CN107101322A - 统一最大削减负荷持续时间的变频空调群组潜力评估方法 - Google Patents

统一最大削减负荷持续时间的变频空调群组潜力评估方法 Download PDF

Info

Publication number
CN107101322A
CN107101322A CN201710241453.7A CN201710241453A CN107101322A CN 107101322 A CN107101322 A CN 107101322A CN 201710241453 A CN201710241453 A CN 201710241453A CN 107101322 A CN107101322 A CN 107101322A
Authority
CN
China
Prior art keywords
mrow
msub
air
conditioning
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710241453.7A
Other languages
English (en)
Other versions
CN107101322B (zh
Inventor
张静页
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201710241453.7A priority Critical patent/CN107101322B/zh
Publication of CN107101322A publication Critical patent/CN107101322A/zh
Application granted granted Critical
Publication of CN107101322B publication Critical patent/CN107101322B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)
  • Coloring Foods And Improving Nutritive Qualities (AREA)

Abstract

本发明涉及一种统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述方法包括以下步骤:(1)建立变频空调的负荷模型,(2)通过相关参数的计算使得空调升高温度后的稳定削减功率和最大削减功率可控,(3)建立群组负荷削减模型,(4)设计空调群组需求响应潜力评估流程,(5)设计空调群组退出受控流程。该技术方案充分考虑了变频空调的工作运行特点和用户的舒适度上限,调用变频空调群组参与需求响应以实现负荷削减,保证了负荷削减的准确性和平稳性,考虑了空调退出受控时的反弹负荷,保证了控制结束后空调群组负荷的平稳。

Description

统一最大削减负荷持续时间的变频空调群组潜力评估方法
技术领域
本发明涉及一种评估方法,具体涉及一种统一最大削减负荷持续时间的变频空调群组潜力评估方法,属于电力需求响应技术领域。
背景技术
空调负荷是居民负荷的主要组成部分,变频空调在市场占有的份额越来越大,且其具有良好的调节特性,因此对变频空调参与需求响应的控制方法进行研究很有必要。变频空调可以通过改变压缩机的转速而连续地调节其容量以适应动态变化的空调房间负荷需要,较常规定速空调器具有更优越的运行经济性和舒适性。目前空调需求响应的控制方法主要包括开关控制、周期性暂停控制和提高设定温度,变频空调的工作原理决定了其只适合提高设定温度的控制方法。变频空调提高设定温度后,将以最低频率运行一段时间,不同的设定温度和空调参数,最大削减功率的大小和持续时间的长短不一致,较难统一控制,为实现空调群组削减负荷的平稳和准确,本文提出了通过统一最大削减负荷持续时间的变频空调群组需求响应控制方法。
发明内容
本发明正是针对现有技术中存在的技术问题,提供一种统一最大削减负荷持续时间的变频空调群组潜力评估方法,本发明提供一种基于变频空调工作原理和房间一阶热参数模型的变频空调功率模型,在此基础上提出了统一最大削减功率持续时间,建立负荷削减模型,实现平稳准确削减空调群组负荷并抑制反弹负荷,评估群组需求响应潜力的方法。
为了实现上述目的,本发明的技术方案如下,一种统一最大削减负荷持续时间的变频空调需求响应控制方法,在变频空调模型的基础上,考虑提高设定温度的需求响应控制方法,通过确定统一的最大削减负荷持续时间,计算各台空调的稳定削减功率和设定温度,建立负荷削减模型,确定空调群组的控制方案,设计群组退出受控流程,保证负荷削减的平稳准确和退出受控后的负荷平稳,评估空调群组的潜力。
上述方法包如下步骤:
(1)建立变频空调的负荷模型,
(1.1)建立房间模型,
房间模型主要描述空调房间在室内外冷热源作用下的温度变化,当前基于空调房间热力学的仿真中最常用的为等效热参数模型,其原始微分方程过于复杂,其简化后的一阶微分方程形式如下:
式中,Tin(t)为t时刻室内气体温度,℃;R为空调房间等效热阻,Ω;C为空调房间等效热容,F;Tout(tk)为tk时刻室外环境温度,℃;QAC(tk)为时刻tk注入房间的冷量,kW;
(1.2)建立控制系统模型;
变频空根据室内温度与用户设定温度之差ΔT来计算目标频率f,室内温度传感器每一分钟检测一次ΔT:
(1.3)功率和制冷量模型,
相关文献的一系列实验证明变频空调的电功率及制冷功率与压缩机的频率、冷凝器的外部温度、蒸发器的回水温度成一次线性关系。可建立空调功率与室内温度、室外温度、频率之间的一次函数关系,空调冷量与室内温度、室外温度、频率之间的一次函数关系:
P(tk)=a1+b1Tin(tk)+c1Tout(tk)+d1f(tk) (3)
Q(tk)=a2+b2Tin(tk)+c2Tout(tk)+d2f(tk) (4)
其中,a1为空调功率常数项,kW;b1为空调功率室内温度系数,kW/℃;c1为空调功率室外温度系数,kW/℃;d1为空调功率频率系数,kW/Hz。a2为空调冷量常数项,kW;b2为空调冷量室内温度系数,kW/℃;c2为空调冷量室外温度系数,kW/℃;d2为空调冷量频率系数,kW/Hz。根据空调的运行特点和大量实际运行数据分析,在压缩机的频率、冷凝器的外部温度、蒸发器的回水温度在一定范围内时,系数为定值,a1为负,b1、c1、d1为正,c2为负,a2、b2、d2为正;
(2)空调参与需求响应控制相关参数计算,
通过一定的需求响应控制手段控制空调运行,即使得空调升高温度后的稳定削减功率和最大削减功率以及最大削减功率持续时间可控。由空调的最大削减功率持续时间tlast2,可以推导出空调新的设定温度Tset2,根据Tset2可以推导出空调的重新稳定运行时的频率,继而推导出稳定削减功率,空调最大削减功率即空调正常运行的功率和最低频率运行时的功率之差,
相关参数计算公式如下:
(2.1)室温上升时间,
因此,空调设定温度由室温Ts1调到温度上限Tss(Tss>Ts1),带入公式(1)可以推导升温过程的持续时间tlast,i
其中Qmin为最小频率时注入的冷量,
(2.2)最大削减功率,
最小频率时,将室内温度Tin近似为Ts1,室外温度Tout视为定值,代入公式(3)可得空调功率为Pmin=a1+b1Ts1+c1Tout+d1fmin。设定温度提高前的功率可以近似为P=a1+b1Ts1+c1Tout+d1fs1,最大削减功率为
ΔPmax=d1(fs1-fmin) (6),
(2.3)设定温度计算,
空调保持最小频率运行时,根据公式(1)室温在Δt内变化的大小ΔTin,min可近似为:
空调原状态运行时,根据公式(1)室温在Δt内变化的大小ΔTin,max可近似为:
因此新的设定温度应为
(2.4)运行频率估算,
根据新的设定温度Ts2和室外温度Tout(tk),代入公式(1),整理可得将其代入公式(4),得到压缩机的设定频率fs2
(2.5)稳定削减功率,
将Tset2,fs2代入公式(3),得到稳定削减功率为
ΔPw=b1(Ts1-Ts2)+d1(fs1-fs2) (11)
(3)建立群组负荷削减模型;
(3.1)假设小组中共有N台空调(N≥K),目标为在Tct时间内响应削减电力Pm,统一的最大削减功率持续时间为Tlast2,计算第i台空调新的设定温度Ts2,i和稳定削减功率ΔPw,i,最大削减功率ΔPmax,i,求解负荷削减模型,计算各时段受控的空调台数,
(3.2)选择第一个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
其中,α1,i为空调在第一时段是否受控,1为受控,0为不受控,ΔPmax,i为第i台空调最大削减功率。求解出受控空调编号为集合CT1
(3.3)选择第二个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
其中,ΔPw,i为第i台空调稳定削减的功率,α2,i为第i台空调在第二个时段是否受控,1为受控,0为不受控,
约束条件:只可以调用未参与第一个时段的空调:
α1,i2,i≤1 i=1,2,...,N (14);
受控空调编号为集合CT2
(3.4)以此类推,选择第K个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
其中,αn,i为第i台空调在第n个时段是否受控,1为受控,0为不受控;
约束条件:只可以调用未参与前n-1个时段的空调:
α1,i2,i+...+αK,i≤1 i=1,2,...,N (16)
受控空调编号为集合CTK
(4)设计空调群组需求响应潜力评估流程,
(4.1)计算一个群组中各台空调设定温度提高至上限时的最大削减功率持续时间tlast,i,再计算群组统一的最大削减功率持续时间tlast2,tlast2满足
tlast2≤tlast,i i=1,...,N (17)
K×tlast2=tct K∈Z (18)
为保证空调群组的需求响应潜力最大,K尽量小;
(4.2)计算各台空调新的设定温度和稳定削减功率;
(4.3)评估空调群组的需求响应潜力,假设空调群组的最大削减功率目标值为ΔPmax,由负荷削减模型求解控制方案,当受控的空调数量大于上限,实际的削减功率与目标削减功率的最大误差也小于允许值时,该假设的目标削减功率即为空调群组的最大需求响应潜力。否则,当受控空调数量小于上限时,增大目标削减功率;当实际的削减功率与目标削减功率的最大误差大于允许值时,减小目标削减功率。
(5)设计空调群组退出受控流程,
(5.1)计算各台空调降低到原始设定温度,最高频率运行的持续时间,根据公式(1)得到:
选择控制时间间隔Δttc,其尽量小,但大于等于所有空调的最高频率运行持续时间,满足:
Δttc≥tre,i i=1,2,...,N (20);
(5.2)每个Δttc时段,选择nc台空调退出受控,nc台空调变为最高功率运行,在Δttc内均逐步降为原始设定温度运行的功率,下一个时段,再选择nc+1台空调退出控制,直至所有空调都退出受控,每个时段控制整个群组的总功率不大于正常运行时的功率的一定范围。
第C个时段选择nC台空调退出受控:
其中,α为允许大于正常运行的功率的范围,P1为不受控的空调的平均功率,Nc为原控制方案中受控的空调总个数,nj为第j个时段退出控制的空调台数,Pch为受控中的空调的平均功率,Pmax为保持最大频率运行时的功率。
相对于现有技术,本发明具有如下优点,1)该技术方案考虑变频空调功率冷量和频率之间的关系,在房间一阶等效热参数模型的基础上建立了变频空调负荷模型,与实际变频空调的运行情况更贴近,保证了模型的实际意义;2)该技术方案采用了统一最大削减负荷持续时间,计算各台空调在设定温度提高的上限的最大削减负荷持续时间,确定统一的最大削减负荷持续时间,计算各台空调的设定温度和稳定削减功率,实际采取提高设定温度的方法实现变频空调的负荷削减,实用价值更高,在用户的舒适度允许范围内进行控制;充分利用了变频空调提高设定温度后以最低频率运行时的最大削减功率;3)本发明提到的负荷削减办法,模型的准确性是在假设室外环境温度不变的前提下,考虑全天室外环境温度变化,目标削减时间不宜过长,以实现负荷削减的平稳准确,空调分组投入控制,先投入的空调受控时间相对较长但在用户运行受控时间内,不会影响用户的舒适度;4)本发明提出的空调群组潜力评估方法,可以充分挖掘空调群组的需求响应潜力,保证尽可能多的空调参与控制,且削减效果平稳准确;5)本发明中考虑了空调退出控制反弹负荷较大,设计了群组退出受控的流程,减小了退出受控后空调负荷对系统运行的冲击。
附图说明
图1为本发明实施流程图;
图2为本发明抽象后的单台空调提高设定温度后的负荷变化曲线;
图3为本发明理论空调群组负荷削减曲线;
图4为本发明实际负荷削减曲线;
图5为本发明理论退出受控后负荷曲线。
具体实施方式:
为了加深对本发明的理解,下面结合附图对本实施例做详细的说明。
实施例1:一种统一最大削减负荷持续时间的变频空调需求响应控制方法,所述方法包括
以下步骤,(1)建立变频空调的负荷模型,
(1.1)建立房间模型,
房间模型主要描述空调房间在室内外冷热源作用下的温度变化,当前基于空调房间热力学的仿真中最常用的为等效热参数模型,其原始微分方程过于复杂,其简化后的一阶微分方程形式如下:
式中,Tin(t)为t时刻室内气体温度,℃;R为空调房间等效热阻,Ω;C为空调房间等效热容,F;Tout(tk)为tk时刻室外环境温度,℃;QAC(tk)为时刻tk注入房间的冷量,kW。
(1.2)建立控制系统模型,
变频空根据室内温度与用户设定温度之差ΔT来计算目标频率f,室内温度传感器每一分钟检测一次ΔT:
(1.3)功率和制冷量模型,
相关文献的一系列实验证明变频空调的电功率及制冷功率与压缩机的频率、冷凝器的外部温度、蒸发器的回水温度成一次线性关系。可建立空调功率与室内温度、室外温度、频率之间的一次函数关系,空调冷量与室内温度、室外温度、频率之间的一次函数关系:
P(tk)=a1+b1Tin(tk)+c1Tout(tk)+d1f(tk) (3)
Q(tk)=a2+b2Tin(tk)+c2Tout(tk)+d2f(tk) (4)
其中,a1为空调功率常数项,kW;b1为空调功率室内温度系数,kW/℃;c1为空调功率室外温度系数,kW/℃;d1为空调功率频率系数,kW/Hz。a2为空调冷量常数项,kW;b2为空调冷量室内温度系数,kW/℃;c2为空调冷量室外温度系数,kW/℃;d2为空调冷量频率系数,kW/Hz。根据空调的运行特点和大量实际运行数据分析,在压缩机的频率、冷凝器的外部温度、蒸发器的回水温度在一定范围内时,系数为定值,a1为负,b1、c1、d1为正,c2为负,a2、b2、d2为正。
