CN107119673B - 一种适用不同桩径的钢筋笼支撑装置 - Google Patents
一种适用不同桩径的钢筋笼支撑装置 Download PDFInfo
- Publication number
- CN107119673B CN107119673B CN201710353937.0A CN201710353937A CN107119673B CN 107119673 B CN107119673 B CN 107119673B CN 201710353937 A CN201710353937 A CN 201710353937A CN 107119673 B CN107119673 B CN 107119673B
- Authority
- CN
- China
- Prior art keywords
- bar
- briquetting
- wheel disc
- casing
- axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明一种适用不同桩径的钢筋笼支撑装置主要用于建筑工程领域灌注桩钢筋笼加工使用,它安装快捷方便,具有通用性;它主要由轮盘、幅杆、套管、钢筋固定器、轴A、支撑架组成,其主要工作原理是:先根据图纸设计的桩基钢筋笼受力主筋的个数,确定套管及幅杆的个数,并在轮盘上找到相应的孔,再将多个套管分别拧入轮盘的多个孔内并使多个套管均匀地排列在轮盘上,然后将多个幅杆分别拧入多个套管内,再将多根钢筋的端部分别放入钢筋固定器的固定杆的凹槽内,转动压块并使压块下端的凹槽压在钢筋的上端表面上,拧紧螺帽,螺帽将通过压块将钢筋固定紧,最后转动幅杆,使多根钢筋的位置满足设计图纸要求,安装工作完成。
Description
技术领域
本发明主要用于建筑工程领域灌注桩钢筋笼加工使用。
背景技术
目前的灌注桩钢筋笼加工均在施工现场进行,圆形的钢筋笼需要先固定主筋,再在主筋外围焊接箍筋,但主筋的固定又需要焊接临时钢筋固定环,不但浪费材料且耗时费力,很不经济。
发明内容
本发明解决了上述问题,它不需要焊接临时钢筋固定环,安装快捷方便,具有通用性;本发明主要由轮盘(1)、幅杆(2)、套管(3)、钢筋固定器(4)、轴A(5)、支撑架(12)组成;轮盘(1)的侧面与轴A(5)的侧面固定,轴A(5)穿过支撑架(12)上端的孔并可绕其孔旋转,轮盘(1)的外缘有多个孔(6),孔(6)有内螺纹,套管(3)的下端有外螺纹(13),套管(3)的下端拧入孔(6)内,套管(3)的内圆有内螺纹,幅杆(2)有外螺纹,幅杆(2)的外螺纹拧入套管(3)的内螺纹内;钢筋固定器(4)由压块(7)、螺帽(8)、固定杆(9)、轴B(10)组成,固定杆(9)的下端固定有铰接头(14),铰接头(14)可以在幅杆(2)的上端转动,固定杆(9)的右上端有外螺纹,固定杆(9)的左上端固定有轴B(10),压块(7)的左端与轴B(10)铰接,压块(7)可以绕轴B(10)转动,压块(7)的下端有凹槽,其凹槽与钢筋(11)的上表面吻合;其主要工作原理是:先根据图纸设计的桩基钢筋笼受力主筋的个数,确定套管(3)及幅杆(2)的个数,并在轮盘(1)上找到相应的孔(6),再将多个套管(3)分别拧入轮盘(1)的多个孔(6)内并使多个套管(3)均匀地排列在轮盘(1)上,然后将多个幅杆(2)分别拧入多个套管(3)内,再将多根钢筋(11)的端部分别放入钢筋固定器(4)的固定杆(9)的凹槽内,转动压块(7)并使压块(7)下端的凹槽压在钢筋(11)的上端表面上,将螺帽(8)套在固定杆(9)的右上端并拧紧螺帽(8),螺帽(8)将通过压块(7)将钢筋(11)固定紧,最后转动幅杆(2),使多根钢筋(11)的位置满足设计图纸要求,用同样的方法安装另一侧的钢筋笼支撑装置,安装工作完成,转动钢筋笼就可以进行正常的箍筋焊接工作了。
附图说明
附图标记说明:1-轮盘,2-幅杆,3-套管,4-钢筋固定器,5-轴A,6-孔,7-压块,8-螺帽,9-固定杆,10-轴B,11-钢筋,12-支撑架,13-外螺纹,14-铰接头。
图1是本发明的侧立面图。
图2是本发明轮盘与幅杆的分解示意图。
图3是钢筋固定器的大样图。
图4是钢筋固定器的压块处于张开状态的示意图。
图5是本发明的正立面图。
具体实施方式
发明内容已详细说明了本发明的具体实施方式,这里不再重复,需说明:不同建筑物的灌注桩的桩径是不一样的,其钢筋笼受力主筋的数量也是不一样的,为了满足这种变化,本发明在轮盘1上设计多个孔6,以满足不同受力主筋数量的需要,根据图纸设计的桩基钢筋笼受力主筋的个数,确定套管3及幅杆2的个数并在轮盘1上找到相应的孔6。
Claims (1)
1.一种适用不同桩径的钢筋笼支撑装置,其特征是:它主要由轮盘(1)、幅杆(2)、套管(3)、钢筋固定器(4)、轴A(5)、支撑架(12)组成;轮盘(1)的侧面与轴A(5)的侧面固定,轴A(5)穿过支撑架(12)上端的孔并可绕其孔旋转,轮盘(1)的外缘有多个孔(6),孔(6)有内螺纹,套管(3)的下端有外螺纹(13),套管(3)的下端拧入孔(6)内,套管(3)的内圆有内螺纹,幅杆(2)有外螺纹,幅杆(2)的外螺纹拧入套管(3)的内螺纹内;钢筋固定器(4)由压块(7)、螺帽(8)、固定杆(9)、轴B(10)组成,固定杆(9)的下端固定有铰接头(14),铰接头(14)可以在幅杆(2)的上端转动,固定杆(9)的右上端有外螺纹,固定杆(9)的左上端固定有轴B(10),压块(7)的左端与轴B(10)铰接,压块(7)可以绕轴B(10)转动,压块(7)的下端有凹槽,其凹槽与钢筋(11)的上表面吻合;其主要工作原理是:先根据图纸设计的桩基钢筋笼受力主筋的个数,确定套管(3)及幅杆(2)的个数,并在轮盘(1)上找到相应的孔(6),再将多个套管(3)分别拧入轮盘(1)的多个孔(6)内并使多个套管(3)均匀地排列在轮盘(1)上,然后将多个幅杆(2)分别拧入多个套管(3)内,再将多根钢筋(11)的端部分别放入钢筋固定器(4)的固定杆(9)的凹槽内,转动压块(7)并使压块(7)下端的凹槽压在钢筋(11)的上端表面上,将螺帽(8)套在固定杆(9)的右上端并拧紧螺帽(8),螺帽(8)将通过压块(7)将钢筋(11)固定紧,最后转动幅杆(2),使多根钢筋(11)的位置满足设计图纸要求,用同样的方法安装另一侧的钢筋笼支撑装置,安装工作完成,转动钢筋笼就可以进行正常的箍筋焊接工作了。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710353937.0A CN107119673B (zh) | 2017-05-18 | 2017-05-18 | 一种适用不同桩径的钢筋笼支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710353937.0A CN107119673B (zh) | 2017-05-18 | 2017-05-18 | 一种适用不同桩径的钢筋笼支撑装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107119673A CN107119673A (zh) | 2017-09-01 |
CN107119673B true CN107119673B (zh) | 2019-04-05 |
Family
ID=59728406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710353937.0A Active CN107119673B (zh) | 2017-05-18 | 2017-05-18 | 一种适用不同桩径的钢筋笼支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107119673B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442710A (zh) * | 2018-02-01 | 2018-08-24 | 中建三局集团有限公司 | 一种用于任意桩径钢筋笼精细加工的装置及加工方法 |
CN109083332A (zh) * | 2018-06-29 | 2018-12-25 | 潘晓青 | 一种便于钢筋笼捆扎的钢筋撑开装置 |
CN109505296A (zh) * | 2019-01-07 | 2019-03-22 | 中铁七局集团有限公司 | 一种可重复利用的钢筋笼防变形支架 |
CN111188502B (zh) * | 2020-01-09 | 2021-06-04 | 中国建筑第二工程局有限公司 | 一种用于钢筋扎丝操作的调节支撑结构 |
CN111119064B (zh) * | 2020-01-16 | 2021-05-04 | 天津新亚太工程建设监理有限公司 | 一种跨海大桥墩身钢筋笼预制支撑装置及其监理办法 |
CN115075227B (zh) * | 2022-06-27 | 2024-02-13 | 青海送变电工程有限公司 | 一种调整灌注桩钢筋笼的辅助装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0033889A2 (de) * | 1980-02-05 | 1981-08-19 | Dyckerhoff & Widmann Aktiengesellschaft | Vorrichtung an einer Maschine zum kontinuierlichen Herstellen von Bewehrungskörben für Rohre oder dergleichen aus Stahlbeton |
CN2610193Y (zh) * | 2003-04-04 | 2004-04-07 | 郑文科 | 混凝土泵管安全固定卡 |
CN204052739U (zh) * | 2014-09-04 | 2014-12-31 | 葛洲坝集团第二工程有限公司 | 制作大直径桥梁桩基钢筋笼可调节式定位器 |
CN104594336A (zh) * | 2015-01-30 | 2015-05-06 | 国家电网公司 | 特高压灌注桩基础钢筋笼内部支撑装置 |
CN204626440U (zh) * | 2015-05-27 | 2015-09-09 | 中国葛洲坝集团股份有限公司 | 可调节桩基钢筋定位装置 |
CN105414411A (zh) * | 2015-12-17 | 2016-03-23 | 中铁十六局集团第三工程有限公司 | 一种桩基础辅笼加工胎架及桩基础辅笼加工方法 |
