CN204668721U - Mobile substation steel structure base - Google Patents

Mobile substation steel structure base Download PDF

Info

Publication number
CN204668721U
CN204668721U CN201520401587.7U CN201520401587U CN204668721U CN 204668721 U CN204668721 U CN 204668721U CN 201520401587 U CN201520401587 U CN 201520401587U CN 204668721 U CN204668721 U CN 204668721U
Authority
CN
China
Prior art keywords
column
truss element
rear column
front column
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520401587.7U
Other languages
Chinese (zh)
Inventor
李志明
刘巍
徐军
廉浩明
冯峰
余金华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuxi Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Wuxi Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuxi Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201520401587.7U priority Critical patent/CN204668721U/en
Application granted granted Critical
Publication of CN204668721U publication Critical patent/CN204668721U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to basis, a kind of mobile substation, a kind of specifically can the mobile substation steel structure base of rapid-assembling, belong to transformer substation foundation technical field.It comprises multiple truss element, and multiple truss element is connected in series integral by bolt; Each truss element comprises row's front column and row's rear column, and front column is identical with rear column quantity, parallel to each other between front column and rear column, and is oppositely arranged one by one.Every two front column upper and lower sides are welded to connect a crossbeam respectively, and every two rear column upper and lower sides are welded to connect a crossbeam respectively.Welding upper longeron in upper end between the front column be oppositely arranged and rear column, the lower longeron of lower end welding.The utility model not only saves the time that field basic makes, and it is more convenient that transport is installed, and improves speed of application; Basis can rapid disassembling, and can reuse, and reduces construction cost, does not account for soil, free from environmental pollution; Structure is reliable, long service life.

Description

Mobile substation steel structure base
Technical field
The utility model relates to basis, a kind of mobile substation, a kind of specifically can the mobile substation steel structure base of rapid-assembling, belong to transformer substation foundation technical field.
Background technology
Along with social economy's ground development and the improving constantly of living standards of the people, for adapting to new development situation and the rigid demand of electricity consumption, existing solution is all electric substations of newly-built Large Copacity, large load substantially.In view of the present situation that land resource finite sum Wuxi Area capacity-load ratio is higher, the transformation of most of electric substation, dilatation, enlarging are all carried out on original transformer station place.
Unaffected in order to ensure the electricity consumption of user before original electric substation place is carried out the replacing of equipment, dilatation, usually carry out load transfer plan.In the load transfer plan process of the Overall Reconstruction of transformer station, often need to be applied to mobile substation.Mobile substation needs first by masonry or concrete constructions Equipment Foundations before installing, and the cycle is longer.Do not give full play to the feature of mounted equipment rapid-assembling.Integral installation that although switchgear all realizes " container ", the quantities that Equipment Foundations all will carry out on-the-spot civil engineering is at every turn comparatively large, and the duration is longer.Half a year was on active service by 1 year in mobile substation at every turn, after engineering terminates, needed to remove basis, caused concrete to waste, contaminated environment.And mobile substation can only use once, can not recycle, its cost of investment is higher, is unfavorable for economizing on resources and environmental protection.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, thus provides a kind of mobile substation steel structure base, can rapid-assembling at the scene, and can reuse, and shortens electric substation's construction period, creates great economic benefit and social benefit.
According to the technical scheme that the utility model provides, mobile substation steel structure base comprises multiple truss element, it is characterized in that: multiple truss element is connected in series integral by bolt; Each truss element comprises row's front column and row's rear column, and front column is identical with rear column quantity, parallel to each other between front column and rear column, and is oppositely arranged one by one; Every two front column upper and lower sides are welded to connect a crossbeam respectively, and every two rear column upper and lower sides are welded to connect a crossbeam respectively; Welding upper longeron in upper end between the front column be oppositely arranged and rear column, the lower longeron of lower end welding.
Further, truss element is four.
Further, upper longeron welds stiffener upper bracket, lower longeron welds stiffener lower carriage, and weld stiffener between stiffener upper bracket and stiffener lower carriage, stiffener is obliquely installed.
Further, each truss element left and right sides is provided with hanger.
Compared with the prior art the utility model has the following advantages:
The utility model structure is simple, compact, reasonable, makes outside the venue owing to taking, and split is transported, the mode of on-the-spot integral installation, not only saves the time that field basic makes, and it is more convenient that transport is installed, and improves speed of application; Basis can rapid disassembling, and can reuse, and reduces construction cost, does not account for soil, free from environmental pollution; Structure is reliable, long service life.
Accompanying drawing explanation
Fig. 1 is the utility model front view.
Fig. 2 is the utility model end view.
Fig. 3 is the utility model upward view.
Description of reference numerals: longeron, 6-stiffener, 7-stiffener upper bracket, 8-stiffener lower carriage, 9-hanger, 10-rear column under 1-truss element, 2-front column, 3-crossbeam, the upper longeron of 4-, 5-.
Embodiment
Embodiment in is by reference to the accompanying drawings further described by the utility model below:
As shown in Fig. 1 ~ 3, the utility model mainly comprises multiple truss element 1, and multiple truss element 1 is connected in series integral by bolt, and in embodiment as shown in Figure 1, described truss element 1 is four.
Each truss element 1 comprises row's front column 2 and row's rear column 10, and front column 2 is identical with rear column 10 quantity, parallel to each other between front column 2 and rear column 10, and is oppositely arranged one by one.Every two front column 2 upper and lower sides are welded to connect a crossbeam 3 respectively, and every two rear column 10 upper and lower sides are welded to connect a crossbeam 3 respectively.Welding upper longeron 4 in upper end between the front column 2 be oppositely arranged and rear column 10, the lower longeron 5 of lower end welding.
In order to improve the bonding strength between upper longeron 4 and lower longeron 5, described upper longeron 4 welds stiffener upper bracket 7, lower longeron 5 welds stiffener lower carriage 8, welds stiffener 6 between stiffener upper bracket 7 and stiffener lower carriage 8, described stiffener 6 is obliquely installed.
Conveniently transport truss element 1, each truss element 1 left and right sides is provided with hanger 9.
The utility model structure is simple, compact, reasonable, and overall structure is connected in series integral by multiple truss element, and each truss element completes welding in workshop, and the scene that is then transported to is connected in series.Each truss element both sides are provided with hanger, conveniently transport.Make outside the venue owing to taking, split is transported, the mode of on-the-spot integral installation, not only saves the time that field basic makes, and it is more convenient that transport is installed, and improves speed of application; Basis can rapid disassembling, and can reuse, and reduces construction cost, does not account for soil, free from environmental pollution; Structure is reliable, long service life.