(2)空调参与需求响应控制相关参数计算,
通过相关参数的计算控制空调运行,即使得空调升高温度后的稳定削减功率和最大削减功率以及最大削减功率持续时间可控,提高设定温度后负荷变化情况如附图2所示。由空调的最大削减功率持续时间tlast2,可以推导出空调新的设定温度Tset2,根据Tset2可以推导出空调的重新稳定运行时的频率,继而推导出稳定削减功率。空调最大削减功率即空调正常运行的功率和最低频率运行时的功率之差。
相关参数计算公式如下:
(2.1)室温上升时间,
因此,空调设定温度由室温Ts1调到温度上限Tss(Tss>Ts1),带入公式(1)可以推导升温过程的持续时间tlast,i
其中Qmin为最小频率时注入的冷量,
(2.2)最大削减功率,
最小频率时,将室内温度Tin近似为Ts1,室外温度Tout视为定值,代入公式(3)可得空调功率为Pmin=a1+b1Ts1+c1Tout+d1fmin。设定温度提高前的功率可以近似为P=a1+b1Ts1+c1Tout+d1fs1,最大削减功率为
ΔPmax=d1(fs1-fmin) (6)
(2.3)设定温度计算,
空调保持最小频率运行时,根据公式(1)室温在Δt内变化的大小ΔTin,min可近似为:
空调原状态运行时,根据公式(1)室温在Δt内变化的大小ΔTin,max可近似为:
因此新的设定温度应为
(2.4)运行频率估算,
根据新的设定温度Ts2和室外温度Tout(tk),代入公式(1),整理可得将其代入公式(4),得到压缩机的设定频率fs2
(2.5)稳定削减功率,
将Tset2,fs2代入公式(3),得到稳定削减功率为
ΔPw=b1(Ts1-Ts2)+d1(fs1-fs2) (11)
(3)建立群组负荷削减模型,
(3.1)假设小组中共有N台空调(N≥K),目标为在Tct时间内响应削减电力Pm,统一的最大削减功率持续时间为Tlast2,第i台空调计算设定温度Ts2,i和稳定削减功率ΔPw,i,最大削减功率ΔPmax,i,求解负荷削减模型,选择各时段受控的空调。理论负荷削减曲线如附图3所示。
(3.2)选择第一个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
其中,α1,i为空调在第一时段是否受控,1为受控,0为不受控,ΔPmax,i为第i台空调最大削减功率。求解出受控空调编号为集合CT1
(3.3)选择第二个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
其中,ΔPw,i为第i台空调稳定削减的功率,α2,i为第i台空调在第二个时段是否受控,1为受控,0为不受控,
约束条件:只可以调用未参与第一个时段的空调:
α1,i2,i≤1 i=1,2,...,N (14),
受控空调编号为集合CT2
(3.4)以此类推,选择第K个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
其中,αn,i为第i台空调在第n个时段是否受控,1为受控,0为不受控,
约束条件:只可以调用未参与前n-1个时段的空调:
α1,i2,i+...+αK,i≤1 i=1,2,...,N (16)
受控空调编号为集合CTK
该方案中,假设一组空调500台,设定温度在[24,25.5]之间均匀分布,假设目标削减功率150kW,统一的最大削减功率持续时间为12分钟,即5个控制时段,根据负荷削减模型求得的空调群组的控制方案如表1所示,共有442台空调受控,
表1 控制方案
仿真空调群组的实际运行情况,实际削减功率与目标削减功率如附图4所示,误差在15%以内。可见采用该种控制策略空调群组的削减功率较准确和平稳,
(4)设计空调群组需求响应潜力评估流程,
(4.1)计算一个群组中各台空调设定温度提高至上限时的最大削减功率持续时间tlast,i,在计算群组统一的最大削减功率持续时间tlast2,tlast2满足
tlast2≤tlast,i i=1,...,N (17)
K×tlast2=tct K∈Z (18)
为保证空调群组的需求响应潜力最大,K尽量小,
(4.2)计算各台空调新的设定温度和稳定削减功率,
(4.3)评估空调群组的需求响应潜力,假设空调群组的最大削减功率目标值为ΔPmax,由负荷削减模型求解控制方案,当受控的空调数量大于上限,实际的削减功率与目标削减功率的最大误差也小于允许值时,该假设的目标削减功率即为空调群组的最大需求响应潜力。否则,当受控空调数量小于上限时,增大目标削减功率;当实际的削减功率与目标削减功率的最大误差大于允许值时,减小目标削减功率。
(5)设计空调群组退出受控流程,
(5.1)计算各台空调降低到原始设定温度,最高频率运行的持续时间,根据公式(1)得到:
选择控制时间间隔Δttc,其尽量小,但大于等于所有空调的最高频率运行持续时间,满足:
Δttc≥tre,i i=1,2,...,N (20),
(5.2)每个Δttc时段,选择nc台空调退出受控,nc台空调变为最高功率运行,在Δttc内均逐步降为原始设定温度运行的功率,下一个时段,再选择nc+1台空调退出控制,直至所有空调都退出受控,每个时段控制整个群组的总功率不大于正常运行时的功率的一定范围。
第C个时段选择nC台空调退出受控:
其中,α为允许大于正常运行的功率的范围,P1为不受控的空调的平均功率,Nc为原控制方案中受控的空调总个数,nj为第j个时段退出控制的空调台数,Pch为受控中的空调的平均功率,Pmax为保持最大频率运行时的功率。
分组退出,允许与受控前的功率最大偏差为20%,退出受控的方案如表2所示,一个控制时段为2分钟。退出受控后空调群组的负荷如附图5所示。
表2 退出受控的方案
需要说明的是上述实施例,并非用来限定本发明的保护范围,在上述技术方案的基础上所作出的等同变换或替代均落入本发明权利要求所保护的范围。

Claims (6)

1.一种统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述方法包括以下步骤:
(1)建立变频空调的负荷模型,
(2)通过相关参数的计算使得空调升高温度后的稳定削减功率和最大削减功率可控,
(3)建立群组负荷削减模型,
(4)设计空调群组需求响应潜力评估流程,
(5)设计空调群组退出受控流程。
2.根据权利要求1所述的统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述步骤(1)建立变频空调的负荷模型,具体如下,
(1.1)建立房间模型,
<mrow> <msub> <mi>T</mi> <mrow> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mrow> <mi>k</mi> <mo>+</mo> <mn>1</mn> </mrow> </msub> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>A</mi> <mi>C</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mi>R</mi> <mo>-</mo> <mo>&amp;lsqb;</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>A</mi> <mi>C</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mi>R</mi> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msup> <mi>e</mi> <mrow> <mo>-</mo> <mfrac> <mrow> <mi>&amp;Delta;</mi> <mi>t</mi> </mrow> <mrow> <mi>R</mi> <mo>&amp;CenterDot;</mo> <mi>C</mi> </mrow> </mfrac> </mrow> </msup> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
式中,Tin(t)为t时刻室内气体温度,℃;R为空调房间等效热阻,Ω;C为空调房间等效热容,F;Tout(tk)为tk时刻室外环境温度,℃;QAC(tk)为时刻tk注入房间的冷量,kW;
(1.2)建立控制系统模型,
变频空调根据室内温度与用户设定温度之差ΔT来计算目标频率f,室内温度传感器每一分钟检测一次ΔT:
(1.3)建立功率和制冷量模型,
根据实验数据,建立空调功率与室内温度、室外温度、频率之间的一次函数关系,空调冷量与室内温度、室外温度、频率之间的一次函数关系:
P(tk)=a1+b1Tin(tk)+c1Tout(tk)+d1f(tk) (3)
Q(tk)=a2+b2Tin(tk)+c2Tout(tk)+d2f(tk) (4)
其中,a1为空调功率常数项,kW;b1为空调功率室内温度系数,kW/℃;c1为空调功率室外温度系数,kW/℃;d1为空调功率频率系数,kW/Hz。a2为空调冷量常数项,kW;b2为空调冷量室内温度系数,kW/℃;c2为空调冷量室外温度系数,kW/℃;d2为空调冷量频率系数,kW/Hz。
3.根据权利要求2所述的统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述步骤(2)通过相关参数的计算使得空调升高温度后的稳定削减功率和最大削减功率可控,由空调的最大削减功率持续时间tlast2,推导出空调新的设定温度Tset2,根据Tset2推导出空调的重新稳定运行时的频率,继而推导出稳定削减功率,具体如下,
(2.1)室温上升时间,
因此,空调设定温度由室温Ts1调到温度上限Tss(Tss>Ts1),带入公式(1)可以推导升温过程的持续时间tlast,i
<mrow> <msub> <mi>t</mi> <mrow> <mi>l</mi> <mi>a</mi> <mi>s</mi> <mi>t</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>=</mo> <mo>-</mo> <mi>R</mi> <mo>&amp;CenterDot;</mo> <mi>C</mi> <mo>&amp;CenterDot;</mo> <mi>l</mi> <mi>n</mi> <mrow> <mo>(</mo> <mfrac> <mrow> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>Q</mi> <mi>min</mi> </msub> <mo>&amp;CenterDot;</mo> <mi>R</mi> </mrow> <mrow> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>1</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>Q</mi> <mi>min</mi> </msub> <mo>&amp;CenterDot;</mo> <mi>R</mi> </mrow> </mfrac> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow> 1
其中Qmin为最小频率时注入的冷量,
(2.2)最大削减功率,
最小频率时,将室内温度Tin近似为Ts1,室外温度Tout视为定值,代入公式(3)可得空调功率为Pmin=a1+b1Ts1+c1Tout+d1fmin,设定温度提高前的功率可以近似为P=a1+b1Ts1+c1Tout+d1fs1,最大削减功率为
ΔPmax=d1(fs1-fmin) (6);
(2.3)设定温度计算,
空调保持最小频率运行时,根据公式(1),室温在Δt内变化的大小ΔTin,min可近似为:
<mrow> <msub> <mi>&amp;Delta;T</mi> <mrow> <mi>i</mi> <mi>n</mi> <mo>,</mo> <mi>min</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>Q</mi> <mi>min</mi> </msub> <mi>R</mi> <mo>-</mo> <mo>&amp;lsqb;</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>Q</mi> <mi>min</mi> </msub> <mi>R</mi> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msup> <mi>e</mi> <mrow> <mo>-</mo> <mfrac> <mrow> <mi>&amp;Delta;</mi> <mi>t</mi> </mrow> <mrow> <mi>R</mi> <mo>&amp;CenterDot;</mo> <mi>C</mi> </mrow> </mfrac> </mrow> </msup> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>7</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
空调原状态运行时,根据公式(1),室温在Δt内变化的大小ΔTin,max可近似为:
<mrow> <msub> <mi>&amp;Delta;T</mi> <mrow> <mi>i</mi> <mi>n</mi> <mo>,</mo> <mi>max</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>Q</mi> <mi>min</mi> </msub> <mi>R</mi> <mo>-</mo> <mo>&amp;lsqb;</mo> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mi>k</mi> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>Q</mi> <mi>min</mi> </msub> <mi>R</mi> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mo>&amp;rsqb;</mo> <mo>&amp;CenterDot;</mo> <msup> <mi>e</mi> <mrow> <mo>-</mo> <mfrac> <mrow> <mi>&amp;Delta;</mi> <mi>t</mi> </mrow> <mrow> <mi>R</mi> <mo>&amp;CenterDot;</mo> <mi>C</mi> </mrow> </mfrac> </mrow> </msup> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>8</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