-
2017
- 2017-05-18 CN CN201710353937.0A patent/CN107119673B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0033889A2 (de) * | 1980-02-05 | 1981-08-19 | Dyckerhoff & Widmann Aktiengesellschaft | Vorrichtung an einer Maschine zum kontinuierlichen Herstellen von Bewehrungskörben für Rohre oder dergleichen aus Stahlbeton |
CN2610193Y (zh) * | 2003-04-04 | 2004-04-07 | 郑文科 | 混凝土泵管安全固定卡 |
CN204052739U (zh) * | 2014-09-04 | 2014-12-31 | 葛洲坝集团第二工程有限公司 | 制作大直径桥梁桩基钢筋笼可调节式定位器 |
CN104594336A (zh) * | 2015-01-30 | 2015-05-06 | 国家电网公司 | 特高压灌注桩基础钢筋笼内部支撑装置 |
CN204626440U (zh) * | 2015-05-27 | 2015-09-09 | 中国葛洲坝集团股份有限公司 | 可调节桩基钢筋定位装置 |
CN105414411A (zh) * | 2015-12-17 | 2016-03-23 | 中铁十六局集团第三工程有限公司 | 一种桩基础辅笼加工胎架及桩基础辅笼加工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107119673A (zh) | 2017-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107119673B (zh) | 一种适用不同桩径的钢筋笼支撑装置 | |
CN106938309A (zh) | 一种加工圆形钢筋笼的支撑装置 | |
CN204754274U (zh) | 输电线路砼杆加固装置 | |
CN202877797U (zh) | 一种用于液下泵支撑管的焊接装置 | |
CN103114722A (zh) | 一种地下室外墙用三段式止水螺杆 | |
CN106988301B (zh) | 一种加工圆形钢筋笼的中间支撑装置 | |
CN107724677A (zh) | 钢筋混凝土构件中钢筋模板定位施工结构及其施工方法 | |
CN107060357A (zh) | 拼装式墙板的斜撑装置 | |
CN207454482U (zh) | 一种方便安装宽度可调节的骑马螺栓 | |
CN211118722U (zh) | 用于储氢的储气井 | |
CN210685182U (zh) | 一种灌浆套筒钢筋定位工具 | |
CN204174937U (zh) | 可回收钢丝绳拉环的施工装置 | |
CN203034804U (zh) | 一种地下室外墙用三段式止水螺杆 | |
JP4741497B2 (ja) | 相互に方向付けられたねじ切り要素を備える円筒状構成部品およびその製造方法 | |
CN210686008U (zh) | 预埋注浆管调整机构及台车 | |
CN204645582U (zh) | 一种成套外挑钢梁组件 | |
CN103628685B (zh) | 一种防止混凝土泵管侧向位移的方法及混凝土泵管加固装置 | |
CN204512116U (zh) | 有灌浆孔的多节膨胀螺栓 | |
CN210396725U (zh) | 一种截割回转机构及具有该机构的掘进机 | |
CN207582964U (zh) | 一种简易套管固定装置 | |
CN206903343U (zh) | 一种铁塔钢管变径法兰连接节点装置 | |
CN203684540U (zh) | 钢筋对接固定装置 | |
CN203401110U (zh) | 一种钻孔模 | |
CN104612166A (zh) | 一种支护孔壁的组合支护装置及支护方法 | |
CN206037896U (zh) | 隧道掘进机步进施工段钻爆洞径检测工具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200521 Address after: 2-1, No. 222, Caishi North Street, Yongxin town, Qijiang District, Chongqing Patentee after: Chongqing Jianzhong construction engineering Co., Ltd Address before: 448000 Hubei Province, Jingmen city Dongbao District Road No. 1 Building 6 401 aquamarine Patentee before: JINGMEN CHUANGJIA MACHINERY TECHNOLOGY Co.,Ltd. |
|