Claims (4)

1. a mobile substation steel structure base, comprises multiple truss element (1), it is characterized in that: multiple truss element (1) is connected in series integral by bolt; Each truss element (1) comprises row's front column (2) and row's rear column (10), and front column (2) is identical with rear column (10) quantity, parallel to each other between front column (2) and rear column (10), and is oppositely arranged one by one; Every two front column (2) upper and lower sides are welded to connect a crossbeam (3) respectively, and every two rear column (10) upper and lower sides are welded to connect a crossbeam (3) respectively; Welding upper longeron (4) in upper end between the front column (2) be oppositely arranged and rear column (10), the lower longeron (5) of lower end welding.
2. mobile substation as claimed in claim 1 steel structure base, is characterized in that: described truss element (1) is four.
3. mobile substation as claimed in claim 1 steel structure base, it is characterized in that: described upper longeron (4) upper welding stiffener upper bracket (7), lower longeron (5) upper welding stiffener lower carriage (8), weld stiffener (6) between stiffener upper bracket (7) and stiffener lower carriage (8), stiffener (6) is obliquely installed.
4. mobile substation as claimed in claim 1 steel structure base, is characterized in that: described each truss element (1) left and right sides is provided with hanger (9).
CN201520401587.7U 2015-06-11 2015-06-11 Mobile substation steel structure base Active CN204668721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520401587.7U CN204668721U (en) 2015-06-11 2015-06-11 Mobile substation steel structure base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520401587.7U CN204668721U (en) 2015-06-11 2015-06-11 Mobile substation steel structure base

Publications (1)

Publication Number Publication Date
CN204668721U true CN204668721U (en) 2015-09-23

Family

ID=54139069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520401587.7U Active CN204668721U (en) 2015-06-11 2015-06-11 Mobile substation steel structure base

Country Status (1)

Country Link
CN (1) CN204668721U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104934857A (en) * 2015-06-11 2015-09-23 国家电网公司 Steel structure foundation of mobile substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104934857A (en) * 2015-06-11 2015-09-23 国家电网公司 Steel structure foundation of mobile substation

Similar Documents

Publication Publication Date Title
CN204668721U (en) Mobile substation steel structure base
CN202090660U (en) Alternative-current supper high voltage steel tube tower butt-welded connection variable-slope node
CN204871074U (en) Dolly device is transported to curb
CN203487548U (en) Connecting structure of transformer substation steel bracket and concrete foundation joint
CN104934857A (en) Steel structure foundation of mobile substation
CN207017165U (en) A kind of temporary support for being used to support steel box-girder
CN204590410U (en) A kind of outdoor power transformation framework cantilever steel girder
CN204001781U (en) Quick group of steel work floor frame to moulding bed
CN203247703U (en) Steel structural plant frame
CN204089240U (en) A kind of off-grid type energy storage quick charging system
CN203666706U (en) Simple two-wheel lever transportation tool
CN203891514U (en) Main transformer framework for omitting end support in substation
CN203795262U (en) Construction site steel road
CN207010045U (en) A kind of architectural structure system provided with inlet-outlet line roof of transformer substation framework
CN204456883U (en) A kind of prefabricated detachable discharging platform
CN104895391A (en) External inserted cross arm connecting device for steel pipe rods
CN204876754U (en) Narrow ji gangguanta's of four posts connected node is assembled to modularization
CN203430064U (en) Base of sliding assembling jig frame for mounting large-span steel structure roof primary truss
CN204023603U (en) A kind of shearing resistance screw communication base station basis
CN204727238U (en) The support frame of jacket, chunk ro-ro transport
CN204947527U (en) A kind of iron tower of power transmission line cable bearer
CN204690993U (en) Assembling buckling restrained brace structure
CN203614916U (en) Movable pump pipe fixing support
CN203394079U (en) Large overweight box-type beam mounting assisting parallel truss
CN204356834U (en) A kind of vertical bearing plate of rainwater-collecting module

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant