it is proposed of the Modern City Traffic theories such as row, the city slow-vehicle system using bicycle expressway as representative are progressively taken seriously.
Bicycle expressway refers to the urban transportation infrastructure for being exclusively used in cycling, has the characteristics that:1) row It is fast to sail speed, traffic efficiency is high.At present due to Computer method in city, the travel speed of bicycle is less than 10km/h, and voluntarily Scooter 30km/h during the design of car highway, the efficiency that greatly improves that cyclists only alleviate the congestion of large size city indirectly Effect.2) people-oriented, it is fair to embody.Bicycle highway carries out the non-separation of machine so that bicycle enjoys independent right of way, fills Code insurance protects injury of the cycling person from motor vehicle, and reduces influencing each other for two kinds of vehicles.3) it is green, it is low Carbon health.Green Travel is advocated in bicycle expressway, life idea, protection urban ecology to improving modern city low-carbon environment-friendly Environment has positive meaning.
The bicycle traffic system of domestic city is still in the starting stage at present, its planning and designing, manufacture installation it is theoretical and Technology far falls behind countries in Europe.This problem puts forth effort on the planning of large size city bicycle expressway and builds key issue and grinds Study carefully, by reasonably planning, perfect design and overall process construction, propose city bicycles expressway system integration solution party Case, it is significant to the green in promotion city, low-carbon and sustainable development.
The supporting construction for being currently used for steel box-girder of the supporting as expressway generally use Bailey bracket, needs one to save during use One section is set up, and sets up cumbersome, and is required also higher for worker, is caused cost of labor high and set up time length.In addition, for The higher situation of supporting construction, in order to ensure the stability of Bailey bracket support, it is necessary to be supported using multiple rows of Bailey bracket, Bailey bracket consumption Amount is big, and cost is high.
Utility model content
The utility model embodiment technical problem to be solved is to provide a kind of interim branch for being used to support steel box-girder Support, it is intended to solve the problems, such as the supporting construction of prior art exist set up it is cumbersome, set up that the time is long and cost is high.
The utility model embodiment is achieved in that a kind of temporary support for being used to support steel box-girder, described interim Support frame includes four tubing strings on the basis of being fixed on, and four tubing strings enclose jointly is set as a sky for being easy to accommodating pier stud Between, in four tubing strings, some the first horizontal strokes being mutually detachably connected are erected between adjacent two tubing string upper ends Beam, described some first crossbeams enclose jointly is set as a main frame, and the upper end of the main frame, which is fixed with, some to be used to support The backbar of steel box-girder.
Further, the main frame is rectangular, is interfixed between the first crossbeam and the tubing string by welding, It is bolted to connection between the first crossbeam and first crossbeam.
Further, the bottom of four described tubing strings is connected by expansion bolt with basis.
Further, in four described tubing strings, it is erected with and some mutually detachably connects between adjacent tubing string lower end The second cross beam connect.
Further, interfixed between the second cross beam and the tubing string by welding, the second cross beam and the It is bolted to connection between two crossbeams.
Further, ride upon and welded admittedly by reinforcement between the first crossbeam of the tubing string upper end and the tubing string tube wall It is fixed.
Further, described some backbars are evenly distributed in the surrounding of the main frame.
Compared with prior art, beneficial effect is the utility model embodiment:Temporary support bag of the present utility model Four tubing strings are included, basis is fixed in the bottom of four tubing strings, and four tubing strings enclose the space for being set as being easy to accommodating pier stud, Pier stud carries out being permanently fixed support to steel box-girder;First crossbeam is set up between adjacent two tubing strings in four tubing strings, if Dry first crossbeam encloses composition main frame, some backbars is fixed in the upper end of main frame, for being propped up steel box-girder temporarily Support, after the completion of being set up between steel box-girder, is reused, it has cost low, takes after above-mentioned temporary support is dismantled If the advantages of easy, time saving and stability is good.
Brief description of the drawings
Fig. 1 is the temporary support main structure diagram that the utility model embodiment provides;
Fig. 2 is the view of the temporary support support steel box-girder shown in Fig. 1;
Fig. 3 is Fig. 1 side structure schematic view;
Fig. 4 is Fig. 1 overlooking the structure diagram.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
As shown in Figures 1 to 4, it is that the temporary support one provided by the utility model for being used to support steel box-girder is preferably implemented Example, the temporary support include four tubing strings 1 on the basis of being fixed on, and four tubing strings 1 enclose jointly to be set as one and be easy to accommodating pier Post A space, pier stud A are used to be permanently fixed steel box-girder B.In the present embodiment, four tubing strings 1 are tubular pillar, its bottom End is connected by expansion bolt (not shown) with basis, is easy to carry out dismounting recycling to tubular pillar.In four pipes In post 1, some first crossbeams 2 being mutually detachably connected are erected between adjacent two upper ends of tubing string 1, some first is horizontal Beam 2 is H profile steel, and H profile steel is enclosed jointly is set as a rectangular main frame 20, and the upper end of main frame 20 is fixed with some be used for Support steel box-girder B backbar 3.Specifically, interfixed between first crossbeam 2 and tubing string 1 by welding, ensure first crossbeam 2 stability being connected with tubing string 1, are fixedly connected between first crossbeam 2 and first crossbeam 2 by bolt 4, are easy to first crossbeam 2 It is detachably connected between first crossbeam 2, is easy to first crossbeam 2 to reuse and carries out bolt 4 by adding first crossbeam 2 Connection, so as to increase the length of main frame 20, some backbars 3 are evenly distributed in the surrounding of main frame 20, with according to steel case Beam B width demand, is supported to steel box-girder B, has cost low, sets up the advantages of easy, time saving and stability is good.
In above-described embodiment, in order to further increase the stability of four tubing strings 1, in four tubing strings 1, adjacent tubing string Some second cross beams 5 being mutually detachably connected are erected between 1 lower end.Specifically, second cross beam 5 is H profile steel, second cross beam Interfixed, be fixedly connected between second cross beam 5 and second cross beam 5 by bolt 4, so as to right by welding between 5 and tubing string 1 Second cross beam 5 is reused.In addition, it is welded between the first crossbeam 2 of the upper end of tubing string 1 and the tube wall of tubing string 1 and leads to Cross reinforcement 6 to be welded and fixed, first crossbeam 2, reinforcement 6 and tubing string 1 form a triangular structure, meet above-mentioned interim branch Support support steel box-girder B intensity requirement.
The construction method of above-mentioned temporary support comprises the following steps:
S1, according to site operation situation and the steel box-girder B width situations to be supported, by the installation position of four tubing strings 1 Put structure and be set as a rectangle, and basis is fixed in the bottom of four tubing strings 1 by expansion bolt;And in four tubing strings 1 In adjacent two lower ends of tubing string 1 be welded and fixed second cross beam 5, connected between second cross beam 5 and second cross beam 5 by bolt 4 Connect, to strengthen the stability of the temporary support.
S2, four upper ends of tubing string 1 first crossbeam 2 is welded and fixed, passed through between first crossbeam 2 and first crossbeam 2 Bolt 4 is fixedly connected, to meet the width demand of steel box-girder B width.And in the first crossbeam 2 of the every upper end of tubing string 1 and this Reinforcement of weld beam 6 between the tube wall of root tubing string 1, further enhance the stability of the temporary support.
S3, in some backbars 3 of the upper end vertical welding of first crossbeam 1, for temporary support steel box-girder.
Above-mentioned temporary support has the following advantages that:
(1) H profile steel and tubular pillar of wide material sources can be made full use of, can live processing and fabricating, save construction duration.
(2) welding and bolt connecting mode are passed through, you can be rapidly completed installation and dismounting, it is steady on the one hand can to increase connection Solidity, on the other hand the temporary support can be dismounted, facilitate entrucking to be reused.
(3) bolt connection is carried out, between two second cross beams by adding first crossbeam between two first crossbeams Bolt connection is carried out by adding second cross beam, suitable for being supported to the steel box-girder in different wide faces.
(4) for supporting higher steel box-girder, tubular pillar can save traditional institute according to required random length is taken With the waste of multiple rows of Bailey bracket material, cost is reduced.
(5) backbar being fixed on main frame can coordinate the Secondary Control correction of jack progress height.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (7)