因此新的设定温度应为
<mrow> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>2</mn> </mrow> </msub> <mo>=</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>1</mn> </mrow> </msub> <mo>+</mo> <mfrac> <mrow> <msub> <mi>&amp;Delta;T</mi> <mrow> <mi>i</mi> <mi>n</mi> <mo>,</mo> <mi>min</mi> </mrow> </msub> <mo>+</mo> <mn>2</mn> <mo>&amp;times;</mo> <msub> <mi>&amp;Delta;T</mi> <mrow> <mi>i</mi> <mi>n</mi> <mo>,</mo> <mi>max</mi> </mrow> </msub> </mrow> <mn>3</mn> </mfrac> <mo>&amp;times;</mo> <mfrac> <msub> <mi>t</mi> <mrow> <mi>l</mi> <mi>a</mi> <mi>s</mi> <mi>t</mi> </mrow> </msub> <mrow> <mi>&amp;Delta;</mi> <mi>t</mi> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>9</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
(2.4)运行频率估算,
根据新的设定温度Ts2和室外温度Tout(tk),代入公式(1),整理可得将其代入公式(4),得到压缩机的设定频率fs2
<mrow> <msub> <mi>f</mi> <mrow> <mi>s</mi> <mn>2</mn> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <mfrac> <mrow> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>2</mn> </mrow> </msub> </mrow> <mi>R</mi> </mfrac> <mo>-</mo> <msub> <mi>a</mi> <mn>2</mn> </msub> <mo>-</mo> <msub> <mi>b</mi> <mn>2</mn> </msub> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>2</mn> </mrow> </msub> <mo>+</mo> <msub> <mi>c</mi> <mn>2</mn> </msub> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <msub> <mi>d</mi> <mn>2</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>10</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
(2.5)稳定削减功率,
将Tset2,fs2代入公式(3),得到稳定削减功率为
ΔPw=b1(Ts1-Ts2)+d1(fs1-fs2) (11)。
4.根据权利要求3所述的统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述步骤(3)建立群组负荷削减模型,具体如下,
(3.1)假设小组中共有N台空调(N≥K),目标为在Tct时间内响应削减电力Pm,统一的最大削减功率持续时间为Tlast2,计算第i台空调新的设定温度Ts2,i和稳定削减功率ΔPw,i,最大削减功率ΔPmax,i,求解负荷削减模型,选择各时段受控的空调;
(3.2)选择第一个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </mtd> <mtd> <mrow> <mo>|</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <mrow> <msub> <mi>&amp;alpha;</mi> <mrow> <mn>1</mn> <mo>,</mo> <mi>i</mi> </mrow> </msub> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mi>m</mi> </msub> <mo>|</mo> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>12</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
其中,α1,i为空调在第一时段是否受控,1为受控,0为不受控,ΔPmax,i为第i台空调最大削减功率。求解出受控空调编号为集合CT1
(3.3)选择第二个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </mtd> <mtd> <mrow> <mo>|</mo> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>CT</mi> <mn>1</mn> </msub> </mrow> </munder> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>w</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mi>i</mi> <mo>&amp;NotElement;</mo> <msub> <mi>CT</mi> <mn>1</mn> </msub> </mrow> <mi>N</mi> </munderover> <mrow> <msub> <mi>&amp;alpha;</mi> <mrow> <mn>2</mn> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>&amp;times;</mo> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mi>m</mi> </msub> <mo>|</mo> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>13</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
其中,ΔPw,i为第i台空调稳定削减的功率,α2,i为第i台空调在第二个时段是否受控,1为受控,0为不受控,
约束条件:只调用未参与第一个时段的空调:
α1,i2,i≤1 i=1,2,...,N (14);
受控空调编号为集合CT2
(3.4)以此类推,选择第K个时段的受控空调,以受控空调削减功率之和与目标削减功率偏差最小为目标:
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </mtd> <mtd> <mrow> <mo>|</mo> <munder> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>&amp;Element;</mo> <msub> <mi>CT</mi> <mn>1</mn> </msub> <mo>,</mo> <msub> <mi>CT</mi> <mn>2</mn> </msub> <mo>,</mo> <mo>...</mo> <msub> <mi>CT</mi> <mrow> <mi>K</mi> <mo>-</mo> <mn>1</mn> </mrow> </msub> </mrow> </munder> <mi>M</mi> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mi>i</mi> <mo>&amp;NotElement;</mo> <msub> <mi>CT</mi> <mn>1</mn> </msub> <mo>,</mo> <msub> <mi>CT</mi> <mn>2</mn> </msub> <mo>,</mo> <mo>...</mo> <msub> <mi>CT</mi> <mrow> <mi>K</mi> <mo>-</mo> <mn>1</mn> </mrow> </msub> </mrow> <mi>N</mi> </munderover> <mrow> <msub> <mi>&amp;alpha;</mi> <mrow> <mi>K</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>&amp;times;</mo> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mi>m</mi> </msub> <mo>|</mo> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>15</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
其中,αn,i为第i台空调在第n个时段是否受控,1为受控,0为不受控;
约束条件:只调用未参与前n-1个时段的空调:
α1,i2,i+...+αK,i≤1 i=1,2,...,N (16)
受控空调编号为集合CTK
5.根据权利要求3或4所述的统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述步骤(4)设计空调群组需求响应潜力评估流程,具体如下,
(4.1)计算一个群组中各台空调设定温度提高至上限时的最大削减功率持续时间tlast,i,再计算群组统一的最大削减功率持续时间tlast2,tlast2满足
tlast2≤tlast,i i=1,...,N (17);
K×tlast2=tct K∈Z (18);
为保证空调群组的需求响应潜力最大,K尽量小;
(4.2)计算各台空调新的设定温度和稳定削减功率;
(4.3)评估空调群组的需求响应潜力,假设空调群组的最大削减功率目标值为ΔPmax,由负荷削减模型求解控制方案,当受控的空调数量大于上限,实际的削减功率与目标削减功率的最大误差也小于允许值时,该假设的目标削减功率即为空调群组的最大需求响应潜力,否则,当受控空调数量小于上限时,增大目标削减功率;当实际的削减功率与目标削减功率的最大误差大于允许值时,减小目标削减功率。
6.根据权利要求5所述的统一最大削减负荷持续时间的变频空调群组潜力评估方法,其特征在于,所述步骤5)设计空调群组退出受控流程具体如下,
(5.1)计算各台空调降低到原始设定温度,最高频率运行的持续时间,根据公式(1)得到:
<mrow> <msub> <mi>t</mi> <mrow> <mi>r</mi> <mi>e</mi> </mrow> </msub> <mo>=</mo> <mo>-</mo> <mi>R</mi> <mo>&amp;CenterDot;</mo> <mi>C</mi> <mo>&amp;CenterDot;</mo> <mi>l</mi> <mi>n</mi> <mrow> <mo>(</mo> <mfrac> <mrow> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>1</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>&amp;CenterDot;</mo> <mi>R</mi> </mrow> <mrow> <msub> <mi>T</mi> <mrow> <mi>o</mi> <mi>u</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mn>2</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>&amp;CenterDot;</mo> <mi>R</mi> </mrow> </mfrac> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>19</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
选择控制时间间隔Δttc,其尽量小,但大于等于所有空调的最高频率运行持续时间,满足:
Δttc≥tre,i i=1,2,...,N (20)
(5.2)每个Δttc时段,选择nc台空调退出受控,nc台空调变为最高功率运行,在Δttc内均逐步降为原始设定温度运行的功率,下一个时段,再选择nc+1台空调退出控制,直至所有空调都退出受控,每个时段控制整个群组的总功率不大于正常运行时的功率的一定范围;
第C个时段选择nC台空调退出受控:
<mrow> <msub> <mi>n</mi> <mi>C</mi> </msub> <mo>=</mo> <mfrac> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <mi>&amp;alpha;</mi> <mo>)</mo> <mo>&amp;times;</mo> <mi>N</mi> <mo>&amp;times;</mo> <msub> <mi>P</mi> <mn>1</mn> </msub> <mo>-</mo> <mo>(</mo> <msub> <mi>N</mi> <mi>c</mi> </msub> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mrow> <mi>C</mi> <mo>-</mo> <mn>1</mn> </mrow> </munderover> <msub> <mi>n</mi> <mi>j</mi> </msub> <mo>)</mo> <mo>&amp;times;</mo> <msub> <mi>P</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>-</mo> <mo>(</mo> <mi>N</mi> <mo>-</mo> <msub> <mi>N</mi> <mi>c</mi> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mrow> <mi>C</mi> <mo>-</mo> <mn>1</mn> </mrow> </munderover> <msub> <mi>n</mi> <mi>j</mi> </msub> <mo>)</mo> <mo>&amp;times;</mo> <msub> <mi>P</mi> <mn>1</mn> </msub> </mrow> <msub> <mi>P</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>21</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
其中,α为允许大于正常运行的功率的范围,P1为不受控的空调的平均功率,Nc为原控制方案中受控的空调总个数,nj为第j个时段退出控制的空调台数,Pch为受控中的空调的平均功率,Pmax为保持最大频率运行时的功率。
CN201710241453.7A 2017-04-13 2017-04-13 统一最大削减负荷持续时间的变频空调群组潜力评估方法 Active CN107101322B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710241453.7A CN107101322B (zh) 2017-04-13 2017-04-13 统一最大削减负荷持续时间的变频空调群组潜力评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710241453.7A CN107101322B (zh) 2017-04-13 2017-04-13 统一最大削减负荷持续时间的变频空调群组潜力评估方法