1. a kind of temporary support for being used to support steel box-girder, it is characterised in that the temporary support includes being fixed on basis On four tubing strings, four tubing strings enclose jointly is set as a space for being easy to accommodating pier stud, in four tubing strings, phase Some first crossbeams being mutually detachably connected are erected between two adjacent tubing string upper ends, described some first crossbeams are total to A main frame is set as with enclosing, the upper end of the main frame is fixed with some backbars for being used to support steel box-girder.
2. the temporary support as claimed in claim 1 for being used to support steel box-girder, it is characterised in that the main frame is in square Shape, interfixed by welding between the first crossbeam and the tubing string, passed through between the first crossbeam and first crossbeam Bolt is fixedly connected.
3. the temporary support as claimed in claim 1 or 2 for being used to support steel box-girder, it is characterised in that four described pipes The bottom of post is connected by expansion bolt with basis.
4. the temporary support as claimed in claim 1 or 2 for being used to support steel box-girder, it is characterised in that at described four In tubing string, some second cross beams being mutually detachably connected are erected between adjacent tubing string lower end.
5. the temporary support as claimed in claim 4 for being used to support steel box-girder, it is characterised in that the second cross beam and institute State and interfixed by welding between tubing string, is bolted to connection between the second cross beam and second cross beam.
6. the temporary support for being used to support steel box-girder as described in claim 1 or 5, it is characterised in that ride upon the pipe It is welded and fixed between the first crossbeam of post upper end and the tubing string tube wall by reinforcement.
7. the temporary support as claimed in claim 2 for being used to support steel box-girder, it is characterised in that described some backbars It is evenly distributed in the surrounding of the main frame.
CN201720583444.1U 2017-05-23 2017-05-23 A kind of temporary support for being used to support steel box-girder Active CN207017165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720583444.1U CN207017165U (en) 2017-05-23 2017-05-23 A kind of temporary support for being used to support steel box-girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720583444.1U CN207017165U (en) 2017-05-23 2017-05-23 A kind of temporary support for being used to support steel box-girder

Publications (1)

Publication Number Publication Date
CN207017165U true CN207017165U (en) 2018-02-16

Family

ID=61476991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720583444.1U Active CN207017165U (en) 2017-05-23 2017-05-23 A kind of temporary support for being used to support steel box-girder

Country Status (1)

Country Link
CN (1) CN207017165U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130518A (en) * 2017-05-23 2017-09-05 中建钢构有限公司 A kind of temporary support and its construction method for being used to support steel box-girder
CN108425683A (en) * 2018-03-28 2018-08-21 兰州理工大学 A kind of assembled pile foundation conversion tunnel structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130518A (en) * 2017-05-23 2017-09-05 中建钢构有限公司 A kind of temporary support and its construction method for being used to support steel box-girder
CN108425683A (en) * 2018-03-28 2018-08-21 兰州理工大学 A kind of assembled pile foundation conversion tunnel structure and construction method

Similar Documents

Publication Publication Date Title
CN107142831A (en) Bicycle high speed steel box girder and preparation method thereof
CN203201562U (en) Shield tunneling machine initial counter-force frame convenient to detach, install and transport
CN203430063U (en) Slipping splicing scaffold used for installing large-span steel structure roof primary truss
CN207017165U (en) A kind of temporary support for being used to support steel box-girder
CN109736438A (en) A kind of concrete filled steel tube connects with steel tube device and its construction method
CN107130518A (en) A kind of temporary support and its construction method for being used to support steel box-girder
CN201835518U (en) Seamless combination formwork
CN205400756U (en) Variable section platform truck
CN206903347U (en) A kind of Multifunctional communication tower of communication base station
CN207259937U (en) Bicycle high speed steel box girder
CN207775719U (en) A kind of Bridge Erector for setting up full precast beam
CN207017167U (en) A kind of interim door frame for being used to support bike lane's bridge
CN107119549A (en) Bicycle expressway and the construction method that bicycle expressway is set up under BRT
CN207017132U (en) A kind of bicycle expressway
CN203920973U (en) A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel
CN203247703U (en) Steel structural plant frame
CN202704950U (en) Supporting frame
CN208827934U (en) A kind of electric tractor chassis based on bi-motor coupling driving
CN202767096U (en) Single-pole-tower precast independent foundation
CN203034916U (en) Assembled construction barrier
CN204668721U (en) Mobile substation steel structure base
CN205933009U (en) From rising tower crane foundation ballast structure
CN206667056U (en) A kind of new V supports support
CN204690993U (en) Assembling buckling restrained brace structure
CN213447884U (en) Foundation unit for steel structure light rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20220923

Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Engineering Group Co.,Ltd.

TR01 Transfer of patent right