Publications (2)

Publication Number Publication Date
CN107101322A true CN107101322A (zh) 2017-08-29
CN107101322B CN107101322B (zh) 2019-11-29

Family

ID=59674937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710241453.7A Active CN107101322B (zh) 2017-04-13 2017-04-13 统一最大削减负荷持续时间的变频空调群组潜力评估方法

Country Status (1)

Country Link
CN (1) CN107101322B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109243547A (zh) * 2018-07-09 2019-01-18 河海大学 一种空调负荷群需求响应潜力定量评估方法
CN109598642A (zh) * 2018-12-10 2019-04-09 国网山东省电力公司电力科学研究院 一种精准切负荷系统可中断负荷评估机制的建立方法
CN110726209A (zh) * 2019-10-29 2020-01-24 珠海格力电器股份有限公司 空调控制方法、装置、存储介质以及处理器
CN111380160A (zh) * 2018-12-27 2020-07-07 江苏方天电力技术有限公司 一种用户舒适度的暖通空调负荷需求响应潜力挖掘方法
CN112484257A (zh) * 2020-12-04 2021-03-12 东南大学 一种大规模变频空调群双层一致性控制方法
CN112665159A (zh) * 2021-01-07 2021-04-16 西安建筑科技大学 基于需求响应的负荷反弹量优化、负荷调节方法及系统
CN112865113A (zh) * 2021-01-21 2021-05-28 华中科技大学 一种聚合空调需求响应直接负荷控制方法和系统
CN113420413A (zh) * 2021-05-27 2021-09-21 国网上海市电力公司电力科学研究院 一种基于负荷可塑性的柔性负荷可调节能力量化方法及系统
CN113991655A (zh) * 2021-10-28 2022-01-28 国网上海市电力公司 定频空调负荷聚合需求响应潜力评估方法、装置及介质
CN114123250A (zh) * 2021-12-14 2022-03-01 东南大学 变频空调参与电力系统一次调频控制策略及频率恢复方法
CN115325666A (zh) * 2022-07-18 2022-11-11 东南大学溧阳研究院 基于lstm和热储机理的空调响应能力评估方法和装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363653A (zh) * 2008-08-22 2009-02-11 日滔贸易(上海)有限公司 中央空调制冷系统的能耗控制方法及装置
DE102009034369B3 (de) * 2009-07-23 2010-08-26 Sinitec Vertriebsgesellschaft Mbh Verfahren zur Anpassung eines Steuersignals zur Vorgabe einer Solldrehzahl eines Lüfters in einem Computersystem sowie entsprechendes Computersystem
CN105004015A (zh) * 2015-08-25 2015-10-28 东南大学 一种基于需求响应的中央空调建模及控制策略
CN105138847A (zh) * 2015-09-01 2015-12-09 东南大学 变频空调负荷参与需求响应的节电潜力评估方法
CN105352108A (zh) * 2015-09-29 2016-02-24 中国电力科学研究院 一种基于空调用电模式的负荷优化控制方法
JP5955206B2 (ja) * 2012-12-10 2016-07-20 三菱電機株式会社 デマンド制御装置及びその方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363653A (zh) * 2008-08-22 2009-02-11 日滔贸易(上海)有限公司 中央空调制冷系统的能耗控制方法及装置
DE102009034369B3 (de) * 2009-07-23 2010-08-26 Sinitec Vertriebsgesellschaft Mbh Verfahren zur Anpassung eines Steuersignals zur Vorgabe einer Solldrehzahl eines Lüfters in einem Computersystem sowie entsprechendes Computersystem
JP5955206B2 (ja) * 2012-12-10 2016-07-20 三菱電機株式会社 デマンド制御装置及びその方法
CN105004015A (zh) * 2015-08-25 2015-10-28 东南大学 一种基于需求响应的中央空调建模及控制策略
CN105138847A (zh) * 2015-09-01 2015-12-09 东南大学 变频空调负荷参与需求响应的节电潜力评估方法
CN105352108A (zh) * 2015-09-29 2016-02-24 中国电力科学研究院 一种基于空调用电模式的负荷优化控制方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Y. KIM, E. FUENTES,L. K. NORFORD: "Experimental Study of Grid Frequency Regulation Ancillary Service of a Variable Speed Heat Pump", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
丁小叶: "变频空调参与需求响应的调控策略与效果评估", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109243547B (zh) * 2018-07-09 2021-07-06 河海大学 一种空调负荷群需求响应潜力定量评估方法
CN109243547A (zh) * 2018-07-09 2019-01-18 河海大学 一种空调负荷群需求响应潜力定量评估方法
CN109598642A (zh) * 2018-12-10 2019-04-09 国网山东省电力公司电力科学研究院 一种精准切负荷系统可中断负荷评估机制的建立方法
CN111380160A (zh) * 2018-12-27 2020-07-07 江苏方天电力技术有限公司 一种用户舒适度的暖通空调负荷需求响应潜力挖掘方法
CN110726209A (zh) * 2019-10-29 2020-01-24 珠海格力电器股份有限公司 空调控制方法、装置、存储介质以及处理器
CN112484257A (zh) * 2020-12-04 2021-03-12 东南大学 一种大规模变频空调群双层一致性控制方法
CN112665159B (zh) * 2021-01-07 2021-12-21 西安建筑科技大学 基于需求响应的负荷反弹量优化、负荷调节方法及系统
CN112665159A (zh) * 2021-01-07 2021-04-16 西安建筑科技大学 基于需求响应的负荷反弹量优化、负荷调节方法及系统
CN112865113A (zh) * 2021-01-21 2021-05-28 华中科技大学 一种聚合空调需求响应直接负荷控制方法和系统
CN113420413A (zh) * 2021-05-27 2021-09-21 国网上海市电力公司电力科学研究院 一种基于负荷可塑性的柔性负荷可调节能力量化方法及系统
CN113991655A (zh) * 2021-10-28 2022-01-28 国网上海市电力公司 定频空调负荷聚合需求响应潜力评估方法、装置及介质
CN113991655B (zh) * 2021-10-28 2023-09-19 国网上海市电力公司 定频空调负荷聚合需求响应潜力评估方法、装置及介质
CN114123250A (zh) * 2021-12-14 2022-03-01 东南大学 变频空调参与电力系统一次调频控制策略及频率恢复方法
CN114123250B (zh) * 2021-12-14 2023-12-22 东南大学 变频空调参与电力系统一次调频控制策略及频率恢复方法
CN115325666A (zh) * 2022-07-18 2022-11-11 东南大学溧阳研究院 基于lstm和热储机理的空调响应能力评估方法和装置

Also Published As

Publication number Publication date
CN107101322B (zh) 2019-11-29

Similar Documents

Publication Publication Date Title
CN107101322A (zh) 统一最大削减负荷持续时间的变频空调群组潜力评估方法
CN105042800B (zh) 基于需求响应的变频空调负荷建模与运行控制方法
CN110332664B (zh) 一种空调器控制方法和空调器
CN107062518B (zh) 一种空调器控制方法及控制装置
CN105588272B (zh) 一种空调风机控制方法及装置
CN108375175B (zh) 空调系统控制方法及装置
CN108361926B (zh) 一种基于温冷感的空调器控制方法和空调器
CN104374042B (zh) 空调负荷的控制方法及系统
CN107178869B (zh) 变频空调负荷的聚合控制削峰方法
CN109114729A (zh) 一种空调器控制方法和空调器
CN112283902A (zh) 空调器控制方法和空调器
CN110895010A (zh) 一种空调的控制方法、装置、存储介质及空调
CN107525236A (zh) 基于人体舒适度的空调器控制方法及空调器
CN107490150A (zh) 一种空调器出风温度的控制方法及空调器
CN106482294B (zh) 空调运行控制方法
CN106705353A (zh) 一种多联机空调控制方法
CN103185384A (zh) 空调器及用于空调器的湿度控制方法和装置
CN105020859B (zh) 一种基于等舒适度损失原则的中央空调负荷削减调温方法
CN106642592A (zh) 一种空调器的控制方法及装置
CN106352510A (zh) 适于空调器的自动模式控制方法及装置
CN113375303A (zh) 新风空调控制方法、装置、电子设备和存储介质
CN109855253A (zh) 用于空调器的控制方法
CN106196441A (zh) 实现空调制冷控制的方法及装置
CN113028604A (zh) 基于聚合空调的温度调节控制及调度方法
CN106765987A (zh) 空调节能控制方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant